Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “compositional analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Model Validation for the FY2021 SRS Composite Analysis Monitoring Plan

Using a projected end-state date of 2065 (SRNS 2015b), the Savannah River Site (SRS) Composite Analysis (CA) modeling for each facility and waste site began on the inventory year assigned to it so that source depletion and radionuclide transport out of the system could be appropriately captured. Some SRS waste sites that have already achieved their end states (i.e., end-state inventories and end-state configuration) are currently contributing to the potential off-site public dose through source release, groundwater transport, discharge to on-site surface streams, and stream transport to the CA point of assessments (POAs). The inventory year assigned to these waste sites is 2002 or before. This means that SRS CA results from 2002 and beyond are a reasonable representation for these waste sites that have already achieved their end states and are currently contributing to the potential off-site public dose. The SRS Annual Environmental Report (AER) monitoring can differentiate and separate liquid pathway data allowing the data representing only waste sites at their end state to be produced. Because the SRS CA has projected reasonable end-state impacts from 2002 and beyond, and the AER monitoring can differentiate and separate operating and end-state contributions to annual liquid pathway release, an opportunity exists to use the AER monitoring data to validate the SRS CA model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Flow Simulation with the P2R Model for the Composite Analysis Base Case

In order to meet the requirements of U.S. Department of Energy (DOE) in DOE O 435.1, Radioactive Waste Management, a composite analysis (CA) must be completed for the Central Plateau at the Hanford Site. The CA requires estimates of fate and transport of radionuclides in the groundwater from multiple sources within the modeling domain. This document details the application of the Plateau-to-River (P2R) Model version 8.3 to predict the flow of groundwater on the Central Plateau for the 10,000-year simulation to support the CA. The simulated flow field will support the simulation of fate and transport of contaminants for use in predicting dose as part of the CA. This document describes the changes made to model inputs in order to simulate the predictive flow field for the CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contaminant Transport Simulation with the P2R Model for the Composite Analysis Base Case

In order to meet the requirements of U.S. Department of Energy (DOE) in DOE O 435.1, Radioactive Waste Management, a composite analysis (CA) must be completed for the Central Plateau at the Hanford Site. The updated Hanford CA requires estimates of fate and transport of radionuclides in the groundwater from multiple sources within and downgradient of the Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Flow Simulation with the P2R Model for the Composite Analysis Base Case

In order to meet the requirements of U.S. Department of Energy (DOE) in DOE O 435.1 Chg.1, Radioactive Waste Management, a Composite Analysis (CA) must be completed for the Central Plateau at the Hanford Site. The CA requires estimates of fate and transport of radionuclides in the groundwater from multiple sources within the modeling domain. This document details the application of the P2R Model version 8.3 to predict the flow of groundwater on the Central Plateau for the 10,000-year simulation to support the CA. The simulated flow field will support the simulation of fate and transport of contaminants for use in predicting dose as part of the CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2020) (Rev. 2)

