Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distributed energy management system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Coordinated Inverter Control to Increase Dynamic PV Hosting Capacity: A Real-Time Optimal Power Flow Approach

High penetrations of distributed photovoltaics (PV) could cause adverse grid impacts, such as voltage violations. The recent development in inverter technologies provides the opportunity to develop control systems to realize effective PV governance and thus to improve dynamic PV hosting capacity for distribution grids. In this paper, a novel distributed energy resource management system (DERMS) solution is proposed by adopting the real-time optimal power flow (OPF) approach for coordinated control of the distributed PV inverters. The proposed approach eliminates the dependence on load knowledge via measurement feedback correction, and it can be implemented in real time. One challenge is that the technique is sensitive to the data availability and integrity of voltage measurements. Therefore, a decentralized DERMS approach is developed by leveraging the concepts of state estimation. The framework and the effectiveness of the solution approach are numerically demonstrated on a real distribution feeder in Southern California.

14 SOLAR ENERGY↗

Hardware-in-the-Loop Evaluation of an Advanced Distributed Energy Resource Management Algorithm

This paper presents the laboratory performance evaluation of voltage regulation under a new distributed energy resource management system (DERMS) algorithm via an advanced hardware-in-tbe-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of a full-scale real-world distribution system from a utility partner, the DERMS software controller, and power hardware photovoltaic (PV) inverters. The new DERMS algorithm is developed based on online multiobjective optimization (OMOO) algorithms that perform fast dispatch of distributed solar PV simulated in a real-time digital simulator and real physical hardware devices. Experimental tests confirm the correct functioning of the HIL platform for evaluating controller algorithms and satisfactory voltage regulation performance of the developed OMOO algorithms.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Hardware-in-the-Loop Evaluation of an Advanced Distributed Energy Resource Management Algorithm: Preprint

This paper presents the laboratory performance evaluation of voltage regulation under a new distributed energy resource management system (DERMS) algorithm via an advanced hardware-in-tbe-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of a full-scale real-world distribution system from a utility partner, the DERMS software controller, and power hardware photovoltaic (PV) inverters. The new DERMS algorithm is developed based on online multiobjective optimization (OMOO) algorithms that perform fast dispatch of distributed solar PV simulated in a real-time digital simulator and real physical hardware devices. Experimental tests confirm the correct functioning of the HIL platform for evaluating controller algorithms and satisfactory voltage regulation performance of the developed OMOO algorithms.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Hardware-in-the-Loop Evaluation of an Advanced Distributed Energy Resource Management Algorithm

This paper presents the laboratory performance evaluation of voltage regulation under a new distributed energy resource management system (DERMS) algorithm via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of a full-scale real-world distribution system from a utility partner, the DERMS software controller, and power hardware photovoltaic (PV) inverters. The new DERMS algorithm is developed based on online multi-objective optimization (OMOO) algorithms that perform fast dispatch of distributed solar PV simulated in a real-time digital simulator and real physical hardware devices. Experimental tests confirm the correct functioning of the HIL platform for evaluating controller algorithms and satisfactory voltage regulation performance of the developed OMOO algorithms.

41 EE - Solar Energy Technologies Office (EE-4S)↗

SolarSTARTS: Solar-Assisted State-Aware and ResilienT infrastructure System

This final technical report provides a description and results of the design, development, testing, and validation of the Automated Resilience Management System (ARMS) solution, which integrates different systems to collect, store and process relevant information from the power distribution system to automatically manage the operation of multiple energy assets to enhance the resilience of the power grid against high-impact physical incidents (e.g., hurricanes) and cyber threats. The developed solution comprises a suite of novel AI-based algorithms designed to first detect, locate, and classify anomalies by collecting and analyzing data from multiple monitoring and control devices

14 SOLAR ENERGY↗

Keystone Solar Future Project (KSFP)

The Keystone Solar Future Project (KSFP, also referred to as “Keystone Project” in the report) implements a cost-effective, secure, reliable, and safe technology platform that paves the way for future interconnected distributed energy resources (DER), creates a framework that enables high penetration of DER, and transforms the DER interconnection process. The project is important and necessary in a few aspects. First, the industry definition of Distributed Energy Resource Management System (DERMS) is not yet validated against field deployments and mostly implemented in small pilots relying on third party integration. Keystone project implements a direct plug and play communication to inverter based DER systems. Secondly, most interconnection application portal is not yet fully integrated with back-end system, thus lacks the capability to drive a complete and accurate modeling of DER assets into the planning and operational systems. Keystone project rolled out a fully integrated modeling process of DERs from interconnection to operational management. Lastly, customers were given an opportunity to learn about the advanced functions of the inverters and take full advantages of their benefits through participation in the pilot program. During the project, the technical effectiveness and economic feasibility of DER management were investigated and demonstrated in real life events and simulation studies. The project highlighted the importance of coordinated DER interconnection, installation and management with the rest of the distribution system.

