Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ground loop”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Selection of an Alternate Biocide for the ISS Internal Thermal Control System Coolant, Phase 2

The ISS (International Space Station) ITCS (Internal Thermal Control System) includes two internal coolant loops that utilize an aqueous based coolant for heat transfer. A silver salt biocide had previously been utilized as an additive in the coolant formulation to control the growth and proliferation of microorganisms within the coolant loops. Ground-based and in-flight testing demonstrated that the silver salt was rapidly depleted, and did not act as an effective long-term biocide. Efforts to select an optimal alternate biocide for the ITCS coolant application have been underway and are now in the final stages. An extensive evaluation of biocides was conducted to down-select to several candidates for test trials and was reported on previously. Criteria for that down-select included: the need for safe, non-intrusive implementation and operation in a functioning system; the ability to control existing planktonic and biofilm residing microorganisms; a negligible impact on system-wetted materials of construction; and a negligible reactivity with existing coolant additives. Candidate testing to provide data for the selection of an optimal alternate biocide is now in the final stages. That testing has included rapid biocide effectiveness screening using Biolog MT2 plates to determine minimum inhibitory concentration (amount that will inhibit visible growth of microorganisms), time kill studies to determine the exposure time required to completely eliminate organism growth, materials compatibility exposure evaluations, coolant compatibility studies, and bench-top simulated coolant testing. This paper reports the current status of the effort to select an alternate biocide for the ISS ITCS coolant. The results of various test results to select the optimal candidate are presented.

Wilson, Mark E.↗

Human-in-the-Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chamber) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere of 8 psi total pressure and 32% oxygen concentration, life support systems (food, air, water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international partners.

Henninger, Donald L.↗

Human in the Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chambers) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere capable of 14.7 to 8 psi total pressure and 21 to 32% oxygen concentration, life support systems (food, air, and water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon, Mars). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international, industrial and academic partners.

Henninger, Donald L.↗

Robotics System Process and Concept for On-orbit Assembly for Potential Mars Sample Return

Proposed Mars Sample Return (MSR) missions would require on-orbit assembly of containment vessels to meet backward Planetary Protection requirements and transfer of the sample container through various stations and positions. Some operations would have to be performed autonomously, and others would require ground-in-loop decision-making stages and verification processes. One concept design for an Earth Return Orbiter (ERO) Capture, Contain, and Return System (CCRS) Transfer Mechanism (TM) is a multi-Degree of Freedom (DOF) manipulator that utilizes a passive End Effector (EE) to assist in containment vessel assembly. To converge on a feasible design, a robotic system process has been instantiated. This process is composed of three main phases: robotic problem definition (operating environment, operations/functions, system goals), robotic solution selection (trade studies on the number of degrees of freedom, number of mechanisms, types of mechanisms), robotic solution design, implementation, and verification and validation (kinematic configuration, robotic and kinematic analysis and topology optimization of components). As a final product of this process, a half-scale functional prototype of the TM was developed to demonstrate the end-to-end operation capability.

Strahle, Jackson W↗

A Virtual Reality Planning Environment for High-Risk, High-Latency Teleoperation

In-Space Servicing, Assembly, and Manufacturing has the potential to enable larger-scale and longer-lived infrastructure projects in space. Servicing in particular has the potential to vastly increase the usable lifetimes of satellites, both newly launched and existing. However, some of these servicing tasks require delicate manipulation and, to apply to existing satellites, need to be able to operate on structures that were not designed for servicing and, in some cases, where the exact shape of the structure is not known in advance. For this reason, human-in-the-loop ground-based teleoperation is the only option for some missions. Ground-based teleoperation presents its own difficulties. In addition to the challenge of performing delicate operations in constrained spaces, communication with the servicing platform is subject to a variable time delay on the order of 2-7 seconds, and the only visual feedback comes from camera views with limited situational awareness and viewing angles.

