Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “buildings”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Transactive Control Design for Commercial Buildings to Provide Demand Response

Transactive coordination and control is a new type of distributed strategy that is designed to engage various self-interested distributed energy resources such as controllable loads, distributed generators, and energy storage for providing demand response. In this paper, a novel transactive control design is proposed for commercial buildings to coordinate the electricity demand of the package rooftop air conditioning units (RTUs) for demand response. Such a coordination is realized by introducing a local relationship between the temperature setpoint and the market clearing price. With the proposed market-based control, the demand of individual RTUs is adjusted by changing their temperature setpoints as a response to the market clearing prices. Two dierent scenarios of demand response are considered herein. One is to limit the peak demand of commercial buildings, in which a new market clearing strategy based on proportionalintegral- derivative control with respect to the demand limit is proposed. The other one is to perform price responsive control, in which the total demand of commercial buildings will respond to the real-time pricing. The proposed transactive strategy is also tested and demonstrated on a real occupied building located at Pacic Northwest National Laboratory. The eld testing results conrm the eectiveness of the proposed transactive coordination and control for commercial building with RTUs to provide demand response.

Huang, Sen↗

Sault Tribe Building Efficiency Audits of Tribally-Owned Governmental Buildings and Residential Tribal Housing

The Tribe is working to reduce energy consumption and expense in Tribally-owned governmental buildings and low income housing sites. In 2009, the Tribe applied to the U. S. Department of Energy for funding to conduct energy audits of Tribally-owned governmental buildings. Findings from the energy audits would define the extent and types of energy efficiency improvements needed, establish a basis for energy priorities, strategies and action plans, and provide a benchmark for measuring improvements from energy efficiency implementations. In 2010, the DOE awarded a grant in the amount of $95,238 to the Tribe to fund the energy audits of nine governmental buildings and to pay for travel expenses associated with attendance and participation at the DOE annual program reviews. In 2011, the Tribe applied for and was awarded a DOE grant in the amount of $75,509 to conduct energy audits of the remaining 30 Tribally-owned governmental buildings. Repeating mobilization steps performed during the first DOE energy audits grant, the Tribe initiated the second round of governmental building energy audits by completing energy auditor procurement. The selected energy auditor successfully passed DOE debarment and Sault Tribe background clearances. The energy audits contract was awarded to U. P. Engineers and Architects, Inc. of Sault Ste. Marie, Michigan. The Tribe continued mobilizing for the energy audits by providing the energy auditor with one year of electric, gas and water utility invoice copies per building, as well as supplemental building information, such as operating hours. The Tribe also contacted building occupants to coordinate scheduling for the on-site energy audit inspections and arranged for facilities management personnel to guide the energy auditor through the buildings and answer questions regarding building systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Historic Significance and Current Condition Assessment of Building 06-CP-10, Device Assembly Building, Area 6, Nevada National Security Site, Nye County, Nevada

This report was produced in partial fulfillment of the mitigation of adverse effects to Building 06-CP-10, the first device assembly building on the Nevada National Security Site (NNSS), and is intended to comply with the 2021 Memorandum of Agreement DE-GM58-21NA25543 Between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Demolition of Fourteen Buildings and Structures in Area 6 of the Nevada National Security Site, Nye County (hereafter referred to as the MOA). This MOA was executed to resolve adverse effects from the U.S. Department of Energy (DOE) plan to demolish 14 architectural resources at the Control Point and in the vicinity in Area 6 of the NNSS. The management and operations contractor for the NNSS identified these 14 architectural resources as environmental hazards unsafe for human occupation due to deterioration and rodent infestation. Building 06-CP-10 and two small magazine bunkers (06-CP-10A and 06-CP-805) associated with Building 06-CP-10 are scheduled for demolition as part of this undertaking. Building 06-CP-10 was originally recorded in 2003 during a historical evaluation of four buildings in Area 6. In consultation with the Nevada State Historic Preservation Office, the building was determined individually eligible for inclusion in the NRHP under the Secretary of the Interior’s Significance Criterion A because of its association with nuclear testing and under Significance Criterion C as a distinct type of construction associated with the nuclear industry. Building 06-CP-10A, a munitions magazine, and 06- CP-805, a cap-and-fuse bunker, have been recorded as contributing accessory resources to 06-CP-10. Pursuant to Stipulation III.C.3 of the MOA, this report provides a summary of the historic significance of Building 06-CP-10 and a description of its current condition and accessory resources. In addition, an updated Architectural Resource Assessment (ARA) form with new information and photographs is included in the appendix in fulfillment of Stipulation III.C.2.

