Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “infrastructure planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Elevating Engagement: Insights for Energy Infrastructure Siting from Oregon Literature

Our study conducts a meta-synthesis of existing Oregon-based literature on stakeholder and community engagement methods across a variety of contexts to identify best practices and lessons learned to inform future engagement processes for Oregon’s energy siting. We analyze and synthesize these strategies to understand what has worked well across engagement practices and how we can integrate and learn from a variety of methods to develop more effective practices for engagement moving forward. We look at the successes and challenges for each method, applying lessons learned to the pre-permitting phase of energy development and infrastructure planning in Oregon. Our results synthesize key recommendations for engagement in the pre-permitting phase for energy infrastructure siting in Oregon, such as consensus and relationship building, local partnerships, and background research to understand community context.

energy infrastructure↗

Interpretable Machine Learning for Characterizing Electric Vehicle Charging Behavior: Insights from Real-World Data

As electric vehicle (EV) adoption rises globally, concerns about the impact on aging electrical grids grow, particularly regarding the charging behavior of EV drivers. This study analyzes real-world driving and charging data from Ford battery electric vehicles (BEVs) collected between 2018 and 2019 to develop interpretable models that characterize charging behavior and quantify influencing factors. Prior research has relied on assumptions regarding driver behavior, often overlooking actual charging patterns. By employing generalized linear mixed models (GLMMs), this work offers insights into how various elements, such as next trip distance and state of charge (SOC), influence charging decisions. The dataset comprises over three million park-trip pairs from 1,997 vehicles, revealing that features related to driving behavior significantly dictate charging behavior, while infrastructure and regional factors have lesser impacts. The findings suggest that existing simulation models may oversimplify EV charging behavior assumptions. This work utilizes real-world EV driving and charging data to train interpretable models that describe charging behavior and quantify the factors most associated with how drivers use charging infrastructure. This research underscores the need for interpretable, data-driven methodologies to inform future EV infrastructure planning and grid management.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Public water supply infrastructure extensification and diversification in surface waters is insufficient to meet future demands in Texas

The data were developed to evaluate the capacity of existing and potential new surface water supply infrastructure to meet projected public water demands across districts in Texas under multiple future socioeconomic and climate scenarios. The database integrates hydrologic, water quality, infrastructure, energy, cost, demographic, and demand-projection information for candidate surface water supply locations. Candidate sites include stream reaches, waterbodies, reservoir surplus locations, and potential new reservoir sites. Water availability is characterized using historical and projected flow conditions, while site suitability is evaluated using five indicators: Water Availability Index (WAI), Water Quality Index (WQI), Energy Requirement Index (ERI), Water Treatment Cost (WTC), and Water Infrastructure Cost (WIC). The datasets include statewide candidate-site information, district-level demand projections under Shared Socioeconomic Pathways (SSPs), runoff-based allocation constraints, climate-stress metrics, and optimization outputs evaluating alternative infrastructure planning strategies. Optimization results compare Business-as-Usual (BAU) and All Surface Water (AllSW) demand-management approaches under both scaled and fixed cost-cap strategies. Associated validation datasets provide district-level feasibility assessments, infrastructure selection outcomes, cost-cap utilization, demand satisfaction metrics, and constraint diagnostics. Additional datasets quantify projected changes in storage and flow conditions as well as water availability stress for both existing and newly selected intake locations under the SSP5 scenario for mid-century and late-century climate conditions. Together, these datasets support assessment of the extent to which surface-water infrastructure expansion and diversification strategies can satisfy future public water demands while accounting for hydrologic, economic, and planning constraints across Texas. Dataset(s) Description Dataset_preoptimization.xlsx Comprehensive pre-optimization dataset containing candidate water-supply sites and associated hydrologic, water-quality, infrastructure, climate, demographic, runoff, and demand-projection variables used as inputs to the optimization analyses. Includes variable descriptions and the full statewide candidate-site database. District_level_site_selection.zip - Compressed archive containing all SSP-specific district-level optimization result files MESIO_ssp1_results.xlsx District-level site selection results for SSP1 (MESIO). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. MESID_ssp2_results.xlsx District-level site selection results for SSP2 (MESID). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. LCMRD_ssp3_results.xlsx District-level site selection results for SSP3 (LCMRD). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-Low_ssp4l_results.xlsx District-level site selection results for SSP4-Low (IRDev-Low). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-High_ssp4h_results.xlsx District-level site selection results for SSP4-High (IRDev-High). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. RSIM_ssp5_results.xlsx District-level site selection results for SSP5 (RSIM). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. tx_hydrological_stress.xlsx Hydrological stress dataset for existing and newly selected intake locations. Includes projected mid-century and late-century changes, gain/loss classifications, planning strategy information, and accompanying variable descriptions. Also includes water-stress metrics derived from historical and projected low-flow conditions.

