Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “gateway”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Neutron Science TeraGrid Gateway

The unique contributions of the Neutron Science TeraGrid Gateway (NSTG) are the connection of national user facility instrument data sources to the integrated cyberinfrastructure of the National Science FoundationTeraGrid and the development of a neutron science gateway that allows neutron scientists to use TeraGrid resources to analyze their data, including comparison of experiment with simulation. The NSTG is working in close collaboration with the Spallation Neutron Source (SNS) at Oak Ridge as their principal facility partner. The SNS is a next-generation neutron source. It has completed construction at a cost of $1.4 billion and is ramping up operations. The SNS will provide an order of magnitude greater flux than any previous facility in the world and will be available to all of the nation's scientists, independent of funding source, on a peer-reviewed merit basis. With this new capability, the neutron science community is facing orders of magnitude larger data sets and is at a critical point for data analysis and simulation. There is a recognized need for new ways to manage and analyze data to optimize both beam time and scientific output. The TeraGrid is providing new capabilities in the gateway for simulations using McStas and a fitting service on distributed TeraGrid resources to improved turnaround. NSTG staff are also exploring replicating experimental data in archival storage. As part of the SNS partnership, the NSTG provides access to gateway support, cyberinfrastructure outreach, community development, and user support for the neutron science community. This community includes not only SNS staff and users but extends to all the major worldwide neutron scattering centers.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design of an MSAT-X mobile transceiver and related base and gateway stations

This paper summarizes the results of a design study of the mobile transceiver, base station, and gateway station for NASA's proposed Mobile Satellite Experiment (MSAT-X). Major ground segment system design issues such as frequency stability control, modulation method, linear predictive coding vocoder algorithm, and error control technique are addressed. The modular and flexible transceiver design is described in detail, including the core, RF/IF, modem, vocoder, forward error correction codec, amplitude-companded single sideband, and input/output modules, as well as the flexible interface. Designs for a three-carrier base station and a 10-carrier gateway station are also discussed, including the interface with the controllers and with the public-switched telephone networks at the gateway station. Functional specifications are given for the transceiver, the base station, and the gateway station.

Fang, Russell J. F.↗

Shield Optimization in Simple Geometry for the Gateway Concept

The great cost of added radiation shielding is a potential limiting factor in many deep space missions. For this enabling technology, we are developing tools for optimized shield design over multi-segmented missions involving multiple work and living areas in the transport and duty phase of various space missions. The total shield mass over all pieces of equipment and habitats is optimized subject to career dose and dose rate constraints. Preliminary studies of deep space missions indicate that for long duration space missions, improved shield materials will be required. The details of this new method and its impact on space missions and other technologies will be discussed. This study will provide a vital tool for evaluating Gateway designs in their usage context. Providing protection against the hazards of space radiation is one of the challenges to the Gateway infrastructure designs. We will use the mission optimization software to scope the impact of Gateway operations on human exposures and the effectiveness of alternate shielding materials on Gateway infrastructure designs. This study will provide a guide to the effectiveness of multifunctional materials in preparation to more detailed geometry studies in progress.

Tripathi, R. K.↗

Recommendation for a Medical System Concept of Operations for Gateway Missions

NASA’s exploration missions to cis-lunar space will establish a permanent gateway to future transport missions to Mars. These missions mandate a significant paradigm change for mission planning, spacecraft design, human systems integration, and in-flight medical care due to constraints on mass, volume, power, resupply, and medical evacuation capability. These constraints require medical system development to be tightly integrated with mission and habitat design to provide a sufficient medical infrastructure and enable mission success. This concept of operations provides a vision of medical care needs that will be used to guide the development of a medical system for the cis-lunar Gateway Habitat. This medical system will serve as the precursor to what is implemented in future exploration missions to Mars. This concept of operations documents an overview of the stakeholder needs and system goals of a medical system and provides examples of the types of activities for which the system will be used during the mission. This concept of operations informs the ExMC systems engineering effort to define the Gateway Habitat Medical System by documenting the medical activities and capabilities relevant to Gateway missions, as identified by the ExMC clinician community. In addition, this concept of operations will inform the subsequent systems engineering process of developing technical requirements, system architectures, interfaces, and verification and validation approaches for the medical system. This document supports the closure of ExMC Gap Med01: We do not have a concept of operations for medical care during exploration missions, corresponding to the ExMC-managed human system risk: Risk of Adverse Health Outcomes & Decrements in Performance due to Inflight Medical Conditions.

