Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deep well”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Subsidence and eustasy at the continental margin of eastern North America

Biostratigraphic data from the COST B-2 well off New York and four deep commercial wells off Nova Scotia have been used to remove the effect of sediment loading at the Atlantic-type continental margin off the East Coast of North America. The resulting subsidence contains terms due to both 'tectonic' and 'eustatic' effects. By assuming the tectonic subsidence is thermal in origin these effects can be separated. The 'eustatic' effects have been isolated by least squares fitting an exponential curve to the subsidence data. The resulting sea-level curve shows a maximum rise in sea level during the Late Cretaceous era which probably does not exceed 150 m. The tectonic subsidence has been interpreted in terms of a simple thermal model for the cooling lithosphere. Based on this model the thermal thickness of the lithosphere and the total amount of crustal thinning are estimated. These estimates which are consistent with surface ship gravity and GEOS-3 altimeter measurements are used to define the structural elements which control the tectonic evolution of the margin.

Watts, A. B.↗

A Comparison of Groundwater Sampling Technologies, Including Passive Diffusion Sampling, for Radionuclide Contamination - 20205

Using traditional high-flow purge methods for long-term water quality monitoring of deep groundwater wells can be expensive, affect contaminant migration, and produce excessive volumes of discharge water that can be difficult to manage. The use of low-flow pumping methods and depth discrete bailers (DDBs) can reduce the cost of sampling deep groundwater wells. In general, using different pumping methods to obtain reproducible and representative groundwater can be challenging. Passive diffusion samplers (PDSs) have successfully been used in long-term monitoring for volatile organic compounds, major ions, and trace-elements, but application has been limited for stable and radioactive isotopes. Beginning in 2018, the United States Geological Survey (USGS) conducted three sampling events to test the ability of PDSs and DDBs to obtain reproducible and representative groundwater samples. The sampled well is completed in a regional, permeable carbonate aquifer and is one in a set of wells that have historically been used for tritium tracer testing. All samples were obtained at 180 m (590 ft) below land surface (bls) in a 13.97 cm (5.5 inch) uncased well that has a total depth of 202 m (662 ft) bls. The first sampling event deployed a regenerated cellulose dialysis membrane (RCDM) PDS for 14 days with deionized water as the blank. The second sampling event deployed a RCDM for 27 days also with deionized water as the blank. The third sampling event deployed a Dual Membrane (DM) PDS for 65 days using a blank of tritium-dead carbonate water. The DM PDS was used to assess the effect of longer term deployment on tritium concentrations and address whether or not the PDSs reached equilibrium with ambient groundwater. The day after each of the three passive samplers were retrieved a DDB was used to obtain discrete non-integrated groundwater samples. For each DDB sampling day, the bailer was lowered into the well 10 consecutive times to determine if the water chemistry changed from the first to the last bailed sample. Quality assurance samples including blanks and duplicates were obtained during all three sampling events. All blank waters had tritium concentrations less than 21±33 pCi/L. Major ion (e.g. calcium, chloride, sodium, and sulfate) results were compared between all samples obtained with RCDM and DDB. Major ion concentrations showed a coefficient of variation of less than 6% between all RCDM and DDB samples; however, the coefficient of variation between the different deployment times and the two different methods for trace-element concentrations was much larger, particularly for manganese (82%), lead (41%), and zinc (33%). Stable isotope values were compared between the RCDM and DDB samples. The DDB sample results all fell within analytical uncertainty and were considered representative of the formation groundwater. The stable isotope values from the RCDM samples indicated that a longer deployment time was necessary to gain equilibrium and to obtain representative groundwater samples. Tritium results from groundwater samples obtained from the RCDM, DM, and DDB indicate that groundwaters obtained with PDSs produced tritium concentrations 2 to 3 times higher (between 1,426 and 3,060±87 pCi/L) than groundwaters obtained with a DDB (479 to 1,219±51 pCi/L). The longer the passive diffusion samplers were deployed, the higher the tritium concentration, suggesting that equilibrium with tritium was not reached within a 27-day deployment. DDB samples showed tritium results declining from the first to the last bailed sample for all three sampling events. This research suggests that tritium results from groundwater samples obtained from PDSs are more reproducible than samples obtained from DDBs. Also, PDSs likely do not accumulate isotopes of water but rather equilibrate with the ambient groundwater. On the other hand, both PDSs and DDBs were able to provide representative groundwater samples for major ions and have the potential to produce representative groundwater samples for stable isotopes of water (δD and δ{sup 18}O). Utilizing the most effective method for sampling groundwater is important for long-term groundwater monitoring. Quantifying the ability of passive diffusion groundwater samplers to obtain representative radioactive chemistry samples will help determine if these methods can be a useful alternative to pumping and purging wells for long-term monitoring. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Technological and Medical Human Health and Well-Being Options in Deep Space