Okoye, Perpetua I. (ORCID:0000000215545033)↗

IDAES GTEP 0.1 Release

The Institute for the Design of Advanced Energy Systems (IDAES) Generation and Transmission Expansion Planning (GTEP) package provides a Pyomo-based implementation of a modular, flexible, Generalized Disjunctive Programming (GDP) formulation for power infrastructure planning problems. This package is designed with the following goals in mind: - Abstract GTEP modeling away from any particular case study or fixed modeling assumptions (e.g., technologies, temporal resolution, spatial resolution, policy implications, etc.) - Admit flexible decision sets and heterogeneous parameterization - Allow high-level modeling options to be understood easily, chosen modularly, and changed rapidly

AS↗

Lawrence Berkeley National Laboratory 2015 Annual Financial Report

FY2015 financial results reflect a year of significant scientific, operational and financial achievement for Lawrence Berkeley National Laboratory. Complementing many scientific accomplishments, Berkeley Lab completed construction of four new research facilities: the General Purpose Laboratory, Chu Hall, Wang Hall and the Flexlab Building Efficiency Testbed. These state-of-the-art facilities allow for program growth and enhanced collaboration, in part by enabling programs to return to the Lab’s Hill Campus from offsite locations. Detailed planning began for the new Integrative Genomics Building (IGB) that will house another major program currently located offsite. Existing site infrastructure was another key focus area. The Lab prioritized and increased investments in deferred maintenance in alignment with the Berkeley Lab Infrastructure Plan, which was developed under the leadership of the DOE Office of Science. With the expiration of American Recovery and Reinvestment Act (ARRA) funds, we completed the close-out of all of our 134 ARRA projects, recording total costs of $331M over the FY2009-2015 period. Download the report to read more.

Source record↗

Analysing the usage and evidencing the importance of fast chargers for the adoption of battery electric vehicles

An appropriate charging infrastructure is one of the key aspects needed to support the mass adoption of battery electric vehicles (BEVs), and it is suggested that publically available fast chargers could play a key role in this infrastructure. As fast charging is a relatively new technology, very little research is conducted on the topic using real world datasets, and it is of utmost importance to measure actual usage of this technology and provide evidence on its importance to properly inform infrastructure planning. 90,000 fast charge events collected from the first large-scale roll-outs and evaluation projects of fast charging infrastructure in the UK and the US and 12,700 driving days collected from 35 BEVs in the UK were analysed. Using multiple regression analysis, we examined the relationship between daily driving distance and standard and fast charging and demonstrated that fast chargers are more influential. Fast chargers enabled using BEVs on journeys above their single-charge range that would have been impractical using standard chargers. Fast chargers could help overcome perceived and actual range barriers, making BEVs more attractive to future users. At current BEV market share, there is a vital need for policy support to accelerate the development of fast charge networks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Non-stationary precipitation design standards for stormwater infrastructure modernization at USAF installations

The resilience of defense infrastructure systems to a changing climate is critical for national security. Climate induced recurrent flooding is already impacting over 20 U.S. Air Force installations, underscoring the urgency of revisiting precipitation standards and stormwater infrastructure design. Despite growing scientific knowledge and an expanding set of tools for updating outdated precipitation standards based on the assumption of climate stationarity, the adoption of climate informed analyses remain limited in practice. This study utilizes an existing framework to update Intensity (or Depth)-Duration-Frequency (DDF) curves using an ensemble of future climate projections. Change factors in precipitation estimates are derived and applied to six USAF installations across the U.S. The analysis is further extended to evaluate the implications of climate-informed DDFs on stormwater infrastructure performance and flood analysis at Tyndall AFB. Results indicate that the current design precipitation estimates are likely to become obsolete in all six USAF bases by the end of the century. The wide range of change factors across 32 GCM ensembles highlights the need to integrate uncertainty and evolving scientific data into infrastructure planning. The study also finds that the impacts of a changing climate vary spatially and temporally, emphasizing the value of localized analysis for infrastructure decision-making. The work advances ongoing DoD and societal efforts to implement adaptation strategies aimed at enhancing infrastructure resilience.

