Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

HBU R and D Cask Transportation Options - 20436

The TN-32B HBU Demonstration Cask was successfully loaded in November 2017 with 32 high burnup (HBU) fuel assemblies at Dominion's North Anna Nuclear Plant and is collecting thermal data as intended. The first two phases of this very successful project sponsored by DOE and EPRI was designed to collect thermal data of HBU fuel to support extended storage. The next phase of the project requires the cask be licensed for transportation so the cask can be relocated to a site (to be determined by DOE) to facilitate long term monitoring and additional research on the fuel. This is a unique challenge given the constraints that exist for this particular bolted metal cask. The TN-32B cask is a 234,288 lb. (storage configuration) dry storage system that was selected for this project and it was modified to provide thermal data and the ability to collect gas samples after loading. Several major issues must be addressed to obtain the transport license including protecting the seven lid penetrations that were made to allow for the insertion of the thermocouples into the selected fuel assemblies after the cask was loaded. In order to protect the integrity of the research, the payload must remain as is. Therefore, the cask system must be placed into the transportation configuration without rewetting the fuel, replacing the lid and without removing the thermocouple instrumentation that is currently installed. A critical portion of the design and engineering that was performed in the first two phases of the project was to ensure that future transportation of the cask was integrated into the approach. Efforts were made to accommodate requirements such as containment boundary leakage testing, installation of impact limiter brackets and lid bolts suitable for transportation. Due to the science requirements of the project, the fuel selected was intended to yield the highest payload temperatures permitted to provide the greatest value for the researchers. This resulted in higher than usual external dose rates and surface temperatures that warranted performing as much preparatory work prior to cask loading to ensure ALARA and personnel safety to the greatest extent practical rather than working on a loaded cask. In addition to the work performed prior to cask load, there are remaining challenges such as protecting the modified lid, design and fabrication of impact limiters that accommodate the modified cask lid and preserving the thermocouple connections for continued monitoring. The project team is currently performing the necessary calculations, engineering, and design to support the licensing as required by the US NRC. Pre-application meetings have been held to inform the regulator of the planned technical approach to ensure compliance with the applicable regulations. The current plan is to obtain the transportation C of C by the end of 2021. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford's Double-Shell Tank AY-102 Recovery Project - 17416

Since at least August 2012, Hanford Tank 241-AY-102 (AY-102) has been leaking from its primary tank into its secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued Administrative Order No. 10618 requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The three parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addresses the remaining requirements and implements enforceable milestone dates, including initiation of waste retrieval by March 4, 2016 and completion of waste retrieval operations by March 4, 2017. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. A significant number of obstructions and in-tank equipment limit accessibility to the high source term AY-102 waste and the location of the selected receiver tank required installation of an extensive, heavily-shielded above-ground transfer line. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and the first phase of operations within a highly compressed, aggressive schedule. Waste retrieval operations in AY-102 commenced on March 3, 2016 and the initial operating phase concluded on April 30. Additional sluicing capability was required to complete the mission and four Extended Reach Sluicers were installed to support the second operating phase, which began on December 8, 2016. As of December 31, 2016, approximately 97% of the original waste volume had been removed, resulting in an estimated remaining waste volume of about 75,000 liters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhancing Price Response Programs through Auto-DR: California's 2007 Implementation Experience

This paper describes automated demand response (Auto-DR) activities, an innovative effort in California to ensure that DR programs produce effective and sustainable impacts. Through the application of automation and communication technologies coupled with well-designed incentives and DR programs such as Critical Peak Pricing (CPP) and Demand Bidding (DBP), Auto-DR is opening up the opportunity for many different types of buildings to effectively participate in DR programs. We present the results of Auto-DR implementation efforts by the three California investor-owned utilities for the Summer of 2007. The presentation emphasizes Pacific Gas and Electric Company's (PG&E) Auto-DR efforts, which represents the largest in the state. PG&E's goal was to recruit, install, test and operate 15 megawatts of Auto-DR system capability. We describe the unique delivery approaches, including optimizing the utility incentive structures designed to foster an Auto-DR service provider community. We also show how PG&E's Critical Peak Pricing (CPP) and Demand Bidding (DBP) options were called and executed under the automation platform. Finally, we show the results of the Auto-DR systems installed and operational during 2007, which surpassed PG&E's Auto-DR goals. Auto-DR is being implemented by a multi-disciplinary team including the California Investor Owned Utilities (IOUs), energy consultants, energy management control system vendors, the Lawrence Berkeley National Laboratory (LBNL), and the California Energy Commission (CEC).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Determination of thermal accommodation coefficients from heat transfer measurements between parallel plates.