Teleoperation↗

Evaluation of Grounding Impedance of a Complex Lightning Protective System Using Earth Ground Clamp Measurements and ATP Modeling

A new Lightning Protection System (LPS) was designed and built at Launch Complex 39B (LC39B), at the Kennedy Space Center (KSC), Florida, which consists of a catenary wire system (at a height of about 181 meters above ground level) supported by three insulators installed atop three towers in a triangular configuration. A total of nine downconductors (each about 250 meters long, on average) are connected to the catenary wire system. Each of the nine downconductors is connected to a 7.62-meter radius circular counterpoise conductor with six equally spaced 6-meter long vertical grounding rods. Grounding requirements at LC39B call for all underground and above ground metallic piping, enclosures, raceways, and cable trays, within 7.62 meters of the counterpoise, to be bounded to the counterpoise, which results in a complex interconnected grounding system, given the many metallic piping, raceways, and cable trays that run in multiple direction around LC39B. The complexity of this grounding system makes the fall of potential method, which uses multiple metallic rods or stakes, unsuitable for measuring the grounding impedances of the downconductors. To calculate the downconductors grounding impedance, an Earth Ground Clamp (a stakeless grounding resistance measuring device) and a LPS Alternative Transient Program (ATP) model are used. The Earth Ground Clamp is used to measure the loop impedance plus the grounding impedance of each downconductor and the ATP model is used to calculate the loop impedance of each downconductor circuit. The grounding impedance of the downconductors is then calculated by subtracting the ATP calculated loop impedances from the Earth Ground Clamp measurements.

Mata, Carlos T.↗

(abstract) Mars Pathfinder Active Thermal Control System: Ground and Flight Performance of a Mechanically Pumped Cooling Loop

A key element of the Mars Pathfinder thermal control system is the Heat Rejection System (HRS). The HRS of Mars Pathfinder is designed to actively control the temperatures of the various parts of the spacecraft.This is achieved by mechanically circulating single-phase Freon 11 liquid through the lander and cruise electronics box heat exchangers and transferring the heat to an external radiator on the cruise stage. This is the first time in spacecraft history that a mechanically pumped cooling loop has been used on a long duration spacecraft mission. Many lessons have been learned during the testing and ground and flight operation of the HRS. This paper will present the performance of the mechanically pumped cooling loop during the ground and flight operations. Based on the lessons learned from this experience, recommendations on the design and operation of the pumped cooling loops for future space missions will be made.

Mars↗

Introduction to Tools and Techniques for Surface Sampling on Europa

The NASA Jet Propulsion Laboratory (JPL) is studying excavation and collection of a sample from an icy surface for a potential landed mission to Europa. Europa presents unique challenges in planetary sampling. Very little is known about the local topography and material composition of the surface. The environmental conditions of being cryogenically cold (80-130K), low gravity (~1/7th Earth), no atmosphere, low lighting conditions, and limited ground in the loop opportunities have forced JPL to look at sampling differently than past missions. Interacting with the surface of the Jovian moon requires a sampling system that is robust to local topography on the scale of the lander and/or the tool. In addition, the sampling system must be capable both of detecting faults and automatically adjusting to them to achieve the mission objectives without ground in the loop feedback. Presented here is an overview of a sampling system concept that involves a two-stage approach for collecting a sample. The first stage uses an excavation tool to prepare the surface site for sample collection by removing the top layer of irradiated material and clearing tailings from the hole. The second stage then generates and collects a sample for delivery to instruments on-board a lander. Also presented is an introduction for how autonomy and sensing technologies might be employed to enable mission success.

Tevere, Erica L.↗

De-tuning tolerant loop antenna

A loop antenna is described herein that is suitable for operation in free space or in proximity to a ground plane. The loop antenna comprises a looped conductive element with a gap formed therein and a tab extending toward the gap. A length of the tab of the loop antenna is selected such that a detuning loss of the loop antenna from operation in free space to operation in proximity to a ground plane is low. In an exemplary embodiment, the length of the tab is selected such that a reactance of the loop antenna in free space is within a threshold level of a reactance of the loop antenna when the antenna is in proximity to a ground plane.