Intensity-duration-frequency curves↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Community Engagement Tips for EV Infrastructure Deployment

This Joint Office of Energy and Transportation help sheet provides tips for conducting community engagement to support electric vehicle (EV) infrastructure planning and deployment. This document is a tool and an informative resource to be used in conjunction with other guidance. It is not intended to set policy or establish or replace any standards under state or federal law applicable to public notice or community engagement.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Macro Analysis to Estimate Electric Vehicles Fast-Charging Infrastructure Requirements in Small Urban Areas

Electric vehicles (EVs) are known to reduce emissions and fossil fuel dependency. However, the limited range, long charging time, and inadequate charging infrastructure have hampered the adoption of EVs. The current EV charging infrastructure planning studies and tools require detailed information, extensive resources, and skills that can be a significant barrier to urban areas for finding the required charging infrastructure to support a targeted EV market share. This study generates regression models to estimate the number of direct current fast charging stations and the chargers to support the EV charging demand for urban areas. These models provide macro-level estimates of the required infrastructure investment in urban areas, which can be easily implemented by policy-makers and city planners. This study incorporates data obtained from applying a disaggregate optimization-based charger placement model, developed recently by the same authors, for multiple case studies to generate the required data to calibrate the macro-level models, in the state of Michigan. This simulated data set includes the number of charging stations and chargers for each market share, technology advancement scenario, and the transportation network topology. The results show that the number of charging stations reduces with battery size and charging power and increases with EV market share and the road network lane length. The number of chargers reduces with charging power, whereas it increases with battery size, EV market share, and vehicle miles traveled in the system. The model developed here can be applied to any state having urban characteristics and weather conditions similar to Michigan.

Engineering↗

Pit Production Strategic Analysis Tool

The LANL Pit Production Strategic Analysis tool is an executive-level decision support tool for planning related to the demand and production of pits. The spreadsheet-based tool includes decision factors for stockpile program demand combined with production and infrastructure planning at PF-4, Savanna River, and future production options. The tool graphically compares supply and demand under different scenarios. The tool is based on NNSA planning documents and process analyses.

97 MATHEMATICS AND COMPUTING↗

Radiation Case Strategic Analysis Tool [Fact Sheet]

The LANL Radiation Case Production Planning Tool is an executive-level decision support tool for planning related to the demand and production of radiation cases. The spreadsheet-based tool includes decision factors for stockpile program demand combined with production and infrastructure planning at Y-12. The tool displays graphical comparisons of supply and demand under different scenarios. The tool is based on NNSA planning documents and process analyses from Y12.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Scalable PETSc Implementation of the Three-Phase Unbalanced AC Power Flow Solver

A revolutionary transition of energy infrastructure, spanning across supply and demand sectors, is happening all around the world. Integration of renewable energy sources into our ever-complex power distribution networks is central to the infrastructure planning of the future. One step towards achieving this goal is to solve unbalanced transmission and distribution systems. Traditional approaches and software tools are not suitable because they assume a completely balanced 3-phase system, hence a single-phase equivalent can be solved. Renewable energy such as wind and solar power are intermittent and can pose a challenge when integrating into an already unbalanced power grid. Furthermore, these power grids can be quite large at scale consisting of potentially thousands of buses, which can be computationally demanding. This poster presents preliminary work on designing a robust and scalable 3-phase unbalanced AC power flow solver. The proposed power flow solver will eventually be built on top of the PETSc library and utilizes state-of-the-art parallel data structures like the DMNetwork as well as iterative solvers and preconditioners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Master Services Agreement - Flexible Feeder/Distribution System Support: Cooperative Research and Development (Final Report)

PGE will engage NREL on a broad range of projects related to the integration of distributed energy resources (DERs) into the utility's operations. This portfolio of work could include projects focused on DER adoption models, advanced distribution management system (ADMS) and distributed energy management system (DERMS) design, DER dispatch strategy development, and DER valuation framework development. Additional topics could include long-term energy planning, renewable energy, energy efficiency and demand-side management. As well as technology evaluations and design guidance for building retrofits and new construction projects, energy and energy infrastructure planning, policies, and markets (and their analysis), energy storage, energy security and resilience (including energy system-related cybersecurity), transportation and mobility, technology integration analysis. Additionally, other assistance as requested by PGE consistent with NREL’s expertise.