14 SOLAR ENERGY↗

Management of Risk and Uncertainty Through Optimized Co-Operation of Transmission Systems and Microgrids With Responsive Loads (Final Report)

The evolution of the power system to the reliable, efficient and sustainable system of the future will involve development of both demand- and supply-side technology and operations. Ambitious national and state-level goals around the decarbonization of electricity relies on the integration of very high levels of renewable resources, most of which are variable and intermittent. The use of demand response is an ideal approach to counterbalance the intermittency of renewable generation and brings the consumer into the spotlight. Though individual consumers are interconnected at the low-voltage distribution system, these resources are typically modeled as variables at the transmission network level. Demand-side participation cannot be leveraged effectively without explicitly including the distribution system dynamics in the optimization-based wholesale market operations. This project grew from a vision for co-optimized interaction of distribution systems, or microgrids, with the high-voltage transmission system. In this framework, microgrids encompass consumers, distributed renewables and storage. The energy management system of the lower voltage system (distribution or microgrid) can also sell (buy) excess (necessary) energy from the transmission system. Until recently, very little research had been conducted on the co-optimization of these two systems due to computational limitations. However, advances in computational capabilities, and the judicious use of decomposition methods and innovative approximation methods for high-dimension dynamic programming made this goal a viable objective for this project, leading to a fundamental shift in the ability to integrate and fully utilize demand-side resources. To this end, the modeling framework developed introduces a novel co-optimization framework, to include the operations of both the transmission and distribution systems (or microgrids) in operational decision making. This framework was used to analyze renewable and distributed generation along with responsive demand and to compare the capability of co-optimized systems to perform with higher levels of variable renewables. An ideal microgrid is defined as an electric entity capable of operating in both interconnected (with the high-voltage grid) and islanded mode. As such, the microgrid should incorporate generating units (traditional units and intermittent) and if needed, exchange power with the high-voltage grid. The interplay between the microgrid and high-voltage grid motivated the development of the co-optimization approach to ensure efficient performance of the interconnected network. Results show that the use of a bi-level optimization approach is an appropriate structure, capable of co-optimizing a transmission system with multiple distribution systems and microgrids. While increasing the number of connected systems provides increasing flexibility for renewables integration this can also the economic benefits to the low-voltage subsystems with each additional system connected. Comparison of a traditional single-level decision structure with the co-optimization approach illustrates a reduction in overall system cost under co-optimization, while specific cost allocations to transmission and distribution systems are changed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Resiliency with a 100% Renewable Microgrid

San Diego Gas & Electric Company (SDG&E) installed America’s first and largest utility-scale microgrid in Borrego Springs in 2013. The first generation Borrego Springs Microgrid utilized diesel generators to form and stabilize the microgrid island, with support from grid-scale batteries and local solar photovoltaic (PV) generation. In this project, SDG&E in partnership with National Renewable Energy Laboratory (NREL) demonstrated through modeling, simulation and utility field testing that blackstart and islanding of the microgrid can be led with 100% renewable, inverter based resources (IBRs), to help reduce community reliance on conventional generation resources. Through equipment upgrades, grid-forming island leader capability was transitioned to a battery IBR instead of the Borrego Springs Microgrid diesel generators. A new microgrid controller was integrated to the microgrid and programmed to control and manage multiple energy storage systems. Synchrophasor and other power quality data verified autonomous, high-speed response of the IBRs through blackstart, islanding, and load step testing. Results of project field evaluations provide distribution systems operators (DSO) with increased confidence that renewable, IBR can replace traditional generators to blackstart and island microgrids and rapidly establish stable island frequency with rapid changes in peak power demand. Importantly, the project validated the integration feasibility of a distributed energy resource management system (DERMS) controller that manages multiple grid-forming and grid-following IBRs, establishing a standard design interface to reduce the complexity of integrating new DERs in the future and supporting replication by the industry. As a result of learnings in this project, SDG&E has implemented the microgrid controller strategy at multiple other microgrid sites, thereby validating the replicability of the solution. Hardware-in-the-loop (HIL) simulations including power and controller HIL hardware — along with electromagnetic transient (EMT) simulations of Borrego Springs Microgrid —informed adjustments to inverter parameters and were important to characterize the performance of the IBRs in relevant operating conditions before deployment. The EMT and HIL simulations of islanding the entire community are important contributions in providing confidence in IBR performance prior to future islanding of the community in the field. High-fidelity EMT and/or HIL simulation of IBRs can de-risk field operations, and its relevance and importance as a tool is increasing as distribution grids and microgrids become more complex and dynamic with an increasing proportion of renewable generation, distributed energy storage, and two-way power and energy flows.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing a Distributed Trust Model for Distributed Energy Resources