42 ENGINEERING↗

Simplifying operations with an uplink/downlink integration toolkit

The Operations Engineering Lab (OEL) at JPL has developed a simple, generic toolkit to integrate the uplink/downlink processes, (often called closing the loop), in JPL's Multimission Ground Data System. This toolkit provides capabilities for integrating telemetry verification points with predicted spacecraft commands and ground events in the Mission Sequence Of Events (SOE) document. In the JPL ground data system, the uplink processing functions and the downlink processing functions are separate subsystems that are not well integrated because of the nature of planetary missions with large one-way light times for spacecraft-to-ground communication. Our new closed-loop monitoring tool allows an analyst or mission controller to view and save uplink commands and ground events with their corresponding downlinked telemetry values regardless of the delay in downlink telemetry and without requiring real-time intervention by the user. An SOE document is a time-ordered list of all the planned ground and spacecraft events, including all commands, sequence loads, ground events, significant mission activities, spacecraft status, and resource allocations. The SOE document is generated by expansion and integration of spacecraft sequence files, ground station allocations, navigation files, and other ground event files. This SOE generation process has been automated within the OEL and includes a graphical, object-oriented SOE editor and real-time viewing tool running under X/Motif. The SOE toolkit was used as the framework for the integrated implementation. The SOE is used by flight engineers to coordinate their operations tasks, serving as a predict data set in ground operations and mission control. The closed-loop SOE toolkit allows simple, automated integration of predicted uplink events with correlated telemetry points in a single SOE document for on-screen viewing and archiving. It automatically interfaces with existing real-time or non real-time sources of information, to display actual values from the telemetry data stream. This toolkit was designed to greatly simplify the user's ability to access and view telemetry data, and also provide a means to view this data in the context of the commands and ground events that are used to interpret it. A closed-loop system can prove especially useful in small missions with limited resources requiring automated monitoring tools. This paper will discuss the toolkit implementation, including design trade-offs and future plans for enhancing the automated capabilities.

Murphy, Susan C.↗

Calculation of Operations Efficiency Factors for Mars Surface Missions

For planning of Mars surface missions, to be operated on a sol-by-sol basis by a team on Earth (where a "sol" is a Martian day), activities are described in terms of "sol types" that are strung together to build a surface mission scenario. Some sol types require ground decisions based on a previous sol's results to feed into the activity planning ("ground in the loop"), while others do not. Due to the differences in duration between Earth days and Mars sols, for a given Mars local solar time, the corresponding Earth time "walks" relative to the corresponding times on the prior sol/day. In particular, even if a communication window has a fixed Mars local solar time, the Earth time for that window will be approximately 40 minutes later each succeeding day. Further complexity is added for non-Mars synchronous communication relay assets, and when there are multiple control centers in different Earth time zones. The solution is the development of "ops efficiency factors" that reflect the efficiency of a given operations configuration (how many and location of control centers, types of communication windows, synchronous or non-synchronous nature of relay assets, sol types, more-or-less sustainable operations schedule choices) against a theoretical "optimal" operations configuration for the mission being studied. These factors are then incorporated into scenario models in order to determine the surface duration (and therefore minimum spacecraft surface lifetime) required to fulfill scenario objectives. The resulting model is used to perform "what-if" analyses for variations in scenario objectives. The ops efficiency factor is the ratio of the figure of merit for a given operations factor to the figure of merit for the theoretical optimal configuration. The current implementation is a pair of models in Excel. The first represents a ground operations schedule for 500 sols in each operations configuration for the mission being studied (500 sols was chosen as being a long enough time to capture variations in relay asset interactions, Earth/Mars time phasing, and seasonal variations in holidays). This model is used to estimate the ops efficiency factor for each operations configuration. The second model in a separate Excel spreadsheet is a scenario model, which uses the sol types to rack up the total number of "scenario sols" for that scenario (in other words, the ideal number of sols it would take to perform the scenario objectives). Then, the number of sols requiring ground in the loop is calculated based on the soil types contained in the given scenario. Next, the scenario contains a description of what sequence of operations configurations is used, for how many days each, and this is used with the corresponding ops efficiency factors for each configuration to calculate the "ops duration" corresponding to that scenario. Finally, a margin is applied to determine the minimum surface lifetime required for that scenario. Typically, this level of analysis has not been performed until much later in the mission, and has not been able to influence mission design. Further, the notion of moving to sustainable operations during Prime Mission - and the effect that that move would have on surface mission productivity and mission objective choices - has not been encountered until the most recent rover missions (MSL and Mars 2018).

