Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merlon M.↗

Software for Estimating Costs of Testing Rocket Engines

A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

Hines, Merlon M.↗

Deep space network software cost estimation model

A parametric software cost estimation model prepared for Deep Space Network (DSN) Data Systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit DSN software life cycle statistics. The estimation model output scales a standard DSN Work Breakdown Structure skeleton, which is then input into a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. C.↗

Deep space network software cost estimation model

A parametric software cost estimation model prepared for Jet PRopulsion Laboratory (JPL) Deep Space Network (DSN) Data System implementation tasks is described. The resource estimation mdel modifies and combines a number of existing models. The model calibrates the task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software life-cycle statistics.

Tausworthe, R. C.↗

Software cost/resource modeling: Deep space network software cost estimation model

A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. J.↗

Developing Decommissioning Cost Estimating Relationships and the Decommissioning Estimate Analysis Library Estimating System - 20423

DOE-EM's Consolidated Business Center (EM-CBC) Office of Cost Estimating has developed a system of Decommissioning Cost Estimating Relationships (CERs) and Models to improve the reliability and efficiency of its estimates. The development builds on the multi-year process of collecting and organizing historical cost data from DOEEMs decommissioning projects and estimate model development to support project and program-level decommissioning estimates. The latest work has extended these models down to project scope element and component building area levels, allowing the actual costs of work for these estimate components to be assembled into estimates that reflect specific projects. The CERs have been incorporated into two estimator-friendly products - as cost libraries in the MII estimating program and as an MS Excel-based model, and are available for DOE federal staff use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Software Development Cost Estimation Executive Summary

Identify simple fully validated cost models that provide estimation uncertainty with cost estimate. Based on COCOMO variable set. Use machine learning techniques to determine: a) Minimum number of cost drivers required for NASA domain based cost models; b) Minimum number of data records required and c) Estimation Uncertainty. Build a repository of software cost estimation information. Coordinating tool development and data collection with: a) Tasks funded by PA&E Cost Analysis; b) IV&V Effort Estimation Task and c) NASA SEPG activities.

data mining↗

Systems engineering and integration: Cost estimation and benefits analysis

Space Transportation Avionics hardware and software cost has traditionally been estimated in Phase A and B using cost techniques which predict cost as a function of various cost predictive variables such as weight, lines of code, functions to be performed, quantities of test hardware, quantities of flight hardware, design and development heritage, complexity, etc. The output of such analyses has been life cycle costs, economic benefits and related data. The major objectives of Cost Estimation and Benefits analysis are twofold: (1) to play a role in the evaluation of potential new space transportation avionics technologies, and (2) to benefit from emerging technological innovations. Both aspects of cost estimation and technology are discussed here. The role of cost analysis in the evaluation of potential technologies should be one of offering additional quantitative and qualitative information to aid decision-making. The cost analyses process needs to be fully integrated into the design process in such a way that cost trades, optimizations and sensitivities are understood. Current hardware cost models tend to primarily use weights, functional specifications, quantities, design heritage and complexity as metrics to predict cost. Software models mostly use functionality, volume of code, heritage and complexity as cost descriptive variables. Basic research needs to be initiated to develop metrics more responsive to the trades which are required for future launch vehicle avionics systems. These would include cost estimating capabilities that are sensitive to technological innovations such as improved materials and fabrication processes, computer aided design and manufacturing, self checkout and many others. In addition to basic cost estimating improvements, the process must be sensitive to the fact that no cost estimate can be quoted without also quoting a confidence associated with the estimate. In order to achieve this, better cost risk evaluation techniques are needed as well as improved usage of risk data by decision-makers. More and better ways to display and communicate cost and cost risk to management are required.

Dean, ED↗

Bayesian Rules of Thumb: Robust Uncertainty Quantification in Early Project Cost Estimation

Systems engineers often make use of cost Rules ofThumb in order to estimate cost during early phases of projectformulation. These Rules of Thumb typically take the form ofa sequence of percentages over which a total cost is allocatedacross NASA WBS elements. Rules of Thumb can then be usedto extrapolate cost from one or more known WBS elements tothe remaining unknown WBS elements, assisting early projectformulation architecture studies (such as those in JPL’s Team Xand A Team).A number of issues can arise when generating and using costRules of Thumb. For example, many records of project costsconsist of incomplete data. Typical methods of dealing withincomplete cost allocation data include (a) ignoring missionswith incomplete data, or (b) taking averages of the non-zero percentagesacross missions, but both of these methods can result inbiased estimates if the existence of incomplete data correlateswith total mission cost or any particular WBS element. Anothercommon example is cost reported in one or more incorrect WBSelements. This is especially prevalent in smaller missions whereit is more common for engineers to perform tasks that fall underthe purview of multiple WBS elements.Furthermore, a Rule of Thumb estimate is typically reported asa point estimate; there is no reported uncertainty around thepercentages used to generate an allocation. Even in the rarecase in which confidence intervals around mean percentages areprovided, there may be positive or negative correlations betweenWBS elements which can skew estimates.Here we attempt to address these problems by formulatingprobabilistic Rules of Thumb in which a distribution of allocationschemes, rather than a single allocation scheme, is generated.We use a bootstrap imputation method to simultaneouslyaccount for uncertainty in the missing data while using allavailable information contained in the dataset. The imputeddatasets are then input into a multivariate Bayesian modelwhich accounts for correlations between WBS elements andproperly accounts for uncertainty in the final Rule of Thumbpercentages and predictions. We describe the mathematicalmodel and provides snippets of R code utilizing the brms(Bayesian Regression Models using Stan) package. To illustratethis model, we generate a Bayesian Level 2 WBS Cost Rule ofThumb for MIDEX (Medium-Class Explorers) missions withdata extracted from NASA’s CADRe. We then compare thismethod’s performance with the classical Rule of Thumb method.