Rubin, David↗

Gateway Lunar Habitat Modules as the Basis for a Modular Mars Transit Habitat

This paper provides a summary of the results from a recent concept study of various configurations for a Mars Transit Habitat. The designs considered are composed of modules based on published contractor concepts proposed for the lunar Gateway through NASA’s NextSTEP program. Using these Gateway concepts as a starting point for the design of a Mars Transit Habitat has potential advantages. Both Gateway and Mars Transit Habitats will have similar requirements for long-term operations in deep space, autonomous and remote operations when the crew is not onboard, and similar requirements for transferring crew to and from a planetary surface—the Moon and Mars respectively. The contractor designs for Gateway were traded against a monolithic transit habitat previously proposed by NASA’s Mars Integration Group. In addition, these concepts were considered for a “shakedown” mission for the transit habitat hardware in cislunar space to build confidence in new systems, including the advanced environmental control and life support systems needed for Mars missions. The results presented include overall vehicle configurations, mass, and volume estimates for the selected design concepts. Two concepts using large expandable modules are identified as leading candidates for a Mars Transit Habitat and the remaining elements are identified as representative of the habitable pressure vessels needed for safe haven configurations, logistics modules, surface habitats, rovers, and descent and ascent crew cabins in the overall Mars Architecture.

Smitherman, David↗

Development Of 12 Kw Hall Thrusters for Nasa Lunar Gateway Power And Propulsion Element

NASA is embarking on a new and exciting era of human exploration to the Moon and its vicinity. As part of the Artemis program, NASA is developing the lunar Gateway, an orbiting platform in Near Rectilinear Halo Orbit (NRHO) about the Moon. The first two elements of the Gateway will be launched in 2024 and will be transferred from a high Earth orbit to the NRHO via the use of Solar Electric Propulsion (SEP). The SEP system is located on the Power and Propulsion Element (PPE) which will provide up to 60 kW of power. Aerojet Rocketdyne is developing the 12 kW flight Hall thrusters to be used for transferring the PPE and the Habitat and Logistics Outpost (HALO) module to NRHO. Work is continuing on the development testing, and these results will be described in the paper. The project has also recently completed its critical design review and is transitioning to the fabrication of the three flight thrusters. The 12 kW Hall thrusters are being developed under the NASA Advanced Electric Propulsion System (AEPS) program. As part of the AEPS program, AR built two Engineering Test Unit (ETU) Hall thrusters based on the NASA HERMeS engine and conducted a series of tests to validate the design. One series of tests focused on environments and functional testing, while the other series was mainly focused on long duration test blocks. Results from these tests were used to compare with NASA data from the HERMeS thruster. The comparison of the test results showed no change to the critical performance and lifetime parameters, which enabled the next phase of the program to proceed. Currently testing is continuing on the Engineering Development Units (EDU) as part of the flight qualification activities. The successful completion of the CDR serves as the starting point for the flight thruster fabrication, which is now underway to support the launch of the Gateway modules in 2024. The development and qualification of the AEPS 12 kW Hall thrusters is proceeding well. As the program completes CDR and transitions into flight builds of the three 12 kW Hall thrusters that will be used to transfer the combined PPE and HALO stack to the NRHO, the results of the development testing are reviewed in this presentation, and a status of the program and future plans is provided. The launch of the two Gateway modules and the transfer of this large payload to cislunar orbit will mark a significant milestone in electric propulsion, as it will demonstrate the ability of SEP to transfer very large payloads over great distances. This establishes the precedent that could lead to cargo transfers from the Earth to the Moon or even to Mars using SEP.

Hall thrusters↗

Solar Absorptivity Degradation of Spacecraft Materials Due to UV and Charged Particles in the Gateway Environment

Gateway will be an outpost in cislunar space designed to survive a 15-year mission to support human Moon landings and future deep space exploration. The Gateway Passive Thermal Control System (PTCS) Group has identified charged particle and UV degradation of potential Gateway materials as a knowledge gap for the Near Rectilinear Halo Orbit (NRHO) and transit environment, especially the slow spiral transit planned for the first two modules. Solar absorptivity degradation is important to quantify because the end-of-life absorptivity impacts thermal performance of the system. To address this, ground testing has been completed at NASA Goddard Space Flight Center in which potential Gateway materials, including radiators, multi-layer insulation (MLI), and structural materials are subjected to the expected transit plus 15-year on-orbit charged particle fluence (9.86x1015 protons/cm2 at 2.5 keV and 3.1x1016 electrons/cm2 at 10 keV) and 5093 Equivalent Solar Hours (ESH). Reflectivity of a single sample of each material was measured in atmosphere and in vacuum inside the chamber after exposure to incremental levels of ESH and charged particle fluence. Increase in absorptivity of most samples were seen throughout the test including large differences in absorptivity of materials of the same category. Future planned testing will validate these results and include additional materials of interest.

