Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

U.S. Wind projected to Be $60 billion business by 2013

A recent U.S. Department of Energy report concluded that there are no insurmountable barriers to meeting 20 percent of U.S. electricity generation from wind by 2030, but identified upgrading of the transmission grid as a major challenge, requiring a $60+ billion investment. One major obstacle is the highly fragmented ownership of the 200,000-mile network among some 500 diverse, intensely territorial entities.

17 WIND ENERGY↗

RFA for Solar/Geothermal Hybrid Thermal Energy Storage Modeling: Cooperative Research and Development Final Report, CRADA Number CRD-16-646

Hyperlight Energy is an innovative concentrated solar power (CSP) company whose business charter is to commercialize a disruptively low-cost, CSP collector system that is ultimately for providing heat for solar thermal/geothermal hybrid power plants, process heat applications (e.g., enhanced oil recovery), and solar thermal power generation. Hyperlight's CSP collector system utilizes a linear Fresnel reflector (LFR) configuration. This LFR configuration consists of mirrors mounted in low-cost, precision plastic extrusions, which are integrated into raft assemblies and floated on low-cost, sealed waterbeds. Hyperlight's CSP collector technology has been developed under private equity investment, government grant and commercial funding. Hyperlight has been awarded a 1.5-million DOE COLLECTS contract with an additional 1.6 million in matched funds from private investment and the California Energy Commission. This DOE project will support the final steps of product development for bulk commercialization and deployment of the Hyperlight CSP collector system. The work will culminate in a final operational deployment at a commercially relevant site. Several such site options are currently under evaluation, including two geothermal sites. Hyperlight identified a very low-cost way to put renewable energy electrons on the grid at peak times, upgrading underutilized geothermal plants with Hyperlight's low cost CSP and thermal energy storage (TES). While Hyperlight's CSP collector work is maturing quickly for commercial pilot launch, an optimal TES system for solar thermal/geothermal hybridization needs to be evaluated and ultimately developed so Hyperlight can develop commercial retrofit projects at a scale of hundreds of megawatts of renewable energy power output at sites across the United States, followed by greenfield projects in a multi-GW sized market.

15 GEOTHERMAL ENERGY↗

The Best of Both Worlds: Combined Thermal and Battery Storage for Widespread Building Decarbonization

To meet 2050 decarbonization targets, widespread building electrification is a critical complement to clean power generation. Behind-the-meter storage (BTMS) (e.g., battery electric energy storage [EES] and thermal energy storage [TES]) integrated with buildings or building end uses to store and supply energy at optimal times can minimize burdens associated with operation, planning, and upgrades to the electrical grid sometimes triggered by building electrification. Such BTMS systems can serve the dual purpose of providing enhanced resilience at the building and grid level, and support the deployment of renewable generation needed for wide-scale decarbonization. While TES can cost-effectively shed and shift thermal loads, it cannot generally backup or shift non-thermal building end uses. EES, by contrast, is more expensive, but applicable to all end uses (i.e., thermal and electrical loads). Combined together, these storage systems can be traded off against one another to perform optimally in meeting demand flexibility, decarbonization goals, and energy resilience of the buildings at a lower total system cost. This paper proposes a framework to define BTMS benefits, provides four illustrative electrification scenarios using TES and EES, and discusses the combined TES/EES benefits with building energy modeling results. The paper also highlights potential barriers to adoption of BTMS and a path forward.

buildings↗

Effects of grids in drift tubes

In 2011, we upgraded a 201 MHz buncher in the proton injector for the alternating gradient synchrotron (AGS) - relativistic heavy ion collider (RHIC) complex. In the buncher we installed four grids made of tungsten to improve the transit time factor. The grid installed drift tubes have 32 mm of inner diameter and the each grid consists of four quadrants. The quadrants were cut out precisely from 1mm thick tungsten plates by a computerized numerically controlled (CNC) wire cutting electrical discharge machining (EDM). The 3D electric field of the grid was simulated.