Layback, Sharon L.↗

Recent Ground-based Test Results for the Closed Loop Two-Phase Flow Chilldown Test Module for Future Integration with the Flow Boiling and Condensation Experiment onboard International Space Station

Effective cryogenic fluid management is important to the success of future manned and unmanned NASA missions, and the transfer line chilldown process is recognized as a key technological challenge. To address this challenge, the Two-phase Flow and Thermal Management Lab (TFTML) at Case Western Reserve University is collaborating with NASA Glenn Research Center to develop, test and deploy a closed loop two-phase flow chilldown test section onboard the International Space Station to be integrated with the current Flow Boiling and Condensation Experiment (FBCE) module. The final results of this project will create the first chilldown process database under pure and sustained microgravity conditions and will significantly advance the understanding of the chilldown process for cryogenic fluid management. In the present work, the ground-based test results of the closed loop SS-316 chilldown test section in a horizontal configuration at varying inlet mass flow rates (3-40 g/s) and inlet liquid subcooling (5-35 0C) are presented. The working fluid is PF-5060 and the chilldown curves captured the entire quenching curve involving the different boiling regimes and temperature transition points viz., film boiling, Leidenfrost/re-wetting point, transition boiling, critical heat flux (CHF), nucleate boiling, onset of nucleate boiling (ONB) and single-phase liquid flow regions, when the test section is pre-heated to around 250 0C. The major findings of the present study are, (i) the bottom part of the test section sees a lower re-wetting temperature due to the horizontal flow configuration, (ii) the re-wetting temperatures are relatively unaffected by inlet liquid mass flow rates though the increase in mass flow rates reduce the chilldown time, and (iii) the re-wetting temperatures decrease with decrease in inlet liquid subcooling. Further, preliminary flow visualization studies in a transparent pyrex test section will also be presented to understand the intricate flow boiling regime transitions during the chilldown process.

ISS↗

Background and architecture for an autonomous ground station controller

The Deep Space Station Controller (DSSC) is state of the art ground station control architecture being developed at JPL. During the past few years the technology development program at JPL demonstrated a series of increasingly competent automated ground station prototypes of which the DSSC is the latest. It has been designed for robust closed loop control of ground stations utilized for forward and return link communications with NASA's deep space exploration missions.

controller for ground station automation fault det↗

Open spin chains for giant gravitons and relativity

In this work, we study open spin chains for strings stretched between giant graviton states in the N=4 SYM field theory in the collective coordinate approach. We study the boundary conditions and the effective Hamiltonian of the corresponding spin chain to two loop order. The ground states of the spin chain have energies that match the relativistic dispersion relation characteristic of massive W boson particles on the worldvolume of the giant graviton configurations, up to second order in the limit where the momentum is much larger than the mass. We find evidence for a non-renormalization theorem for the ground state wave function of this spin chain system. We also conjecture a generalization of this result to all loop orders which makes it compatible with a fully relativistic dispersion relation. We show that the conjecture follows if one assumes that the spin chain admits a central charge extension that is sourced by the giant gravitons, generalizing the giant magnon dispersion relation for closed string excitations. This provides evidence for ten dimensional local physics mixing AdS directions and the five-sphere emerging from an N=4 SYM computation in the presence of a non-trivial background (made of D-branes) that break the conformal field theory of the system.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Operational loopwheel suspension systems for Mars Rover demonstration model: Loopwheel failure report

