The Big Plunge at Venus: The DAVINCI Descent Phase

DAVINCI (Deep Atmosphere Venus Investigation of Noble gases, Chemistry, and Imaging) was selected as one of two new Discovery missions in summer of 2021 with the primary goals are to study how the Venus atmosphere formed and changed over time. DAVINCI does this by making in situ measurements of the atmosphere and taking images below the cloud layer during the descent phase. The probe is neither designed nor required to land on the surface so all critical science data must be taken and transmitted to a relay spacecraft prior to impact. This architecture drives the mission to a carefully-crafted concept of operations; deployments, instrument operations, and communications are choreographed to ensure the right data is gathered at the right altitude given the uncertainties in the trajectory and timeline. A complex flow of analyses and tests throughout development will validate the system’s ability to execute the mission goals. In the end, DAVINCI will be ready for the one opportunity at one hour of descent time to meet its driving science goals.

DAVINCI↗

InSight Robotic Arm Testing Activities for HP3 Mole Anomaly Recovery on Mars

The InSight lander’s Heat Flow and Physical Properties Package (HP3) was deployed on Mars in February 2019and began attempting to penetrate to its target depth range of3-5 meters shortly thereafter. However, the mole’s downwardprogress stopped after only 35 cm of penetration. In response,the project convened an Anomaly Response Team (ART) andsince then has been attempting to diagnose the problem andassist the mole using the tools available on Mars. The key assetused in this effort has been the Instrument Deployment System(IDS), which includes two cameras and a robotic InstrumentDeployment Arm (IDA). Since the IDS was originally intendedonly to deploy InSight’s primary instruments to the Martiansurface, new testbed setups, experiments, and operational protocols (e.g., command sequences) were required and had to bedeveloped on a short timeline. The HP3 Mole ART first focusedon gathering all observable data on Mars about the state ofthe mole and Support Structure Assembly (SSA), as well asthe physical properties of the Martian regolith. This includedusing the robotic arm to point the IDC at the SSA duringdiagnostic hammering attempts to observe motion of the SSAand science tether. Images taken during these attempts revealedsome motion of the SSA, but no apparent change in mole depth.At JPL, the IDS and Testbed teams re-created the hardwareconfiguration on Mars based on limited knowledge of the mole’sstate. They devised and tested techniques to use the roboticarm and cameras to accomplish previously untested activitieson Mars, including imaging the HP3, using the IDA to interactwith the terrain, and using the IDA to move the SSA awayfrom the partially-embedded mole. The team executed the morepromising techniques on Mars. After diagnostic hammering onMars, the team decided to move the SSA to gain visibility ofthe mole’s configuration and access to the soil around the mole.After developing the technique and practicing the maneuver inthe InSight testbed, the team lifted the SSA on Mars and placedit behind the mole. This revealed a pit surrounding the nowexposed mole, observations of which provided essential cluesfor determining the root cause of the mole’s lack of progress.The IDS and Testbed teams altered the testbed to match thesituation on Mars. They devised IDA techniques to determinethe Martian soil properties and assist the mole’s descent. Theytested these techniques in the testbed and executed the more978-1-7281-2734-7/20/$31.00 c 2021 IEEE. Copyright 2020 CaliforniaInstitute of Technology. U.S. Government sponsorship acknowledged.promising ones on Mars. These include using the robotic arm toalter the regolith near the mole and to push on the mole while ithammers. This paper discusses the anomaly resolution testing inthe testbed at JPL, describes how the IDS team prepared for theanomaly recovery activities on Mars, and provides preliminaryresults of the efforts to assist the HP3 mole on Mars.

Kim, Junggon↗

The missing correlation between the potential rate impacts of rooftop solar and the timing of state net metering policy revisions

Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states—California and Hawaii—retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY↗

Fast Reactor Materials R&D Update

Presentation detailing Major focus: Deployment of A709 for fast reactor structural applications in the area of Design, Fabrication, Supply Chain, and Adx Rx Operation. Also discuss additional work to support A709 development, High level timeline for Irradiation design data, and processing parameters.