43 PARTICLE ACCELERATORS↗

Control Strategies for Electric Vehicle (EV) Charging Using Renewables and Local Storage

The increase of electric vehicle (EV) and plug-in hybrid-electric vehicle (PHEV) adoption creates a need for more EV supply equipment (EVSE) infrastructure (i.e., EV chargers). The impact of EVSE installations could be significant due to limitations in the electric grid and potential demand charges for residential and commercial customers. The use of renewables (e.g., solar) and local storage (e.g., battery bank) can mitigate loads caused by EVSE on the electric grid. This would eliminate costly upgrades needed by utilities and decrease demand charges for consumers. This paper aims to explore control systems that mitigate the impact of EVSE on the electric grid using solar energy and battery banks. Three control systems are investigated and compared in this study. The first control system discharges the battery bank at a constant rate during specific times of the day based on historical data. The second discharges the battery bank based on the number of EVs charging (linear) and the amount of solar energy being generated. The third discharges the battery bank based on a sigmoid function (non-linear) in response to the number of EVs charging, and also takes into consideration the amount of renewables being generated. The first and second control systems recharge the battery bank at night when demand charges are lowest. The third recharges the battery bank at night and during times of the day when there is an excess of solar. Experiments are conducted using data from a private site that has 25 solar-assisted charging stations at Oak Ridge National Laboratory (ORNL) in Oak Ridge, TN and 4 at a public site in Nashville, TN. Results indicate the third control system having better performance, negating up to 71% of EVSE load, compared with the second control system (up to 61%) and the first control system (up to 58%).

Castello, Charles C↗

The Cost of Distribution System Upgrades to Accommodate Increasing Penetrations of Distributed Photovoltaic Systems on Real Feeders in the United States

The increasing deployment of distributed photovoltaic systems (DPV) can impact operations at the distribution level and the transmission level of the electric grid. It is important to develop and implement forward-looking approaches for calculating distribution upgrade costs that can be used to inform system planning, market and tariff design, cost allocation, and other policymaking as penetration levels of DPV increase. Using a bottom-up approach that involves iterative hosting capacity analysis, this report calculates distribution upgrade costs as a function of DPV penetration on three real feeders - two in California and one in the Northeastern United States.

14 SOLAR ENERGY↗

Placing power linres : GIS helps site energy corridors.

Turn the lights on when you enter a room, then turn the lights off when you leave. Most of us repeat this sequence many times each day, and never give it another thought. But that seemingly simple light switch on the wall connects us to one of the most complex systems in the world: the electrical grid. Most of the United States is served by a highly reliable and adequate supply of electrical power, which is distributed through a grid of thousands of miles of electricity-transmission lines. However, as the electricity-supply infrastructure ages and consumer demand for electricity grows, the capacity to deliver electrical power hasn't kept pace with demand, and upgrading the electrical-transmission grid has become a more pressing need. From 1988-1998, demand for transmission grew by 30 percent while transmission grew by only 15 percent. From 1999-2009, demand grew by 20 percent and transmission by only 3 percent Despite a short-term decline related to the economic downturn and improved efficiency, U.S. energy consumption is expected to increase by 14 percent between 2008 and 2035. This growth will drive the need to develop viable routes for new transmission lines. Because transmission lines extend over large distances, they typically cross many federal, tribal, state, local and private land jurisdictions, each with a complex and varying set of siting issues and land-management practices. And as the existing grid needs improvement to meet growing demand, the U.S. is rapidly developing renewable energy sources, particularly solar and wind energy, often in areas far removed from existing electricity-transmission infrastructure and energy-consumption areas.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Report: High Energy Physics at the Energy Frontier at Louisiana Tech

The Louisiana Tech University High Energy Physics group has developed a research program aimed at experimentally testing the Standard Model of particle physics and searching for new phenomena through a focused set of analyses in collaboration with the ATLAS experiment at the Large Hadron Collider (LHC) at the CERN laboratory in Geneva. This research program includes involvement in the current operation and maintenance of the ATLAS experiment and full involvement in Phase 1 and Phase 2 upgrades in preparation for future high luminosity (HL-LHC) operation of the LHC. Our focus is solely on the ATLAS experiment at the LHC, with some related detector development and software efforts. We have established important service roles on ATLAS in five major areas: Triggers, especially jet triggers; Data Quality monitoring; grid computing; GPU applications for upgrades; and radiation testing for upgrades. Our physics research is focused on multijet measurements and top quark physics in final states containing tau leptons, which we propose to extend into related searches for new phenomena. Focusing on closely related topics in the jet and top analyses and coordinating these analyses in our group has led to high efficiency and increased visibility inside the ATLAS collaboration and beyond. Based on our work in the DØ experiment in Run II of the Fermilab Tevatron Collider, Louisiana Tech has developed a reputation as one of the leading institutions pursuing jet physics studies. Currently we are applying this expertise to the ATLAS experiment, with several multijet analyses in progress.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Numerical simulation for the accelerator of the KSTAR neutral beam ion source

