Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “groundwater monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Sensor Recommendations for Long Term Monitoring of the F-Area Seepage Basins

In mid-2018, a new paradigm for long-term monitoring was developed after of decade of applied research projects funded by the Department of Energy’s office of Environmental Management Technology Development program. The program at SRNL was focused on transitioning complex environmental waste sites from active to passive remediations strategies. A key result of these studies was that the use of enhanced attenuation approaches at radiologically contaminated sites will result in the creation of secondary source areas in the subsurface that will require monitoring for decades. Alternative monitoring approaches are being developed and tested at the Savannah River Site’s F-Area Hazardous Waste Management Facility, the new paradigm provides innovative solutions that will significantly lower costs of monitoring through the coupling of data collection, machine learning and deterministic groundwater modeling. The foundation of this approach is a well-optimized network of sensors for measuring hydrogeochemical master variables that control, and therefore act as indicators of groundwater contaminant transport. By monitoring changes in the controlling master variables over time arising from geological and environmental shifts, predictive modelling can assist with identifying new strategies for ensuring regulatory requirements are met if trends toward conditions for potential remobilization of attenuated contaminants are detected. In this report, we evaluated commercially available single parameter sensor platforms (e.g., temperature/depth) and configurable multi-parameter sensor platforms (e.g., pH, oxidation-reduction potential, temperature, depth, dissolved oxygen, and conductivity). Each was scored using an optimization function based on how well the system supports the proposed long-term monitoring paradigm, in general, and the site-specific conditions at F-Area, in particular. Several viable sensor systems were identified. Of these, a combined platform including the In-Situ Aqua TROLL 500 multi-parameter sensor platform and the In-Situ temperature/depth sensor had the highest rating and was identified as the most suitable candidate for installation and monitoring of the master variables and potentiometric surface that control groundwater contaminant plumes emanating from the F-Area Seepage Basins. The discussion of recommended potential deployment locations builds upon recommendations made by Denham et al (2019).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site 2019 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). This report summarizes the 2019 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (Mission Support and Test Services, LLC 2019, 2020a, 2020b). Direct radiation monitoring data indicate exposure levels at the Area 3 and Area 5 RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data at the Area 3 and Area 5 RWMSs show that tritium concentrations in water vapor and americium and plutonium concentrations in air particles are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS are below established investigation levels. Leachate samples collected from the leachate collection systems at the Area 5 mixed low-level waste disposal unit are below established contaminant regulatory limits. During 2019, precipitation at the Area 3 RWMS was 77 percent above average, and precipitation at the Area 5 RWMS was 69 percent above average. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter at the Area 5 RWMS dries the soil and prevents downward percolation of precipitation more effectively than evaporation as measured from the bare-soil weighing lysimeter. Vadose zone monitoring in the Area 3 and Area 5 RWMS soil covers shows no evidence of precipitation percolating through the covers to the waste. Moisture from precipitation did not percolate below 120 centimeters (3.9 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS during 2019. There was no drainage through 2.4 meters (8 ft) of soil as indicated from the Area 3 drainage lysimeters that received only natural precipitation. At the Area 3 RWMS, which received three times the natural precipitation, 57 percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter. All 2019 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facilities’ PAs.

2019↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2022 Long-Term Hydrologic Monitoring Program Report for the Rio Blanco, Colorado Site

This report presents the monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) during the 2022 sampling event at the Rio Blanco, Colorado, Site, where an underground nuclear test was conducted in 1973. The test resulted in residual radionuclide contamination at the detonation depth. The 2022 sampling event included the collection of samples from onsite groundwater wells to monitor for any potential contamination that might be attributed to the Rio Blanco nuclear tests. This report summarizes the laboratory results obtained from the sampling along with the historical results since monitoring began in the 1970s. This annual report and previous reports are available on the LM public website at https://www.energy.gov/lm/rio-blanco-colorado-site. Data collected during this and previous monitoring events are available on the Geospatial Environmental Mapping System (GEMS) website at https://gems.lm.doe.gov/#site=RBL.

