Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “environmental requirements program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Lawrence Livermore National Laboratory Environmental Report 2021

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2021 are to record Lawrence Livermore National Laboratory’s (LLNL’s) compliance with environmental standards and requirements, describe LLNL’s environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites—the Livermore Site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL’s Environmental Functional Area. Submittal of the report satisfies requirements under DOE Order 231.1B, “Environment, Safety and Health Reporting,” and DOE Order 458.1, “Radiation Protection of the Public and Environment.” The report is distributed electronically and is available at https://saer.llnl.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning with 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website. Sampling location maps throughout this report were created using ArcGIS® software by Esri. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL’s compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL’s compliance with environmental regulations; and Chapter 3 is a description of LLNL’s environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL’s environmental monitoring programs and monitoring data for 2021: effluent and ambient air monitoring and dose assessment (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). The remaining two chapters discuss LLNL’s groundwater remediation program (Chapter 7), and quality assurance for the environmental monitoring programs (Chapter 8). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The report uses Système International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, “Metric Usage in Federal Government Programs” (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary. The report is the responsibility of LLNL’s Environmental Functional Area. Monitoring data were obtained through the combined efforts of the Environmental Functional Area; Environmental Restoration Department; Physical and Life Sciences Environmental Monitoring Radiological Laboratory; and the Radiation Protection Functional Area.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Directed Research and Development FY-2009

The FY 2009 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support the future DOE missions and national research priorities. LDRD is essential to the INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enhances technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development. Established by Congress in 1991, LDRD proves its benefit each year through new programs, intellectual property, patents, copyrights, publications, national and international awards, and new hires from the universities and industry, which helps refresh the scientific and engineering workforce. The benefits of INL's LDRD research are many as shown in the tables below. Last year, 91 faculty members from various universities contributed to LDRD research, along with 7 post docs and 64 students. Of the total invention disclosures submitted in FY 2009, 7 are attributable to LDRD research. Sixty three refereed journal articles were accepted or published, and 93 invited presentations were attributable to LDRD research conducted in FY 2009. The LDRD Program is administered in accordance with requirements set in DOE Order 413.2B, accompanying contractor requirements, and other DOE and federal requirements invoked through the INL contract. The LDRD Program is implemented in accordance with the annual INL LDRD Program Plan, which is approved by the DOE, Nuclear Energy Program Secretarial Office. This plan outlines the method the laboratory uses to develop its research portfolio, including peer and management reviews, and the use of other INL management systems to ensure quality, financial, safety, security and environmental requirements and risks are appropriately handled. The LDRD Program is assessed annually for both output and process efficiency to ensure the investment is providing expected returns on technical capability enhancement. The call for proposals and project selection process for the INL LDRD program begins typically in April, with preliminary budget allocations, and submittal of the technical requests for preproposals. A call for preproposals is made at this time as well, and the preparation of full proposals follows in June and closes in July. The technical and management review follows this, and the portfolio is submitted for DOE-ID concurrence in early September. Project initiation is in early October. The technical review process is independent of, and in addition to the management review. These review processes are very stringent and comprehensive, ensuring technical viability and suitable technical risk are encompassed within each project that is selected for funding. Each proposal is reviewed by two or three anonymous technical peers, and the reviews are consolidated into a cohesive commentary of the overall research based on criteria published in the call for proposals. A grade is assigned to the technical review and the review comments and grade are released back to the principal investigators and the managers interested in funding the proposals. Management criteria are published in the call for proposals, and management comments and selection results are available for principal investigator and other interested management as appropriate. The DOE Idaho Operations Office performs a final review and concurs on each project prior to project authorization, and on major scope/budget changes should they occur during the project's implementation. This report begins with several research highlights that exemplify the diversity of scientific and engineering research performed at the INL in FY 2009. Progress summaries for all projects are organized into sections reflecting the major areas of research focus at the INL. These sections begin with the DOE-NE Nuclear Science and Technology mission support area, followed by the National and Homeland Security and the Energy and Environmental Science and Technology areas. The major INL initiatives and the INL's Distinctive Signatures areas complete the project summaries. The appendices provide information on project relevance to DOE missions and major national programs as well as an author index, list of refereed publications and index of key terms.

