Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Dynamic RPS Path to Flight - Nuclear and Emerging Technologies for Space

NASA Glenn Research Center has been pursuing the development of dynamic power conversion for several decades. Candidate NASA missions involve mutli-year travel to far away destinations, or to extreme environments where sunlight does not exist. Human-base mission studies also show that power needs would be beyond the capabilities of solar energy conversion, and instead would require nuclear reactor energy sources, for which the thermal energy must be converted to electricity. Dynamic power conversion technology has developed sufficiently to make a sound engineering argument that it is suitable for these NASA missions. Dynamic conversion power sources have yet to be flown in space, and thus suffer a disadvantage owing to their lack of heritage data on flight missions. One of the largest obstacles for adoption is the uncertainty in reliability of a device with moving parts. However, significant progress has been made toward demonstrating the technology capable in all relevant environments, with the necessary long life. Another hurdle for adoption is the lack of mission, which would drive specific requirements, and provide a solid timeline for technology development endpoint. Until a mission is identified, an alternative approach is necessary to advance a dynamic power conversion system towards flight.

Oriti, Salvatore↗

Assessment of Crew Time for Maintenance and Repair Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, understanding how crew repair and maintenance timelines are impacted by mission operations and technology changes is vital for future mission planning. Past work has been done using historical International Space Station (ISS) data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available datasets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat (SH), and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA ISS maintenance and crew time data are logged into two central databases: the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS). Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair time for each failure and repair event. The entire maintenance activity dataset is then categorized based on the class of failed component to ensure a significant sample size for each class and accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time to Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. The authors applied these modeling methods to a case study of a crewed mission to the planned SH and produced expected corrective maintenance crew time distributions. The results produced an expected corrective maintenance crew time at over 24 hours per mission, and a maintenance crew time distribution that reflects the importance of planning for sufficient maintenance requirements each mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

Assessment of Crew Time for Maintenance and Repairs Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, it will be necessary to understand how crew repair and maintenance timelines are impacted by mission operations and technology changes. Past work has been done using historical ISS data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available data sets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat, and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA International Space Station (ISS) maintenance and crew time data are logged into two central databases, the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS) respectively. Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. MDC provides a detailed catalog of failure events and an overview of the failure’s required maintenance and OPTimIS provides a description of crew activities and crew time durations dedicated to maintenance. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair times for each failure event. Data is also classified by the outcome of each repair event, whether the failed component was replaced or whether it was repaired in place. The entire maintenance activity dataset is then categorized based on the class of failed component to allow for a statistically significant sample size for each class and to provide accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time To Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

Stochastic Verification by Analysis for Autonomous Systems Management Architecture (ASMA)

The Gateway Vehicle Systems Manager (VSM) is the top-level of a distributed, hierarchical software control system. VSM is data-driven and will make decisions related to mission, fault, resource management and vehicle control. These attributes combined with a high degree of autonomy make it susceptible to emergent behavior. In order to achieve the high level of confidence needed in this critical system, the VSM team has developed a multifaceted verification strategy employing traditional verification techniques, simulation, model checking, and runtime verification. Individual algorithms are verified using conventional testing and model checking using assume-guarantee contracts. A discrete event-based simulation approach is being developed to verify timelines. This presentation describes an enhancement to the verification approach using analysis to enhance system robustness by detecting and resolving the potential for emergent behavior. The verification by analysis employs a Software in the Loop (SITL) environment with real flight software executing on emulated processors, simulations of vehicle subsystems, flight dynamics, and human inputs. Since the possible input space and configuration data set are too large for exhaustive testing, a Monte Carlo approach is used to cover feasible scenarios, augmented with corner cases and known higher-risk scenarios. A key problem in using Monte Carlo-based system verification is evaluating test results to ensure that system behavior is correct. The presentation describes the approach the VSM team uses to monitor behavior for compliance with predetermined boundaries and to identify anomalous behavior for further analysis. This presentation describes the multi-level systems approach to verification, and the simulation-based layer that covers the feasible state space: 1. Overview of the Gateway VSM 2. Special challenges due to heterogeneous, hierarchical architecture 3. Modeling and simulation environment using flight software and system simulations 4. Developing input sets to ensure state-space coverage 5. Developing model and data configuration sets to ensure model coverage 6. Interpreting results without predetermined outcomes 7. Lessons learned and future work

Verification and Validation↗

Application of Shuttle EVA Systems to Payloads. Volume 2: Payload EVA Task Completion Plans

Candidate payload tasks for EVA application were identified and selected, based on an analysis of four representative space shuttle payloads, and typical EVA scenarios with supporting crew timelines and procedures were developed. The EVA preparations and post EVA operations, as well as the timelines emphasizing concurrent payload support functions, were also summarized.