54 ENVIRONMENTAL SCIENCES↗

IBPSA Project 2 BOPTEST: An update on the test cases available in the framework for testing advanced control strategies in buildings

Project 2 develops software infrastructure, test cases, and extensions for the Building Optimization Testing Framework (BOPTEST) to address the expanding needs of building and urban energy system controls through open international collaboration. This paper provides an overview of the new test cases available as of BOPTEST version 0.7.1. Each test case is developed using open-source Modelica libraries and Spawn of EnergyPlus, enabling the creation of high-fidelity building models that incorporate envelope dynamics, Heating Ventilation and Air Conditioning (HVAC) systems, and explicit control representations. Currently, eight test cases are available, with five additional cases under development. These test cases cover a wide range of climates, building types, and HVAC systems. This paper compiles and summarizes test case descriptions, cites original manuscripts that developed them for a more detailed description, and reports baseline control performance metrics. Furthermore, two example applications are presented: one illustrating different levels of control, from supervisory to low-level, and another demonstrating how Model Predictive Control (MPC) solutions must be adapted from continuous to integer to control some building actuators.

Zanetti, Ettore↗

Extract useful information from building permits data to profile a city’s building retrofit history

Building retrofit is one of the key strategies for cities to reduce energy use and GHG emissions. The historical information about changes to buildings is crucial to infer the buildings’ current energy system efficiency levels and to identify candidate buildings for retrofit. In general, a building permit is required before the start of any construction activity of a building, such as changing building structure, remodeling, or installing new equipment. Moreover, many large cities provide public datasets of building permits in history. Therefore, the permits are a potentially good resource for mining information on the city’s retrofit history. In this study, we use the permit dataset from the city of San Francisco as a case study. Location and time information from the dataset is also used to depict the retrofit timeline of each building and the whole building stock. The type of work of the permit is inferred from the descriptive text by a machine learning model. At last, the limitations of the current permit dataset and potential improvements on the permit data management are discussed to better utilize the information in the future.

Zhang, Wanni↗

The Building Science Advisor: A Web-Based Tool to Assess the Durability of Building Envelope Components

The Department of Energy (DOE) and Oak Ridge National Laboratory (ORNL) have developed an innovative new design tool that will put building science expert advice in the hands of every building designer who cares to manage moisture risk in high-R envelope components. As modern buildings become increasingly more airtight, constructed with modern labor-saving materials, and equipped with air-conditioning, they have become less forgiving to moisture intrusion. The Building Science Advisor (BSA) provides building science knowledge and advice based on expert experience, field measurements, laboratory tests, and computer simulations.BSA users are prompted to enter relevant information about the building location, design, and material selection options like cladding, structural system, and insulation. Influential factors such as climate, building air tightness, material properties, and internal moisture loads are also considered to estimate and compare the moisture durability performance of several design options. If the BSA deems the assembly’s performance unsatisfactory, it will provide the reasons why, and suggest necessary changes to wall design to ensure more robust performance.Using the BSA tool enables building designers to confidently select assembly design characteristics that achieve their design goals with the least moisture durability risk. Links to design-specific guidance are also be provided to help users manage any remaining risk. This tool will further enable DOE’s Building Technologies Office (BTO) to meet its long-term energy goal of a 50% reduction in building energy consumption by reducing builder concern about using highly energy efficient wall systems.