36 MATERIALS SCIENCE↗

GPM Timeline Inhibits For IT Processing

The Safety Inhibit Timeline Tool was created as one approach to capturing and understanding inhibits and controls from IT through launch. Global Precipitation Measurement (GPM) Mission, which launched from Japan in March 2014, was a joint mission under a partnership between the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). GPM was one of the first NASA Goddard in-house programs that extensively used software controls. Using this tool during the GPM buildup allowed a thorough review of inhibit and safety critical software design for hazardous subsystems such as the high gain antenna boom, solar array, and instrument deployments, transmitter turn-on, propulsion system release, and instrument radar turn-on. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As a result of this process, a new tool safety inhibit timeline was created for management of inhibits and their controls during spacecraft buildup and testing during IT at GSFC and at the launch range in Japan. The Safety Inhibit Timeline Tool was a pathfinder approach for reviewing software that controls the electrical inhibits. The Safety Inhibit Timeline Tool strengthens the Safety Analysts understanding of the removal of inhibits during the IT process with safety critical software. With this tool, the Safety Analyst can confirm proper safe configuration of a spacecraft during each IT test, track inhibit and software configuration changes, and assess software criticality. In addition to understanding inhibits and controls during IT, the tool allows the Safety Analyst to better communicate to engineers and management the changes in inhibit states with each phase of hardware and software testing and the impact of safety risks. Lessons learned from participating in the GPM campaign at NASA and JAXA will be discussed during this session.

Inhibits↗

The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions

Data supporting the article “The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions” (https://www.nlr.gov/docs/fy25osti/93543.pdf). Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states-California and Hawaii-retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY↗

Applications of explainable artificial intelligence in renewable energy research

Researchers in renewable energy are applying deep learning (DL) to a variety of problems from diverse renewable energy domains, such as biofuels, wind, solar, power systems, buildings, vehicles, and transportation systems. Improvements in accuracy may be demonstrated using DL in laboratory settings. However, the lack of interpretability of DL models poses a practical limitation to their utility in advancing scientific knowledge and in the deployment of DL models in safety-critical energy systems. In this article, we discuss explainable artificial intelligence (XAI) as one pathway toward more interpretable DL models. We explore a brief timeline of U.S. national laboratory interest in XAI, an overview and taxonomy of methods in the field of XAI, and a selection of applications across renewable energy research domains. We conclude by highlighting pivotal areas where XAI can accelerate innovation in artificial intelligence for renewable energy research and other essential future directions.

97 MATHEMATICS AND COMPUTING↗

Commissioning the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is going through final integration and testing and is planned to launch in 2021. The last remaining optical challenge for JWST is to fully align the observatory in flight to meet the optical requirements but this effort involves many system considerations to do this safely and efficiently and the entire effort will take several months. This talk will cover what it takes to deploy and optically commission the telescope including the many interactions and constraints of deployment, thermal, optical, attitude control and contamination properties of the observatory. The talk will cover the final optical requirements that the telescope will need to meet and will provide the roadmap of timelines, cooldown profiles, Wavefront Sensing and Control steps, system constraint considerations, and implementation of lessons learned from the ground test campaign that will result in meeting those optical requirements. The talk will also cover the organizational structure and processes in place to assure this process will be successful and efficient.

Commissioning JWST OBS↗

Flight Dynamics Operations: Methods and Lessons Learned from Space Shuttle Orbit Operations

The Flight Dynamics Officer is responsible for trajectory maintenance of the Space Shuttle. This paper will cover high level operational considerations, methodology, procedures, and lessons learned involved in performing the functions of orbit and rendezvous Flight Dynamics Officer and leading the team of flight dynamics specialists during different phases of flight. The primary functions that will be address are: onboard state vector maintenance, ground ephemeris maintenance, calculation of ground and spacecraft acquisitions, collision avoidance, burn targeting for the primary mission, rendezvous, deorbit and contingencies, separation sequences, emergency deorbit preparation, mass properties coordination, payload deployment planning, coordination with the International Space Station, and coordination with worldwide trajectory customers. Each of these tasks require the Flight Dynamics Officer to have cognizance of the current trajectory state as well as the impact of future events on the trajectory plan in order to properly analyze and react to real-time changes. Additionally, considerations are made to prepare flexible alternative trajectory plans in the case timeline changes or a systems failure impact the primary plan. The evolution of the methodology, procedures, and techniques used by the Flight Dynamics Officer to perform these tasks will be discussed. Particular attention will be given to how specific Space Shuttle mission and training simulation experiences, particularly off-nominal or unexpected events such as shortened mission durations, tank failures, contingency deorbit, navigation errors, conjunctions, and unexpected payload deployments, have influenced the operational procedures and training for performing Space Shuttle flight dynamics operations over the history of the program. These lessons learned can then be extended to future vehicle trajectory operations.

