Base Support Building Solid Waste Management Unit (SWMU) 014 PlumeStop Injection Pilot Study Work Plan

This document is a Pilot Study Work Plan (PSWP) for a PlumeStop® permeable reactive barrier (PRB) at the Base Support Building (BSB; the Site) located at the John F. Kennedy Space Center (KSC), Florida. The Site has been designated as Solid Waste Management Unit (SWMU) 014 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This document was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0010, Task Order 80KSC021F0096. This PSWP details the permeable reactive barrier (PRB) being installed at the BSB to decrease concentrations of per- and polyfluoroalkyl substances (PFAS) in downgradient groundwater using PlumeStop®. PlumeStop® is a colloidal activated carbon that PFAS compounds readily adsorb to. This PSWP outlines the design criteria, injection plan, and performance monitoring schedule for the proposed PlumeStop® PRB study that will guide the possible selection for use and future design of future full-scale PlumeStop® PRBs at KSC.

PFAS↗

JPL Resource Allocation Planning Scheduling Office (RAPSO) long range forecasting

The paper introduces the concept of the long range forecasting function, which is then used to identify periods of peak oversubscription of resources years before they actually happen, so that proper corrective actions (construction of additional antennas, reduction in support committment to the impacted projects) can be implemented.

RAPSO long range forecasting↗

Priority scheme planning for the robust SSM/PMAD testbed

Whenever mixing priorities of manually controlled resources with those of autonomously controlled resources, the space station module power management and distribution (SSM/PMAD) environment requires cooperating expert system interaction between the planning function and the priority manager. The elements and interactions of the SSM/PMAD planning and priority management functions are presented. Their adherence to cooperating for common achievement are described. In the SSM/PMAD testbed these actions are guided by having a system planning function, KANT, which has insight to the executing system and its automated database. First, the user must be given access to all information which may have an effect on the desired outcome. Second, the fault manager element, FRAMES, must be informed as to the change so that correct diagnoses and operations take place if and when faults occur. Third, some element must engage as mediator for selection of resources and actions to be added or removed at the user's request. This is performed by the priority manager, LPLMS. Lastly, the scheduling mechanism, MAESTRO, must provide future schedules adhering to the user modified resource base.

Elges, Michael R.↗

A Generative Control Capability for a Model-based Executive

This paper describes Burton, a core element of a new generation of goal-directed model-based autonomous executives. This executive makes extensive use of component-based declarative models to analyze novel situations and generate novel control actions both at the goal and hardware levels. It uses an extremely efficient online propositional inference engine to efficiently determine likely states consistent with current observations and optimal target states that achieve high level goals. It incorporates a flexible generative control sequencing algorithm within the reactive loop to bridge the gap between current and target states. The system is able to detect and avoid damaging and irreversible situations, After every control action it uses its model and sensors to detect anomalous situations and immediately take corrective action. Efficiency is achieved through a series of model compilation and online policy construction methods, and by exploiting general conventions of hardware design that permit a divide and conquer approach to planning. The paper presents a formal characterization of Burton's capability, develops efficient algorithms, and reports on experience with the implementation in the domain of spacecraft autonomy. Burton is being incorporated as one of the key elements of the Remote Agent core autonomy architecture for Deep Space One, the first spacecraft for NASA's New Millenium program.

Williams, Brian C.↗

Galileo completing VEEGA - A mid-term report

In December Galileo will complete its Venus-Earth-Earth-Gravity Assist (VEEGA) mission phase and will be placed on a direct trajectory to Jupiter arriving in December 1995. Galileo will be the first aircraft to orbit Jupiter and send a probe into its atmosphere and will perform an intensive and comprehensive investigation of the planet. Observations made during the October 1991 encounter with the asteroid Gaspra are discussed. The observation plan to be used for earth and moon observations during the December 1992 gravity assist encounter is described. The Galileo High-Gain Antenna (HGA) deployment anomaly status is reported and future corrective actions are outlined. The low-gain antenna contingency mission to be implemented if the HGA cannot be deployed is described and overall performance and status of the space craft are discussed. The selected tour for the Galileo Jupiter satellite-gravity-assist orbital tour is described and the decision rationale for performing the August 1993 asteroid Ida flyby option is presented.

O'Neil, William J.↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

Adapting ASPEN for Orbital Express

By studying the Orbital Express mission, modeling the spacecraft and scenarios, and testing the system, a technique has been developed that uses recursive decomposition to represent procedural actions declaratively, schema-level uncertainty reasoning to make uncertainty reasoning tractable, and lightweight, natural language processing to automatically parse procedures to produce declarative models. Schema-level uncertainty reasoning has, at its core, the basic assumption that certain variables are uncertain, but not independent. Once any are known, then the others become known. This is important where a variable is uncertain for an action and many actions of the same type exist in the plan. For example, if the number of retries to purge pump lines was unknown (but bounded), and each attempt required a sub-plan, then, once the correct number of attempts required for a purge was known, it would likely be the same for all subsequent purges. This greatly reduces the space of plans that needs to be searched to ensure that all executions are feasible. To accommodate changing scenario procedures, each is ingested into a tabular format in temporal order, and a simple natural-language parser is used to read each step and to derive the impact of that step on memory, power, and communications. Then an ASPEN (Activity Scheduling and Planning Environment) model is produced based on this analysis. The model is tested and further changed by hand, if necessary, to reflect the actual procedure. This results in a great savings of time used for modeling procedures. Many processes that need to be modeled in ASPEN (a declarative system) are, in fact, procedural. ASPEN includes the ability to model activities in a hierarchical fashion, but this representation breaks down if there is a practically unbounded number of sub-activities and decomposition topologies. However, if recursive decomposition is allowed, HTN-like encodings are enabled to represent most procedural phenomena. For example, if a switch requires a variable (but known at the time of the attempt) number of attempts to switch on, one can recurse on the number of remaining switch attempts and decompose into either the same switching activity with one less required attempt, or not decompose at all (or decompose into a dummy task), resulting in the end of the decomposition. In fact, any bounded procedural behavior can be modeled using recursive decompositions assuming that the variables impinging the disjunctive decomposition decision are computable at the time that the decision is made. This enables one to represent tasks that are controlled outside of the scheduler, but that the scheduler must accommodate, without requiring one to give a declarative model of the procedural behavior.