Thermal accommodation coefficients have been derived for a variety of gas-surface combinations using an experimental apparatus developed to measure the pressure dependence of the conductive heat flux between parallel plates at unequal temperature separated by a gas-filled gap. The heat flux is inferred from temperature-difference measurements across the plates in a configuration where the plate temperatures are set with two carefully controlled thermal baths. Temperature-controlled shrouds provide for environmental isolation of the opposing test plates. Since the measured temperature differences in these experiments are very small (typically 0.3 C or less over the entire pressure range), high-precision thermistors are used to acquire the requisite temperature data. High-precision components have also been utilized on the other control and measurement subsystems in this apparatus, including system pressure, gas flow rate, plate alignment, and plate positions. The apparatus also includes the capability for in situ plasma cleaning of the installed test plates. Measured heat-flux results are used in a formula based on Direct Simulation Monte Carlo (DSMC) code calculations to determine the thermal accommodation coefficients. Thermal accommodation coefficients have been determined for three different gases (argon, nitrogen, helium) in contact with various surfaces. Materials include metals and alloys such as aluminum, gold, platinum, and 304 stainless steel. A number of materials important to fabrication of Micro Electro Mechanical Systems (MEMS) devices have also been examined. For most surfaces, coefficient values are near 0.95, 0.85, and 0.45 for argon, nitrogen, and helium, respectively. Only slight differences in accommodation as a function of surface roughness have been seen. Surface contamination appears to have a more significant effect: argon plasma treatment has been observed to reduce thermal accommodation by as much as 0.10 for helium. Mixtures of argon and helium have also been examined, and the results have been compared to DSMC simulations incorporating thermal-accommodation values from single-species experiments.

36 MATERIALS SCIENCE↗

Integration and Testing of the Lunar Reconnaissance Orbiter Attitude Control System

Throughout the Lunar Reconnaissance Orbiter (LRO) Integration and Testing (I&T) phase of the project, the Attitude Control System (ACS) team completed numerous tests on each hardware component in ever more flight like environments. The ACS utilizes a select group of attitude sensors and actuators. This paper chronicles the evolutionary steps taken to verify each component was constantly ready for flight as well as providing invaluable trending experience with the actual hardware. The paper includes a discussion of each ACS hardware component, lessons learned of the various stages of I&T, a discussion of the challenges that are unique to the LRO project, as well as a discussion of work for future missions to consider as part of their I&T plan. LRO ACS sensors were carefully installed, tested, and maintained over the 18 month I&T and prelaunch timeline. Care was taken with the optics of the Adcole Coarse Sun Sensors (CSS) to ensure their critical role in the Safe Hold mode was fulfilled. The use of new CSS stimulators provided the means of testing each CSS sensor independently, in ambient and vacuum conditions as well as over a wide range of thermal temperatures. Extreme bright light sources were also used to test the CSS in ambient conditions. The integration of the two SELEX Galileo Star Trackers was carefully planned and executed. Optical ground support equipment was designed and used often to check the performance of the star trackers throughout I&T in ambient and thermal/vacuum conditions. A late discovery of potential contamination of the star tracker light shades is discussed in this paper. This paper reviews how each time the spacecraft was at a new location and orientation, the Honeywell Miniature Inertial Measurement Unit (MIMU) was checked for data output validity. This gyro compassing test was performed at several key testing points in the timeline as well as several times while LRO was on the launch pad. Sensor alignment tests were completed several times to ensure that hardware remained on a rigid platform.

Simpson, Jim↗

Measurements in Flight of the Lateral-Control Characteristics of an Airplane Equipped with Full-Span Zap Flaps and Simple Circular-Arc-Type Ailerons

Flight tests were conducted on the OS2U-2 seaplane with simple circular-arc-type ailerons directly connected to the actuating torque tube. Two aileron test installations were made, differing only in the inclination of the projecting surface with the wing's upper surface. The lateral-control characteristics of the airplane were determined from data obtained in stalls and rudder-fixed aileron rolls. The revised ailerons were deficient in maximum rolling effectiveness, but were capable of controlling the rolling tendencies of the airplane near the stall.