Zeroth order, maintenance of human health requires supportive protection from the hazards of space, including supplying breathable air, comfortable temperatures, a supportive diet/nutrition, radiation protection, and sufficient gravity to avoid the combinatorial impacts of such effecting human operability and health. Spacecraft operability must be “fail-safe” to ensure these basic human life support conditions are maintained throughout the mission and the mission(s) must be affordable. There are known effects and unknowns effects regarding aspects of human health for Mars duration missions. Mars has the order of a third g. We have no data regarding the health impacts of this on humans or the combinatorial effects associated with 45% GCR on the Martian surface over time. There is a suspicion that if humans survive such conditions over long times they will evolve to living at reduced g and become “Martians”. Cascading failures and subcritical degradations in systems of systems causing an overall unrecoverable failure are a potential issue. There are two exremely complex systems associated with humans-Mars missions: the technical, engineering, and architectural system of systems that enable the mission and the humans. Both need to be mutually configured and operated to mitigate the overall risks and hazards of the mission. Regarding the humans that mitigation includes both the mission risks and supporting-to-increasing the human immune and other concomitant physiological systems. This report will summarize the risks, current mitigation approaches, and putative approaches including lifestyle, nutrition, and “wellness” approaches to possibly improve the human capacity to withstand the large number of combinatorial human physiological rigors of the missions. The wellness observations also apply to and are derived from Earth terrestrial applicable research.

Dennis M Bushnell↗

High-Voltage CMOS Active Pixel Sensor

The high-voltage CMOS (HVCMOS) sensors are a novel type of CMOS active pixel sensors for ionizing particles that can be implemented in CMOS processes with deep n-well option. The pixel contains one sensor electrode formed with a deep n-well implanted in a p-type substrate. CMOS pixel electronics, embedded in shallow wells, are placed inside the deep n-well. By biasing the substrate with a high negative voltage and by the use of a lowly doped substrate, a depleted region depth of at least 30 µm can be achieved. The electrons generated by a particle are collected by drift, which induces fast detectable signals. This publication presents a 4.2-cm 2 large HVCMOS pixel sensor implemented in a commercial 180-nm process on a lowly doped substrate and its characterization.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Methane Plume Emissions Associated With Puget Sound Faults in the Cascadia Forearc

Methane gas plumes have been discovered to issue from the seafloor in the Puget Sound estuary. These gas emission sites are co-located over traces of three major fault zones that fracture the entire forearc crust of the Cascadia Subduction Zone. Multibeam and single-beam sonar data from cruises conducted in 2011, 2018, 2019, 2020 and 2021 identified the acoustic signature of over 330 bubble plumes. Dissolved gas from the plumes combines to elevate seawater methane concentrations of the entire Puget Sound estuary. Fluid samples from adjacent terrestrial hot springs and deep-water wells surrounding the estuary contain a helium-3 isotope signature, indicating a deep fluid source located near the underlying Cascadia Subduction Zone. However, Puget Sound seawater emission sites lack chemical isotope signatures and elevated thermal anomalies expected from association with a deep plate-interface reservoir. The existence of vigorous marine methane plumes located in areas of thin sediment cover and above the traces of deeply-penetrating forearc fault zones – but still presenting no thermal or chemical anomalies that are found in many other similar forearc environments and remain an unresolved paradox.

54 ENVIRONMENTAL SCIENCES↗

Utah FORGE Well 16A(78)-32 X-ray Diffraction Data

This submission contains x-ray diffraction data taken from 3,600 to 10,987 feet deep in well 16A(78)-32 in the Roosevelt Hot Springs Geothermal Area as part of the Utah FORGE project. 78 rock samples were taken. Samples are taken in a range of ten feet at 100 foot increments. Mineral abundances are given in weight percent of the sample, with results rounded to the nearest whole number. Fields marked with tr (trace) indicate that mineral is present, but that its abundance calculated from the Rietveld refinement was less than one weight percent; that it was observed in the clay-sized fraction, but not the bulk; and/or that it was observed in low abundance during petrographic analyses. The samples were taken between 10/29/2020 and 12/24/2020 during the drilling of well 16A(78)-32.