Source record↗

Technology Directions for the 21st Century

The Office of Space Communications (OSC) is tasked by NASA to conduct a planning process to meet NASA's science mission and other communications and data processing requirements. A set of technology trend studies was undertaken by Science Applications International Corporation (SAIC) for OSC to identify quantitative data that can be used to predict performance of electronic equipment in the future to assist in the planning process. Only commercially available, off-the-shelf technology was included. For each technology area considered, the current state of the technology is discussed, future applications that could benefit from use of the technology are identified, and likely future developments of the technology are described. The impact of each technology area on NASA operations is presented together with a discussion of the feasibility and risk associated with its development. An approximate timeline is given for the next 15 to 25 years to indicate the anticipated evolution of capabilities within each of the technology areas considered. This volume contains four chapters: one each on technology trends for database systems, computer software, neural and fuzzy systems, and artificial intelligence. The principal study results are summarized at the beginning of each chapter.

Crimi, Giles F.↗

Nanotechnology: A Vast Field For The Creative Mind

This viewgraph presentation gives examples of possible future uses of nanotechnology, with some emphasis on carbon nanotubes and medical applications. The presentation provides an overview of organizations conducting nanotechnology research in the United States, and suggests a timeline for nanotechnology development.

Benavides, Jeannette↗

Propellant Gauging for Exploration

This paper presents a brief overview of propellant gauging needs and requirements in the context of lunar exploration missions defined by the Exploration Systems Architecture Study (ESAS) report. A timeline for the development and testing of gauging technologies, and a few key design review dates are presented. A lunar exploration mission scenario is discussed which aids in defining the propellant gauging needs. The fleet of new exploration vehicles includes the Ares I and Ares V launch vehicles, Earth Departure Stage (EDS), Lunar Surface Access Module (LSAM) ascent and descent stages, and the Orion Crew Exploration Vehicle (CEV). The liquid propellant choices are currently oxygen - hydrogen for the launch vehicles, the EDS, and LSAM descent module; oxygen - methane for LSAM ascent module; and monomethylhydrazine nitrogen tetroxide (MMH-NTO) for the CEV. Estimated tank sizes, temperatures, pressures, and storage durations are presented. A baseline propellant gauging system is proposed that is based on high Technology Readiness Level (TRL) gauging technologies. In order to be considered for use on the new exploration vehicles, any new gauging technologies will have to show a clear benefit over the baseline methods in terms of performance and/or cost.

Zimmerli, Gregory A.↗

Biomedical Support of U.S. Extravehicular Activity

The world's first extravehicular activity (EVA) was performed by A. A. Leonov on March 18, 1965 during the Russian Voskhod-2 mission. The first US EVA was executed by Gemini IV astronaut Ed White on June 3, 1965, with an umbilical tether that included communications and an oxygen supply. A hand-held maneuvering unit (HHMU) also was used to test maneuverability during the brief EVA; however the somewhat stiff umbilical limited controlled movement. That constraint, plus difficulty returning through the vehicle hatch, highlighted the need for increased thermal control and improved EVA ergonomics. Clearly, requirements for a useful EVA were interrelated with the vehicle design. The early Gemini EVAs generated requirements for suits providing micro-meteor protection, adequate visual field and eye protection from solar visual and infrared radiation, gloves optimized for dexterity while pressurized, and thermal systems capable of protecting the astronaut while rejecting metabolic heat during high workloads. Subsequent Gemini EVAs built upon this early experience and included development of a portable environmental control and life support systems (ECLSS) and an astronaut maneuvering unit. The ECLSS provided a pressure vessel and controller with functional control over suit pressure, oxygen flow, carbon dioxide removal, humidity, and temperature control. Gemini EVA experience also identified the usefulness of underwater neutral buoyancy and altitude chamber task training, and the importance of developing reliable task timelines. Improved thermal management and carbon dioxide control also were required for high workload tasks. With the Apollo project, EVA activity was primarily on the lunar surface; and suit durability, integrated liquid cooling garments, and low suit operating pressures (3.75 pounds per square inch absolute [psia] or 25.8 kilopascal [kPa],) were required to facilitate longer EVAs with ambulation and significant physical workloads with average metabolic rates of 1000 BTU/hr and peaks of up to 2200 BTU/hr. Mobility was further augmented with the Lunar Roving Vehicle. The Apollo extravehicular mobility unit (EMU) was made up of over 15 components, ranging from a biomedical belt for capturing and transmitting biomedical data, urine and fecal containment systems, a liquid cooling garment, communications cap, a modular portable life support system (PLSS), a boot system, thermal overgloves, and a bubble helmet with eye protection. Apollo lunar astronauts performed successful EVAs on the lunar surface from a 5 psia (34.4 kPa) 100% oxygen environment in the Lunar Lander. A maximum of three EVAs were performed on any mission. For Skylab a modified A7LB suit, used for Apollo 15, was selected. The Skylab astronaut life support assembly (ALSA) provided umbilical support through the life support umbilical (LSU) and used open loop oxygen flow, rather than closed-loop as in Apollo missions. Thermal control was provided by liquid water circulated by spacecraft pumps and electrical power also was provided from the spacecraft via the umbilical. The cabin atmosphere of 5 psia (34.4 kPa), 70% oxygen, provided a normoxic atmosphere and because of the very low nitrogen partial pressures, no special protocols were required to protect against decompression sickness (DCS) as was the case with the Apollo spacecraft with a 5 psi, 100% oxygen environment.