AILERON CONTROLS - VOUGHT OS2U-2↗

Validation & Verification of Electrical Components B2 Test Facility

The research focus of this project is to assist in the closure of Measurement, Monitoring and Control System (MMCS) and other electrical requirements in support of the B2 Space Launch System (SLS) Core Stage Green Run Test Project. Alongside this goal I am to understand project management tools to analyze and control activities/tasks associated with those items. The project I am working on will assist electrical engineers in developing and or identifying closure rationale for the MMCS and electrical requirements. Also as serving the role of a training project manager, I am to develop and maintain a method for tracking progress with estimate completion dates specifically identifying those items during this performance window. The methods I used in order to perform the research consisted of worddocuments, excel sheets, and pdf documents needed for review. For example, documents consisted of: a SLS Core Stage Green Run Facility Requirement Document (FRD) identifying the SSC MMCS and electrical requirements, a Stage Controller to SSC Interface Control Document (ICD) identifying the SSC requirements, and the B2 SLS Core Stage Green Run Test project System Requirements Document (SRD) which identifies the MMCS and electrical requirements. The files were sent to me by both mentors, Mr. Barry Robinson and Ms. Dawn Davis. Overall, the review process for the word documents and excel spreadsheets proved to be successful. The data for the electrical components were accurate and were consistent with the original recorded data. However, the consistency with the pdf documents did not follow up all the way. Attention to this mistake was made and further revisions were done in order for the data to agree with each other. Furthermore, an itinerary was designed using Microsoft Outlook in order to track progress with estimated completion dates. This project contributes to NASA/Center Missions and Goals through the Waterfall Model. The Waterfall Model is a linear system used for engineering design. In the Waterfall Model, the fourth step is Verification and Validation. This involves installation, testing, and debugging of the B2 SLS Core Stage electrical components. For the SLS Core Stage Green Run Test Project, each requirement contained in this approved requirements set will have at least one Verification Item (VI) assigned to it. During the design phase, VIs will mostly consist of Analysis or Inspection types. Design phase VIs and closure information will be documented in Dynamics Data Management System (DDMS) in the form of analysis reports and design documentation.

Bastian, Tyler↗

Kinetic Monte Carlo Simulations of Chemical Reactions on Surfaces

Lattice based kinetic Monte Carlo (kMC) simulations are a powerful tool for micro-kinetic modeling. The kinetic Monte Carlo technique stochastically simulates chemical reaction processes (e.g. adsorption, desorption, diffusion), where the probability of a given reaction process being selected is weighted by its rate constant. The open source software package, KMOS1, allows fast construction of kMC simulations by automatically implementing a computationally efficient kMC framework, thus allowing the researcher to focus on accurate parameterization and formulation of the kinetic model. From this, the spatiotemporal evolution (e.g. concentration, surface configuration, turnover frequencies) of crystal surfaces or bulk crystalline structures is obtained. KMOS uses the variable step-size method implementation of kMC. At each step, the VSSM updates available events, calculates the corresponding transition rates and simulation time, and selects one of the available events. The lattice based kMC technique has many potential applications within SRNL where chemical kinetics are of interest. By transitioning through time along a trajectory of configuration space, fundamental insights to a system's dominant reactions and parameters can be gained, leading to improved materials and process design. In this work, we have established capabilities for fast implementation of kMC simulations through the installation and testing of the KMOS software on SRNL high performance computing resources. The parameterization of kMC simulations is often performed from first-principles energetic calculations. For the purposes of this work, the test cases use arbitrary species and thus, have arbitrary parameterization. In order to demonstrate the use of KMOS, two primary test cases are shown. Case 1 involves simple adsorption and desorption. Case 2 involves a slightly more complex mechanism. The evolution of the surface concentration and the final surface configuration for simulation Case 2 is shown. Rate-limiting processes and rate-limiting configurations are not always known or understood, but kMC provides information pertaining to both. The capability to implement efficient micro-kinetic models using the kinetic Monte Carlo technique has been established through the testing and installation of KMOS on SRNL HPC resources.