Cutri-Kohart, Rebecca M.↗

SolarAPP+ Performance Review: 2021 Data

Accelerating rooftop solar photovoltaic (PV) deployment has strained the capacity of local authorities responsible for permitting, inspection, and interconnection (PII). Given the ongoing expansion of rooftop PV, a growing number of authorities having jurisdiction (AHJs) and utilities are reforming PII processes to reduce delays. AHJs could significantly reduce PII timelines through reforms such as expedited reviews for small-scale systems, online customer portals, and over-the-counter permitting. However, independent reforms do not resolve issues associated with PII variability across AHJs, and many AHJs lack the resources to implement reforms. In response to these challenges, the National Renewable Energy Laboratory (NREL) developed the Solar Automated Permit Processing Plus (SolarAPP+) platform, in collaboration with local governments, code development organizations, and industry stakeholders. This report shows SolarAPP+ performance in 2021 across AHJs.

14 SOLAR ENERGY↗

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Mars InSight Entry, Descent, and Landing Trajectory and Atmosphere Reconstruction

The InSight mission landed on the surface of Mars on November 26th, 2018. The InSight system performance met all design requirements, although several performance metrics fell near the boundaries of the predictions. The peak deceleration was high, the overall timeline was short, and the landing site was uprange and crossrange from the target. This paper describes the reconstruction of the entry, descent, and landing trajectory and atmosphere. The approach utilizes a Kalman filter to blend sensor data to obtain the vehicle trajectory. The aerodynamic database is used in combination with the sensed accelerations to obtain estimates of the atmosphere-relative state, which in turn is used to derive the free-stream atmospheric conditions during entry, until the time of parachute deployment. The results indicate that the reconstructed atmosphere was approximately 1σbelow the preflight atmosphere. Analysis of the reconstructed vehicle attitude angles indicate that the aerodynamic lift was oriented downward at entry. The vehicle developed a roll rate during entry, which directed a component of the lift to the north. The low density and aerodynamic lift direction are determined to be the primary causes of the high deceleration, short timeline, and location of the landing site relative to the target.

Christopher D Karlgaard↗

Mars InSight Entry, Descent, and Landing Trajectory and Atmosphere Reconstruction

The InSight mission landed on the surface of Mars on November 26th, 2018. The InSight system performance met all design requirements, although several performance metrics fell near the boundaries of the predictions. The peak deceleration was high, the overall timeline was short, and the landing site was uprange and crossrange from the target. This paper describes the reconstruction of the entry, descent, and landing trajectory and atmosphere. The approach utilizes a Kalman filter to blend sensor data to obtain the vehicle trajectory. The aerodynamic database is used in combination with the sensed accelerations to obtain estimates of the atmosphere-relative state, which in turn is used to derive the free-stream atmospheric conditions during entry, until the time of parachute deployment. The results indicate that the reconstructed atmosphere was approximately 1σbelow the preflight atmosphere. Analysis of the reconstructed vehicle attitude angles indicate that the aerodynamic lift was oriented downward at entry. The vehicle developed a roll rate during entry, which directed a component of the lift to the north. The low density and aerodynamic lift direction are determined to be the primary causes of the high deceleration, short timeline, and location of the landing site relative to the target.

Christopher D Karlgaard↗

In-Conduit Hydropower for Public Water Supply Systems: Development Challenges and Costs

Conduit hydropower leverages existing water infrastructure to provide energy solutions, though deployment has been slow. A 2022 US Department of Energy (DOE)–funded report led by Oak Ridge National Laboratory (ORNL) summarizes a reconnaissance-level study of hydropower potential at national conduits (Kao et al., 2022). The report includes power and energy estimates across three major sectors of conduit hydropower potential: municipal, agricultural, and industrial. Water resources include public water supply systems (municipal and industrial), irrigation canal systems (agricultural), thermoelectric cooling systems (industrial), and wastewater systems (municipal and industrial). In total, 1.41 GW of power potential was estimated nationwide. Subsequently, DOE has funded ORNL through the Conduit Hydropower Engineering, Evaluation, and Technology Acceleration project (CHEETA) to improve deployment potential for conduit hydropower. Work thus far has focused on “in-conduit” hydropower (ICH)—or “in-pipe” hydropower—for public water supply systems, though the project is planning to cover conduit hydropower more broadly. The timeline of ORNL’s conduit hydropower related research and development (R&D) is shown in Figure 1. The results of CHEETA should benefit the hydropower industry by providing insights into costs, barriers, and other considerations that impact project development. The hydropower industry and municipal/industrial conduit stakeholders will use the output to inform development decisions and advance low-impact hydropower growth in the US.

