Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “completeness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Combustion Module-2 Preparations Completed for SPACEHAB Mission Including the Addition of a New Major Experiment

The Combustion Module-1 (CM-1) was a large, state-of-the-art space shuttle Spacelab facility that was designed, built, and operated on STS-83 and STS-94 by a team from the NASA Glenn Research Center composed of civil servants and local support contractors (Analex and Zin Technologies). CM-1 accomplished the incredible task of providing a safe environment to support flammable and toxic gases while providing a suite of diagnostics for science measurements more extensive than any prior shuttle experiment (or anything since). Finally, CM-1 proved that multiple science investigations can be accommodated in one facility, a crucial step for Glenn's Fluids and Combustion Facility developed for the International Space Station. However, the story does not end with CM-1. In 1998, CM-2 was authorized to take the CM-1 accomplishments a big step further by completing three major steps: Converting the entire experiment to operate in a SPACEHAB module. Conducting an extensive hardware refurbishment and upgrading diagnostics (e.g., cameras, gas chromatograph, and numerous sensors). Adding a new, completely different combustion experiment.

Over, Ann P.↗

Deep Space 1 Ion Engine Completed a 3-Year Journey

A xenon ion engine and power processor system, which was developed by the NASA Glenn Research Center in partnership with the Jet Propulsion Laboratory and Boeing Electron Dynamic Devices, completed nearly 3 years of operation aboard the Deep Space 1 spacecraft. The 2.3-kW ion engine, which provided primary propulsion and two-axis attitude control, thrusted for more than 16,000 hr and consumed more than 70 kg of xenon propellant. The Deep Space 1 spacecraft was launched on October 24, 1998, to validate 12 futuristic technologies, including the ion-propulsion system. After the technology validation process was successfully completed, the Deep Space 1 spacecraft flew by the small asteroid Braille on July 29, 1999. The final objective of this mission was to encounter the active comet Borrelly, which is about 6 miles long. The ion engine was on a thrusting schedule to navigate the Deep Space 1 spacecraft to within 1400 miles of the comet. Since the hydrazine used for spacecraft attitude control was in short supply, the ion engine also provided two-axis attitude control to conserve the hydrazine supply for the Borrelly encounter. The comet encounter took place on September 22, 2001. Dr. Marc Rayman, project manager of Deep Space 1 at the Jet Propulsion Laboratory said, "Deep Space 1 plunged into the heart of the comet Borrelly and has lived to tell every detail of its spinetingling adventure! The images are even better than the impressive images of comet Halley taken by Europe's Giotto spacecraft in 1986." The Deep Space 1 mission, which successfully tested the 12 high-risk, advanced technologies and captured the best images ever taken of a comet, was voluntarily terminated on December 18, 2001. The successful demonstration of the 2-kW-class ion propulsion system technology is now providing mission planners with off-the-shelf flight hardware. Higher power, next generation ion propulsion systems are being developed for large flagship missions, such as outer planet explorers and sample-return missions.

Sovey, James S.↗

Microsystems Fabrication Laboratory-New Class 100 Cleanroom Completed and Certified

A new Microsystems Fabrication Laboratory (MFL), a Class 100 cleanroom fabrication facility, was completed and certified in 2002 at the NASA Glenn Research Center. This facility, to be used by Glenn's Instrumentation and Controls Division, was designed and built as part of the NASA Construction of Facilities Program. The design, construction, and certification phases were managed by personnel from Glenn s Facilities and Test Engineering Division. Because of time constraints and the need for specialized cleanroom expertise, this 1000 ft2 laboratory was completed using a design-build procurement. Facility Planning & Resources (Pittsburgh, PA) was selected as the prime contractor and provided the architectural design and project management. A major subcontractor, AdvanceTEC, LLC (Richmond, VA), provided the mechanical and electrical design and performed the construction services. Throughout this fast-track project, Facilities and Test Engineering Division personnel provided overall project management and worked closely with the contractors to ensure that the customers needs were addressed and that the impact of the project implementation was minimized.

