Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “engineering process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Adaptive laboratory evolution and genetic engineering improved terephthalate utilization in Pseudomonas putida KT2440

Poly(ethylene terephthalate) (PET) is one of the most ubiquitous plastics and can be depolymerized through biological and chemo-catalytic routes to its constituent monomers, terephthalic acid (TPA) and ethylene glycol (EG). TPA and EG can be re-synthesized into PET for closed-loop recycling or microbially converted into higher-value products for open-loop recycling. Here, in this study, we expand on our previous efforts engineering and applying Pseudomonas putida KT2440 for PET conversion by employing adaptive laboratory evolution (ALE) to improve TPA catabolism. Three P. putida strains with varying degrees of metabolic engineering for EG catabolism underwent an automation-enabled ALE campaign on TPA, a TPA and EG mixture, and glucose as a control. ALE increased the growth rate on TPA and TPA-EG mixtures by 4.1- and 3.5-fold, respectively, in approximately 350 generations. Evolved isolates were collected at the midpoints and endpoints of 39 independent ALE experiments, and growth rates were increased by 0.15 and 0.20 h -1 on TPA and a TPA-EG, respectively, in the best performing isolates. Whole-genome re-sequencing identified multiple converged mutations, including loss-of-function mutations to global regulators gacS, gacA, and turA along with large duplication and intergenic deletion events that impacted the heterologously-expressed tphAB II catabolic genes. Reverse engineering of these targets confirmed causality, and a strain with all three regulators deleted and second copies of tphAB II and tpaK displayed improved TPA utilization compared to the base strain. Taken together, an iterative strain engineering process involving heterologous pathway engineering, ALE, whole genome sequencing, and genome editing identified five genetic interventions that improve P. putida growth on TPA, aimed at developing enhanced whole-cell biocatalysts for PET upcycling.

36 MATERIALS SCIENCE↗

Remote Sensing System (Engineering Change Proposal (ECP) 2)

The primary technical objective of this CRADA was for Sandia National Laboratories (SNL) and Northrop Grumman Systems Corporation, acting through Northrop Grumman Aerospace Systems (NGAS), to collaborate, as needed, to inform a Remote Sensing System (RSS) development, led by the NGAS CRADA partner, through its System Design Review (SDR) and subsequent Program Design Review (PDR) milestones. More specifically, tasks and deliverables involved SNL and NGAS collaborating in seven broad areas: System Engineering, System Modeling and Simulation, System and Component Design, Assessment and Implementation, System Integration and Testing, Data Path Design and Engineering and Collection Segment Processing Engineering and Implementation. The collaboration between SNL and NGAS has resulted in a benefit to both organizations, and the public/taxpayers, by ensuring that legacy knowledge is not lost to future developments and will be incorporated into ongoing and future U.S. sensor systems.

47 OTHER INSTRUMENTATION↗

Recent Advances of PyROS: A Pyomo Solver for Nonconvex Two-Stage Robust Optimization in Process Systems Engineering

This poster highlights uncertainty and technical risk reduction capabilities in CCSI2, with a focus on robust optimization. It presents recent advances of the two-stage robust optimization (RO) solver PyROS and applications to advanced energy systems optimization. To demonstrate the computational performance and reliability of PyROS, a benchmarking study on a library of over 8,500 small-scale RO problems is presented. Further, PyROS is used to obtain robust system designs of a MEA-based CO2 absorber under uncertainty in the thermodynamic property models for a variety of CO2 capture rate threshold requirements. Overall, the results demonstrate that the PyROS solver, including recent extensions to multi-stage RO settings, provides a reliable avenue to optimize the design and operation of advanced energy systems subject to various sources of parametric uncertainty.

Sherman, Jason↗

Recent Advances of PyROS: A Pyomo Solver for Nonconvex Two-Stage Robust Optimization in Process Systems Engineering

This poster highlights uncertainty and technical risk reduction capabilities in CCSI2, with a focus on robust optimization. It presents recent advances of the two-stage robust optimization (RO) solver PyROS and applications to advanced energy systems optimization. To demonstrate the computational performance and reliability of PyROS, a benchmarking study on a library of over 8,500 small-scale RO problems is presented. Further, PyROS is used to obtain robust system designs of a MEA-based CO2 absorber under uncertainty in the thermodynamic property models for a variety of CO2 capture rate threshold requirements. Overall, the results demonstrate that the PyROS solver, including recent extensions to multi-stage RO settings, provides a reliable avenue to optimize the design and operation of advanced energy systems subject to various sources of parametric uncertainty.