54 ENVIRONMENTAL SCIENCES↗

Hydraulic Performance of Funnel & Gate and Base Injection at the F-Area Seepage Basins

The SGW-Support Group Environmental Compliance and Area Completion Projects (EC&ACP) of Savannah River Nuclear Solutions (SRNS) operates a funnel and gate (F&G) passive groundwater remediation system in conjunction with base injection to restore the quality of groundwater migrating from the F-Area seepage basins to Fourmile Branch. Groundwater levels were monitored biweekly and continuously over a 15-month period to study the aerial and temporal effect of operating the F&G and base injection remediation systems.

42 ENGINEERING↗

Geochemical and microbial characteristics of seepage water and mineral precipitates in a radwaste disposal facility impacted by seawater intrusion and high alkalinity

The construction of an underground facility can dramatically change the quality, flow direction, and level of groundwater. It may also impact subsurface microbial composition and activity. Groundwater quality was monitored over eight years in two observational wells near an underground disposal facility on the east coast of South Korea. The results showed dramatic increases in dissolved ions such as O 2 , Na, Ca, Mg, and SO 4 during facility construction. Seepage water samples downgradient from the silos and tunnels, and precipitates deposited along the seepage water flow path were collected to determine the impact inside the disposal facility. X-ray analysis (powder X-ray diffraction (pXRD) and X-ray absorption fine structure (XAFS)) were used to characterize the mineral precipitates. Microbial community composition was determined by 16S rRNA gene sequencing. The seepage water composition was of two types: Ca-Cl and Ca-Na-HCO 3 . The ratio of Cl and δ 18 O showed that the Ca-Cl type seepage water was influenced by groundwater mixed with seawater ranging from 2.7% to 15.1%. Various sulfate-reducing bacteria were identified in the Ca-Cl type seepage water, exhibiting relatively high sulfate content from seawater intrusion. Samples from the Ca-Na-HCO 3 type seepage water had an extremely high pH (>10) and abundance of Hydrogenophaga. The precipitates observed along the flow path of the seepage water included calcite, ferrihydrite, green rust, and siderite, depending on seepage water chemistry and microbial activity. This study suggests that the construction of underground structures creates distinct, localized geochemical conditions (e.g., high alkalinity, high salinity, and oxic conditions), which may impact microbial communities. These biogeochemical changes may have undesirable large-scale impacts such as water pump clogging. Overall, an understanding of the process and long-term monitoring are essential to assess the safety of underground facilities.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2022

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2022 at the U.S. Department of Energy Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12. Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. The following sections of this report provide details regarding the CY 2022 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information.

54 ENVIRONMENTAL SCIENCES↗

Data for: A Synoptic System for Capturing Ecosystem Control Points Across Terrestrial-Aquatic Interfaces

The investigation of how climate change and water level fluctuations impact variable and interconnected ecosystems, like the interfaces between terrestrial and aquatic environments, requires the collection and integration of many data types. We describe an integrative and autonomous environmental monitoring approach that uses environmental sensors and data loggers to monitor surface water, groundwater, soil, and vegetation changes and generate essential data for predictive models. We established the network at seven sites along the Chesapeake Bay and Lake Erie coastlines, including a large-scale flood manipulation experiment, collectively generating over three million observations per month. Such sensor networks hold great promise for tracking and comprehending environmental changes where land and water intersect. The sensor system and overall approach to sensor management that we have designed is intended to be widely accessible for research teams spanning in size from an individual investigator to large multi-institution projects. This dataset shows example data generated by the sensor network described above. Data output for data loggers connected to groundwater water quality sondes measuring dissolved oxygen, pH, oxidative redox potential (ORP), groundwater elevation, groundwater salinity and temperature, and groundwater elevation; replicate soil moisture and conductivity probes installed at 10 and 30 cm below the ground surface; rainfall and solar radiation; and mean sap flow from 8 replicate probes. Sensors are installed at upland forest (UP), wetlands (W), and transitional locations between these ecosystems (TR). Example datasets are from Goodwin Islands in the Chesapeake Bay and Portage River along the Lake Erie coastline.