Borato, Frances M.↗

Summary of Resources for the International Space Station Environmental Control and Life Support System For Core Complete Modules

The Core Complete Environmental Control and Life Support (ECLS) System for the International Space Station (ISS) will consist of components and subsystems in both the United States (U.S.) and International Partner elements which together will perform the functions of Temperature and Humidity Control (THC), Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Water Recovery and Management (WRM), Fire Detection and Suppression (FDS), and Vacuum System (VS) for the station. Due to limited resources available on ISS, detailed attention is given to minimizing and tracking all resources associated with all systems, beginning with estimates during the hardware development phase through measured actuals when flight hardware is built and delivered. A summary of resources consumed by the addition of future U.S. ECLS system hardware to get to Core Complete is presented, including launch weight, average continuous and peak power loads, on-orbit volume and resupply logistics.

Williams, David E.↗

Completed Beltrami-Michell Formulation in Polar Coordinates

A set of conditions had not been formulated on the boundary of an elastic continuum since the time of Saint-Venant. This limitation prevented the formulation of a direct stress calculation method in elasticity for a continuum with a displacement boundary condition. The missed condition, referred to as the boundary compatibility condition, is now formulated in polar coordinates. The augmentation of the new condition completes the Beltrami-Michell formulation in polar coordinates. The completed formulation that includes equilibrium equations and a compatibility condition in the field as well as the traction and boundary compatibility condition is derived from the stationary condition of the variational functional of the integrated force method. The new method is illustrated by solving an example of a mixed boundary value problem for mechanical as well as thermal loads.

Patnaik, Surya N.↗

A Complete Tank Test of a Model of a Flying-Boat Hull - N.A.C.A. Model No.11

This note discusses the limitations of the conventional tank test of a seaplane model. The advantages of a complete test, giving the characteristics of the model at all speeds, loads, and trim angles in the useful range are pointed out. The data on N.A.C.A. Model No.11, obtained from a complete test, are presented and discussed. The results are analyzed to determine the best trim angle for each speed and load. The data for the best angles are reduced to non-dimensional form for ease of comparison and application. A practical problem using the characteristics of model no.11 is presented to show the method of calculating the take-off time and run of a seaplane from these data.

Shoemaker, James M.↗

Comparisons of Temporal and Spatial Trends in the Spatially Complete Global Spectral Surface Albedos Products

Five years of spatially complete snow-free land surface albedo data have been prepared using high quality white-sky and black-sky land surface albedo observations (MOD43B3) from the MODIS instrument aboard NASA's Terra satellite platform. The data were generated using an updated ecosystem-dependent temporal interpolation technique. In this paper, we describe the refinements in the technique and the creation of a spatially complete snow-free five-year aggregate climatology product. This paper also describes an error analysis of the interpolation technique. The filled albedo products are examined through comparisons of temporal and spatial trends for pixels that have been filled versus pixels that have been retained in the original MOD43B3 values. The variability in the trends showcase how the filling technique maintains the pixel-level spatial, spectral, and temporal integrity of the MOD43B3 data. These comparisons are made for both a single-year of filled data, year 2002, and for the five-year aggregate climatology product.

Moody, Eric G.↗

Completing and Adapting Models of Biological Processes

We present a learning-based method for model completion and adaptation, which is based on the combination of two approaches: 1) R2D2C, a technique for mechanically transforming system requirements via provably equivalent models to running code, and 2) automata learning-based model extrapolation. The intended impact of this new combination is to make model completion and adaptation accessible to experts of the field, like biologists or engineers. The principle is briefly illustrated by generating models of biological procedures concerning gene activities in the production of proteins, although the main application is going to concern autonomic systems for space exploration.

Margaria, Tiziana↗

A Method for Calculating the Probability of Successfully Completing a Rocket Propulsion Ground Test

Propulsion ground test facilities face the daily challenge of scheduling multiple customers into limited facility space and successfully completing their propulsion test projects. Over the last decade NASA s propulsion test facilities have performed hundreds of tests, collected thousands of seconds of test data, and exceeded the capabilities of numerous test facility and test article components. A logistic regression mathematical modeling technique has been developed to predict the probability of successfully completing a rocket propulsion test. A logistic regression model is a mathematical modeling approach that can be used to describe the relationship of several independent predictor variables X(sub 1), X(sub 2),.., X(sub k) to a binary or dichotomous dependent variable Y, where Y can only be one of two possible outcomes, in this case Success or Failure of accomplishing a full duration test. The use of logistic regression modeling is not new; however, modeling propulsion ground test facilities using logistic regression is both a new and unique application of the statistical technique. Results from this type of model provide project managers with insight and confidence into the effectiveness of rocket propulsion ground testing.