Sherman, Jason↗

Process systems engineering enables efficient and sustainable membrane-based critical material separations

This presentation summarizes work completed over the past year for PrOMMiS Task 2.1. The first half of the preseation motivates the need to develop sustainable critical mineral separation technology, and how PSE is particularly well-suited to tackle this problem. The second half of the presentation presents preliminary results for the custom cost model for diafiltration (2.1) using the superstructure flowsheet developed by Carnegie Mellon University. The presentation serves to emphasize the multi-disciplinary and collaborate nature of developing a circular economy of critical minerals and materials.

Dougher, Molly↗

A Novel Integrated Fermentation Process with Engineered Microbial Consortia for Butanol Production from Lignocellulose Sugars without CO 2 Emission

The goal of this project was to develop a synthetic microbial consortium consisting of a lactic acid bacterium, a carboxydotrophic acetogen, and a solventogenic clostridia for the production of n butanol, an advanced biofuel and industrial chemical, from lignocellulose sugars (mainly glucose and xylose) and formate (produced from CO 2 by electrochemical reduction) in an integrated bioprocess (biorefinery), which can provide an effective solution to the technical challenges in developing energy and carbon optimized synthesis for the bioeconomy and achieve the program objectives of ARPA-E. The project focused on the design, modeling and construction of synthetic microbial consortia consisting of three bacterial species to maximize carbon conversion and butanol production with a 100% theoretical product yield from glucose and zero or negative CO 2 emission.

09 BIOMASS FUELS↗

Feature Engineering and Process Mining to Enable Hazard Detection in Health Information Technology

Motivation for this work originates from a recognized need for developing data-driven approaches through analysis of complex electronic health records. Specifically, we aim to enhance the reliability of health information technology (HIT) systems by detection of plausible HIT hazards in clinical order transactions. In the absence of well-defined event logs in corporate data warehouses, our proposed approach identifies relevant timestamped data fields that could indicate transactions in the clinical order life cycle generating raw event sequences. Subsequently, we adopt state transitions of the OASIS Human Task standard to map the raw event sequences and simplify the complex process that clinical radiology orders go through. We describe how the current approach provides the potential to investigate areas of improvement and potential hazards in HIT systems. The discussion concludes with a use case and opportunities for future applications.

Ozmen, Ozgur↗

Safety-Related Instrumentation and Control Upgrade Pilot Project: NUREG- 0711 Process Development, Planning and Analysis Activities, and Lessons Learned

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper presents the development execution of the HFE Program through completion of the Planning and Analysis Phase as defined by NUREG-0711 as well as HFE lessons learned.

99 GENERAL AND MISCELLANEOUS↗

Broadening a SARS-CoV-1–neutralizing antibody for potent SARS-CoV-2 neutralization through directed evolution

The emergence of severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2) underscores the need for strategies to rapidly develop neutralizing monoclonal antibodies that can function as prophylactic and therapeutic agents and to help guide vaccine design. Here, we demonstrate that engineering approaches can be used to refocus an existing antibody that neutralizes one virus but not a related virus. Through a rapid affinity maturation strategy, we engineered CR3022, a SARS-CoV-1–neutralizing antibody, to bind to the receptor binding domain of SARS-CoV-2 with >1000-fold increased affinity. The engineered CR3022 neutralized SARS-CoV-2 and provided prophylactic protection from viral challenge in a small animal model of SARS-CoV-2 infection. Deep sequencing throughout the engineering process paired with crystallographic analysis of engineered CR3022 elucidated the molecular mechanisms by which the antibody can accommodate sequence differences in the epitopes between SARS-CoV-1 and SARS-CoV-2. This workflow provides a blueprint for the rapid broadening of neutralization of an antibody from one virus to closely related but resistant viruses.

Biochemistry & Molecular Biology↗

Materials for Advanced Ultrasupercritical Steam Turbines Task 4: Cast Superalloy Development