Electric power system operators can manage distribution system reliability by coordinating end customer usage of distributed energy resources. The end customers in this regard are Service Provisioning Customers, who provide their energy resources to a Grid Service Provider, which in turn dispatches large aggregations of distributed energy resources to provide reliable service to the power system.The security of this system relies upon information protection mechanisms, as described in IEEE 2030.5. However, in addition to preventive security measures, a monitoring function is required to ensure trustworthiness. Trust models are a method to detect and respond to both expected and unexpected behavior. Different trust models are required for various types and characteristics of each situation. This paper will describe the topics that must be considered when developing a trust model as it applies to distributed energy resources. The major contribution of this paper is the creation and application of a Distributed Trust Model applied to distributed energy resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Beyond DERMS: Platform Development, Flexibility, Prediction, and Value Measurements

This report describes the results from the “Beyond DERMS” project that aims to build, deploy, and demonstrate - at megawatt scale with thousands of devices - a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. The results demonstrate how emerging ‘internet of energy’ technologies can be leveraged to simultaneously solve the grid problems of today and prepare for the challenges of tomorrow in a way that goes beyond the capabilities of existing distributed energy resource management systems (DERMS).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a Configurable DERMS Test System in GridAPPS-D

Distributed Energy Resources and their increased penetration within the power grid are a suitable method to provide essential reliability services. In order to do so, they must operate in aggregate. Aggregation of a wide variety of systems with varying standards and protocols is a complex task, which could benefit from rules and standards to support interoperability. To this end, the Portland State University Power Lab has developed the Energy Grid of Things project, which includes a Distributed Energy Resource Management System to provide aggregation and demonstrate the usage of an Energy Services Interface: a set of rules governing the interface between resource owners and aggregator businesses. This thesis presents a Modeling Environment that provides a simulation and test platform reflecting the complex needs of an aggregator. A grid simulator is required that is able to reflect the effects of thousands of Distributed Energy Resources operating in tandem; furthermore, these effects must be communicated to external actors such as the Grid Operator, which provides grid service requests to the aggregator and requires feedback. The Modeling Environment provides all of this functionality by leveraging the GridAPPS-D platform to develop an interoperable class-based system that provides configurable simulations with modular input and output APIs. The Modeling Environment uses abstractions to allow any feasible type of input to be reflected within the model as a Distributed Energy Resource, and serves as a proof-of-concept for the development of aggregation simulation and testing within GridAPPS-D.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DERMS Online: A New Voltage Sensitivity-Enabled Feedback Optimization Framework: Preprint

This paper proposes a distributed energy resource management system (DERMS) solution by developing a new voltage sensitivity enabled feedback optimization framework. The key idea is to adopt a measurement feedback scheme to reformulate the original nonlinear optimization into a linear programming (LP) problem via perturb and observe-based voltage sensitivity analysis. The proposed solution eliminates the dependence on load knowledge and can be implemented online thanks to an efficient open-source solver for LP problems. The proposed DERMS online platform is generalizable to deal with various types of distributed energy resources (DERs), including distributed photovoltaics (PVs), energy storage, electric vehicles, demand response, etc. Comparison results with other control methods on a realistic distribution feeder in Southern California highlight the feasibility as well as benefits for the proposed framework.