54 ENVIRONMENTAL SCIENCES↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

The Nature and State of Groundwater Contamination at the Nevada National Security Site: What Have We Learned from Decades of Groundwater Analysis? - 20337

The regulatory framework for remediating radionuclide contamination from underground nuclear testing at the Nevada National Security Site (NNSS) is based on a combination of characterization and modeling studies, monitoring, and institutional controls [1]. Currently, tritium is the largest contributor (∼90%) to the estimated 44.6 million-curie radionuclide inventory resulting from underground testing [2]. Because of its short half-life (12.32 years), its relative contribution reduces below 10% of the total radiologic inventory over the next 120 years as a result of radioactive decay. Although tritium levels are observed well above the Safe Drinking Water Act (SDWA) maximum contaminant levels (MCLs) in groundwater, other radionuclides are well below their MCLs except within the nuclear test near-field (nuclear test cavity and chimney) environment. In fact, most device-derived radionuclides are below their MCL in groundwater even in samples collected from this near-field environment. The distribution of radionuclides following the nuclear detonation greatly influences the availability of potential contaminants for groundwater transport. Tritium is initially distributed in the gas phase, later as tritiated water in steam, and finally as liquid water, and is available to groundwater transport away from the near-field environment. Other radionuclides that are mobile in groundwater are {sup 14}C, {sup 36}Cl, {sup 99}Tc, and {sup 129}I though their radiologic inventory is small when compared to tritium. Many radionuclides (e.g. U, Pu, Am) are incorporated to a significant extent into the melt glass at the bottom of the cavity and are accessible to groundwater primarily through the slow process of glass dissolution. These radionuclides are also adsorbed to the surfaces of the crushed rock within the cavity and chimney which limits their migration in groundwater. Although colloid facilitated transport of radionuclides at the NNSS has been observed [3], radionuclide concentrations decrease with time and migration distances due to desorption and colloid filtration processes. Current studies indicate that radionuclides associated with colloids are unlikely to migrate downgradient from NNSS underground nuclear tests at concentrations above the SDWA MCL [4][5]. The results of over 50 years of sampling, along with an understanding of these post detonation processes, indicate that tritium is the only contaminant of concern downgradient of testing and that even tritium will not exceed its MCL in groundwater after ∼120 years. Although other longer-lived radionuclides may continue to be released slowly from the near-field environment they will likely never reach levels exceeding their MCLs in groundwater downgradient of the NNSS. Groundwater monitoring will continue to verify these observations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geophysical Characterization and Monitoring of the 200 Area Treated Effluent Disposal Facility to Support Permit Renewal; TEDF Geophysical Monitoring

The Treated Effluent Disposal Facility (TEDF), located in the 200 East Area of the Hanford Site, is a site where non-hazardous and non-radioactive liquid wastes are disposed into two state-permitted infiltration basins. In 2016, the Washington State Department of Ecology denied a permit renewal request for TEDF due to the inability to adequately assess the impact of TEDF discharge water on the underlying groundwater quality. TEDF overlies the relatively impermeable Ringold Lower Mud (RLM) unit, whose upper contact lies in the vadose zone approximately 30 m below ground surface and approximately 10 m above the water table boundary. The RLM is assumed to isolate TEDF discharge water from the natural groundwater aquifer, which is monitored using wellbores screened below the RLM. Therefore, samples collected from monitoring wells near TEDF are not considered representative of TEDF discharge water. Rather, TEDF discharge water is assumed to mound on top of the RLM to form a perched aquifer. To support permitting of the TEDF, a new monitoring well is required that can be used to sample water from the presumed perched water aquifer above the RLM. Ideally, the screened section of the well would be located at the peak of the perched water mound(s), which presumably occurs at the point of maximum vertical flux from TEDF to the RLM, or equivalently where the dominant infiltration flow paths reach the RLM. This report describes how time-lapse 3D electrical resistivity tomography (ERT) was used in conjunction with nominal TEDF discharge operations to image the dominant flow paths from each pond to the RLM. Results are summarized in Figure ES.1. Figure ES.1A shows a satellite image of the TEDF overlain by an array of surface ERT electrodes. The solid and dashed black circles denote the zones of maximum vertical flux at the RLM within the south and north ponds, respectively, and presumably the regions where perched water peaks during discharge. Figure ES.1B shows time-lapse difference imaging results approximately 15 days after switching discharge from the south pond to the north pond. Blue iso-surfaces beneath the north pond denote regions of increasing bulk electrical conductivity caused by increasing saturation due to infiltrating water. Red iso-surfaces beneath the south pond denote regions that were previously saturated during the south pond discharge and are now de-saturating, causing a decrease in bulk electrical conductivity. In both cases, the zones of maximum change mark the dominant flow paths to the RLM. Figure ES.1C shows time-lapse imaging results approximately 15 days after switching discharge from the north pond to the south pond. In this case, blue iso-surfaces mark the dominant flow paths to the RLM from the south pond. The red iso-surfaces mark the dominant flow paths that existed during discharge to the north pond. The regions of maximum change in bulk conductivity (due to saturation or desaturation) that mark the primary flow paths are equivalent in both cases and denoted by the dashed solid and black circles. If a perched water zone forms on the RLM, it is likely to mound within or near the dashed circle during discharge to the north pond, and in the solid circle during discharge to the south pond. In other words, if perched water mounding occurs, the circles mark the optimum locations suggested by the ERT imaging for monitoring boreholes to be placed, enabling samples to be collected that are representative of TEDF discharge impacts on groundwater quality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving the End State for the Pahute Mesa Corrective Action Units at the Nevada National Security Site - 20355