Recent experiments with a prototype long-pulse, high-current ion source being developed for the neutral beam injection system of the Korea Superconducting Tokamak Advanced Research have shown that the accelerator grid assembly needs a further upgrade to achieve the final goal of 120keV/65A for the deuterium ion beam. The accelerator upgrade concept was determined theoretically by simulations using the IGUN code. The simulation study was focused on finding parameter sets that raise the optimum perveance as large as possible and reduce the beam divergence as low as possible. From the simulation results, it was concluded that it is possible to achieve this goal by sliming the plasma grid (G1), shortening the second gap (G2-G3), and adjusting the G2 voltage ratio.

43 PARTICLE ACCELERATORS↗

2015 California Demand Response Potential Study - Charting California’s Demand Response Future. Interim Report on Phase 1 Results

Demand response (DR) is an important resource for keeping the electricity grid stable and efficient; deferring upgrades to generation, transmission, and distribution systems; and providing other customer economic benefits. This study estimates the potential size and cost of the available DR resource for California’s three investor-owned utilities (IOUs), as the California Public Utilities Commission (CPUC) evaluates how to enhance the role of DR in meeting California’s resource planning needs and operational requirements. As the state forges a clean energy future, the contributions of wind and solar electricity from centralized and distributed generation will fundamentally change the power grid’s operational dynamics. This transition requires careful planning to ensure sufficient capacity is available with the right characteristics – flexibility and fast response – to meet reliability needs. Illustrated is a snapshot of how net load (the difference between demand and intermittent renewables) is expected to shift. Increasing contributions from renewable generation introduces steeper ramps and a shift, into the evening, of the hours that drive capacity needs. These hours of peak capacity need are indicated by the black dots on the plots. Ultimately this study quantifies the ability and the cost of using DR resources to help meet the capacity need at these forecasted critical hours in the state.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Climate balance of biogas upgrading systems

One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

09 BIOMASS FUELS↗

Guest Editorial: Planning and operation of resilient distribution system for integrated multi-energy

Resilience is the ability of power systems to prepare for and adapt to low-probability, high-impact incidents and withstand and recover rapidly from disruptions. With the ageing of electricity distribution infrastructure and increasing threats of weather-related incidents and natural disasters, the need to effectively enhance the resilience of the electricity distribution system has become urgent and has attracted worldwide attention. Although there are an increasing number of publications related to enhancing resilience strategies, resilience is an emerging concept in power systems. Existing practices are mostly focused on deploying distributed energy resources (DERs) and microgrids, hardening the existing infrastructures and building redundant capacities. However, from a broader perspective, resilience enhancement of power distribution system is a systematic engineering, involving long-term system planning and upgrading (e.g., deployment of smart grid technologies and intelligent switches), short-term proactive scheduling, real-time robust and resilient control of DERs, and post-event restoration and recovery strategies. Based on this point, this Special Issue in IET Energy System Integration focuses on soliciting the most recent and original technologies, scheduling and control strategies for improving the resilience of power distribution system. Eight papers are presented in this Special Issue, covering various aspects related to resilience enhancement of power distribution system, including fault-tolerant frequency measurement, robust scheduling of integrated electricity and district heating systems, robust control of DERs, efficient methods for safety verification as well as novel graph theory-based approach to restore the distribution systems after multiple simultaneous faults. A brief introduction of these 8 papers is provided below.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Shunt-Connected FACTS and Synchronous Condensers

In recent years, the electric-transmission system has undergone a significant transformation marked by a greater integration of renewable-energy sources like wind and solar, the phasing out of thermal generation plants, and a concerted effort towards electrifying energy consumption. To keep pace with the integration of renewable-energy sources and the escalating demands of industries and households, it is imperative to expand and modernize the existing power infrastructure. These upgrades are essential to maintain grid stability, enhance power delivery, and boost overall efficiency of the system. However, challenges have emerged with the growing complexity of power grids, particularly in the realms of voltage control, transient stability, and power-quality management.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Grid Edge Visibility: Gaps and a Road Map