Optical Property↗

Gateway Program Safety and Mission Assurance Integration - The Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther from Earth, spacecraft designs must optimize mass and volume while minimizing human and spacecraft risk. To accomplish this, the Gateway Program Safety and Mission Assurance (S&MA) office develops, implements, and ensures compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability, and quality assurance. This paper will detail the evolution of the Gateway Program S&MA integration functions, and provide its current status and lessons learned for future human spaceflight programs.

Helen Vaccaro↗

Modeling of Gateway Environmental Control and Life Support Systems as A Means to Investigate the Subsystem and Integrated Architecture Performance

As Human spaceflight evolves and develops, the technology the crew relies on for life support must become more advanced than at any point in NASA’s history. Nowhere is this more apparent than the Gateway, where lessons learned from Mercury to ISS are being applied in the design and production of the life support systems. Some of these technological improvements are proven in flight configuration, or have a heritage of proven flight hardware, but many are of a lower technology readiness level. Due to the unpredictable nature of the metabolic byproducts (CO 2 , H 2 O, and heat), even the proven technologies can fail to meet requirements for crew safety. Detailed modeling of individual components excels in proving component level requirements are met, but fails to verify system or architecture level requirements. This paper expounds upon an effort to take a number of detailed component level models of the Gateway ECLSS and integrate them into a larger architecture model known as the Gateway Integrated ECLSS Model (GIEM). The GIEM is then used to study how the subsystems work synergistically to meet environmental requirements as well as investigate how changes at the component level effect the Gateway stack as a whole.

Modeling↗

The Miniaturized Electron Proton Telescope, MERiT onboard Lunar Gateway

The Lunar Gateway or the Gateway, part of NASA’s Artemis program, is a space station orbiting around the moon The cis-lunar Gateway platform provides the opportunity for Heliophysics investigations to advance our knowledge of the coupled Sun-Earth system and the opportunity better understand the radiation environment in order to support and improve crew safety and operations at the Moon and beyond. The Heliophysics Environmental and Radiation Measurement Experiment Suite (HERMES) is a suite of instruments place on the outside of the Habitation and Logistics Outpost ( HALO) monitor the Sun’s radiation environment and space weather. HERMES, led byNASA’s Goddard Space Flight Center, will monitor lower energy solar particles critical to scientific investigations of the Sun including the solar winds. Additional suite of instruments provided by ESA, the European Radiation Sensors Array (ERSA) will complement space weather studies. We report here on the energetic particle instrument, the Minaturized Electron Proton Telescope (MERiT) on board HERMES designed to measure electrons and protons in the energy range ~0.3-9. MeV and ~1-190 MeV in 11 and 20 differential energy channels respectively. MERiT is a solid state detector telescope with the two sensor heads:one looking sunward and the other anti-sunward. MERiT will help advance our understanding of solar energetic particles, low energy cosmic rays and energetic electrons in the magnetospheric tail. We will describe the instrument in details and the science topics it is expected to address. Lunar Gateway is currently expected to launch in 2024

Shri Kanekal↗

Gateway Integrated ECLSS Model Analysis of Intermodule Ventilation Failures

The Gateway Integrated ECLSS Model (GIEM) is a set of two independent models, made in Aspen Custom Modeler (ACM) and Thermal Desktop (TD), of the Gateway stack and each modules' associated environment control and life support system (ECLSS). The GIEM utilizes the 41-Node Metabolic Man (METMAN) to simulate crew inside the Gateway consuming O2 and producing CO2, H2O, and heat for the ECLSS to remove. The modules and visiting vehicles all have different levels of ECLSS capabilities and may rely on other modules and Intermodular Ventilation (IMV), which is used to exchange gas between the modules, to ensure the entire Gateway environment is controlled. If IMV were to fail or be turned off, some vehicles may have limited access to necessary ECLSS functions. This analysis focuses on evaluating O2, CO2, and H2O levels when crew are in vehicles without their own life support and IMV has failed to evaluate how long before the atmosphere is unsafe for the crew. This analysis uses the integrated nature of the GIEM to look at time to effect for O2 depletion and CO2 and H2O buildup when crew are working in vehicles that have been cut off from the ECLSS-active portion of the stack. This information is used to inform for how long crew can safely continue working in the ECLSS-inactive vehicles before experiencing a requirement violation or physical limitation and can be referenced when developing maintenance and emergency response concept of operations (ConOps).

