Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

The NASA CSTI High Capacity Power Program

The SP-100 program was established in 1983 by DOD, DOE, and NASA as a joint program to develop the technology necessary for space nuclear power systems for military and civil applications. During 1986 and 1987, the NASA Advanced Technology Program was responsible for maintaining the momentum of promising technology advancement efforts started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for future space applications. In 1988, the NASA Advanced Technology Program was incorporated into NASA's new Civil Space Technology Initiative (CSTI). The CSTI program was established to provide the foundation for technology development in automation and robotics, information, propulsion, and power. The CSTI High Capacity Power Program builds on the technology efforts of the SP-100 program, incorporates the previous NASA advanced technology project, and provides a bridge to the NASA exploration technology programs. The elements of CSTI high capacity power development include conversion systems: Stirling and thermoelectric, thermal management, power management, system diagnostics, and environmental interactions. Technology advancement in all areas, including materials, is required to provide the growth capability, high reliability, and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall program will develop and demonstrate the technology base required to provide a wide range of modular power systems while minimizing the impact of day/night operations as well as attitudes and distance from the Sun. Significant accomplishments in all of the program elements will be discussed, along with revised goals and project timelines recently developed.

Winter, Jerry M.↗

The NASA CSTI High Capacity Power Project

The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements are presented, along with revised goals and project timelines recently developed.

Winter, J.↗

The NASA CSTI high capacity power project

The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.

Winter, J.↗

Semi-autonomous design concepts for a Mars rover

Studies of rover mobility and surface rendezvous for a Mars Rover/Sample Return (MRSR) mission have been performed. The objective of these efforts has been to identify and address the most challenging issues and develop the most promising design options for the rover mobility and navigation subsystems. A series of trade studies culminated in three candidate design concepts: a large, but otherwise conventional four-wheel drive vehicle; a sophisticated and agile six-legged walking vehicle; and a greatly simplified legged vehicle. This paper summarizes the key design features for these three concepts. For each design, the approaches to vehicle locomotion, sensing and navigation are discussed first. Timelines are developed for the adopted concepts of operation which constrain the range of the remaining parameters. Estimates of rover mass, volume, and power are provided, and performance is projected for vehicle range, terrain traversibility and navigation accuracy.

Spiessbach, Andrew J.↗

Risk Informed Timelines (RIT) v.1.0

Risk Informed Timelines (RIT) is a more modern and holistic method for understanding how access delay timelines are developed and utilized in physical security system evaluations. The software utilizes Bayesian methods to combine subject matter expert judgement and small performance test datasets in a consistent and defensible way. It allows a more holistic view of delay performance that provides distributions of task times and task success probabilities to account for tasks that, if failed, would result in failure of the attack. The RIT methodology is meant to enable security risk managers to begin the transition into more comprehensive delay timeline analysis. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. SAND2021-8294 O

Noel, ToddG.↗

Learning from the Pandemic: the Future of Meetings in HEP and Beyond

The COVID-19 pandemic has by-and-large prevented in-person meetings since March 2020. While the increasing deployment of effective vaccines around the world is a very positive development, the timeline and pathway to "normality" is uncertain and the "new normal" we will settle into is anyone's guess. Particle physics, like many other scientific fields, has more than a year of experience in holding virtual meetings, workshops, and conferences. A great deal of experimentation and innovation to explore how to execute these meetings effectively has occurred. Therefore, it is an appropriate time to take stock of what we as a community learned from running virtual meetings and discuss possible strategies for the future. Continuing to develop effective strategies for meetings with a virtual component is likely to be important for reducing the carbon footprint of our research activities, while also enabling greater diversity and inclusion for participation. This report summarizes a virtual two-day workshop on Virtual Meetings held May 5-6, 2021 which brought together experts from both inside and outside of high-energy physics to share their experiences and practices with organizing and executing virtual workshops, and to develop possible strategies for future meetings as we begin to emerge from the COVID-19 pandemic. This report outlines some of the practices and tools that have worked well which we hope will serve as a valuable resource for future virtual meeting organizers in all scientific fields.