99 GENERAL AND MISCELLANEOUS↗

Interactive Visualizations for Communicating Compliance and Sustainability Statements in Annual Site Environmental Reports - 20419

The annual reports of organizations are a recurring type of public disclosure that communicates what an organization has done and/or plans to do. Worldwide, organizations use annual reports as powerful instruments for communication that is rich in narrative content and visuals. From the perspective of the leadership of an organization, statutory annual reports are communication devices to stakeholders. By analogy, from the perspective of stakeholders, the annual reports are learning devices that presents stakeholders with contents to generate knowledge about an organization. We have chosen the online accessible U.S. Department of Energy (DOE) Annual Site Environmental Reports (ASERs) as a collection of resources for communicating and learning the environmental management strategies on environmental compliance and environmental sustainability. Environmental Compliance 'consists of regulatory compliance and monitoring programs that implement federal, state, and local requirements, agreements, and permits.' Environmental Sustainability 'promotes and integrates initiatives such as energy and natural resource conservation, waste minimization, green remediation, and the use of sustainable products and services.' Interactive visualizations of textual data designed with visual analytics software can allow stakeholders to interact with statements on the environmental management strategies by performing diverse actions that promote learning. These actions include annotating, comparing, filtering, navigating, selecting and sharing relevant statements. We expect that the possibility of these multiple actions in an interactive manner help stakeholders to learn more effectively about the environmental strategies at U.S. DOE sites. The current case study for the project is a collection of 1,894 annotated (value-added) statements (sentence text) from the eight chapters of the 2017 Savanah River Site (SRS) annual site environmental report. The preliminary interactive visualizations are available online. (authors)

54 ENVIRONMENTAL SCIENCES↗

Ecological Impacts of the Space Shuttle Program at John F. Kennedy Space Center, Florida

The Space Shuttle Program was one of NASAs first major undertakings to fall under the environmental impact analysis and documentation requirements of the National Environmental Policy Act of 1969 (NEPA). Space Shuttle Program activities at John F. Kennedy Space Center (KSC) and the associated Merritt Island National Wildlife Refuge (MINWR) contributed directly and indirectly to both negative and positive ecological trends in the region through the long-term, stable expenditure of resources over the 40 year program life cycle. These expenditures provided support to regional growth and development in conjunction with other sources that altered land use patterns, eliminated and modified habitats, and contributed to cultural eutrophication of the Indian River Lagoon. At KSC, most Space Shuttle Program related actions were conducted in previously developed facilities and industrial areas with the exception of the construction of the shuttle landing facility (SLF) and the space station processing facility (SSPF). Launch and operations impacts were minimal as a result of the low annual launch rate. The majority of concerns identified during the NEPA process such as potential weather modification, acid rain off site, and local climate change did not occur. Launch impacts from deposition of HCl and particulates were assimilated as a result of the high buffering capacity of the system and low launch and loading rates. Metals deposition from exhaust deposition did not display acute impacts. Sub-lethal effects are being investigated as part of the Resource Conservation and Recovery Act (RCRA) regulatory process. Major positive Space Shuttle Program effects were derived from the adequate resources available at the Center to implement the numerous environmental laws and regulations designed to enhance the quality of the environment and minimize impacts from human activities. This included reduced discharges of domestic and industrial wastewater, creation of stormwater management systems, remediation of past contamination sites, implementation of hazardous waste management systems, and creation of a culture of sustainability. Working with partners such as the USFWS and the St Johns River Water Management District (SJRWMD), wetlands and scrub restoration and management initiatives were implemented to enhance fish and wildlife populations at the Center. KSC remains the single largest preserve on the east coast of Florida in part due to NASAs commitment to stewardship. Ongoing Ecological Program projects are directed at development of information and knowledge to address future KSC management questions including the transition to a joint government and commercial launch facility, enhanced habitat management requirements for wetlands and scrub, potential impacts of emerging contaminants, and adaptation to climate change including projected sea level rise over the next 50-75 years.