97 MATHEMATICS AND COMPUTING↗

The atomization of water-oil emulsions

The paper presents the results of experimental studies on atomization of the emulsions flowing through twin-fluid atomizers obtained by the use of the digital microphotography method. The main elements of the test installation were: nozzle, reservoir, pump and measurement units of liquid flow. The photographs were taken by a digital camera with automatic flash at exposure time of 1/8000 s and subsequently analyzed using Image Pro-Plus. The oils used were mineral oils 20-90, 20-70, 20-50 and 20-30. The studies were performed at flow rates of liquid phase changed from 0.0014 to 0.011 (dm{sup 3}/s) and gas phase changed from 0.28 to 1.4 (dm{sup 3}/s), respectively. The analysis of photos shows that the droplets being formed during the liquid atomization have very different sizes. The smallest droplets have diameters of the order of 10 {mu}m. The experimental results showed that the changes in physical properties of a liquid phase lead to the significant changes in the spray characteristics. The analysis of the photos of water and emulsions atomization process showed that the droplet sizes are dependent on gas and liquid flow rates, construction of nozzle and properties of liquid. The differences between characteristics of atomization for water and emulsions have been observed. Analysis of photos on forming the droplets in air-water and air-emulsions systems showed that droplets are bigger in air-emulsion system (at the same value of gas to liquid mass ratio). The values of Sauter mean diameter (SMD) increased with increase of volume fraction of oil in emulsion. The droplet size increased with emulsion viscosity. (author)

42 ENGINEERING↗

A metabolic modeling platform for the computation of microbial ecosystems in time and space (COMETS)

Genome-scale stoichiometric modeling of metabolism has become a standard systems biology tool for modeling cellular physiology and growth. Extensions of this approach are emerging as a valuable avenue for predicting, understanding and designing microbial communities. Computation of microbial ecosystems in time and space (COMETS) extends dynamic flux balance analysis to generate simulations of multiple microbial species in molecularly complex and spatially structured environments. Here we describe how to best use and apply the most recent version of COMETS, which incorporates a more accurate biophysical model of microbial biomass expansion upon growth, evolutionary dynamics and extracellular enzyme activity modules. In addition to a command-line option, COMETS includes user-friendly Python and MATLAB interfaces compatible with the well-established COBRA models and methods, as well as comprehensive documentation and tutorials. Overall, this protocol provides a detailed guideline for installing, testing and applying COMETS to different scenarios, generating simulations that take from a few minutes to several days to run, with broad applicability to microbial communities across biomes and scales.

59 BASIC BIOLOGICAL SCIENCES↗

Status of ProtoDUNE Dual Phase

The Deep Underground Neutrino Experiment (DUNE) will use a large liquid argon (LAr) detector consisting of four modules each with a fiducial mass of 10 ktons of LAr. One of the technology options for the far detector modules is a liquid-argon Time Projection Chamber (TPC) working in Dual Phase mode. A large demonstrator, called ProtoDUNE Dual-Phase, with a 6 × 6 × 6 m 3 (300t) active volume, is currently under-construction at the CERN neutrino platform. As well as being the engineering prototype of a Far Detector module, it will also demonstrate the concept of a very large Dual-Phase LAr TPC. The design of the TPC including the fabrication, testing, installation and commissioning of the various detector components is outlined.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

HydraGNN v5.0

HydraGNN v5.0 expands the code base into a more portable, scalable, and flexible framework for scientific graph learning, with particular strength in atomistic machine-learning interatomic potentials and large-scale distributed training. The release adds Fully Sharded Data Parallel (FSDP) support alongside existing DDP and DeepSpeed paths, including FSDP-aware checkpointing and optimizer integration, and introduces a configurable multi-precision training workflow supporting FP32, BF16, and FP64 across GPUs and Intel XPUs. For atomistic modeling, HydraGNN v5.0 strengthens its MLIP capabilities through dynamic graph construction at every forward pass, energy-conserving force prediction via automatic differentiation, and per-atom energy loss formulations, while extending EGNN models to properly handle periodic boundary conditions. The release also broadens model expressiveness through graph-level attribute conditioning, adds new multi-task and model-parallel extensions such as MACE support and encoder/decoder branch optimization, and expands application coverage with integrated examples for datasets including OC25, Nabla2-DFT, QCML, Open Polymers 2026, and OPF. In parallel, HydraGNN v5.0 improves production readiness through performance optimizations for large-scale runs, stratified sampling and linear-regression preprocessing utilities, and tested installation scripts for DOE supercomputers including Frontier, Aurora, Perlmutter, and Andes. Overall, the release advances HydraGNN as a robust software platform for scalable graph neural networks across materials science, chemistry, and scientific machine learning workflows