Chouinard, Caroline↗

Post-Closure Inspection and Monitoring Report for Surface Corrective Action Unit 417 at the Central Nevada Test Area, Nevada, Site

This report documents the biennial postclosure site inspections conducted in June 2018 at the surface Corrective Action Unit (CA U) 417 at the Central Nevada Test Area, Nevada, Site. The UC-I, UC-3, and UC-4 sites are inspected every 2 years, in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report published in 2001. The requirements for postclosure monitoring have been modified over the years through negotiations with the Nevada Division of Environmental Protection (NDEP). Modifications were documented through three separate Records of Technical Change to the Closure Report, which were approved by NDEP in 2003, 2011, and 2015. The UC-1, UC-3, and UC-4 sites were all observed as being in good condition during the 2018 inspections. A few minor cracks on the UC-1 Central Mud Pit cover were repaired during the UC- I inspection. A concrete monument at the northeast corner of Mud Pit U3E at the UC-3 site had some damage near the top of the monument, but the damage has not impacted the functionality of the monument or survey pin on top of the monument. No issues were identified at the UC-4 site. No maintenance or additional repair activities are recommended at the UC-1, UC-3, and UC-4 sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan, Revision 2

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO). It addresses URs established under the FFACO for releases related to the development, testing, and production of nuclear weapons that are located on the NNSS and that are accessed through the NNSS main gate. FFACO URs are established at sites where contamination remains at levels exceeding final action levels (FALs) or is forecasted to exceed Safe Drinking Water Act (SDWA) maximum contaminant levels (CFR, 2025a) over the next 1,000 years following completion of corrective actions. Administrative URs are established at Industrial Sites and Soils sites where contamination remains at levels exceeding industrial action levels as defined in the Soils RBCA document. All URs stipulate restrictions sufficient to ensure the protection of human health, safety, and the environment.

54 ENVIRONMENTAL SCIENCES↗

Comprehensive Environmental Informatics System (CEIS) Integrating Crew and Vehicle Environmental Health

Integrated Vehicle Health Management (IVHM) systems have been pursued as highly integrated systems that include smart sensors, diagnostic and prognostics software for assessments of real-time and life-cycle vehicle health information. Inclusive to such a system is the requirement to monitor the environmental health within the vehicle and the occupants of the vehicle. In this regard an enterprise approach to informatics is used to develop a methodology entitled, Comprehensive Environmental Informatics System (CEIS). The hardware and software technologies integrated into this system will be embedded in the vehicle subsystems, and maintenance operations, to provide both real-time and life-cycle health information of the environment within the vehicle cabin and of its occupants. This comprehensive information database will enable informed decision making and logistics management. One key element of the CEIS is interoperability for data acquisition and archive between environment and human system monitoring. With comprehensive components the data acquired in this system will use model based reasoning systems for subsystem and system level managers, advanced on-board and ground-based mission and maintenance planners to assess system functionality. Knowledge databases of the vehicle health state will be continuously updated and reported for critical failure modes, and routinely updated and reported for life cycle condition trending. Sufficient intelligence, including evidence-based engineering practices which are analogous to evidencebased medicine practices, will be included in the CEIS to result in more rapid recognition of off-nominal operation to enable quicker corrective actions. This will result from better information (rather than just data) for improved crew/operator situational awareness, which will produce significant vehicle and crew safety improvements, as well as increasing the chance for mission success, future mission planning as well as training. Other benefits include improved reliability, increase safety in operations and cost of operations. The cost benefits stem from significantly reduced processing and operations manpower, predictive maintenance for systems and subjects. The improvements in vehicle functionality and cost will result from increased prognostic and diagnostic capability due to the detailed total human exploration system health knowledge from CEIS. A collateral benefit is that there will be closer observations of the vehicle occupants as wrist watch sized devices are worn for continuous health monitoring. Additional database acquisition will stem from activities in countermeasure practices to ensure peak performance capability by occupants of the vehicle. The CEIS will provide data from advanced sensing technologies and informatics modeling which will be useful in problem troubleshooting, and improving NASA s awareness of systems during operation.

Nall, Mark E.↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Source record↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Schumann, Deborah C.↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Christopher Lewis Sadler↗

A procedure concept for local reflex control of grasping

An architecture is proposed for the control of robotic devices, and in particular of anthropomorphic hands, characterized by a hierarchical structure in which every level of the architecture contains data and control function with varying degree of abstraction. Bottom levels of the hierarchy interface directly with sensors and actuators, and process raw data and motor commands. Higher levels perform more symbolic types of tasks, such as application of boolean rules and general planning operations. Layers implementation has to be consistent with the type of operation and its requirements for real time control. It is proposed to implement the rule level with a Boolean Artificial Neural Network characterized by a response time sufficient for producing reflex corrective action at the actuator level.

Fiorini, Paolo↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

IMWP↗