Hooke, Melissa A↗

Application of parametric weight and cost estimating relationships to future transport aircraft

A model comprised of system level weight and cost estimating relationships for transport aircraft is presented. In order to determine the production cost of future aircraft its weight is first estimated based on performance parameters, and then the cost is estimated as a function of weight. For initial evaluation CERs were applied to actual system weights of six aircraft (3 military and 3 commercial) with mean empty weights ranging from 30,000 to 300,000 lb. The resulting cost estimates were compared with actual costs. The average absolute error was only 4.3%. Then the model was applied to five aircraft still in the design phase (Boeing 757, 767 and 777, and BAC HS146-100 and HS146-200). While the estimates for the 757 and 767 are within 2 to 3 percent of their assumed break-even costs, it is recognized that these are very sensitive to the validity of the estimated weights, inflation factor, the amount assumed for nonrecurring costs, etc., and it is suggested that the model may be used in conjunction with other information such as RDT&E cost estimates and market forecasts. The model will help NASA evaluate new technologies and production costs of future aircraft.

Beltramo, M. N.↗

Coal gasification systems engineering and analysis. Appendix E: Cost estimation and economic evaluation methodology

The cost estimation and economic evaluation methodologies presented are consistent with industry practice for assessing capital investment requirements and operating costs of coal conversion systems. All values stated are based on January, 1980 dollars with appropriate recognition of the time value of money. Evaluation of project economic feasibility can be considered a two step process (subject to considerable refinement). First, the costs of the project must be quantified and second, the price at which the product can be manufacturd must be determined. These two major categories are discussed. The summary of methodology is divided into five parts: (1) systems costs, (2)instant plant costs, (3) annual operating costs, (4) escalation and discounting process, and (5) product pricing.

Source record↗

Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars

To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level activities.

Hunt, Charles D.↗

Cost Estimates of Roll-to-Roll Production of Organic Light Emitting Devices for Lighting

White organic light emitting devices (WOLEDs) offerdistinct advantages as solid state lighting sources, including high energy efficiency, superior color quality,and a flexible, thin profile that can accommodate a vast array of possible fixture designs. Recent advances in device lifetime and high speed deposition suggest that mass production of WOLED panels is approaching an inflection point. To understand the tradeoffs in the volume manufacturing of WOLED lighting panels, in this work, we estimate the cost of white WOLED panel production based on vacuum and vapor phase deposition in a roll-to-roll production line envisioned to yield an annual capacity of at least 6 × 10 6 m 2 . Assuming a WOLED operating luminance at 10 klm/m 2 , we anticipate a $\$12.5$ /klm cost of a WOLED light engine that includes the cost of the current driverand packaging. With incremental reduction in material and driver costs and improved luminance, the costof WOLED lighting can be reduced to $\$6.3$ /klm in thenear term, potentially positioning WOLEDs for use innumerous premium lighting applications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Cost Estimation of a Permanent Magnet Synchronous Machine for Use in Adjustable Speed-Pumped Storage Hydropower

Electric machine design has become an easier process with the availability of computers in recent decades. However, the interest in electric machine design among students has declined. University-level design courses must compete with courses perceived as more desirable by the potential job market. Hence, the power system engineers with this expertise are very few and are nearing retirement. Contrarily, renewable energy has been picking up in the past few decades. The indeterminacy and variation of renewable energy sources require a balancing mechanism to maintain the constant voltage and frequency of the grid. Adjustable-Speed Pumped-Storage Hydropower plants are considered the contender for future energy storage, providing large capacity and fast-acting response. Large-scale hydropower applications depend on the natural characteristics of each project site, making less expensive, off-the-shelf generators unfeasible. This work gives a shortcut to estimate the cost of constructing a permanent magnet generator for low-volume manufacturing.

13 HYDRO ENERGY↗

Cost estimation for unmanned lunar and planetary programs

A basic model is presented for estimating the cost of unmanned lunar and planetary programs. Cost data were collected and analyzed for eight lunar and planetary programs. Total cost was separated into the following components: labor, overhead, materials, and technical support. The study determined that direct labor cost of unmanned lunar and planetary programs comprises 30 percent of the total program cost. Twelve program categories were defined for modeling: six spacecraft subsystem categories (science, structure, propulsion, electrical power, communications, and guidance and integration, test and quality assurance, launch and flight operations, ground equipment, systems analysis and engineering, and program management). An analysis showed that on a percentage basis, direct labor cost and direct labor manhours compare on a one-to-one ratio. Therefore, direct labor hours is used as the parameter for predicting cost, with the advantage of eliminating the effect of inflation on the analysis.

Dunkin, J. H.↗

Decommissioning Cost Estimate Uncertainty: What is It, How Do You Deal with It? - 16527

The issue of decommissioning cost estimate uncertainty has returned to plague the industry. As we gain more hands-on experience, the expectations are that the cost estimates for future projects should be more accurate and the uncertainties reduced. To some extent this is true, but there remains the issue of how to deal with the major elements of uncertainty of allowances, contingency and risk. The OECD/NEA and the IAEA have joined forces through its member states and outside consultants to bring definition and insight into how to deal with uncertainty. The author has been a participant in this joint organization effort since the outset two years ago. This paper will present the current state-of-the-art in the definitions, approaches, and limitations in the topic of uncertainty. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