Lupo Pasini, Massimiliano [Oak Ridge National Labo↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m$^3$ membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

43 PARTICLE ACCELERATORS↗

Advancement of DOE's EnergyPlus Building Energy Simulation Payment

EnergyPlus{sup TM} is a new generation computer software analysis tool that has been developed, tested, and commercialized to support DOE's Building Technologies (BT) Program in terms of whole-building, component, and systems R&D (http://www.energyplus.gov). It is also being used to support evaluation and decision making of zero energy building (ZEB) energy efficiency and supply technologies during new building design and existing building retrofits. The 5-year project was managed by the National Energy Technology Laboratory and was divided into 5 budget period between 2006 and 2011. During the project period, 11 versions of EnergyPlus were released. This report summarizes work performed by an EnergyPlus development team led by the University of Central Florida's Florida Solar Energy Center (UCF/FSEC). The team members consist of DHL Consulting, C. O. Pedersen Associates, University of Illinois at Urbana-Champaign, Oklahoma State University, GARD Analytics, Inc., and WrightSoft Corporation. The project tasks involved new feature development, testing and validation, user support and training, and general EnergyPlus support. The team developed 146 new features during the 5-year period to advance the EnergyPlus capabilities. Annual contributions of new features are 7 in budget period 1, 19 in period 2, 36 in period 3, 41 in period 4, and 43 in period 5, respectively. The testing and validation task focused on running test suite and publishing report, developing new IEA test suite cases, testing and validating new source code, addressing change requests, and creating and testing installation package. The user support and training task provided support for users and interface developers, and organized and taught workshops. The general support task involved upgrading StarTeam (team sharing) software and updating existing utility software. The project met the DOE objectives and completed all tasks successfully. Although the EnergyPlus software was enhanced significantly under this project, more enhancements are needed for further improvement to ensure that EnergyPlus is able to simulate the latest technologies and perform desired HAVC system operations for the development of next generation HVAC systems. Additional development will be performed under a new 5-year project managed by the National Renewable Energy Laboratory.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Photovoltaic Shading Testbed for Module-Level Power Electronics

This document describes a repeatable test procedure that attempts to simulate shading situations, as would be experienced by typical residential rooftop photovoltaic (PV) systems. This type of shading test is particularly useful to evaluate the impact of different power conversion setups, including microinverters, DC power optimizers and string inverters, on overall system performance. Theperformance results are weighted based on annual estimates of shade to predict annual performance improvement. A trial run of the test procedure was conducted with a side by side comparison of a string inverter with a microinverter, both operating on identical 8kW solar arrays. Considering three different shade weighting conditions, the microinverter was found to increase production by 3.7%under light shading, 7.8% under moderate shading, and 12.3% under heavy shading, relative to the reference string inverter case. Detail is provided in this document to allow duplication of the test method at different test installations and for different power electronics devices.

14 SOLAR ENERGY↗

Safety-Class Uninterruptable Power Supply General Contractor for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-002 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the procurement and construction of a Safety-Class Uninterruptable Power Supply (UPS) facility in accordance with ASME NQA-1 2008 and 2009 addenda. This scope includes Work required to construct a new UPS facility at Technical Area (TA)-55 including procurement, construction, installation, and post installation testing of all structures, systems, and equipment (e.g., foundations, concrete, structural steel, building components, HVAC, fire protection, site utilities) excluding the UPS system itself. Design of the facility and associated infrastructure are provided by LANL. Final design of the UPS system will be provided by the UPS Integrator under separate contract. Procurement of all safety-related components (specified by LANL) must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the Work as described herein.