Lawrence Barrett↗

Overview of the Lunar Gateway External Contamination Environment

As a part of the Artemis mission, Gateway will be a long duration space station in a near rectilinear halo orbit around the Moon. Gateway will be exposed to a variety of external contamination sources, which can degrade external hardware / surfaces and impact science utilization objectives. Requirements and methodologies addressing material outgassing, chemical and electric thruster plumes, vacuum venting, and visiting vehicle interactions have been developed by the Gateway Induced Environments team to ensure vehicle performance and mission success. The external contamination requirements and integration process are described along with required data deliverables. Integrated external contamination analyses are conducted by the Gateway Environments Team to assess compliance with external contamination requirements. This paper provides a current status of integration activities and analysis results, as well as future plans to improve external contamination characterization.

Crystal A. Quiroz↗

Overview of the Lunar Gateway External Contamination Environment

As a part of the Artemis mission, Gateway will be a long duration space station in a near rectilinear halo orbit around the Moon. Gateway will be exposed to a variety of external contamination sources, which can degrade external hardware / surfaces and impact science utilization objectives. Requirements and methodologies addressing material outgassing, chemical and electric thruster plumes, vacuum venting, and visiting vehicle interactions have been developed by the Gateway Induced Environments team to ensure vehicle performance and mission success. The external contamination requirements and integration process are described along with required data deliverables. Integrated external contamination analyses are conducted by the Gateway Environments Team to assess compliance with external contamination requirements. This paper provides a current status of integration activities and analysis results, as well as future plans to improve external contamination characterization.

Crystal A Quiroz↗

Investigation of Radiological Contamination at Parks in the Gateway National Recreation Area - 20350

In 2005, the National Park Service was notified that elevated radiation levels were detected at Great Kills Park during a baseline radiological mapping effort conducted by the Counter Terrorism Bureau of the New York City Police Department and the United States Department of Energy. Great Kills Park is in the Staten Island Unit of the Gateway National Recreation Area. A records search determined that approximately 280 acres of the park was established over an area in which the New York City Department of Sanitation placed approximately 15.1 million cubic yards of waste fill from 1944 to 1948. Since 2005, a series of response actions and investigations were conducted on behalf of the National Park Service to mitigate risk to human health and the environment and to determine the nature of radiological contamination at Great Kills Park. The findings support that radiological contamination is related to certain components of waste fill, including incinerator residue from both on and offsite incinerators, coal ash from the historical use of coal-fired boilers for heating, and incidental radiological artifacts in the waste fill due to their historical use and subsequent disposal. A majority of the radiological artifacts were determined to contain radium-226 and included radioluminescent markers, radium impregnated switch board buttons, radium paint containers, and brachytherapy devices. The National Park Service has several other Parks in the Gateway National Recreation Area that were established in areas with a similar history to Great Kills Park, and overlie waste fill historically placed during landfilling operations, including Spring Creek Park and Dead Horse Bay. Over the last year, the National Park Service has performed additional radiological investigations at Great Kills Park as part of the ongoing Remedial Investigation under the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, preliminary radiological investigations were performed at Spring Creek Park and Dead Horse Bay Park in the Jamaica Bay Unit of Gateway National Recreation Area. These investigation activities identified gamma radiation levels above the ambient level, several of which were attributable to radiological artifacts similar in nature to those recovered at Great Kills Park. Ongoing investigations at Parks in the Gateway National Recreation Area support an association between radiological contamination and historical landfilling practices that were common prior to the regulation and control of radioactive materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building a Single Sign-On System for the Department of Homeland Security's Infrastructure Protection Gateway

The IP Gateway is an interface used by the Department of Homeland Security to collect and manage infrastructure information about communities across the nation. DHS currently depends on a third-party to manage the login system of the IP Gateway; however, in order to provide more consistent service to IP Gateway users, they contracted with INL to develop a new single sign-on system.