Gernhardt, Michael L.↗

NASA: Engineering Space Exploration - Launching to the Moon, Mars, and Beyond

This presentation reviews NASA's program of space exploration, including information about NASA's mission, the human urge to explore, the timeline for the development of the exploration, and what NASA plans to explore and prove during the return to the moon. Also include are views of the planned vehicles, and a review of progress to date in the design and construction of the vehicles. Some of the benefits of space exploration are also reviewed.

Malone, Roy↗

IVS Working Group 4: VLBI Data Structures

In 2007 the IVS Directing Board established IVS Working Group 4 on VLBI Data Structures. This note discusses the current VLBI data format, goals for a new format, the history and formation of the Working Group, and a timeline for the development of a new VLBI data format.

Gipson, John↗

Pilot Field Test: Results of Tandem Walk Performance Following Long-Duration Spaceflight

Coordinated locomotion has proven to be challenging for many astronauts following long duration spaceflight. As NASA's vision for spaceflight points toward interplanetary travel and missions to distant objects, astronauts will not have assistance once they land. Thus, it is vital to develop a knowledge base from which operational guidelines can be written that define when astronauts can be expected to safely perform certain tasks. Data obtained during the Field Test experiment will add important insight to this knowledge base. Specifically, we aim to develop a recovery timeline of functional sensorimotor performance during the first 24 hours and several days after landing. A forerunner of the full Field Test study, the Pilot Field Test (PFT) comprised a subset of the tasks and measurements to be included in the ultimate set.

Cerisano, J. M.↗

Field Test: Results of Tandem Walk Performance Following Long-Duration Spaceflight

BACKGROUND: Coordinated locomotion has proven to be challenging for many astronauts following long duration spaceflight. As NASA's vision for spaceflight points toward interplanetary travel, we must prepare for unassisted landings, where crewmembers may need to perform mission critical tasks within minutes of landing. Thus, it is vital to develop a knowledge base from which operational guidelines can be written that define when astronauts can be expected to safely perform certain tasks. Data obtained during the Field Test experiment (FT) will add important insight to this knowledge base. Specifically, we aim to develop a recovery timeline of functional sensorimotor performance during the first 24 hours and several days after landing. METHODS: FT is an ongoing study of 30 long-duration ISS crewmembers. Thus far, 9 have completed the full FT (5 U.S. Orbital Segment [USOS] astronauts and 4 Russian cosmonauts) and 4 more consented and launching within the next year. This is in addition to the eighteen crewmembers that participated in the pilot FT (11 USOS and 7 Russian crewmembers). The FT is conducted three times preflight and three times during the first 24 hours after landing. All crewmembers were tested in Kazakhstan in either the medical tent at the Soyuz landing site (~one hour post-landing), or at the airport (~four hours post-landing). The USOS crewmembers were also tested at the refueling stop (~12 hours post-landing) and at the NASA Johnson Space Center (~24 hours post-landing) and a final session 7 days post-landing. Crewmembers are instrumented with 9 inertial measurement unit sensors that measure acceleration and angular displacement (APDM's Emerald Sensors) and foot pressure-sensing insoles that measure force, acceleration, and center of pressure (Moticon GmbH, Munich, Germany) along with heart rate and blood pressure recording instrumentation. The FT consists of 12 tasks, but here we will focus on the most challenging task, the Tandem Walk, which was also performed as part of pilot FT. To perform the Tandem Walk, subjects begin with their feet together, their arms crossed at their chest and eyes closed. When ready, they brought one foot forward and touched the heel of their foot to their toe, repeating with the other foot, and continuing for about 10 steps. Three trials were collected with the eyes closed and a fourth trial was collected with eyes open. There are four metrics which are used to determine the performance level of the Tandem Walk. The first is percent correct steps. For a step to be counted as correct, the foot could not touch the ground while bringing it forward (no side stepping), eyes must stay closed during the eyes closed trials, the heel and toe should be touching, or almost touching (no large gaps) and there shouldn't be more than a three second pause between steps. Three judges score each step and the median of the three scores is kept. The second metric is the average step speed, or the number of steps/time to complete them. Thirdly, the root mean squared (RMS) error in the resultant trunk acceleration is used to determine the amount of upper body instability observed during the task. Finally, the RMS error of the mediolateral center of pressure as measured by the Moticon insoles is used to determine the mediolateral instability at the foot level. These four parameters are combined into a new overall Tandem Walk Parameter. RESULTS: Preliminary results show that crewmembers perform the Tandem Walk significantly worse the first 24 hours after landing as compared to their baseline performance. We find that each of the four performance metrics is significantly worse immediately after landing. We will present the results of tandem walk performance during the FT thus far. We will also combine these with the 18 crewmembers that participated in the pilot FT, concentrating on the level of performance and recovery rate. CONCLUSION: The Tandem Walk data collected as part of the FT experiment will provide invaluable information on the performance capabilities of astronauts during the first 24 hours after returning from long-duration spaceflight that can be used in planning future Mars, or other deep-space missions with unassisted landings. FT will determine the average sensorimotor recovery timeline and inform return-to-duty guidelines for unassisted landings.