Messer, Bradley↗

Automata learning algorithms and processes for providing more complete systems requirements specification by scenario generation, CSP-based syntax-oriented model construction, and R2D2C system requirements transformation

Systems, methods and apparatus are provided through which in some embodiments, automata learning algorithms and techniques are implemented to generate a more complete set of scenarios for requirements based programming. More specifically, a CSP-based, syntax-oriented model construction, which requires the support of a theorem prover, is complemented by model extrapolation, via automata learning. This may support the systematic completion of the requirements, the nature of the requirement being partial, which provides focus on the most prominent scenarios. This may generalize requirement skeletons by extrapolation and may indicate by way of automatically generated traces where the requirement specification is too loose and additional information is required.

Hinchey, Michael G.↗

A Completely New Type of Actuator -or- This Ain't Your Grandfather's Internal Combustion Engine

A completely new type of actuator - one that is proposed for use in a variety of environments from sea to land to air to space - has been designed, patented, built, and tested. The actuator is loosely based on the principle of the internal combustion engine, except that it is a completely closed system, only requiring electrical input, and the working fuel is water. This paper outlines the theory behind the electrolysis- and ignition-based cycle upon which the actuator operates and describes the performance capability test apparatus and results for the actuator. A mechanism application that harnessed the unit s power to twist a scaled rotor blade is also highlighted.

Gore, Brian W.↗

Methods of determining complete sensor requirements for autonomous mobility

A method of determining complete sensor requirements for autonomous mobility of an autonomous system includes computing a time variation of each behavior of a set of behaviors of the autonomous system, determining mobility sensitivity to each behavior of the autonomous system, and computing a change in mobility based upon the mobility sensitivity to each behavior and the time variation of each behavior. The method further includes determining the complete sensor requirements of the autonomous system through analysis of the relative magnitude of the change in mobility, the mobility sensitivity to each behavior, and the time variation of each behavior, wherein the relative magnitude of the change in mobility, the mobility sensitivity to each behavior, and the time variation of each behavior are characteristic of the stability of the autonomous system.

Curtis, Steven A.↗

Complete Tem-Tomography: 3D Structure of Gems Cluster

GEMS (glass with embedded metal and sulfide) grains in interplanetary dust particles (IDPs) are considered to be one of the ubiquitous and fundamental building blocks of solids in the Solar System. They have been considered to be interstellar silicate dust that survived various metamorphism or alteration processes in the protoplanetary disk but the elemental and isotopic composition measurements suggest that most of them have been formed in the protoplanetary disk as condensates from high temperature gas. This formation model is also supported by the formation of GEMS-like grains with respect to the size, mineral assemblage, texture and infrared spectrum by condensation experiments from mean GEMS composition materials. Previous GEMS studies were performed only with 2D observation by transmission electron microscopy (TEM) or scanning TEM (STEM). However, the 3D shape and structure of GEMS grains and the spatial distribution of Fe/FeS's has critical information about their formation and origin. Recently, the 3D structure of GEMS grains in ultrathin sections of cluster IDPs was revealed by electron tomography using a TEM/STEM (JEM-2100F, JEOL). However, CT images of thin sections mounted on Cu grids acquired by conventional TEM-tomography are limited to low tilt angles (e. g., less than absolute value of 75 deg. In fact, previous 3D TEM observations of GEMS were affected by some artifacts related to the limited tilt range in the TEM used. Complete tomographic images should be acquired by rotating the sample tilt angle over a range of more than absolute value of 80 deg otherwise the CT images lose their correct structures. In order to constrain the origin and formation process of GEMS grains more clearly, we performed complete electron tomography for GEMS grains. Here we report the sample preparation method we have developed for this study, and the preliminary results.

Matsuno, J.↗

Completion of the Cassini-Huygens Prime Mission

The Cassini-Huygens mission is a joint endeavor between the United States and Europe to conduct an in-depth investigation of the Saturnian system. The agreement between the parties called for conducting operations in orbit at Saturn for a period of four years, and this was completed on July 1, 2008. The mission has been an unqualified success by any measure, and at the time of the completion of the four years, the spacecraft remained in excellent health and with sufficient consumables remaining that a decision has been reached to continue the endeavor for another two years at the same rate of data collection as in the four-year prime mission. This paper provides a high level overview of the mission's accomplishments in the four years, summarizes the current state of the spacecraft, and gives a summary of the plans and expectations for the two additional years of operations at Saturn.