13 HYDRO ENERGY↗

Pre-Mission Input Requirements to Enable Successful Sample Collection by a Remote Field/EVA Team

This paper is intended to evaluate the sample collection process with respect to sample characterization and decision making. In some cases, it may be sufficient to know whether a given outcrop or hand sample is the same as or different from previous sampling localities or samples. In other cases, it may be important to have more in-depth characterization of the sample, such as basic composition, mineralogy, and petrology, in order to effectively identify the best sample. Contextual field observations, in situ/handheld analysis, and backroom evaluation may all play a role in understanding field lithologies and their importance for return. For example, whether a rock is a breccia or a clast-laden impact melt may be difficult based on a single sample, but becomes clear as exploration of a field site puts it into context. The FINESSE (Field Investigations to Enable Solar System Science and Exploration) team is a new activity focused on a science and exploration field based research program aimed at generating strategic knowledge in preparation for the human and robotic exploration of the Moon, near-Earth asteroids (NEAs) and Phobos and Deimos. We used the FINESSE field excursion to the West Clearwater Lake Impact structure (WCIS) as an opportunity to test factors related to sampling decisions. In contract to other technology-driven NASA analog studies, The FINESSE WCIS activity is science-focused, and moreover, is sampling-focused, with the explicit intent to return the best samples for geochronology studies in the laboratory. This specific objective effectively reduces the number of variables in the goals of the field test and enables a more controlled investigation of the role of the crewmember in selecting samples. We formulated one hypothesis to test: that providing details regarding the analytical fate of the samples (e.g. geochronology, XRF/XRD, etc.) to the crew prior to their traverse will result in samples that are more likely to meet specific analytical objectives than samples collected in the absence of this premission information. We conducted three tests of this hypothesis. Our investigation was designed to document processes, tools and procedures for crew sampling of planetary targets. This is not meant to be a blind, controlled test of crew efficacy, but rather an effort to recognize the relevant variables that enter into sampling protocol and to develop recommendations for crew and backroom training in future endeavors. Methods: One of the primary FINESSE field deployment objectives was to collect impact melt rocks and impact melt-bearing breccias from a number of locations around the WCIS structure to enable high precision geochronology of the crater to be performed [1]. We conducted three tests at WCIS after two full days of team participation in field site activities, including using remote sensing data and geologic maps, hiking overland to become familiar with the terrain, and examining previously-collected samples from other islands. In addition, the team members shared their projects and techniques with the entire team. We chose our "crew members" as volunteers from the team, all of whom had had moderate training in geologic fieldwork and became familiar with the general field setting. The first two tests were short, focused tests of our hypothesis. Test A was to obtain hydrothermal vugs; Test B was to obtain impact melt and intrusive rock as well as the contact between the two to check for contact metamorphism and age differences. In both cases, the test director had prior knowledge of the site geology and had developed a study-specific objective for sampling prior to deployment. Prior to the field deployment, the crewmember was briefed on the sampling objective and the laboratory techniques that would be used on the samples. At the field sites (Fig. 2), the crewmember was given 30 minutes to survey a small section of outcrop (10-15 m) and acquire a suite of three samples. The crewmember talked through his process and the test director kept track of the timeline in verbal cues to the crewmember. At the conclusion, the team member conducting the scientific study appraised the samples and train of thought. Test C was a 90-minute EVA simulation using two crewmembers working out of line-of-sight in communication with a science backroom. The science objectives were determined by the science backroom team in advance using a Gigapan image of the outcrop (Fig. 1). The science team formulated hypotheses for the outcrop units and created sampling objectives for impact-melt lithologies; the science team turned these into a science plan, which they communicated to the crew in camp prior to crew deployment. As part of the science plan, the science team also discussed their sample needs in depth with the crewmembers, including laboratory methods, objectives, and samples sizes needed. During the deployment, the two crewmembers relayed real-time information to the science backroom by radio with no time delay. Both the crew and science team re-evaluated their hypotheses and science plans in real-time. Discussion: Upon evaluation, we found that the focused tests (Tests A and B) were successful in meeting their scientific objectives. The crewmember used their knowledge of how the samples were to be used in further study (technique, sample size, and scientific need) to focus on the sampling task. The crewmember was comfortable spending minimal time describing and mapping the outcrop. The crewmember used all available time to get a good sample. The larger test was unsuccessful in meeting the sampling objectives. When the crewmembers began describing the lithologies, it was quickly apparent that the lithologies were not as the backroom expected and had communicated to the crew. When the outcrop wasn't as expected, the crew members instinctively switched to field characterization mode, taking significant time to characterize and map the outcrop. One crew member admitted that he "kind of lost track" of the sampling strategy as he focused on the basic outcrop characterization. This is the logical first step in a field geology campaign, that a significant amount of time must be spent by the crew and backroom to understand the outcrop and its significance. Basic field characterization of an outcrop is a focused activity that takes significant time and training [2, 3]. Sampling of representational lithologies can be added to this activity for little cost [4]. However, we have shown that identification of unusual or specific samples for laboratory study also takes significant time and knowledge. We suggest that sampling of this type be considered a separate activity from field characterization, and that crewmembers be trained in sampling needs for different kinds of studies (representative lithologies vs. specialized samples) to acquire a mindset for sampling similar to field mapping. Sampling activities should be given a significant amount of specifically allocated time in scheduling EVA activities; and in the better case, that sampling be done as a second activity to a previously studied outcrop where both crew and backroom are comfortable with its context and characteristics. Our hypothesis posited that crewmember knowledge of how the samples would be used upon return would aid them in choosing relevant samples. Our testing bore this hypothesis out to some extent. We therefore recommend that crewmember training should include exposure to the laboratory techniques and analyses that will be used on the samples to foster this knowledge. There is also the potential for increasing crewmember contextual knowledge real-time in the field through the introduction of in situ geochemical technologies such as field portable XRF. The presence of field portable geochemical technology could enable the astronauts to interrogate the samples for K abundance real-time, ensuring they could collect valuable and dateable samples [5]. Though simulations such as these can teach us a fair bit about decision making processes and timeline building, one EVA participant noted that when he wasn't collecting "real" samples, he wasn't at his best. This effect suggests that higher-fidelity studies involving truly remote participants conducting actual scientific studies merit further attention to capture lessons for application to future crew situations.