Rosenberg, M. J. F.↗

TPSAS-NF1676L-27788-DND

NASA Advanced Composites Project (ACP) - Reduce timeline required for development and certification of advanced composite structures by 30 percent Manufacturing Defects - Detrimentally affect quality of parts - Lead to higher cost and cause significant delay Developed guided wave-based technique for detection of manufacturing defects in carbon fiber reinforced polymer (CFRP) composites Extended guided wave - based technique for in-situcure monitoring of composites using high temperature piezoelectric transducers Incorporated embedded fiber Bragg grating (FBG) sensors for guided wave sensing during cure.

Tyler B Hudson↗

Artemis III EVA Mission Capability for de Gerlache-Shackleton Ridge

NASA has committed to sending humans to the Moon no earlier than 2025. The Artemis III mission will include scientific, technology demonstrations, commercial, inspirational, and explorational objectives. Achieving these goals will depend upon balancing priorities and mission constraints. A landing location needs to meet terrain conditions suitable for the lander with acceptable thermal and lighting conditions. This location must also allow access to geological areas of interest within traverse range and capability of walking astronauts. A representative EVA timeline is then developed for an example location on the de Gerlache-Shackleton ridge and used to examine the location’s acceptability as a candidate site for Artemis III. Similar studies are being conducted to NASA’s Science Mission Directorate and Flight Operations.

EVA↗

Ultraviolet Astronomy in the XXI Century

The US 2020 Astrophysics Decadal Survey (Astro2020) has recommended NASA develop the first observatory designed to search for signs of life on exoplanets and enable transformative astrophysics. These ambitious goals demand a large and highly capable space telescope with broad wavelength coverage from the far-UV to the near-IR, in the tradition of the Hubble Space Telescope. Realizing this vision will require aggressive technology development — as well as respect for and careful balancing of the needs of many scientific communities. In this talk, I will review the Decadal recommendations, including the development approach and timeline envisioned for the recommended UV/O/IR flagship. The LUVOIR and HabEx pre-Decadal mission concepts that fed into that flagship will also be reviewed. Finally, I’ll highlight some key technical considerations for the future UV/O/IR Great Observatory.

Aki Roberge↗

SLS-PLAN-IT: A knowledge-based blackboard scheduling system for Spacelab life sciences missions

The primary scheduling tool in use during the Spacelab Life Science (SLS-1) planning phase was the operations research (OR) based, tabular form Experiment Scheduling System (ESS) developed by NASA Marshall. PLAN-IT is an artificial intelligence based interactive graphic timeline editor for ESS developed by JPL. The PLAN-IT software was enhanced for use in the scheduling of Spacelab experiments to support the SLS missions. The enhanced software SLS-PLAN-IT System was used to support the real-time reactive scheduling task during the SLS-1 mission. SLS-PLAN-IT is a frame-based blackboard scheduling shell which, from scheduling input, creates resource-requiring event duration objects and resource-usage duration objects. The blackboard structure is to keep track of the effects of event duration objects on the resource usage objects. Various scheduling heuristics are coded in procedural form and can be invoked any time at the user's request. The system architecture is described along with what has been learned with the SLS-PLAN-IT project.

Kao, Cheng-Yan↗

Development of the Spartan 101 navigation and pointing timeline

This paper presents the techniques and analyses that were used to construct the Spartan 101 mission pointing timeline for the Space Shuttle Orbiter-detached portion of its flight. This covers the design process that had to transform requirements and constraints originating from the experimenter, the Space Transportation System, and the payload hardware design into a workable set of pointing instructions sequenced to mission events. The paper will discuss the technical approach used for initial attitude acquisition, determining target visibility, observation scheduling, and calculation of vehicle maneuvers.

Lambros, S. D.↗