The results are presented from the analysis of a failure which occurred in the fiberglass loop of one of the Loopwheel traction elements delivered to the Jet Propulsion Laboratory (JPL) for use on the JPL Mars Rover demonstration model. The loop failed in compression in the outer fibers forming a hinge which, through cycling, caused the inner fibers to break. The probable cause of this failure was the load being introduced as point loads at the center of the loop causing high compressive stresses and early buckling. To decrease the stress level and delay buckling, the tread lugs can be reshaped so that the entire lug contacts the ground when the loop is loaded. This can be accomplished through removal of lug material, starting with zero removal at the outer edge and linearly increasing to one-half of the lug thickness at the center.

West, E. J. M.↗

Calculating the Lightning Protection System Downconductors' Grounding Resistance at Launch Complex 39B, Kennedy Space Center

A new Lightning Protection System (LPS) was designed and built at Launch Complex 39B (LC39B), at the Kennedy Space Center (KSC), Florida, which consists of a catenary wire system (at a height of about 181 meters above ground level) supported by three insulators installed atop three towers in a triangular configuration. Nine downconductors (each about 250 meters long) are connected to the catenary wire system. Each downconductor is connected to a 7.62-meter-radius circular counterpoise conductor with six equally spaced, 6-meter-long vertical grounding rods. Grounding requirements at LC39B call for all underground and aboveground metallic piping, enclosures, raceways, and cable trays, within 7.62 meters of the counterpoise, to be bonded to the counterpoise, which results in a complex interconnected grounding system, given the many metallic piping, raceways, and cable trays that run in multiple directions around LC39B. The complexity of this grounding system makes the fall-of-potential method, which uses multiple metallic rods or stakes, unsuitable for measuring the grounding impedances of the downconductors. To calculate the grounding impedance of the downconductors, an Earth Ground Clamp (EGC) (a stakeless device for measuring grounding impedance) and an Alternative Transient Program (ATP) model of the LPS are used. The EGC is used to measure the loop impedance plus the grounding impedance of each downconductor, and the ATP model is used to calculate the loop impedance of each downconductor circuit. The grounding resistance of the downconductors is then calculated by subtracting the ATP calculated loop impedances from the EGC measurements.

Mata, Carlos T.↗

Comparison of Airborne and Ground-Based Function Allocation Concepts for NextGen Using Human-In-The-Loop Simulations

This paper presents an air/ground functional allocation experiment conducted by the National Aeronautics and Space Administration (NASA) using two human-in-the-Loop simulations to compare airborne and ground-based approaches to NextGen separation assurance. The approaches under investigation are two trajectory-based four-dimensional (4D) concepts; one referred to as "airborne trajectory management with self-separation" (airborne) the other as "ground-based automated separation assurance" (ground-based). In coordinated simulations at NASA's Ames and Langley Research Centers, the primary operational participants -controllers for the ground-based concept and pilots for the airborne concept - manage the same traffic scenario using the two different 4D concepts. The common scenarios are anchored in traffic problems that require a significant increase in airspace capacity - on average, double, and in some local areas, close to 250% over current day levels - in order to enable aircraft to safely and efficiently traverse the test airspace. The simulations vary common independent variables such as traffic density, sequencing and scheduling constraints, and timing of trajectory change events. A set of common metrics is collected to enable a direct comparison of relevant results. The simulations will be conducted in spring 2010. If accepted, this paper will be the first publication of the experimental approach and early results. An initial comparison of safety and efficiency as well as operator acceptability under the two concepts is expected.

Wing, David J.↗