Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

NECAP: NASA's Energy-Cost Analysis Program. Part 1: User's manual

The NECAP is a sophisticated building design and energy analysis tool which has embodied within it all of the latest ASHRAE state-of-the-art techniques for performing thermal load calculation and energy usage predictions. It is a set of six individual computer programs which include: response factor program, data verification program, thermal load analysis program, variable temperature program, system and equipment simulation program, and owning and operating cost program. Each segment of NECAP is described, and instructions are set forth for preparing the required input data and for interpreting the resulting reports.

Henninger, R. H.↗

Manufacturing cost analysis of a parabolic dish concentrator (General Electric design) for solar thermal electric power systems in selected production volumes

The manufacturing cost of a General Electric 12 meter diameter concentrator was estimated. This parabolic dish concentrator for solar thermal system was costed in annual production volumes of 100 - 1,000 - 5,000 - 10,000 - 50,000 100,000 - 400,000 and 1,000,000 units. Presented for each volume are the costs of direct labor, material, burden, tooling, capital equipment and buildings. Also presented is the direct labor personnel and factory space requirements. All costs are based on early 1981 economics.

Source record↗

Cost analysis of oxygen recovery systems

The design and development of equipment for flight use in earth-orbital programs, when optimally approached cost effectively, proceed through the following logical progression: (1) bench testing of breadboard designs, (2) the fabrication and evaluation of prototype equipment, (3) redesign to meet flight-imposed requirements, and (4) qualification and testing of a flight-ready system. Each of these steps is intended to produce the basic design information necessary to progress to the next step. The cost of each step is normally substantially less than that of the following step. An evaluation of the cost elements involved in each of the steps and their impact on total program cost are presented. Cost analyses of four leading oxygen recovery subsystems which include two carbon dioxide reduction subsystem, Sabatier and Bosch, and two water electrolysis subsystems, the solid polymer electrolyte and the circulating KOH electrolyte are described.

Yakut, M. M.↗

Cost analysis of hot-air solar-heating systems

Report describes results of study of two operational test sites (Huntsville, Alabama and Carlsbad, New Mexico) furnishing stimates of actual costs and potential cost savings of new and retrofit hot-air solar heating and hot-water system for single family dwellings.

Hawkins, B. J.↗

Space biology initiative program definition review. Trade study 5: Modification of existing hardware (COTS) versus new hardware build cost analysis

The JSC Life Sciences Project Division has been directly supporting NASA Headquarters, Life Sciences Division, in the preparation of data from JSC and ARC to assist in defining the Space Biology Initiative (SBI). GE Government Services and Horizon Aerospace have provided contract support for the development and integration of review data, reports, presentations, and detailed supporting data. An SBI Definition (Non-Advocate) Review at NASA Headquarters, Code B, has been scheduled for the June-July 1989 time period. In a previous NASA Headquarters review, NASA determined that additional supporting data would be beneficial to determine the potential advantages in modifying commercial off-the-shelf (COTS) hardware for some SBI hardware items. In order to meet the demands of program implementation planning with the definition review in late spring of 1989, the definition trade study analysis must be adjusted in scope and schedule to be complete for the SBI Definition (Non-Advocate) Review. The relative costs of modifying existing commercial off-the-shelf (COTS) hardware is compared to fabricating new hardware. An historical basis for new build versus modifying COTS to meet current NMI specifications for manned space flight hardware is surveyed and identified. Selected SBI hardware are identified as potential candidates for off-the-shelf modification and statistical estimates on the relative cost of modifying COTS versus new build are provided.

Jackson, L. Neal↗

Life Cycle Cost Analysis of Shuttle-Derived Launch Vehicles, Volume 1

The design, performance, and programmatic definition of shuttle derived launch vehicles (SDLV) established by two different contractors were assessed and the relative life cycle costs of space transportation systems using the shuttle alone were compared with costs for a mix of shuttles and SDLV's. The ground rules and assumptions used in the evaluation are summarized and the work breakdown structure is included. Approaches used in deriving SDLV costs, including calibration factors and historical data are described. Both SDLV cost estimates and SDLV/STS cost comparisons are summarized. Standard formats are used to report comprehensive SDLV life cycle estimates. Hardware cost estimates (below subsystem level) obtained using the RCA PRICE 84 cost model are included along with other supporting data.

Source record↗

Spacecraft expected cost analysis with k-out-of-n:G subsystems

In designing a subsystem for a spacecraft, the design engineer is often faced with a number of options ranging from planning an inexpensive subsystem with low reliability to selecting a highly reliable system that would cost much more. We minimize the total of the cost of the subsytem and the costs that would occur if the subsystem fails. We choose the subsystem with the lowest total. A k-out-of-n:G subsystem has n modules, of which k are required to be good for the subsystem to be good. We examine two models to illustrate the principles of the k-out-of-n:G subsystem designs. For the first model, the following assumptions are necessary: the probability of failure of any module in the system is not affected by the failure of any other module; and each of the modules has the same probabillity of success. For the second model we are also free to choose k in our subsystem.