Behind-The-Meter (BTM) resources at the grid edge are rapidly becoming an important component of the electric grid, requiring a substantial reconfiguration of traditional grid practices, such as policy changes, market redesign, and infrastructure upgrades. This adjustment is challenged by the fact that, by definition, grid edge elements are not easily observable by grid control entities. Increasing the visibility of these resources is therefore an important goal, one that is experiencing much research and discussion by various power system stakeholders. For example, policy makers are analyzing the tradeoffs of using grid edge meters to impose charges on grid edge electricity generation. System operators, such as the Midcontinent Independent System Operator (MISO) in the United States, can identify visibility information on the electrical location and the size of the grid edge resources as a critical consideration across the transmission-and-distribution (T&D) spectrum. This article summarizes the challenges and needs of grid entities resulting from the introduction of grid edge resources as well the gaps in the extant grid edge visibility frameworks.

behind-the-meter↗

VersiCharge-SG - Smart Grid Capable Electric Vehicle Supply Equipment (EVSE) for Residential Applications

In his 2011 State of the Union address, President Obama called for one million electric vehicles on the road by 2015 [1]. With large-scale Electric Vehicle (EV) or Plug-in Electric Vehicle (PEV or EV for short) or Plug-in Hybrid Electric Vehicle (PHEV) penetration into the US market, there will be drastic reduction in fossil fuel consumption, thus significantly reducing our dependency on foreign oil [2-6]. There will also be significant reduction on Green House Gas (GHG) emissions and smog in the major US cities [3, 7, 8]. Similar studies have also been done other industrial counties [9]. For the fuel cost, with the home electricity rate around $0.13 per kWh, it would cost about $0.05 per mile for DC operation and $0.03 cents per mile for AC operation. But, assuming 25 miles per gallon for a typical vehicle and $4 per gallon, fossil fuel will cost $0.16 per mile [10]. The overall lifecycle cost of PEVs will be several folds lower than the existing fossil fueled vehicles. Despite the above advantages of the EVs, the current cost of EVSE is not affordable for the average consumer. Presently, the cost of installing state-of-the-art residential EVSE ranges from $1500 to $2500 [11]. Low priced EVSE technology, which is easy to install, and affordable to operate and maintain by an average consumer, is essential for the large-scale market penetration of EVs. In addition, the long-term success of this technology is contingent on the PEVs having minimal excessive load and shift impact on the grid, especially at peak times. In a report [2] published by the Pacific Northwest National Laboratory (PNNL), the exiting electric power generation infrastructure, if used at its full capacity 24 hours a day, would support up to 84% of the nation’s cars, pickup trucks and SUVs for an average daily drive of 33 miles. This mileage estimate is certainly much below what an average driver would drive his/her vehicle per day. Another report [3] by the National Renewable Energy Laboratory (NREL) shows that an increased PEV penetration would significantly increase pressure on the peak generation, if no controlled charging strategy was put in place. Investigations from Oak Ridge National Laboratory (ORNL) show that in many regions, additional power generation facilities must be put in place and operate in evening times to recharge the EVs [12]. By all accounts, large PEV penetration will bring to the power grid enormous challenges due to the excessive and stochastic demand, and can entirely change the peak time distribution and behavior, perhaps, into a bi-modal distribution capable of exhausting primary, secondary and even reserves (spinning or non-spinning). To minimize the infrastructure upgrade costs and risks to the grid, and to ensure that power quality and reliability remain within the set standards, the demand for EV plug-ins must then be controlled and coordinated locally and at regional levels. Novel control techniques must be devised to allow for close collaboration between neighboring plug-in requestors, between neighboring communities, and between these and more central power authorities. The concept of electric drive vehicle is not new. The development of electric vehicle has been around since 19th century [13]. But due to a number of reasons and practical limitations at the time, including lower cost of gasoline compared to electricity, excessive refueling times, and abundance of gasoline, the automobile industry embraced gasoline-powered vehicles worldwide [13]. With the global warming, ever reducing reservoirs of fossil oil around the world and increasing political pressure to reduce the national dependency on foreign oil, the last decade of the 20th century witnessed major technological breakthroughs in Alternative Fueled Vehicle (AFV) technologies, including electric vehicles. With GHG emissions and carbon footprint in the minds of many more consumers and politicians, the first decade of the 21stCentury witnessed more breakthroughs with some real life experimentation and sporadic deployment of these technologies [14]. By many accounts, the second decade of the 21st Century is expected to be the time when mass volume production and popular usage of these AFV technologies, especially EV, will materialize. The current DOE request for proposals recognizes the need for major technological changes to ensure that the above national goal is realizable. Two major challenges have been identified: (1) major reduction in the cost of ownership of EVSEs, and (2) managing additional EV loads in the power grid while maintaining power quality, reliability, and affordability. We note that the two challenges are closely linked – A holistic approach to true lifecycle cost of EVSE ownership will certainly include any taxes and surcharges that can be put in place for major potential investments in the grid, and higher electricity charges in case of more frequent and longer peak periods. From a societal perspective, this cost could also include the lost GDP (computed on a local basis) and revenue for businesses at local and regional levels when the grid is no longer capable of meeting the demand and unexpected outages occur. A typical end-point electrical distribution system delivers power to a residential EVSE from the neighborhood distribution pole, as shown in Fig.1. This pole has a transformer (neighboring step-down transformer) that steps down the utility medium voltage to dual 120VAC single phase (also called 240VAC split phase). This voltage is fed through a meter into the residential load control center. The load control center consists of branch circuit breakers and distributes the power supply within various areas of the residential unit. One of the branch circuits from the load control center feeds EV charging station for the unit. An electric vehicle charger is plugged into the socket of the EV charging station and other end of this charger is connected to the vehicle during charging. Figure 1 illustrates a typical configuration of the power grid. The left side of the figure shows the power grid from the power generation to the neighboring step-down transformer, while the right side of the figure shows multiple EVs with the respective charging stations. The typical step-down transformer has an upper limit representing the maximum load that can be requested from these neighboring houses altogether (typically 24 kW). In case the total load increases beyond the supported limit, the protection system (e.g. a circuit breaker) attached to the step-down transformer gets activated automatically.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demand Response Availability Profiles for California in the Year 2020