Space Shuttle Program↗

Savannah River Site Environmental Report for 2011

The Savannah River Site Environmental Report for 2011 (SRNS-STI-2012-00200) is an overview of effluent monitoring and environmental surveillance activities conducted on and in the vicinity of SRS from January 1 through December 31, 2011 - including the Site’s performance against applicable standards and requirements. Details are provided on major programs such as the Environmental Management System (EMS) and permit compliance. Information for the 2011 report was compiled and prepared by the Environmental Compliance and Area Completion Projects (EC&ACP) Department of Savannah River Nuclear Solutions LLC (SRNS), the Site’s Management and Operations (M&O) contractor. The “Environmental Monitoring Program Management Plan” (SRS EM Plan, 2010) documents 1) the rationale and objectives for the monitoring program, 2) the frequency of monitoring and analysis, 3) the various sampling locations, and 4) the specific analytical and sampling protocols used. The “Environmental Monitoring Quality Assurance Project Plan” (SRS EM QA Plan, 2010) describes the associated quality assurance requirements.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Environmental Report 2014

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2014 are to record Lawrence Livermore National Laboratory’s (LLNL’s) compliance with environmental standards and requirements, describe LLNL’s environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites—the Livermore Site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL’s Environmental Functional Area. Submittal of the report satisfies requirements under DOE Order 231.1B, “Environment, Safety and Health Reporting,” and DOE Order 458.1, “Radiation Protection of the Public and Environment.”

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Environmental Report 2015

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2015 are to record Lawrence Livermore National Laboratory’s (LLNL’s) compliance with environmental standards and requirements, describe LLNL’s environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites—the Livermore Site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL’s Environmental Functional Area. Submittal of the report satisfies requirements under DOE Order 231.1B, “Environment, Safety and Health Reporting,” and DOE Order 458.1, “Radiation Protection of the Public and Environment.”

54 ENVIRONMENTAL SCIENCES↗

2017 Site Annual Environmental Report

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2017 are to record Lawrence Livermore National Laboratory’s (LLNL’s) compliance with environmental standards and requirements, describe LLNL’s environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites— the Livermore Site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL’s Environmental Functional Area. Submittal of the report satisfies requirements under DOE Order 231.1B, “ Environment, Safety and Health Reporting,” and DOE Order 458.1, “Radiation Protection of the Public and Environment.”

54 ENVIRONMENTAL SCIENCES↗

Education and Training in Radiochemistry – The NAMP Initiative

In 2009, the nuclear industry employed approximately 120,000 people. Nearly 38 percent of the nuclear industry force will be eligible to retire within the next five years. To maintain the current work force, the industry will need to hire approximately 25,000 more workers by 2015. Given that the current radiochemistry workforce is approaching the age for retirement and that a limited number of US universities provide experience with radiochemistry, the United States is faced with a growing demand for the education and training of scientists in the radiochemistry arena. Furthermore, it is critical that the US maintains global leadership in the next generation of safe nuclear energy technology from both a national security and environmental perspective. This will require a robust program that focuses entirely on educating and training the next generation of radiochemists in subjects such as 1- radioanalysis of actinides and radioelements not only in the environment but in medium pertinent to the back end of the nuclear fuel cycle, 2- speciation of radionuclides, 3- detection methods, 4- safeguards etc… Therefore, the National Analytical Management Program (NAMP) has organized a subcommittee focusing on training and education in radiochemistry. Through the efforts of this subcommittee, NAMP has established collaborative associations to foster the exchange of scientific and technical information with professors in radiochemistry programs at different universities. This paper will present our accomplishments and the development of a curriculum for an intermediate radiochemistry course in cooperation with the EPA. These short (2-hour) webinar presentations on specific radiochemistry topics have been developed and will be presented. The webinars are recorded and will become a library or collection of information for on-line access from the NAMP website.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Uncertainty quantification in ToxCast high throughput screening

High throughput screening (HTS) projects like the U.S. Environmental Protection Agency’s ToxCast program are required to address the large and rapidly increasing number of chemicals for which we have little to no toxicity measurements. Concentration-response parameters such as potency and efficacy are extracted from HTS data using nonlinear regression, and models and analyses built from these parameters are used to predict in vivo and in vitro toxicity of thousands of chemicals. How these predictions are impacted by uncertainties that stem from parameter estimation and propagated through the models and analyses has not been well explored. While data size and complexity makes uncertainty quantification computationally expensive for HTS datasets, continued advancements in computational resources have allowed these computational challenges to be met. This study uses nonparametric bootstrap resampling to calculate uncertainties in concentration-response parameters from a variety of HTS assays. Using the ToxCast estrogen receptor model for bioactivity as a case study, we highlight how these uncertainties can be propagated through models to quantify the uncertainty in model outputs. Uncertainty quantification in model outputs is used to identify potential false positives and false negatives and to determine the distribution of model values around semi-arbitrary activity cutoffs, increasing confidence in model predictions. At the individual chemical-assay level, curves with high variability are flagged for manual inspection or retesting, focusing subject-matter-expert time on results that need further input. This work improves the confidence of predictions made using HTS data, increasing the ability to use this data in risk assessment.