Mitchell, Robert T.↗

Completion of Launch Director Console Project and Other Support Work

There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

Steinrock, Joshua G.↗

Cassini Spacecraft Strategy for Recovering from a Complete Loss-Of-Signal Condition

Unlike other faults where the space craft’s automated Fault Protection (FP) routines can be relied upon to provide a carrier signal and telemetered data to the ground-based Spacecraft Operations Flight Support (SOFS) team to facilitate vehicle acquisition, diagnosis, and fault recovery, a complete Loss-of-Spacecraft-Signal (LOS) condition will yield no information at all to help re-acquire the vehicle and resolve the fault. For any FP response activation, the spacecraft’s downlink signal must be acquired via the Deep Space Network (DSN) on the expected (post-fault) Radio Frequency Subsystem (RFS) device configuration commanded by the FP; data that will not be attainable in the case of a complete LOS condition since there is no signal available for the ground station to lock onto. In the case of the Cassini Mission-to-Saturn spacecraft, numerous fault possibilities exist that can cause a LOS condition. Activations of the onboard RFS-related FP can reconfigure the post-fault RFS states, impeding the ground team’s ability to acquire the spacecraft’s downlink signal

Morgan, Paula S.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Completion of the Final Orbit Around Dwarf Planet Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional DV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to all science orbits at Ceres including the final orbit for Dawn’s primary mission, called the low altitude mapping orbit (LAMO), a circular orbit at a mean altitude above Ceres of approximately 385 km. Dawn met or exceeded all pre-launch science requirements and Dawn's prime mission concluded on June 30, 2016. Dawn subsequently received NASA approval for two extended missions at Ceres, called XM1 and XM2. During XM1 IPS was used for orbit maintenance and to transit the spacecraft to several new, higher-altitude science orbits, ending in an elliptical orbit at a maximum altitude of approximately 38,000 km. In XM2, IPS operations included transiting the Dawn spacecraft to its final, highly elliptical orbit at Ceres ranging from 35 km perigee to 4,800 km apogee. Science data acquisition will continue in XM2 until the hydrazine is exhausted, which is expected to occur between August and October 2018. Dawn has successfully completed all science goals for both the primary and XM1 extended missions. To date the IPS has been operated for approximately 51,250 hours, consumed approximately 416 kg of xenon, and provided a delta-V of almost 11.5 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2018. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations for XM1, and XM2 through June 2018.

Rayman, Marc D.↗

Parsec-scale Properties of Steep- and Flat-spectrum Extragalactic Radio Sources from a VLBA Survey of a Complete North Polar Cap Sample

We observed with the Very Long Baseline Array (VLBA) at 2.3 and 8.6 GHz a complete flux-density-limited sample of 482 radio sources with decl. > +75° brighter than 200 mJy at 1.4 GHz drawn from the NVSS catalog. A total of 34% of the sources show parsec-scale emission above the flux density detection limit of 30 mJy; their accurate positions and parsec-scale structure parameters are determined. Among all the sources detected at least at the shortest VLBA baselines, the majority, or 72%, have a steep single-dish spectrum. The fraction of the sources with a detectable parsec-scale structure is above 95% among the flat-spectrum objects and close to 25% among the steep-spectrum objects. We identified 82 compact steep-spectrum source candidates, which make up 17% of the sample; most of them are reported for the first time. The compactness and the brightness temperature of the sources in our sample show a positive correlation with single-dish and VLBA spectral indices. All the sources with a significant 8 GHz variability were detected by the VLBA snapshot observations, which independently confirmed their compactness. We demonstrated that 54% of the sources detected by the VLBA at 2.3 GHz in our sample have a steep VLBA spectrum. The compact radio emission of these sources is likely dominated by optically thin jets or mini-lobes, not by an opaque jet core. These results show that future VLBI surveys aimed at searching for new sources with parsec-scale structure should include not only flat-spectrum sources but also steep-spectrum ones in order to reach an acceptable level of completeness.

A V Popkov↗