Desjarlais, Andre Omer↗

Advanced Building Construction (ABC) Research Opportunities Report: Industrializing Construction to Decarbonize Buildings

The U.S. building stock is responsible for 75% of total U.S. electricity use, 40% of energy use, and 35% of CO 2 emissions. To meet bold national climate change goals, the U.S. must decarbonize the building stock by 2050. However, today’s practices to build or renovate buildings to low-carbon, high-performance levels are generally labor intensive, disruptive, and too costly to quickly scale in the U.S. To retrofit 80% of the U.S. building stock in the U.S. by 2050, the retrofit rate will need to increase by about 15 times for residential buildings and two times for commercial buildings. Additionally, there is a major housing deficit in this country where nearly 600,000 people lack adequate or stable shelter, and the pace of construction is not keeping up with the growing demand. New, more industrialized, replicable, and technologically driven approaches to renovation and new building construction are imperative to help meet such significant national needs and achieve the necessary speed and scale to meet national building decarbonization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Main Street Zero Energy Buildings: The Zero Energy Method in Concept and Practice: Preprint

Ongoing work at the National Renewable Energy Laboratory indicates that net-zero energy building (NZEB) status is both achievable and repeatable today. This paper presents a definition framework for classifying NZEBs and a real-life example that demonstrates how a large-scale office building can cost-effectively achieve net-zero energy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

User’s Manual for RESRAD-BUILD Code V.4: Vol. 1 – Methodology and Models Used in RESRAD-BUILD Code

The RESRAD-BUILD computer code models radionuclide release and transport in indoor environments and performs pathway analyses to evaluate the potential radiological dose and risk incurred by an individual who works or lives in a building contaminated with radioactive material or housing radioactively contaminated furniture or equipment. The code provides four geometries to characterize a radiation source: point, line, area, and volume, in which radionuclides are homogeneously distributed. Radionuclides contained in a source are considered to be released to the indoor air due to various processes including erosion (mechanically or weathering), diffusion (for tritium and radon in a volume source), or emanation (radon in a point, line, or area source). The release can proceed through different time phases with different rates. In RESRAD-BUILD Version 4.0, a dynamic ventilation model is implemented to simulate the fate and transport of source material particles and radionuclides after their releases. This dynamic ventilation model considers (1) air exchange between rooms in the building and between the rooms and the outdoor environment, (2) deposition from air to floor, (3) resuspension from the floor to the air, and (4) periodical vacuuming that reduces the floor deposition. The fate and transport modeling provides estimates of radionuclide concentrations in the source, in the air, and on the floor at different times, which are then integrated over the exposure duration for the calculation of radiation doses and cancer risks. A single run of the RESRAD-BUILD code can model a building with up to 9 rooms, 10 sources, and 10 receptors. The potential radiation dose and cancer risk incurred by each receptor are calculated for seven exposure pathways: (1) external radiation directly from the sources (accounting for shielding), (2) external radiation from radioactive particles deposited on the floors, (3) external radiation from airborne radionuclides, (4) inhalation of airborne radionuclides, (5) inhalation of radon and radon progenies, (6) inadvertent ingestion of radioactive particles directly from the source, and (7) ingestion of radioactive particles deposited on the floors. Various exposure scenarios can be modeled with RESRAD-BUILD, including but are not limited to, office worker, renovation worker, decontamination worker, building visitor, and resident. Both deterministic and probabilistic analyses can be performed to obtain results in both text reports and graphic displays.

61 RADIATION PROTECTION AND DOSIMETRY↗

Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy use requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Building Business Network (B-Biz): Addressing Gaps in the High-Performance Building Technology Market, Especially for Underserved Customers

Increased market intelligence and business model innovation is needed to build contractor confidence in high-performance building technologies in order to increase the speed and scale of adoption to meet the U.S. Department of Energy's building stock decarbonization goals. Although there have been important innovations in energy efficiency, affordability, and decarbonization of building technologies, consumers are not purchasing these technologies at the necessary speed and scale partially due to a gap in institutional understanding around barriers contractors face in providing and servicing these technologies. Small businesses in this market must mitigate risk around high-performance building technologies, limiting their opportunities in the market and impacting the rate of adoption. The Building Business Network (B-Biz) aims to provide high-performance building technology solutions to underserved customers by collaborating with local small businesses that provide and service high-performance building technologies in communities with the lowest rates of adoption. This research explores the current market, the importance of business models, and the opportunity to utilize small businesses to address market gaps in underserved communities.