The Steam Turbine critical stationary structural components are high integrity Large Shell and Valve Casing heavy section Castings, containing high temperature steam under high pressures. Hence to support the development of advanced materials technology for use in an AUSC steam turbine capable of operating with steam conditions of 760°C (1400°F) and 35 Mpa (5000 psia), Casting alloy selection and evaluation of mechanical, metallurgical properties and castability with robust manufacturing methods are mandated. Alloy down select from Phase 1 based on producability criteria and creep rupture properties tested by NETL-Albany and ORNL directed the consortium to investigate cast properties of Haynes 282 and Haynes 263. The goals of Task 4 in Phase 2 are to understand a broader range of mechanical properties, the impact of manufacturing variables on those properties. Scale up the size of heats to production levels to facilitate the understanding of the impact of heat and component weight, on metallurgical and mechanical behavior. GE Power & Water Materials and Processes Engineering for the Phase 2, Task 4.0 Castings work, systematically designed and executed casting material property evaluation, multiple test programs. Starting from 15 lbs. cylinder castings to world’s first 17,000 lbs. poured weight, heavy section large steam turbine partial valve Haynes 282 super alloy casting. This has demonstrated scalability of the material for steam Turbine applications. Activities under Task 4.0, Investigated and characterized various mechanical properties of Cast Haynes 282 and Cast Nimonic 263. The development stages involved were: 1) Small Cast Evaluation: 4 inch diam. Haynes 282 and Nimonic 263 Cylinders. This provided effects of liquidus super heat range and first baseline mechanical data on cast versions of conventional vacuum re-melted and forged Ni based super alloys. 2) Step block castings of 300 lbs. and 600 lbs. Haynes 282 from 2 foundry heats were evaluated which demonstrated the importance of proper heat treat cycles for Homogenization, and Solutionizing parameters selection and implementation. 3) Step blocks casting of Nimonic 263: Carried out casting solidification simulation analysis, NDT inspection methods evaluation, detailed test matrix for Chemical, Tensile, LCF, stress rupture, CVN impact, hardness and J1C Fracture toughness section sensitivity data and were reported. 4) Centrifugal Casting of Haynes 282, weighing 1400 lbs. with hybrid mold (half Graphite and half Chromite sand) mold assembly was cast using compressor casing production tooling. This test provided Mold cooling rates influence on centrifugally cast microstructure and mechanical properties. Graphite mold section out performs sand mold across all temperatures for 0.2% YS; %Elongation, %RA, UTS at 1400°F. Both Stress-LMP and conditional Fracture toughness plots data were in the scatter band of the wrought alloy. 5) Fundamental Studies on Cooling rates and SDAS test program. Evaluated the influence of 6 mold materials Silica, Chromite, Alumina, Silica with Indirect Chills, Zircon and Graphite on casting solidification cooling rates. Actual Casting cooling rates through Liquidus to Solidus phase transition were measured with 3 different locations based thermocouples placed in each mold. Compared with solidification simulation cooling rates and measurement of SDAS, microstructure features were reported. The test results provided engineered casting potential methods, applicable for heavy section Haynes 282 castings for optimal properties, with foundry process methods and tools. 6) Large casting of Haynes 282 Drawings and Engineering FEM models and supplemental requirements with applicable specifications were provided to suppliers for the steam turbine proto type feature valve casing casting. Molding, melting and casting pouring completed per approved Manufacturing Process Plan during 2014 Q4. The partial valve casing was successfully cast after casting methods were validated with solidification simulation analysis and the casting met NDT inspection and acceptance criteria. Heat treated and sectioned to extract trepan samples at different locations comparing with cast on coupons test data. Material properties requisite for design, such as tensile, creep/rupture, LCF, Fracture Toughness, Charpy V-notch chemical analysis testing were carried out. The test results will be presented in the final report. The typical Haynes 282 large size Steam Turbine production casting from Order to Delivery foundry schedule with the activity break up is shown in Figures 107 and 108. • From Purchase Order placement to Casting pouring ~ 26 weeks. 1. Sales and commercial review 3 2. Engineering Drawings/models review 4 3. Pattern and core box manufacturing 6 4. Casting process engineering review 4 5. FEM and solidification simulation analysis 4 6. Gating & Feeder Attachments, Ceramic tiling 2 7. Molding and coremaking production scheduling 6 8. Melting planning and schedule 3 9. Pouring, cooling and shake out 2 • From Pouring to casting Delivery ~ 29 weeks 10. Shot blast and riser cutting, gates removal 3 11. Homogenizing , solutionizing HT furnace prep 4 12. Grinding, Fettling 2 13. Aging HT Cycle, cooling 2 14. VT and LPT NDT inspections 2 15. Radiographic inspection 4 16. Mechanical testing, Chemical analysis test certs 4 17. Casting weld repair upgrades and Aging PWHT 4 18. NDT after weld repairs and casting upgrades 3 19. Casting Final Inspection and test certifications 3 20. Package and delivery 2 Hence the Total Lead time from P.O to Casting delivery is approximately 55 weeks. The Task 4.2 and Task 4.3 activities and reporting completed.

Thangirala, Mani↗