Patterson, Richard↗

Full-scale testing, production and cost analysis data for the advanced composite stabilizer for Boeing 737 aircraft. Volume 1: Technical summary

The full scale ground test, ground vibration test, and flight tests conducted to demonstrate a composite structure stabilizer for the Boeing 737 aircraft and obtain FAA certification are described. Detail tools, assembly tools, and overall production are discussed. Cost analyses aspects covered include production costs, composite material usage factors, and cost comparisons.

Aniversario, R. B.↗

Parametric Cost Analysis of Refueling Options in Cislunar Space

Over the next several years NASA intends to develop and maintain a sustained human presence in cislunar space and on the surface of the Moon. The sustained lunar presence will then serve as a steppingstone for human missions to Mars. To propel the spacecraft taking humans and cargo to and from the lunar surface and to and from Mars will require on the order of hundreds of tons of propellant. Single-use refueling elements (expendable tankers) may be more cost-effective for smaller campaigns, but as the propellant demand grows, so does the potential for a cost benefit from reusable tankers. The cost of two different architectures for delivering propellant to cislunar space was estimated and compared. The first architecture relies on expendable tankers for propellant delivery while the second architecture reuses every element, including launch vehicle stages. The study determined that if the cost of reusing refueling tankers is consistent with the current state of the art, the expendable refueling architecture is more cost effective. However, refinements of the methods used to estimate launch and tanker reuse costs are needed to provide more precise estimates of the breakeven point.

Daniel J Tiffin↗

Development of a Multivariable Parametric Cost Analysis for Space-Based Telescopes

Over the past 400 years, the telescope has proven to be a valuable tool in helping humankind understand the Universe around us. The images and data produced by telescopes have revolutionized planetary, solar, stellar, and galactic astronomy and have inspired a wide range of people, from the child who dreams about the images seen on NASA websites to the most highly trained scientist. Like all scientific endeavors, astronomical research must operate within the constraints imposed by budget limitations. Hence the importance of understanding cost: to find the balance between the dreams of scientists and the restrictions of the available budget. By logically analyzing the data we have collected for over thirty different telescopes from more than 200 different sources, statistical methods, such as plotting regressions and residuals, can be used to determine what drives the cost of telescopes to build and use a cost model for space-based telescopes. Previous cost models have focused their attention on ground-based telescopes due to limited data for space telescopes and the larger number and longer history of ground-based astronomy. Due to the increased availability of cost data from recent space-telescope construction, we have been able to produce and begin testing a comprehensive cost model for space telescopes, with guidance from the cost models for ground-based telescopes. By separating the variables that effect cost such as diameter, mass, wavelength, density, data rate, and number of instruments, we advance the goal to better understand the cost drivers of space telescopes.. The use of sophisticated mathematical techniques to improve the accuracy of cost models has the potential to help society make informed decisions about proposed scientific projects. An improved knowledge of cost will allow scientists to get the maximum value returned for the money given and create a harmony between the visions of scientists and the reality of a budget.

Dollinger, Courtnay↗

Parametric Cost Analysis of Refueling Options in Cis-Lunar Space

Over the next several years NASA intends to develop and maintain a sustained human presence in cis-lunar space and on the surface of the moon. The sustained lunar presence will then serve as a stepping stone to human Mars missions. To propel the spacecraft taking humans and cargo to and from the lunar surface and to and from Mars will require on the order of hundreds of tons of propellant. Expendable, one-time use refueling elements maybe more cost effective for smaller campaigns, but as the propellant requirement grows, so does the cost benefit of reusable systems. This paper will analyze the cost of several different architectures for delivering propellant to cislunar space to determine the conditions in which each architecture is likely to be more cost effective. The first architecture relies on expendable elements for propellant delivery while the second one reuses every element including launch vehicle stages. In addition to these two basic approaches, trades will analyze alterations to the architectures such as mission design, level of thermal control, and the incorporation of buses,tugs, and depots, each with different propellants, sizes, and reusability assumptions.

Paul D Friz↗

Conceptual design and cost analysis of hydraulic output unit for 15 kW free-piston Stirling engine

A long-life hydraulic converter with unique features was conceptually designed to interface with a specified 15 kW(e) free-piston Stirling engine in a solar thermal dish application. Hydraulic fluid at 34.5 MPa (5000 psi) is produced to drive a conventional hydraulic motor and rotary alternator. Efficiency of the low-maintenance converter design was calculated at 93.5% for a counterbalanced version and 97.0% without the counterbalance feature. If the converter were coupled to a Stirling engine with design parameters more typcial of high-technology Stirling engines, counterbalanced converter efficiency could be increased to 99.6%. Dynamic computer simulation studies were conducted to evaluate performance and system sensitivities. Production costs of the complete Stirling hydraulic/electric power system were evaluated at $6506 which compared with $8746 for an alternative Stirling engine/linear alternator system.

White, M. A.↗