59 BASIC BIOLOGICAL SCIENCES↗

A study of total space life performance of GSFC spacecraft

The space life performance of 57 Goddard Space Flight Center spacecraft is given. The time distribution of 449 malfunctions, of which 248 were classified as failures, is presented. Test data were available for 39 of the spacecraft and permitted a comparison of system test performance with the first-day, first-month, and total space life performance. The failures per spacecraft for the system environmental tests and the three time periods in space were 12, 0.9, 1.7, and 5.0, respectively. Relevance of the data to the pre-shuttle and shuttle eras is discussed. Classifications of failures by type of device and spacecraft subsystem are included. A continuation of the Goddard philosophy of requiring a system-level environmental test program is justified.

Timmins, A. R.↗

Environmental qualification testing of terrestrial solar cell modules

The placement of solar cell modules in various climates and locations throughout the world results in different degrees and combinations of environmental stresses. Coupled with a design lifetime goal of 20 years, early detection and correction of module design deficiencies can result in significantly better long-term economics. This paper describes an environmental test research program for developing qualification requirements and procedures for flat-plate solar cell modules. A multiple iterative approach for establishing and evaluating test requirements is discussed as well as the rationale for the selection of levels and durations for the current qualification tests. The status of study efforts involving optical surface soiling, encapsulation delamination, and voltage bias-humidity testing is reviewed.

Hoffman, A. R.↗

General Environmental Verification Specification

The NASA Goddard Space Flight Center s General Environmental Verification Specification (GEVS) for STS and ELV Payloads, Subsystems, and Components is currently being revised based on lessons learned from GSFC engineering and flight assurance. The GEVS has been used by Goddard flight projects for the past 17 years as a baseline from which to tailor their environmental test programs. A summary of the requirements and updates are presented along with the rationale behind the changes. The major test areas covered by the GEVS include mechanical, thermal, and EMC, as well as more general requirements for planning, tracking of the verification programs.

Milne, J. Scott, Jr.↗

Mars Exploration Rover Mission: Entry, Descent, and Landing System Validation

System validation for a Mars entry, descent, and landing system is not simply a demonstration that the electrical system functions in the associated environments. The function of this system is its interaction with the atmospheric and surface environment. Thus, in addition to traditional test-bed, hardware-in-the-loop, testing, a validation program that confirms the environmental interaction is required. Unfortunately, it is not possible to conduct a meaningful end-to-end test of a Mars landing system on Earth. The validation plan must be constructed from an interconnected combination of simulation, analysis and test. For the Mars Exploration Rover mission, this combination of activities and the logic of how they combined to the system's validation was explicitly stated, reviewed, and tracked as part of the development plan.

system validation↗

Magnetic Testing, and Modeling, Simulation and Analysis for Space Applications

The Aerospace Corporation (Aerospace) and Lockheed Martin Space Systems (LMSS) participated with Jet Propulsion Laboratory (JPL) in the implementation of a magnetic cleanliness program of the NASA/JPL JUNO mission. The magnetic cleanliness program was applied from early flight system development up through system level environmental testing. The JUNO magnetic cleanliness program required setting-up a specialized magnetic test facility at Lockheed Martin Space Systems for testing the flight system and a testing program with facility for testing system parts and subsystems at JPL. The magnetic modeling, simulation and analysis capability was set up and performed by Aerospace to provide qualitative and quantitative magnetic assessments of the magnetic parts, components, and subsystems prior to or in lieu of magnetic tests. Because of the sensitive nature of the fields and particles scientific measurements being conducted by the JUNO space mission to Jupiter, the imposition of stringent magnetic control specifications required a magnetic control program to ensure that the spacecraft's science magnetometers and plasma wave search coil were not magnetically contaminated by flight system magnetic interferences. With Aerospace's magnetic modeling, simulation and analysis and JPL's system modeling and testing approach, and LMSS's test support, the project achieved a cost effective approach to achieving a magnetically clean spacecraft. This paper presents lessons learned from the JUNO magnetic testing approach and Aerospace's modeling, simulation and analysis activities used to solve problems such as remnant magnetization, performance of hard and soft magnetic materials within the targeted space system in applied external magnetic fields.