15 GEOTHERMAL ENERGY↗

Using Strain in the Vadose Zone During Sinusoidal-Rate Well Tests to Characterize an Aquifer

Well tests with sinusoidal variation in pumping rate are appealing because of the ability to filter competing signals and they also can be set up with no net removal of water, which is an advantage at contaminated sites. Current methods of interpreting sinusoidal-rate well tests analyze the phase lag and amplitude of pressure signals in the aquifer. This approach is restricted by the availability of monitoring wells. An alternative approach could be to measure the stain in the vadose zone instead of pressure in the aquifer. The goal of this research is to evaluate the feasibility of using signals from in-situ sensors in the vadose zone to characterize sinusoidal-rate well tests. Well tests with a variety of periods and amplitudes were performed using a well completed in an unconfined saprolite aquifer with a water table at 9m depth at our test site near Clemson, South Carolina. Vertical strain was measured every meter between 1 to 7 m using a distributed optical fiber sensing technique called coherence length gated microwave photonics interferometry (CMPI). A novel packaging system was designed to couple the optical fiber to the saprolite. The results show that strain measured in the vadose zone during sinusoidal-rate pumping varies periodically with amplitudes from 0.1 to 3 microstrain, depending on the amplitude of the sinusoidal pumping rate. Hydraulic heads at similar radial distances were also periodic with changing amplitudes ranging up to ±0.2 meters. The strain in the vadose zone responds to pressure in the underlying aquifer—the strain is tensile when the pressure is falling, and compressive when the pressure is rising. The phase lag between the pumping rate and the strain was 3 min with a pumping period of 15 minutes, and this gives a hydraulic diffusivity of 0.06 m2/s. This is the same diffusivity obtained by analyzing a constant rate pumping test, and it is slightly larger than the diffusivity (0.044 m2/s) obtained by analyzing the phase lag of the pressure in a nearby monitoring well. Strain measurements in the vadose zone could be made with much less cost and effort than installing a deep monitoring well. These results suggest that strain measurements in the vadose zone could be used to supplement monitoring wells, thereby increasing the resolution, and reducing costs of analyzing well tests.

well test, sinusoidal, periodic pumping, strain↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Monitoring of ground water table depth and soil moisture at the Point Reyes field site

Ground water table (GWT) depth and soil moisture (SM) have been monitored at several locations at the Point Reyes field site (Californian coastal grassland) from 2021 to 2024. Monitoring is still on-going and data may be added to this archive at later time. The SM data have been acquired using Teros 12 Meter soil moisture sensors placed at 10, 30, 60 and 90 cm depth at 5 locations along a small hillslope. These sensors also collect soil temperature and bulk conductance. In addition, some collocated sensors provide pore pressure and Photochemical Reflectance Index (PRI). The GWT depth has been inferred from various type of Onset pressure transducers. The pressure measurements have been corrected for atmospheric pressure variations and sensor position relative to the ground surface to infer GWT depth, as well as with RTK GPS data to infer GWT elevation. The GWT data have been acquired at 5 distinct locations from 2020 to 2024 with the sensors placed at about 4 m depth. In addition, GWT data has been acquired for the 2023-2024 period with sensors located in 1 m deep shallow wells installed near each deeper well. This data is intended to evaluate possibly different dynamic in shallow (perched) and deep aquifer. The datasets are all provided in csv format. Please note that the interpretation of the GWT data needs to be done with consideration of environmental and well characteristics at the site and uncertainty in various variables. For more information on GWT and SM data, please contact the author.

54 ENVIRONMENTAL SCIENCES↗

Utah FORGE: Updated Phase 2C Well Location Coordinates

Utah FORGE has been established to develop, test, and improve the technologies and techniques required to develop EGS-type geothermal resources. Drilling of the first of two deep deviated wells, 16A(78)-32, will begin in the second half of 2020. This well will serve as the injection well for the injection-production well pair that will form the heart of the laboratory. This submission contains an archive of well location data within the Roosevelt Hot Springs geothermal area. An Excel spreadsheet is included containing updated GPS data for Utah FORGE wells drilled during Phase 2C (56-32, 68-32, 78-32). This data was collected over time by the Utah Geological Survey and contains all coordinates collected and the final averaged XY coordinates in both Longitude and Latitude and UTM Zone 12, NAD83. Elevation is also included. GIS shapefiles with well points are provided in the archive.