This document provides an updated Hanford Site composite analysis (CA). A Hanford Site CA was prepared and issued in 1998 (PNNL-11800) with an addendum provided in 2002 (PNNL-11800 Addendum 1). The CA was approved in 2002 (Frei, 2002) and has been maintained (DOE/RL-2000-29 and subsequent revisions) to support low-level waste disposal performance assessments (PAs) and disposal authorizations for facilities at the Hanford Site, including the following: Continued operation of the Environmental Restoration Disposal Facility (ERDF) and the 200 East and 200 West Low-Level Burial Grounds; Construction of the Integrated Disposal Facility (IDF); Forthcoming closure of tank residual waste systems such as Waste Management Area (WMA) C. The CA maintenance program resulted in a determination in 2015 (DOE/RL-2015-66) that the Hanford Site CA needed an update for the following reasons: While the initial Hanford Site CA has been maintained since 2001, the accumulation of basis changes reported in the annual summary reports over the succeeding 14 years merit evaluation in an updated analysis; The U.S. Department of Energy (DOE) Headquarters requested in a memorandum in 2015 (Gilbertson and Marcinowski, 2015) that “as soon as the relevant PAs are complete, the CA will be revised to account for all of the new information.” This updated Hanford Site CA accounts for the following new information: 1. Inclusion of a detailed Hanford Site baseline disposition that projects remedial activities through site closure. There have been significant changes through decision making in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process that were not available when the original CA was produced; 2. Inclusion of an updated inventory basis, new modeling capabilities, and new decisions reached in the associated record of decision (ROD) that was provided by issuance of DOE/EIS-0391 in fiscal year (FY) 2013. Development of a Hanford Site groundwater model from the baseline provided in a technical transfer of models for the Final Tank Closure and Waste Management Environmental Impact Statement (DOE/EIS-0391) commenced in FY 2014 and resulted in the plateau-to-river (P2R) groundwater flow model that is used in this updated Hanford Site CA; 3. Accounting for pump and treat systems, which were not evaluated in the initial CA. Pump and treat systems have had significant impact on groundwater flow system behavior, contaminant transport, and contaminant removal from Hanford Site groundwater. This process is accounted for in the use of the P2R model for this updated Hanford Site CA; 4. Inclusion of water-level data collected since the initial CA was completed. Data collected as the unconfined aquifer water levels continue to recede since the cessation of large liquid discharges in the late 1990s have led to marked improvement in understanding of the flow system for future conditions, particularly regarding northward flow potential in the critical Gable Gap area. The calibration in the latest version of the P2R model accounts for this information; 5. Inclusion of results from the revised ERDF PA completed in 2013 (WCH-5209) that account for updated inventory and expansion of the ERDF facility to about twice the size that was evaluated in the original CA; 6. Use of updated geoframeworks to provide the structural basis for numerical fate and transport models in the groundwater pathway of this updated CA. The geologic basis for groundwater models has continued to improve with additional data collection and interpretation with the creation and maintenance of the Hanford South Geoframework and the Central Plateau Vadose Zone Geoframework tools; 7. Incorporation of updated tank residual inventory estimates. Tank residual inventory estimates have improved with the incorporation of tank retrieval inventory data for those tanks that have completed retrieval. The CA inventory data package includes this updated information; 8. Incorporation of WMA C PA results. Two additional PAs for tank farm closure decisions are in preparation during the period required to prepare an updated Hanford Site CA: WMA C (FY 2016) and WMA A-AX (in preparation). The WMA C PA results are incorporated into the updated Hanford Site CA, and its grouted residuals model is used as the basis for a release model to account for the other tank farm systems modeling in this updated CA; 9. An update to the IDF PA was submitted in FY 2017 and has been reviewed and approved. The results of the IDF PA are incorporated into this updated CA; 10. Updated risk assessment scenarios. The risk assessment scenarios currently in use for Hanford Site CERCLA and Resource Conservation and Recovery Act of 1976 (RCRA) analyses differ from those evaluated in the initial Hanford Site CA. The representative person exposure scenario evaluated in this updated Hanford Site CA is consistent with recent PAs and CERCLA and RCRA analyses as the Hanford Site. This updated Hanford Site CA provides the following: A comparison of the updated Hanford Site CA all-pathway dose results with the performance measures during the compliance period, which is assumed to begin with site closure in calendar 2070 with the last scheduled disposal action and continue for 1,000 years postclosure (to calendar year 3069); A comparison of Hanford Site CA all-pathway dose results with the performance measures during the postcompliance period to address potential peaks beyond the compliance period. This is accomplished by evaluating dose in the period for 9,000 years following the compliance period (i.e., from calendar year 3070 to 12070).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington

The objective of this document is to provide a maintenance plan (MP) that supports the Hanford Site composite analysis (CA). Maintenance consists of four activities: compliance and performance monitoring; research and development; planned reviews and analysis; and revisions to the CA. This MP will be reviewed annually by the site and updated as needed to address priorities based upon new information or proposed changes, the status of any disposal authorization statement (DAS) conditions/limitations and Low-Level Waste Disposal Facility Federal Review Group (LFRG) issues. This revision supersedes Revision 4.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Flow Simulation with the P2R Model for the Composite Analysis Base Case