magnetics↗

NASA Collaborative Approach Mitigates Environmentally-Driven Obsolescence

National Aeronautics and Space Administration (NASA) missions, like Department of Defense (DoD) organizations, require the rigorous testing and qualification of critical materials. Obsolescence supply risks created by environmental requirements can affect the cost, schedule and performance of NASA missions and the resilience of critical infrastructure. The NASA Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center helps to identify obsolescence supply risks driven by environmental requirements and works proactively with NASA Centers and Programs, the DoD, the European Space Agency (ESA) and other agencies and partners to identify and evaluate environmentally friendly alternatives. TEERM tracks environmental regulations, identifies the potential loss of material availability and works with NASA programs and Centers to evaluate potential impacts through a risk assessment approach. TEERM collaborative projects identify, demonstrate and evaluate commercially viable alternative technologies and materials. A major focus during the Space Shuttle Program was the need to replace ozone depleting substances that were used in spray foam and cleaning applications. The potential obsolescence of coatings containing hexavalent chromium and the risks associated with lead free solder were also of concern for the Space Shuttle and present ongoing risks to new programs such as the Space Launch System. One current project teams NASA and ESA in the evaluation and testing of individual coatings and coating systems as replacements for hexavalent chromium coatings in aerospace applications. The proactive, collaborative approach used by TEERM helps reduce the cost burden on any one team partner, reduces duplication of effort, and enhances the technical quality and overall applicability of the testing and analysis.

environmentall-driven obsolescence↗

Major weapon system environmental life-cycle cost estimating for Conservation, Cleanup, Compliance and Pollution Prevention (C3P2)

The Titan 4 Space Launch Vehicle Program is one of many major weapon system programs that have modified acquisition plans and operational procedures to meet new, stringent environmental rules and regulations. The Environmental Protection Agency (EPA) and the Department of Defense (DOD) mandate to reduce the use of ozone depleting chemicals (ODC's) is just one of the regulatory changes that has affected the program. In the last few years, public environmental awareness, coupled with stricter environmental regulations, has created the need for DOD to produce environmental life-cycle cost estimates (ELCCE) for every major weapon system acquisition program. The environmental impact of the weapon system must be assessed and budgeted, considering all costs, from cradle to grave. The Office of the Secretary of Defense (OSD) has proposed that organizations consider Conservation, Cleanup, Compliance and Pollution Prevention (C(sup 3)P(sup 2)) issues associated with each acquisition program to assess life-cycle impacts and costs. The Air Force selected the Titan 4 system as the pilot program for estimating life-cycle environmental costs. The estimating task required participants to develop an ELCCE methodology, collect data to test the methodology and produce a credible cost estimate within the DOD C(sup 3)P(sup 2) definition. The estimating methodology included using the Program Office weapon system description and work breakdown structure together with operational site and manufacturing plant visits to identify environmental cost drivers. The results of the Titan IV ELCCE process are discussed and expanded to demonstrate how they can be applied to satisfy any life-cycle environmental cost estimating requirement.

Hammond, Wesley↗

Status of NASA High-Speed Research Program

This paper provides an overview of the NASA High-Speed Research (HSR) Program dedicated to establishing the technology foundation to support the US transport industry's decision for an environmentally acceptable, economically viable 300 passenger, 5000 n.mi., Mach 2.4 aircraft. The HSR program, begun in 1990, is supported by a team of US aerospace companies. The international economic stakes are high. The projected market for more than 500 High-Speed Civil Transport (HSCT) airplanes introduced between the years 2000 and 2015 translates to more than $200 billion in aircraft sales, and the potential of 140,000 new jobs. The paper addresses the history of supersonic commercial air transportation beginning with the Concorde and TU-144 developments in the early 1960 time period. The technology goals for the HSR program are derived from market study results, projections on environmental requirements, and technical goals for each discipline area referenced to the design and operational features of the Concorde. Progress since the inception of the program is reviewed and a summary of some of the lessons learned will be highlighted. An outline is presented of the remaining technological challenges. Emphasis in this paper will be on the traditional aeronautical technologies that lead to higher performance to ensure economic viability. Specific discussion will center around aerodynamic performance, flight deck research, materials and structures development and propulsion systems. The environmental barriers to the HSCT and that part of the HSR program that addresses those technologies are reviewed and assessed in a companion paper.

Allen H Whitehead Jr↗