Underground nuclear testing at the Nevada National Security Site (NNSS) ended in 1992. To address the impact of radionuclide contamination from underground nuclear testing on the groundwater resources of Nevada, the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program created the Underground Test Area (UGTA) activity to characterize the radionuclides in groundwater, understand the nature and extent of radionuclide migration, and forecast the distribution of radionuclides in groundwater for 1,000 years. The UGTA activity is regulated by the Federal Facility Agreement and Consent Order (FFACO), an agreement negotiated between the Nevada Division of Environmental Protection (NDEP), DOE, and the U.S. Department of Defense (DoD). DOE is close to achieving the end state (closure in place with monitoring and institutional control) for three of the five UGTA corrective action units (CAUs) on the NNSS. A number of challenges remain to achieve the end state of the other two CAUs, both located on Pahute Mesa. Pahute Mesa was the location of 82 underground nuclear tests, less than 10% of the total number of tests on the NNSS. Yet, Pahute Mesa contains slightly more than 60% of the total radionuclides (in curies). Based on groundwater sampling in monitoring wells, two radionuclide plumes have migrated several kilometers (km) in groundwater from selected test cavities and have crossed the boundary of the NNSS (yet remain within the boundaries of Federally controlled land). The path to achieve the end state continues to evolve as more data are collected and a better understanding of radionuclide migration in groundwater is developed. DOE has invested in drilling and sampling more than 50 characterization and monitoring groundwater wells over the past 25 years. The data indicate that the primary radionuclide of concern is tritium as it is about 89% of the total radionuclide inventory (in curies). As well, only tritium has been measured in groundwater outside of cavities at concentrations exceeding the Safe Drinking Water Act (SDWA) standard. For one of the tritium plumes that has migrated across the NNSS boundary, the average rate of migration has been measured as about 45 meters (m) per year with the rate of migration at the leading edge of the plume of about 85 meters per year. At that rate of migration, the tritium plume will decay to safe levels and not reach the publicly accessible environment at concentrations above the SDWA standard. Other radionuclides, at concentrations below the SDWA standards, will be monitored to ensure they remain at safe levels. Consequently, the end state path forward for Pahute Mesa has evolved to take full advantage of the data from the monitoring network to constrain uncertainty in model forecasts and to reduce reliance on probabilistic simulations. The focus of the end state approach relies on developing a monitoring well network that is protective of human health by increasing confidence that no radionuclide plume in the groundwater will migrate undetected to the accessible environment, located about 22 km from the nearest up-gradient underground nuclear test. Using the measured data to remove uncertainty, the evaluation of radionuclide migration from Pahute Mesa is directed toward meeting the goals of the end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2023

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2023. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2023 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Record of Decision↗

West Valley Demonstration Project (WVDP) (Annual Site Environmental Report (ASER), Calendar Year 2022)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2022. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2022 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stable Water Isotope Data for the East River Watershed, Colorado (2014-2025)