B-Biz↗

Is the BPD Nationally Representative? A Comparison of the Building Performance Database to the Commercial Buildings Energy Consumption Survey

The Building Performance Database (BPD) contains building characteristics and energy use data that can be used to benchmark buildings against their peers. However, the BPD contains data from any source that was willing to contribute data, regardless of whether that dataset is representative of the national building stock. This report explores the representativeness of the BPD. Namely, we compared the BPD to the Commercial Buildings Energy Consumption Survey (CBECS), which was designed to be a nationally representative sample of buildings. We divided the datasets into subgroups based on building type and location, we focused on three key variables (floor area, site energy use intensity, and source energy use intensity), and we compared their statistical properties in the BPD to the CBECS. We found that while the BPD contains significantly more buildings with larger floor areas, the BPD is reasonably representative in terms of site and source energy use intensity and does not appear to have a systemic bias towards energy efficient buildings.

42 ENGINEERING↗

Building ControlScore: General Service Administration Office Building Deployment

Improvements to building control systems can lead to energy savings and increased occupant comfort. In an optimized system, process variables such as air temperature will closely follow their desired setpoints and avoid excess energy use. Typically, experts must manually inspect individual control loops to identify poor performance and opportunities for improvement. However, this approach is difficult in modern buildings that have a prohibitively large number of controllers. To address this issue, Pacific Northwest National Laboratory (PNNL) created the ControlScore concept, which takes operating data from the many controllers within a building and generates standardized scores for each loop on a scale of 0 to 10 (a score of 0 indicates poor control, a score of 10 indicates good control). PNNL applied the Building ControlScore application to all available data from a General Services Administration office building within the period of January 1, 2023, to March 9, 2023. The building scored a 4.7 overall, with all 74 of the building’s loops fitting a roughly normal distribution centered around 5. These results indicate that the analyzed systems have below-average performance with room for improvement, especially in the poorly scored systems. Airflow loops tended to have much lower scores than zone temperature loops. The lowest and highest performing systems in the building section were identified, as were all loops with a score less than 1. While the ControlScore identifies loops and systems that aren’t meeting their designated setpoints, it does not indicate the cause of those issues. For example, consider a supply air terminal unit’s airflow loop that received a low score due to it delivering less air than specified by the setpoint. The lower-than-desired airflow could be due to equipment limitations (e.g., the terminal unit or duct serving is too small to accommodate that airflow), malfunctioning equipment (e.g., a stuck damper or bad sensor), or something else entirely. The ControlScore does not diagnose problems it simply identifies the symptoms that can be explored and addressed by building operators.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NORM in Building Materials: A Case Study in Releasing and Disposing of Building Debris within the DOE System - 18123