In order to meet the requirements of U.S. Department of Energy (DOE) in DOE O 435.1 Chg. 1, Radioactive Waste Management, a Composite Analysis (CA) must be completed for the Central Plateau at the Hanford Site. The CA requires estimates of fate and transport of radionuclides in the groundwater from multiple sources within the modeling domain. This document details the application of the P2R Model version 8.3 to predict the flow of groundwater on the Central Plateau for the 10,000-year simulation to support the CA. The simulated flow field will support the simulation of fate and transport of contaminants for use in predicting dose as part of the CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Composite Analysis: Recharge and Inventory Sensitivity Analyses for the A Trenches, BC Cribs and Trenches, and PUREX Area Vadose Zone Models

The main objectives of the composite analysis (CA) compliance case vadose zone (VZ) facet are to simulate transport of radionuclide releases from the surface to the water table, and to provide radionuclide transfer rates to groundwater for inclusion into the Plateau-to-River (P2R) saturated zone (SZ) model (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). The CA compliance case approach to address the scale and distribution of contaminant sources in the VZ facet is to subdivide the Hanford Site Central Plateau into 26 models that contain contaminant sources and liquid discharges likely to commingle during migration through the VZ to the water table

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Flow and Transport Parameters Data Package for the Hanford Site Composite Analysis and Cumulative Impact Evaluation

This report provides a description of the basis for the development and implementation of a conceptual model for vadose zone flow and transport for the composite analysis (CA) groundwater pathway analysis and the cumulative impact evaluation (CIE). The parameterization for a numerical model is intimately linked to the conceptual model framework. The report describes the basis for the selection of hydraulic and transport parameters for the hydrostratigraphic units (HSUs) identified in the 200 East and 200 West Areas. Whenever data are sparse or unavailable, surrogate hydraulic properties are chosen based on samples collected within the 200 Areas and nearby locations that are representative of sediments characteristic of the HSUs identified elsewhere.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2020 Savannah River Site Composite Analysis Annual Summary Review

This document provides the Department of Energy (DOE) Order 435.1 and its manual, Radioactive Waste Management (DOE 2021a, 2021b) required Annual Review for the Savannah River Site (SRS) Composite Analysis (CA). Progress made to-date toward addressing the secondary issue from the LFRG review of the 2010 SRS CA has focused primarily upon inventory estimate improvements. Inventory impacts dose in a linear fashion and reduces the uncertainty with the CA conclusions. Maintenance items are addressed, as funding allows, based on the relative risk associated with meeting the performance objectives. Currently, there is minimal risk in exceeding the DOE 100 mrem/yr CA primary dose limit or the DOE 30 mrem/yr dose constraint (administrative limit). Proposed activities, discoveries, new information and changes potentially affecting the 2010 SRS CA are documented in this and earlier Annual Summary reports, and a consolidated list of changes since the 2010 CA is documented in this report. The impact to the CA of changes arising from updated performance assessment (PA) baselines [i.e., Saltstone Disposal Facility (SDF), E-Area Low-Level Waste Facility (ELLWF), and F & H Tank Farm (FTF & HTF) closures] is expected to be minor for the following reasons: The primary contributors to the SRS CA dose impact at the Upper Three Runs (UTR) point of assessment (POA) are the H-Canyon and Mixed Waste Management Facility (MWMF), contributing 68% and 9%, respectively, to the dose impact at that POA. The combined contribution to the UTR dose impact from all PA’s (SDF, ELLWF, FTF and HTF) is ~2% of this total. The 2010 SRS CA model validation performed indicates that the CA projected dose, while generally conservative, provides a reasonable representation of the maximum annual doses. Doses evaluated are well below the SRS established 15 mrem/yr administrative limit (Crapse et al. 2011). Based on the assessment presented within this annual review and collective engineering judgement, the conclusions of the 2010 SRS CA remain valid and there is reasonable assurance that SRS will meet the performance objectives delineated in DOE Manual 435.1-1. The 2010 SRS CA should be updated to incorporate PA changes, proposed changes to inventories and sources and model improvements accumulated since the 2010 CA. The timing will be dependent on the completion of the ongoing E-Area PA revision.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2021 Savannah River Site Composite Analysis Annual Summary Review