distributed energy resources management↗

DERMS Online: A New Voltage Sensitivity-Enabled Feedback Optimization Framework

This paper proposes a distributed energy resource management system (DERMS) solution by developing a new voltage sensitivity-enabled feedback optimization framework. The key idea is to adopt a measurement feedback scheme to reformulate the original nonlinear optimization into a linear programming (LP) problem via perturb-and-observe-based voltage sensitivity analysis. The proposed solution eliminates the dependence on load knowledge and can be implemented online thanks to an efficient open-source solver for LP problems. Comparison results with other control methods on a real distribution feeder in Southern California highlight the feasibility as well as benefits for the proposed framework.

distributed energy resource management↗

Connecting Minds: AI Use Cases to Bridge Power Systems and Large Language Models for Practical Applications

Recent advances in artificial intelligence (AI) and development of large language models (LLMs) present the opportunity to develop a new generation of power systems applications. In contrast with early power system AI applications based on structured numerical data, LLMs offer unique capabilities to perform logical reasoning using text documents, unstructured data, and application programming interface (API) calls to computational software. This paper seeks to bridge the knowledge gap between power systems engineers and LLM developers through a crosscutting explanation of use cases, characteristics, requirements, practical considerations from the perspectives of both LLM capabilities and industry needs. Specific focus is given to applications that can be realistically deployed by electric utilities. After introducing the architecture of LLMs and unique challenges of the power systems domain, this paper proposes twenty representative LLM applications grouped into categories of 1) power system operations, 2) asset management, 3) system planning and analytics, and 4) energy management and protection systems. Five use cases are presented within each category with descriptions of the motivation, objectives, approaches, example inputs / outputs, and benefits of each use case.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Self-Assembling Microgrids for Resilient Distribution Systems of the Future: Implementation in a Commercial DERMS Platform

Microgrids have long provided resilience to critical facilities such as hospitals and military installations, and they are now increasingly being looked at as a building block for future grids to support the energy resilience needs of the grid of the future. State-of-the-art technologies, such as blackstart algorithms using renewable distributed energy resources (DERs) to effectively and seamlessly form microgrids, have been produced by national labs over the years. Their adoption by the utility industry would be critical to reap the most benefits toward energy and climate resilience, and the pathway is via commercialization of these self-assembling microgrid algorithms by integrating them in a commercial product platform. This project brings a national labs team (LLNL, LANL) together with a vendor (Smarter Grid Solutions) to perform proof-of-concept integration of the algorithms into the vendor’s commercial Distributed Energy Resources Management System (DERMS). The project provides a strong pathway to commercialization of the algorithms thereby promoting adoption of resilient microgrid technology by utilities to offer resilience benefits to all customers and especially to disadvantaged and underserved communities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Insights from PPL's DERMS Implementation

PPL Electric Utilities’ Keystone Solar Future Project (KSFP) is part of the U.S. Department of Energy’s Office of Energy Efficiency and Renewables, Energy Enabling Extreme Real-time Grid Integration of Solar Energy (ENERGISE) grant. The three-year project, beginning in October, 2017, funded an innovative pilot program to develop and evaluate a technology platform and framework for managing high levels of distributed energy resources (DER), and improving future DER interconnection. The KSFP aimed to bridge gaps between existing and future technology, including Distributed Energy Resource Management Systems (DERMS), by monitoring, managing, and optimizing a system with high penetration of solar and other DER. Specifically, the project worked to make Demand Management Systems (DMS) applications, devices, and real-time communications technology DER-aware to allow for advanced applications for utility operations. Here, by installing and implementing a DERMS, project designers transformed how DERs interact with PPL’s distribution system, offering learnings and results worth sharing industry-wide.

Leader, Jared↗

DER as a service-ecoLong and VOLTTRON (Abstract)

The project goal is to commercialize the VOLTTRON-hosted “DER as a Service” (DaaS) application and make it an “out-of-the-box” solution for ecoLong to use as a secure residential energy management system that allows 1.) distributed energy resources (DERs) to participate in wholesale markets and provide services to the grid and 2.) intelligently control the energy in the residential buildings to the desired level while maintaining occupancy comfort. The product will be field deployed onto multiple Solar Liberty sites in New York state to demonstrate wide-scale participation of DERs in wholesale markets to provide services to the grid and validate the effectiveness of the solution. The integrated management of DERs and buildings increases the penetration of solar resources by managing its variability, providing grid services, and solving the evening ramping challenges. Ultimately, the DaaS platform will make buildings and DERs smarter by unlocking grid-interactive efficient buildings.

24 POWER TRANSMISSION AND DISTRIBUTION↗