15 GEOTHERMAL ENERGY↗

Solar Sail Control Actuator Concepts

The thrust produced by a solar sail is a direct function of its attitude. Thus, solar sail thrust vector control is a key technology that must be developed for sailcraft to become a viable form of deep-space transportation. The solar sail community has been studying various sail Attitude Control System (ACS) actuator designs for near Earth orbit as well as deep space missions. These actuators include vanes, spreader bars, two-axis gimbals, floating/locking gimbals with wheels, and translating masses. This paper documents the various concepts and performs an assessment at the highest level. This paper will only compare the various ACS actuator concepts as they stand at the publication time. This is not an endorsement of any particular concept. As concepts mature, the assessments will change.

David Mangus↗

Enhancement of charge density wave correlations in a Holstein model with an anharmonic phonon potential

The Holstein Hamiltonian describes itinerant electrons whose site density couples to local phonon degrees of freedom. In the single-site limit, at half filling, the electron-phonon coupling results in a double-well structure for the lattice displacement, favoring empty or doubly occupied sites. In two dimensions and on a bipartite lattice in d ≥ 2, intersite hopping causes these doubly occupied and empty sites to alternate in a charge density wave (CDW) pattern when the temperature is lowered. Because a discrete symmetry is broken, this occurs in a conventional second-order transition at finite T cdw . In this paper, we investigate the effect of changing the phonon potential energy to one with an intrinsic double-well structure even in the absence of electron-phonon coupling. While this aids in the initial process of pair formation, the implications for subsequent CDW order are nontrivial. One expects that, when the electron-phonon coupling is too strong, the double wells become deep and the polaron mass gets large, an effect which reduces T cdw . Here, we show here the existence of regions of parameter space where the double-well potential, while aiding local pair formation, does so in a way which also substantially enhances long-range CDW order.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Newberry SHR Demonstration Project – Bipartisan Infrastructure Law Enhanced Geothermal (EGS) Pilot Demonstration (Abstract)

This project will create an Engineered Geothermal System (EGS) comprising two or more wells drilled to a depth of 4.25 km into superhot rock (SHR) with a temperature of 425 °C at Newberry Volcano in Central Oregon. An EGS is a manufactured heat exchanger in which water is injected in a deep injection well, or injector, to extract heat from the hot rock at depth and steam is returned to the surface in a production well, or producer, to generate electricity. In this project, the SHR EGS will be made using new methods and technologies to stimulate and connect hydraulic and natural fractures to enable multiple flow pathways between wells, allowing for optimal heat mining from the reservoir rock. The new technologies are designed to operate at rock temperatures much higher than those encountered in traditional geothermal. Following EGS completion, water will be injected into the injector well and steam extracted from the producer well in a long-term connectivity flow test demonstrating SHR reservoir evolution with time and use. Success will be measured by demonstrating the efficacy of new technologies and by producing economic quantities of steam (>40 MWth).

15 GEOTHERMAL ENERGY↗

Intersubband Auger recombination and population inversion in quantum-well subbands

The intersubband-Auger-recombination time of electrons under population-inversion conditions in a single quantum well is calculated by taking into account momentum- and energy-conservation rules, and by employing Fermi-Dirac statistics. The screened matrix element of the electron-electron interaction and the overlap integral are calculated for an infinitely deep quantum well. The results are in a good agreement with published experimental data. As a major nonradiative process, the Auger recombination is related to threshold current of infrared lasers based on intersubband transitions in quantum-well structures. The realization of these devices and other limitations to achieving population inversion are discussed. In view of the results, development of these lasers for emission wavelengths corresponding to energies below the LO-phonon energy seems feasible.