sample collection↗

How the Internet of "Space" Things will Disrupt and Transform Astronaut Work-life

Future long duration exploration missions will require astronauts to work and behave more autonomously. Over the last several years, we have been investigating how integrating sensors into an astronaut’s environment enables crew autonomy. This paper describes the prototypes we have deployed in Earth analogs investigating the concept of the Internet of “Space” Things.

procedure execution↗

Innovation in Radiological Security, Part 1 of 2 – Using a Cloud Solution to Compress the Timely Detection Model

The design and implementation of new security technologies must account for numerous and complex operational challenges. For example, traditionally isolated systems must now survive amid the proliferation of network connectivity and endure the dynamic environments created by organizations tolerating bring-your-own-device policies. When evaluating the cyber, physical, or cyber-physical security of an asset, a common practice in the security industry is to apply the Timely Detection Model (TDM)—a versatile concept that relates the security functions of detection, delay, and response to the progression of an oppositional force’s attack timeline. If implemented correctly, security enhancements can compress the TDM to offer efficiencies to the stakeholders responsible for adjudicating threat scenarios. The efficiencies gained by the response force allow for more effective protection strategies to be realized. One such enhancement, deployed within the radiological security domain—the Sentry-Remote Monitoring System (Sentry-RMS)—is a stand-alone security system that detects, assesses, and communicates priority alarms as a means of thwarting internal and external threats. The SEntry-RMS CommUnications and REsponse (Sentry-SECURE) platform—an optional feature of the Sentry-RMS—is being developed to facilitate more efficient alarm adjudication by site stakeholders and, if necessary, a faster response by law enforcement. This Cloud-hosted platform receives protected information from deployed Sentry-RMS units and relays it to stakeholders that have vested interests in maintaining an elevated level of situational awareness. Operationally, this enables real-time delivery of high-priority alarm and video imagery directly to an identified response stakeholder, such as local law enforcement or site management, via natively developed mobile applications or full platform integration. The Sentry-SECURE platform, as implemented by the U.S. Department of Energy’s Office of Radiological Security, is an example of an innovative security technology that compresses the TDM by (1) enabling a more efficient time to target and (2) better informing a response force’s predetermined tactics, techniques, and procedures. This paper explores the platform’s operational roles, highlights its principal functions, and presents a use case that demonstrates how the platform provides enhanced situational awareness when adjudicating priority alarms.

Sentry-RMS, Timely Detection Model, Sentry-SECURE↗