In 2013, the Office of Management and Budget issued Memorandum 2013-02, clarifying its 'Freeze the Footprint' policy. Memorandum 2013-02 requires that all federal agencies maintain or reduce their total square footage, within each subsequent year, from a FY2012 baseline. Memorandum 2013-02 also requires that total square footage remain constant with respect to the type/intended use of a building. At Los Alamos National Laboratory (LANL), this means that new construction cannot occur without demolition of equivalent (both in type and square footage) building(s). Since 2013, decommissioning and demolition of aging, unused facilities at LANL has increased. In 2016, the TA16-280 building complex was scheduled for demolition. TA16-280 is a former high explosives (HE) processing facility that consists of six buildings connected to each other via weatherproof walkways. It was constructed in the 1950's and has been subsequently used for HE shipping, receiving, and storage. Interviews with radiation protection staff suggest that some of the buildings within the complex may have been used to store depleted uranium metal parts in a non-dispersible form. It is LANL policy to conduct decommissioning surveys for radioactive materials when building history cannot confirm that a structure is radiologically non-impacted. LANL follows the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) process to develop its surveys and clear structures from radiological control. After clearance, a structure may be dispositioned as non-regulated waste, at a significant cost savings compared to regulated disposition pathways such as low-level waste. MARSAME measurements conducted in the 16-280 complex were elevated compared to reference measurements of surrogate materials, and a majority of the survey units failed to pass indistinguishable from background (IFB), which is LANL's unregulated clearance criteria. Further measurements conducted both in situ and in the laboratory indicated the presence of naturally-occurring thorium in several building materials including: poured concrete, the glaze atop ceramic blast tiles, and the porcelain enamel on the exterior of blast-proof ceiling lamps. Other than naturally-occurring thorium, there were no elevated radionuclide concentrations detected in building materials. It should be noted that there was no history of thorium use in the 16-280 complex, and the material in question was in all cases fixed to and within the building materials in question. Except in certain specific cases, such material is exempt from regulation under the Atomic Energy Act of 1954 [3], as amended, and is therefore exempt from regulation under the Nuclear Regulatory Commission, the Department of Energy, and agreement state regulatory frameworks. Despite this regulatory exemption, disposition of material from the 16-280 complex proved to be challenging, principally because local industrial landfills stipulate 'No radioactive material' in their Waste Acceptance Criteria. This disconnect between what is regulated and what is disposable creates a situation where some DOE sites find it easier to disposition property as Low Level Waste in lieu of pursuing a non-regulated disposition pathway. This presentation will explore the specifics of the 16-280 decommissioning project as well as the implications of the release/disposition disconnect for naturally occurring radioactive material and project planning at LANL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Resilience of Residential Building with Thermally Anisotropic Building Envelope Connected to Geothermal Sources

Heat waves and cold snaps have become more frequent and more intense because of climate change. A heat wave and a cold snap are a period of excessively hot and cold weather, respectively, that poses severe risks to building occupants’ health, especially for vulnerable people. They increase electrical energy consumption and put high stress on the grid which leads to potential power outages. Therefore, it is critical to assess and actively improve the thermal resilience of buildings to cope with heat waves, cold snaps, and power outages. The thermally anisotropic building envelope (TABE) is a novel active building envelope that can save energy while maintaining thermal comfort in buildings by redirecting heat and coolness from building envelopes to hydronic loops. When connecting to a ground thermal loop (GL), TABE can utilize the relatively stable temperature of the ground to protect the indoor environment during heat waves and cold snaps. This study assesses the thermal resilience of residential buildings that installed TABE and used ground thermal energy to supply the hydronic loops, abbreviated as ground thermal loop or TABE+GL. The simulation and analysis are conducted for the US Department of Energy prototype single-family detached residential building in the hot climate of Miami, Florida and Tucson, Arizona, and the cold climate of Denver, Colorado, and Rochester, Minnesota. Heat waves and cold snaps were obtained from the historical weather data of 1998-2020 for the studied regions. Three thermal resilience metrics, including the standard effective temperature (SET) degree-hours, the Heat Index, and the Hours of Safety (HOS) were used to quantify the effect of TABE+GL. The results showed that buildings installed TABE+GL could significantly reduce the average SET degree-hours above 30°C, increase HOS, and greatly improve thermal resilience.

Shen, Zhenglai↗

Development of city buildings dataset for urban building energy modeling

Urban building energy modeling (UBEM) is becoming a proven tool to support energy efficiency programs for buildings in cities. Development of a city-scale dataset of the existing building stock is a critical step of UBEM to automatically generate energy models of urban buildings and simulate their performance. This study introduces data needs, data standards, and data sources to develop city building datasets for UBEM. First, a literature review of data needs for UBEM was conducted. Then, the capabilities of the current data standards for city building datasets were reviewed. Moreover, the existing public data sources from several pioneer cites were studied to evaluate whether they are adequate to support UBEM. The results show that most cities have adequate public data to support UBEM; however, the data are represented in different formats without standardization, and there is a lack of common keys to make the data mapping easier. Finally, a case study is presented to integrate the diverse data sources from multiple city departments of San Francisco. The data mapping process is introduced and discussed. It is recommended to use the unique building identifiers as the common keys in the data sources to simplify the data mapping process. Furthermore, the integration methods and workflow are applied to other U.S. cities for developing the city-scale datasets of their existing building stock, including San Jose, Los Angeles, and Boston.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