24 POWER TRANSMISSION AND DISTRIBUTION↗

International Nuclear Safeguards at Sandia

As global nuclear energy expands, assuring peaceful uses of nuclear technology becomes increasingly important. In addition to complying with international nuclear safeguards, a responsible nuclear energy program promotes a corresponding safeguards culture. Establishment of transparent peaceful uses of nuclear technologies starts with cooperative international engagements and safeguards systems. Developing states investing in nuclear energy must assure the international community of their longterm commitment to safeguards, safety, and security (3S) of nuclear materials and technologies. Cultivating a safeguards culture starts in the initial phases of infrastructure planning and must be integrated into the process of developing a responsible nuclear energy program. Sandia National Laboratories supports the implementation of safeguards culture through a variety of activities, including infrastructure development.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Contested environmental policy infrastructure: Socio-political acceptance of renewable energy, water, and waste facilities

The construction of new infrastructure is hotly contested. This paper presents a comparative study on three environmental policy domains in the Netherlands that all deal with legitimising building and locating infrastructure facilities. Such infrastructure is usually declared essential to environmental policy and claimed to serve sustainability goals. They are considered to serve (proclaimed) public interests, while the adverse impact or risk that mainly concerns environmental values as well is concentrated at a smaller scale, for example in local communities. The social acceptance of environmental policy infrastructure is institutionally determined. The institutional capacity for learning in infrastructure decision-making processes in the following three domains is compared: 1.The implementation of wind power as a renewable energy innovation; 2.The policy on space-water adaptation, with its claim to implement a new style of management replacing the current practice of focusing on control and 'hard' infrastructure; 3.Waste policy with a focus on sound waste management and disposal, claiming a preference for waste minimization (the 'waste management hierarchy'). All three cases show a large variety of social acceptance issues, where the appraisal of the impact of siting the facilities is confronted with the desirability of the policies. In dealing with environmental conflict, the environmental capacity of the Netherlands appears to be low. The policies are frequently hotly contested within the process of infrastructure decision-making. Decision-making on infrastructure is often framed as if consensus about the objectives of environmental policies exists. These claims are not justified, and therefore stimulating the emergence of environmental conflicts that discourage social acceptance of the policies. Authorities are frequently involved in planning infrastructure that conflicts with their officially proclaimed policy objectives. In these circumstances, they are often confronted with local actors who support alternatives that are in fact better in tune with the new policy paradigm.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Conceptual Framework for Developing Resilience Metrics for the Electricity, Oil, and Gas Sectors in the United States

This report has been written for the Department of Energy’s Energy Policy and Systems Analysis Office to inform their writing of the Quadrennial Energy Review in the area of energy resilience. The topics of measuring and increasing energy resilience are addressed, including definitions, means of measuring, and analytic methodologies that can be used to make decisions for policy, infrastructure planning, and operations. A risk-based framework is presented which provides a standard definition of a resilience metric. Additionally, a process is identified which explains how the metrics can be applied. Research and development is articulated that will further accelerate the resilience of energy infrastructures.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data and Multistage Optimization for the New Grid

Three essential capabilities for using exascale computing resources on next generation power grid applications are: generating large renewable energy datasets, modeling damage and operations during and after extreme events, and employing multi-stage optimization for infrastructure planning. Powerscenarios, developed as part of the ExaSGD project, addresses these capabilities by enabling users to build synthetic wind farms for large test systems using numerical weather prediction-based data sources. We share examples of using Powerscenarios to build out wind farms on the ACTIVSg2000 test system, to enable simulated operations and emergency asset allocation during a hurricane strike, and to compute multi-stage infrastructure buildouts.

economic dispatch↗