This document provides the Department of Energy (DOE) Order 435.1 and its manual, Radioactive Waste Management (DOE 2021a, 2021b) required Annual Review for the Savannah River Site (SRS) Composite Analysis (CA). Progress made to-date toward addressing the secondary issue from the LFRG review of the 2010 SRS CA has focused primarily upon inventory estimate improvements. Inventory impacts dose in a linear fashion and reduces the uncertainty with the CA conclusions. Maintenance items are addressed, as funding allows, based on the relative risk associated with meeting the performance objectives. Currently, there is minimal risk in exceeding the DOE 100 mrem/yr CA primary dose limit or the DOE 30 mrem/yr dose constraint (administrative limit).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Calculation of Groundwater Pathway Radiological Dose for the Hanford Site Composite Analysis Base Case

The purpose of this environmental calculation file (ECF) is to present the results of the exposure route-specific and total radiological dose assessments for the groundwater exposure pathway as a part of the updated Hanford Site Composite Analysis (CA). The purpose of these radiological dose assessments is to provide an estimate of the cumulative radiological impacts from all screened sources of ionizing radiation and exposure routes that could potentially contribute to the projected dose to a hypothetical member of the public from both existing or future disposal facilities and other sources including past-practice discharge sites.

61 RADIATION PROTECTION AND DOSIMETRY↗

Application of the Recharge Estimation Tool (RET) to Prepare Spatially and Temporally Variable Recharge Boundary Conditions for Hanford Site Composite Analysis Vadose Zone Models

This environmental calculation file (ECF) describes the development of a tool for translating recharge estimates into readable input for STOMP© (Subsurface Transport Over Multiple Phases) vadose zone models primarily supporting the vadose zone (VZ) facets of the updated Hanford Site Composite Analysis (CA) and the Hanford Site Cumulative Impact Evaluation (CIE). The recharge estimates are spatiotemporally variable and are produced by the Recharge Evolution Tool (RET) described in Hanford Site-wide Natural Recharge Boundary Condition for Groundwater Models (ECF-HANFORD-15-0019). Outputs from the RET are given in Esri’s™ feature class format with yearly estimates and associated metadata encapsulated in file geodatabase objects. For STOMP models, the translated output is a text file in the format of an input boundary condition card, consistent with STOMP software requirements. The text file contains assimilated spatiotemporal recharge estimates produced by the RET. The tool discussed in this document will be referred to as the “RET2STOMP” tool.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updates to Composite Analysis Base Case and Null Space Monte Carlo Sensitivity Based on New Unit Dose Factors

This environmental calculation file (ECF) presents the results of the exposure route-specific and total radiological dose assessments for the groundwater exposure pathway as a part of the updated Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2022), based on revised unit dose factors (UDFs) published in CA Special Studies: Updates to the Groundwater Pathway Radiological Dose. The reason for these radiological dose assessments is to estimate the cumulative radiological impacts from all screened sources of ionizing radiation and exposure routes that could potentially contribute to the projected dose to a hypothetical member of the public. Sources of ionizing radiation can include existing or future disposal facilities and other sources including past-practice discharge sites. Additionally, the results of the exposure route-specific and total radiological dose assessments have been revised for the groundwater pathway based on the null space Monte Carlo (NSMC) groundwater concentrations and the most recent updates to the UDFs as a part an uncertainty analysis for the updated Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Composite Analysis Special Studies FY2025 - Groundwater Flow Simulation for use in a Comparison of Simulated Concentrations in the Saturated Zone Estimated by the Plateau-to-River Model Versions 8.3 and 9.1

In order to meet the requirements of U.S. Department of Energy (DOE) in DOE O 435.1, Radioactive Waste Management, a composite analysis (CA) must be completed for the Central Plateau at the Hanford Site. The CA requires estimates of fate and transport of radionuclides in the groundwater from multiple sources within the modeling domain. This Environmental Calculation File (ECF) details the application of the Plateau-to-River (P2R) Model (CP-57037, Rev. 3, Model Package Report for the P2R Model: Version 9.1) to predict the flow of groundwater on the Central Plateau for the 10,000-year simulation to support a special analysis associated with the Hanford Site CA. The simulated flow field will support the simulation of fate and transport of contaminants for comparison to the results obtained as part of the CA to evaluate impact of the updated version of the P2R Model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