Demand response (DR) is being considered as a valuable resource for keeping the electrical grid stable and efficient, and deferring upgrades to generation, transmission, and distribution systems. However, simulations to determine how much infrastructure upgrades can be deferred are necessary in order to plan optimally. Production cost modeling is a technique, which simulates the dispatch of generators to meet demand and reserves in each hour of the year, at minimal cost. By integrating demand response resources into a production cost model (PCM), their value to the grid can be estimated and used to inform operations and infrastructure planning. DR availability profiles and constraints for 13 end-uses in California for the year 2020 were developed by Lawrence Berkeley National Laboratory (LBNL), and integrated into a production cost model by Lawrence Livermore National Laboratory (LLNL), for the California Energy Commission’s Value of Energy Storage and Demand Response for Renewable Integration in California Study. This report summarizes the process for developing the DR availability profiles for California, and their aggregate capabilities. While LBNL provided potential DR hourly profiles for regulation product in the ancillary services market and five-minute load following product in the energy market for LLNL’s study, additional results in contingency reserves and an assumed flexible product are also defined. These additional products are included in the analysis for managing high ramps associated with renewable generation and capacity products and they are also presented in this report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2025 California Demand Response Potential Study - Charting California’s Demand Response Future. Final Report on Phase 2 Results

California’s legislative and regulatory goals for renewable energy are changing the power grid’s dynamics. Increased variable generation resource penetration connected to the bulk power system, as well as, distributed energy resources (DERs) connected to the distribution system affect the grid’s reliable operation over many different time scales (e.g., days to hours to minutes to seconds). As the state continues this transition, it will require careful planning to ensure resources with the right characteristics are available to meet changing grid management needs. Demand response (DR) has the potential to provide important resources for keeping the electricity grid stable and efficient, to defer upgrades to generation, transmission and distribution systems, and to deliver customer economic benefits. This study estimates the potential size and cost of future DR resources for California’s three investor-owned utilities (IOUs): Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE), and San Diego Gas & Electric Company (SDG&E). Our goal is to provide data-driven insights as the California Public Utilities Commission (CPUC) evaluates how to enhance DR’s role in meeting California’s resource planning needs and operational requirements. We address two fundamental questions: 1. What cost-competitive DR service types will meet California’s future grid needs as it moves towards clean energy and advanced infrastructure? 2. What is the size and cost of the expected resource base for the DR service types?

24 POWER TRANSMISSION AND DISTRIBUTION↗