Neubauer, Mark S.↗

FUSRAP Data Management and Information Transitions - 19459

The Formerly Utilized Sites Remedial Action Program (FUSRAP) was created in the mid-1970's to clean up radiological contamination resulting from early development of nuclear weapons. The US Department of Energy (US DOE) was responsible for FUSRAP until October 1997, when Congress transferred administration and execution of FUSRAP site cleanup to the US Army Corps of Engineers (USACE). Currently, the US DOE Office of Legacy Management (LM) determines the eligibility of a site for referral to USACE. USACE determines whether the site is included in FUSRAP for cleanup, conducts remedial actions, and transfers sites back to LM for long-term surveillance and maintenance (LTS and M). LM and USACE established the Data Management Working Group (DMWG) to (1) establish a common understanding of US DOE and USACE district-specific data, records practices, and requirements as they apply to FUSRAP programmatic documents for site transition and transfer; (2) establish methods to ensure accurate data transfer; and (3) develop a timeline for data and records transfer. These methods will ensure continuity of stewardship while transitioning from cleanup to LTS and M and beyond as more FUSRAP sites transfer from USACE to LM. The DMWG has met monthly and the meetings are attended by a wide range of LM and USACE project managers and subject matter experts. Discussion topics have addressed site records management, including data needs and uses; transfer and posting of Administrative Record and Permanent Record files for public accessibility; and management of legal and classified files. There have been a number of group successes, including the following: - Establishment of a common understanding of data and records practices and requirements as the sites transition and transfer from USACE to LM; - Development of effective lines of communication between USACE and LM concerning data management for transition; - Establishment of a cohesive approach to data management between the two agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Statistical chronometry of Meteorites: II. Initial abundances and homogeneity of short-lived radionuclides

Astrophysical models of planet formation require accurate radiometric dating of meteoritic components by short-lived (Al-Mg, Mn-Cr, Hf-W) and long-lived (U-Pb) chronometers, to develop a timeline of such events in the solar nebula as formation of Ca-rich, Al-rich Inclusions (CAIs), chondrules, planetesimals, etc. CAIs formed mostly around a time (“t=0”) when the short-lived radionuclide 26 Al (t 1/2 = 0.72 Myr) was present and presumably homogeneously distributed at a known level we define as ( 26 Al/ 27 Al) SS = 5.23 × 10 -5 . The time of formation after t=0 of another object can be found by determining its initial ( 26 Al/ 27 Al) 0 ratio and comparing it to ( 26 Al/ 27 Al) SS . Dating of meteoritic objects using the Mn-Cr or Hf-W systems is hindered because the abundances ( 53 Mn/ 55 Mn) SS and ( 182 Hf/ 180 Hf) SS at t=0 are not known precisely. To constrain these quantities, we compile literature Al-Mg, Mn-Cr, Hf-W and Pb-Pb data for 13 achondrites and use novel statistical techniques to minimize the discrepancies between their times of formation across these systems. We find that for ( 53 Mn/ 55 Mn) SS = (7.80±0.36)×10 -6 , ( 182 Hf/ 180 Hf) SS = (10.41 ± 0.12) × 10-5, t SS = 4568.65 ± 0.10 Myr, and a 53 Mn half-life of 3.98 ± 0.22 Myr, these four free parameters make concordant 18 formation times recorded by the different systems in all six known volcanic achondrites (the quenched angrites D’Orbigny, Sahara 99555, Northwest Africa 1670; the psuedo-eucrites Asuka 881394 and Ibitira; and the basaltic achondrite Northwest Africa 7325). These parameters also make concordant the ages derived for chondrules from CB/CH achondrites, formed simultaneously in an impact. The other seven achondrites are not quite concordant, but are plutonic angrites or ‘carbonaceous achondrites’ for which simultaneous closure of the isotopic systems might not be expected. Our findings provide very strong support for homogeneity of 26 Al, 53 Mn, and 182 Hf in the solar nebula, and our approach offers a path for more precise chronometry

79 ASTRONOMY AND ASTROPHYSICS↗

GeoVision - Barriers Taskforce

This submission includes papers, presentations, and data developed during the multi-year GeoVision Barriers Taskforce effort. Developers have identified many non-technical barriers to geothermal power development, including land access, permitting, and market barriers. Included in this submission are three papers submitted to the Geothermal Resources Council (GRC) which detail how land access, permitting, and market barriers delay geothermal project development. Also included is the GeoVision Barriers Analysis Summary report, which projects and quantifies the future electric and nonelectric deployment potentials of geothermal technologies within a range of scenarios in addition to their impacts on U.S. jobs, the economy, and environment.