42 ENGINEERING↗

Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, Implementation Strategy for a Distribution Management System

Electric distribution utilities encounter many challenges to successful deployment of Distribution Management Systems (DMSs). The key challenges are documented in this report, along with suggestions for overcoming them. This report offers a recommended list of activities for implementing a DMS. It takes a strategic approach to implementing DMS from a project management perspective. The project management strategy covers DMS planning, procurement, design, building, testing, Installation, commissioning, and system integration issues and solutions. It identifies the risks that are associated with implementation and suggests strategies for utilities to use to mitigate them or avoid them altogether. Attention is given to common barriers to successful DMS implementation. This report begins with an overview of the implementation strategy for a DMS and proceeds to put forward a basic approach for procuring hardware and software for a DMS; designing the interfaces with external corporate computing systems such as EMS, GIS, OMS, and AMI; and implementing a complete solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Innovative Patient Room Lighting System with Integrated Spectrally Adaptive Control

In December of 2013, the U.S. Department of Energy’s SSL R&D Program released a Funding Opportunity Announcement (FOA), that for the first time, contained opportunities for comprehensive application-specific system development. The FOA included opportunities for two applications, one of which was a Patient Room. Philips Lighting Research North America, submitted a proposal for the Patient Room application, and was selected for the complete project award. The award amount was for $497,127, with a Philips Research co-funding commitment 165,709 dollars. The total project value was 662,836 dollars. This project sought to redefine lighting for the patient room application. The goal was to deliver an innovative LED patient suite (patient room and bathroom) lighting system solution that was 40% more energy-efficient than traditional fluorescent incumbent technologies, and would meet all the visual and non-visual needs of patients, caregivers and visitors, and improve the patient experience. State-of-the-art multichannel LED platforms and control technologies that would provide spectral tuning and become part of an intelligent, connected lighting system drove the solution. The project was scoped into four main task areas that included a) System Concept Creation, b) Identification of the Luminaire Portfolio, c) Development of the Connected Lighting Infrastructure, and d) System Performance Validation. Each of the four main tasks were completed and validated extensively over the course the 2 ½ year project. The system concept was created by first developing a lighting design that demonstrated best practices for patient room lighting – illuminance and uniformity for task performance, reduced glare, and convenient controls, in addition to giving patients control over the lighting in their environment. A framework was defined to deliver circadian support via software behaviors. Through that process luminaires were identified from the Philips portfolio that were adaptable – by their form, dimensions, and optical materials – to mix multicolor LED platforms uniformly and deliver target design lumen levels. The Blue Sky luminaire was selected for the patient bed area to give the illusion of skylight while providing white light on the patient bed. Luminaires used existing 2-channel tunable white LED boards, and newly developed 4-channel LED boards. Red-Orange, Blue, Green, and Blue-shifted Yellow LED chips were selected based on spectral characteristics and their ability to produce high quality white light. 4-channel Power over Ethernet (PoE) drivers were developed and firmware written so they would communicate with both 2- and 4-channel boards. These components formed the backbone of the connected lighting infrastructure. Software, flexible and nuanced in its complexity, was written to set behaviors for myriad lighting scenes in the room throughout the 24 hour day – and all could be overridden by manual controls. This included a dynamic tunable white program, three color changing automatic programs that simulated degrees of sunrise to sunset palettes, and an amber night lighting system that offered visual cues for postural stability to minimize the risk of falls. All programs were carefully designed to provide visual comfort for all occupants, support critical task performance for staff, and to support the patient’s 24hr rhythms. A full scale mockup room was constructed in the Philips Cambridge Lab. The lighting system was installed, tested and functionality demonstrated to ensure smooth operation of system components – luminaires, drivers, PoE switches, wall controls, patient remote, and daylight and occupancy sensors. How did the system perform? It met visual criteria, confirmed by calculations, simulations and measurements in the field. It met non-visual criteria, confirmed by setting circadian stimulus (CS) targets and performing calculations using the calculator developed by the Lighting Research Center. Finally, human factors validation studies were conducted to gain insight from real end users in the healthcare profession; surveys were administered, data analyzed, and audio comments captured. The general consensus was positive, with requests to pilot the system in their hospitals. The importance of the research completed under this grant is that it allowed the exploration and development of a unique lighting system, one that would deliver a blend of visual and non-visual criteria in patient room design for today’s healthcare environment. The research investigated the area of multichannel LED technology, multichannel Power over Ethernet (PoE) drivers and their integration with automatic and manual controls as a system – uncovering and meeting challenges along the way. It married visual needs of patients and staff with support for 24 hour rhythms, placing value on the wellbeing of the patient – while successfully saving energy over incumbent technologies. Indications are that the market is ready and willing to invest – multiple healthcare facilities are in line to pilot this system, recognizing its value beyond energy to patient and staff well-being. Its value to the public can best be expressed by a patient support coordinator who, after spending several hours in the room being immersed in the lighting, analyzing all its features, commented: “This re-writes lighting for healthcare”.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