The stable water isotope data for the East River Watershed, Colorado, consists of delta2H (hydrogen) and delta18O (oxygen) values from samples collected at multiple, long-term monitoring sites including streams, groundwater wells, springs, and a precipitation collector used to establish a local meteoric water line (LMWL) for the watershed. These locations represent important and/or unique end-member locations for which stable isotope values can be diagnostic of the connection between precipitation inputs as snow and rain and riverine export. Such locations include drainages underline entirely or largely by shale bedrock, land covered dominated by conifers, aspens, or meadows, and drainages impacted by historic mining activity and the presence of naturally mineralized rock. Developing a long-term record of water isotope values from a diversity of environments is a critical component of quantifying the impacts of both climate change and discrete climate perturbations, such as drought, forest mortality, and wildfire, on water export. Such data may be combined with stream gaging stations co-located at each surface water monitoring site to relate seasonal variations in water export to their stable isotopic signature. Data for liquid water delta2H and delta18O values are reported in units of parts per thousand (per-mil; ‰). This data package contains (1) a zip file (isotope_data_2014-2025.zip) containing a total of 95 files: 96 data files of isotope data from across the Lawrence Berkeley National Laboratory (LBNL) Watershed Function Scientific Focus Area (SFA) which is reported in .csv files per location and a locations.csv (1 file) with latitude and longitude for each location; (2) a file-level metadata (v6_20260901_flmd.csv) file that lists each file contained in the dataset with associated metadata; and (3) a data dictionary (v6_20260901_dd.csv) file that contains terms/column_headers used throughout the files along with a definition, units, and data type. Missing values within the anion data files are noted as either "-9999" or "0.0" for not detectable (N.D.) data. There are a total of 43 locations containing isotope data. Update on 2022-06-10: versioned updates to this dataset was made along with these changes: (1) updated isotope data for all locations up to 2021-12-31 and (2) the addition of the file-level metadata (flmd.csv) and data dictionary (dd.csv) were added to comply with the File-Level Metadata Reporting Format. Update on 2022-09-09: Updates were made to reporting format specific files (file-level metadata and data dictionary) to correct swapped file names, add additional details on metadata descriptions on both files, add a header_row column to enable parsing, and add version number and date to file names (v2_20220909_flmd.csv and v2_20220909_dd.csv). Update on 2023-08-08: Updates were made to both the data files and reporting format specific files. New available anion data was added, up until 2023-03-13. The file level metadata and data dictionary files were updated to reflect the additional data added. Update on 2024-03-11: Updates were made to both the data files and reporting format specific files. New available anion data was added, up until 2024-02-19. Further, revisions to the data files were made to remove incorrect data points (from 1970 and 2001). The reporting format specific files were updated to reflect the additional data added. Update on 2025-05-15: Updates were made to both the data files and reporting format specific files. New available isotope data was added, up until the end of WY2024 (September 30, 2024). International Generic Sample Numbers (IGSNs), when registered, were added to the data files. The reporting format specific files were updated to reflect the additional data added. Update on 2026-09-01: Updates were made to both the data files and reporting format specific files. New available isotope data was added, up until the end of WY2025 (September 30, 2025).

54 ENVIRONMENTAL SCIENCES↗

Molecular detection of per- and polyfluoroalkyl substances in water using time-of-flight secondary ion mass spectrometry

Detection of per- and polyfluoroalkyl substances (PFASs) is crucial in environmental mitigation and remediation of these persistent pollutants. We demonstrate that time-of-flight secondary ion mass spectrometry (ToF-SIMS) is a viable technique to analyze and identify these substances at parts per trillion (ppt) level in real field samples without complicated sample preparation due to its superior surface sensitivity. Several representative PFAS compounds, such as perfluorooctanesulfonic acid (PFOS), perfluorobutanoic acid (PFBA), perfluoropentanoic acid (PFPeA), perfluoheptanoic acid (PFHpA), and perfluorononanoic acid (PFNA), and real-world groundwater samples collected from monitoring wells installed around at a municipal wastewater treatment plant located in Southern California were analyzed in this work. ToF-SIMS spectral comparison depicts sensitive identification of pseudo-molecular ions, characteristic of reference PFASs. Additionally, principal component analysis (PCA) shows clear discrimination among real samples and reference compounds. Our results show that characteristic molecular ion and fragments peaks can be used to identify PFASs. Furthermore, SIMS two-dimensional (2D) images directly exhibit the distribution of perfluorocarboxylic acid (PFCA) and PFOS in simulated mixtures and real wastewater samples. Such findings indicate that ToF-SIMS is useable to determine PFAS compounds in complex environmental water samples. In conclusion, ToF-SIMS provides simple sample preparation and high sensitivity in mass spectral imaging, offering an alternative solution for environmental forensic analysis of PFASs in wastewater in the future.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