99 GENERAL AND MISCELLANEOUS↗

Power and Propulsion Element for Gateway

NASA is taking on the bold objective of returning humans to the Moon by 2024. As part of this effort, the Gateway is being constructed to serve as a command center and way-point in cis-lunar space for lunar exploration missions. The Power and Propulsion Element (PPE) is the first element of Gateway to be launched and will generate all the power and propulsion required over its 15-year service life. To achieve these goals, high-power solar arrays and solar electric propulsion will be implemented and demonstrated. The electrical power system (EPS) of Gateway, prominently featuring lightweight Roll Out Solar Arrays (ROSA) with state-of-the-art Z4J solar cells and a central hinge, will be sized for an end-of-life (EOL) power management and distribution capability of over 55 kilowatts (kW). The solar array circuits are being designed in a modular manner with scalability and extensibility to a 300 kW-class mission. NASA Glenn Research Center is managing the PPE contract on which Maxar Technologies, Inc. is responsible for fabricating and demonstrating the spacecraft. This manuscript provides a summary of the electrical power system, with additional discussion of the ROSA power generation.

Gateway↗

Advanced Electric Propulsion System (AEPS) Enabling a Sustainable Return to the Lunar Surface through NASA Gateway

NASA continues to evolve a human exploration approach for beyond low-Earth orbit. The center of this approach is NASA’s Gateway that is envisioned to provide a maneuverable outpost in lunar orbit to extend human presence in deep space and expand on NASA exploration goals. The Gateway represents the initial step in NASA’s architecture for human cislunar operations, lunar surface access and missions to Mars. NASA announced at the May 2020 NASA Advisory Council’s Human Explorations and Operations Committee a new plan that calls for launching the first two elements of Gateway as a co-manifested mission in the late 2023 timeframe [2]. Launching the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) together reduces mission risk, utilizes the PPE high-powered Electric Propulsion (EP) system to transport both elements to the lunar orbit, and reduces overall cost. NASA and Maxar Technologies have a commercial partnership to develop and demonstration a high-powered Solar Electric Propulsion (SEP) spacecraft [3, 4]. The PPE is baselined to include three 12.5-kW Advanced Electric Propulsion Systems (AEPS) and four 6-kW Hall thrusters, currently under development by Maxar, for a total beginning of life propulsion power of over 48-kW [5]. High-power solar electric propulsion is one of the key technologies that has been prioritized because of its significant exploration benefits, specifically, for missions beyond low Earth orbit. Spacecraft size and mass are currently dominated by onboard chemical propulsion systems and propellants that may constitute more than 50 percent of spacecraft mass. This impact can be substantially reduced through the utilization of SEP, due to its higher specific impulse and lower propellant load required to meet the equivalent mission delta-V. Studies performed for NASA’s HEOMD and Science Mission Directorate (SMD) have demonstrated that 40-kW-class SEP provides the necessary capabilities that would enable near term and future architectures, and science missions [6]. Accordingly, NASA has been developing a 12 kW Hall thruster electric propulsion thruster that can serve as the building block for a 40-kW-class SEP capability. The AEPS development, led by the NASA Glenn Research Center (GRC) and the Jet Propulsion Laboratory (JPL), began with the maturation of the high-power Hall thruster. The technology development work has transitioned to AR via a competitive procurement selection for the AEPS contract in May 2016. Management of the AEPS contract is being led by NASA GRC with funding from NASA’s Science Technology Mission Directorate (STMD) under the Technology Demonstration Missions (TDM) program. NASA continues to support the AEPS development leveraging in-house expertise, plasma modeling capability, and world-class test facilities.

AEPS↗

Attitude Profile Reference for the Earth Orbit Raising Phase of NASA Gateway’s Co-Manifested Vehicle

As part of NASAs lunar exploration Artemis program, the agency is designing a Gateway to orbit8near the moon and provide long term support of a sustained lunar presence at the moon’s south pole.9The first element launched for the Gateway is the Co-Manifested Vehicle (CMV), comprised of the10Power and Propulsion Element (PPE) and Habitation and Lunar Outpost (HALO). The PPE Mission11Design team of McGuire & et. al (2021) has developed a Design Reference Mission (DRM) trajectory12for CMV’s Earth Orbit Raising (EOR) mission phase, which provides the vehicle’s 3 degrees of freedom13(DoF) trajectory information during the approximately yearlong spiral out from low Earth orbit and14into the lunar near-rectilinear halo orbit (NRHO). In tandem, the PPE GN&C team is developing a15high-fidelity and fine temporal resolution 6DoF model of the CMV spacecrafts GN&C performance16for delivery to the Gateway team; this work acts to bridge the gap between Mission Designs 3DoF17reference and detailed GN&Cs attitude simulation.

Guidance Navigation and Control↗