15 GEOTHERMAL ENERGY↗

Development of the Space Operations Incident Reporting Tool (SOIRT)

The space operations incident reporting tool (SOIRT) is an instrument used to record information about an anomaly occurring during flight which may have been due to insufficient and/or inappropriate application of human factors knowledge. We originally developed the SOIRT form after researching other incident reporting systems of this type. We modified the form after performing several in-house reviews and a pilot test to access usability. Finally, crew members from Space Shuttle flights participated in a usability test of the tool after their missions. Since the National Aeronautics and Space Administration (NASA) currently has no system for continuous collection of this type of information, the SOIRT was developed to report issues such as reach envelope constraints, control operation difficulties, and vision impairments. However, if the SOIRT were to become a formal NASA process, information from crew members could be collected in a database and made available to individuals responsible for improving in-flight safety and productivity. Potential benefits include documentation to justify the redesign or development of new equipment/systems, provide the mission planners with a method for identifying past incidents, justify the development of timelines and mission scenarios, and require the creation of more appropriate work/rest cycles.

Minton, Jacquie↗

Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

Lemke, Paul R.↗

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) is the United States focal point to support operations controllers and payload developers conducting payload science operations for the National Aeronautics and Space Administration (NASA) aboard the International Space Station (ISS). Some of the key functions are planning, coordination and scheduling of science activities. This effort occurs in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. Additionally, in Fall 2017, NASA will increase its ability to perform payload science operations aboard the ISS with a fourth crew member. In order to support this, there will be an increasing need to quickly plan and schedule more activities. In the past, it was cumbersome and time-consuming to consolidate copious amounts of planning and change request data from various sources. Planners would summarize information from the Johnson Space Center (JSC) Operations Planning Timeline Integration System (OPTIMIS) and manually integrate it with other data in order to produce a Timeline Planning Summary (TPS). This lengthy process of updating static documents while planning and re-planning was cumbersome, introduced human error, and was inflexible to last minute changes. There was a need for a dynamic, more efficient, less erroneous, and more concise way of building a report that could be readily updated as fast as payload science plans change.

Pedoto, Ramon W.↗

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) supports planning, coordination and scheduling of science activities for the International Space Station (ISS) in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. With the achievement of supporting a fourth crew member aboard the ISS and an increasing amount of payload science activities, came the need for a dynamic, more efficient way of building timeline planning reports that could be readily updated as fast as payload science plans could change. This paper addresses software architecture considerations in the successful cross-center development of an automated planning tool with multiple data sources. It also discusses the practical implementation of a time-boxed, hybrid Agile Software Development (ASD) approach to deliver customer-driven value despite changing requirements with respect to low-Earth orbit operational planning activities. The goal of this paper is to open discussion with members of the international community and trade effective strategies for cross-center architectural and customer-developer driven collaborations, to support increasing utilization of planning and conducting science activities in space.

Pedoto, Ramon W.↗

Structural Development of Flight Systems

An overview of the typical process and timeline for the development of structural systems is presented. Structural design and verification requirements, along with the approaches used to implement these requirements, are discussed. Special considerations are given to limit loads estimation, structural qualification by analysis, modal survey and test/analysis correlation, and response limiting during vibration tests. Several controversal issues that cause inconsistencies and difficulties in the current structural development process are identified and an approach for resolving these issues is recommended.