Borenstain, S.↗

The Advanced Technology Large-Aperture Space Telescope (ATLAST) Technology Roadmap

We present the key technologies and capabilities that will enable a future, large-aperture ultravioletopticalinfrared (UVOIR) space observatory. These include starlight suppression systems, vibration isolation and control systems, lightweight mirror segments, detector systems, and mirror coatings. These capabilities will provide major advances over current and near-future observatories for sensitivity, angular resolution, and starlight suppression. The goals adopted in our study for the starlight suppression system are 10-10 contrast with an inner working angle of 40 milliarcsec and broad bandpass. We estimate that a vibration and isolation control system that achieves a total system vibration isolation of 140 dB for a vibration-isolated mass of 5000 kg is required to achieve the high wavefront error stability needed for exoplanet coronagraphy. Technology challenges for lightweight mirror segments include diffraction-limited optical quality and high wavefront error stability as well as low cost, low mass, and rapid fabrication. Key challenges for the detector systems include visible-blind, high quantum efficiency UV arrays, photon counting visible and NIR arrays for coronagraphic spectroscopy and starlight wavefront sensing and control, and detectors with deep full wells with low persistence and radiation tolerance to enable transit imaging and spectroscopy at all wavelengths. Finally, mirror coatings with high reflectivity ( 90), high uniformity ( 1) and low polarization ( 1) that are scalable to large diameter mirror substrates will be essential for ensuring that both high throughput UV observations and high contrast observations can be performed by the same observatory.

Telescope↗

A Future Large-Aperture UVOIR Space Observatory: Key Technologies and Capabilities

We present the key technologies and capabilities that will enable a future, large-aperture ultravioletopticalinfrared (UVOIR) space observatory. These include starlight suppression systems, vibration isolation and control systems, lightweight mirror segments, detector systems, and mirror coatings. These capabilities will provide major advances over current and near-future observatories for sensitivity, angular resolution, and starlight suppression. The goals adopted in our study for the starlight suppression system are 10-10 contrast with an inner working angle of 20 milliarcsec and broad bandpass. We estimate that a vibration and isolation control system that achieves a total system vibration isolation of 140 dB for a vibration-isolated mass of 5000 kg is required to achieve the high wavefront error stability needed for exoplanet coronagraphy. Technology challenges for lightweight mirror segments include diffraction-limited optical quality and high wavefront error stability as well as low cost, low mass, and rapid fabrication. Key challenges for the detector systems include visible-blind, high quantum efficiency UV arrays, photon counting visible and NIR arrays for coronagraphic spectroscopy and starlight wavefront sensing and control, and detectors with deep full wells with low persistence and radiation tolerance to enable transit imaging and spectroscopy at all wavelengths. Finally, mirror coatings with high reflectivity ( 90), high uniformity ( 1) and low polarization ( 1) that are scalable to large diameter mirror substrates will be essential for ensuring that both high throughput UV observations and high contrast observations can be performed by the same observatory.

Instrument↗

Identifying synoptic controls on boundary layer thermodynamic and cloud properties in a regional forecast model

Although most of our understanding of boundary layer cloudiness is based on idealized, subtropical, barotropic marine environments, boundary layer clouds exist across a range of conditions. In this study, we use the Naval Research Laboratory's Coupled Ocean/Atmosphere Mesoscale Prediction System (COAMPS) and an automated cold-front-relative analysis framework to explore the boundary layer structure associated with low clouds across a transect through the cold front of a midlatitude synoptic cyclone. The model credibly captures boundary layer structure in line with conceptual models of midlatitude cyclones and ground-based observations at Graciosa Island in the Azores. The warm sector is conditionally unstable, with clouds that are too shallow and with too little liquid water, compared to cloud property retrievals from satellite and surface-based instruments. The cold-frontal region exhibits convection associated with weak stability and ascent. Northwest of the cold front, the boundary layer is well mixed, deeper, and capped by a strong inversion maintained by large-scale subsidence. Simulated clouds in frontal and post-frontal regions are mostly too thick, with too much liquid water and too little cloud base drizzle. The post-frontal clouds are associated with grid-scale updrafts, which appear to be the model's attempt to represent mesoscale organization of cellular convection typically observed in the cold sector of midlatitude cyclones. The deep, well-mixed post-frontal boundary layers and cloudiness are maintained by strong surface fluxes, as in cold air outbreaks. Our analysis framework serves as a unique approach to model verification, and our results offer insights into differences in boundary layer cloud behavior between subtropical and synoptic cold-sector regimes.

Eissner, Jordan M. [Univ. of Kansas, Lawrence, KS ↗