Lou, Michael C.↗

Computational Materials for Qualification and Certification (CM4QC) Strategy Document: Maturation of Computational Materials Methods for Aviation-Focused Qualification and Certification of Metal Additive Manufacturing (as an Example of Process-Intensive Materials)

Although considerable scientific and technological advances have been made in recent years in additive manufacturing (AM) processes, these advances have not translated into significant market penetration of AM parts within the aviation industry. It is broadly acknowledged that using traditional qualification and certification (Q&C) approaches for AM components is one of the most significant barriers to broader adoption of AM, resulting in high costs, long product development and certification timelines, and complex design iterations during the product development cycle. A new approach is urgently needed. This document lays out a vision for a new Q&C paradigm with increased use of computational materials (CM) methods aimed at decreasing the time and cost of Q&C of process-intensive material (PIM) approaches in the aviation industry, with AM as the immediate use case. This vision was developed with substantial input from industry, regulatory agencies, government research organizations, and academia.

Edward H Glaessgen↗

Timeline Resource Analysis Program (TRAP): User's manual and program document

The Timeline Resource Analysis Program (TRAP), developed for scheduling and timelining problems, is described. Given an activity network, TRAP generates timeline plots, resource histograms, and tabular summaries of the network, schedules, and resource levels. It is written in ANSI FORTRAN for the Honeywell SIGMA 5 computer and operates in the interactive mode using the TEKTRONIX 4014-1 graphics terminal. The input network file may be a standard SIGMA 5 file or one generated using the Interactive Graphics Design System. The timeline plots can be displayed in two orderings: according to the sequence in which the tasks were read on input, and a waterfall sequence in which the tasks are ordered by start time. The input order is especially meaningful when the network consists of several interacting subnetworks. The waterfall sequence is helpful in assessing the project status at any point in time.

Sessler, J. G.↗

Agile Approach to Assuring the Safety-Critical Embedded Software for NASA's Orion Spacecraft

Human-rated missions like those in NASA's Orion Program continue to grow in complexity. The role of software in achieving ambitious mission objectives has expanded dramatically in the last few decades. Assuring the safety and performance of the embedded flight software is quickly growing beyond the reach of traditional methods and resource levels. The methods used to build these software-dominant systems evolve in an on-going attempt to keep pace with the scope of our ambitions. Agile software development is now commonplace. The long timelines and large batches of work associated with traditional methods are being replaced by rapid delivery of small increments _ as system capabilities are realized in waves. Assurance of these critical software capabilities must therefore conquer an ever-expanding frontier of challenges, and do so with an approach matched to the evolving development methods. This paper recounts the journey of the Orion Independent Verification and Validation (IV&V) team as we addressed this dynamic environment. Widening our aperture to encompass a dramatically larger mission scope, while adjusting our cadence to synchronize with the rapid pace of agile software development, a new approach to IV&V is emerging. This approach is characterized by a sharper focus on mission capabilities, matched with a method to dynamically _follow the risk' as the IV&V team delivers more compelling assurance data in waves. Traditional methods prevalent in IV&V tend to scope the work using artifacts of the development process as they evolve from preliminary to final versions, and the pace of delivery was synchronized with the development timelines prevalent in the waterfall lifecycle. That more static approach is out of phase with the demands of the new environment. Scoping work according to the critical capabilities of the system (rather than artifacts of development) and synchronizing with the rapid pace of agile development, we are moving toward more effective parity with the demands of the environment. We explain the concrete steps we took, the principles that motivated our choices, and the results we have achieved to date.

Capability based assurance↗

Challenges in the post-licensing stage of U.S. hydropower development: Current status and some potential solutions

The issuance of a Federal Energy Regulatory Commission (FERC) license is an important milestone in the development process of new U.S. hydropower projects. The complexity and uncertain timeline of the licensing process have been often cited as a key deterrent to new hydropower installations in the United States. However, very little attention has been paid to post-licensing timelines and attrition rates. This article explores the challenges faced by developers in bringing their FERC-licensed hydropower projects to the construction stage. Post-licensing activities to be completed before starting construction include obtaining additional permitting from other federal or state agencies, completing the technical design, securing financing, and in most cases, negotiating a power purchase agreement. For the set of projects that obtained a FERC license between 2007 and 2018, we assembled a dataset—combining information from FERC dockets and responses from a questionnaire to developers—to calculate attrition rates and development timelines and to examine the reasons for delays and cancellations.

13 HYDRO ENERGY↗