Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building technologies program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

U. S. Building Equipment RD&D Strategy Approach and Technical Options

The goals established by the US Department of Energy s Building Technologies (DOE/BT) Program for deep reductions in energy demand of buildings sector are summarized. Plans for future Research, Development, and Deployment/Demonstration (RD&D) activities to achieve the extremely challenging goals are discussed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Research Dissemination (FY 2018 Annual Progress Report)

This report documents additions and upgrades to the Building America Solution Center, https://basc.pnnl.gov, a web-based resource developed and maintained by the Pacific Northwest National Laboratory for the U.S. Department of Energy’s Building Technology Office. The Building America Solution Center makes research funded by DOE through its Building America program more readily accessible and easily searchable by members of the residential building and remodeling community, including builders, contractors, installers, remodelers, code officials, raters, manufacturers, sales professionals, and building science researchers. This report fulfills 1.5.2.75 PNNL - Building America Research Dissemination, Milestone 4, "Prepare an annual summary of significant platform maintenance activities and all content uploaded to the BASC site (Tasks 1 & 2)."

42 ENGINEERING↗

The NASA Langley building solar project and the supporting Lewis solar technology program

The use of solar energy to heat and cool a new office building that is now under construction is reported. Planned for completion in December 1975, the 53,000 square foot, single story building will utilize 15,000 square feet of various types of solar collectors in a test bed to provide nearly all of the heating demand and over half of the air conditioning demand. Drawing on its space-program-developed skills and resources in heat transfer, materials, and systems studies, NASA-Lewis will provide technology support for the Langley building project. A solar energy technology program underway at Lewis includes solar collector testing in an indoor solar simulator facility and in an outdoor test facility, property measurements of solar panel coatings, and operation of a laboratory-scale solar model system test facility. Based on results obtained in this program, NASA-Lewis will select and procure the solar collectors for the Langley test bed.

Ragsdale, R. G.↗

Roundtable Discussions of the Solid State Lighting R&D Task Priorities - Nov. 2009

The Multi‐year Program Plan (MYPP) for the Solid‐State Lighting (SSL) Program forms a basis on which the Department of Energy (DOE) develops research and development (R&D) funding solicitations. This plan is updated annually. As part of the annual update process the DOE invited 27 experts in SSL to Washington, DC on November 3 rd to the 5 th of 2009 for the SSL roundtables. The purpose of these roundtables was to advise DOE on which R&D tasks are currently most needed in order to advance solid state lighting products. These meetings were conducted over three days. The first two days were dedicated to discussion on Light Emitting Diodes (LEDs) with the final day dedicated to Organic Light Emitting Diodes (OLEDs). The roundtables began with a brief introduction and summary of the goals of the meetings. This was followed by “soapbox” presentations, which allowed participants the forum to present topics for consideration they felt to be important. For additional information on these presentations see Appendix A. The task prioritization conversation followed. During this conversation, participants provided for each R&D task general comments either in support for prioritization for DOE funding in 2010 or reasons they felt it to be untimely. A total of 12 LED core tasks, 22 LED product development tasks, 9 OLED core tasks, and 19 OLED product development tasks were covered. From this master list an abridged list of suggested priority tasks was formed. After the prioritization discussion, participants discussed the current status and targets for various metrics assigned to each prioritized task. The final stage of the roundtable was to review SSL Program’s efficacy targets and milestones for LEDs and OLEDs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance Evaluation of the ThermoLift Natural Gas Fired Air Conditioner and Cold-Climate Heat Pump

ThermoLift is currently developing its Thermal Compression Heat Pump (TCHP™), a natural-gas driven air conditioner and cold-climate heat pump, which can provide space heating, water heating, and air conditioning simultaneously in a single device. The system has broad application as a combined heating, ventilation, and air-conditioning (HVAC) solution with the benefit of substantial energy, cost, and greenhouse gas (GHG) reductions. Unlike traditional vapor compression heat-pumps, the TCHP™ uses helium as a working fluid in place of high global warming potential (GWP) refrigerants. The development effort has produced three iterations or generations of prototypes with advancement of the technology readiness level (TRL) from TRL-1 (TCHP™ Gen 1.0) to TRL-5 (TCHP™ Gen 3.0). In August of 2013, the US DOE solicited the submission of proposals through funding opportunity announcement DE-FOA-0000823, Building Technologies Innovations Program. The Office of Energy Efficiency and Renewable Energy (EERE) subsequently accepted ThermoLift’s proposal to develop a heat pump system based on the Hofbauer cycle, a new cycle that supplants the Vuilleumier cycle and provided funding for prototype evaluation at Oak Ridge National Laboratory (ORNL). ORNL is a widely known research center for developing and evaluating building technologies. Through its Building Technologies Research and Integration Center, ORNL has unique capabilities which allows them to collaborate with industry and academia to advance building component technologies. The TCHP™ Gen 3.0 prototype was shipped to ORNL on July 23, 2018. After installation and integration of the heat pump into ORNL’s test facility and performing instrumentation validation and calibration, extended operation of the heat pump was achieved during continuous operation on August 6, 2018, and includes various heating and cooling temperature ranges and performance analysis. The Gen 3.0 prototype was evaluated at four “ambient” temperatures: −25°C, −8.33°C, 8.33°C, and 20°C, (−13°F, 17°F, 47°F, and 68°F) denoted as test points 1-4, respectively. For heating, cycle coefficients of performance (COP) at the four “ambient” temperatures were found to be 1.30, 1.46, 1.52, and 1.61, respectively. Furthermore, there is no capacity reduction as the inlet temperature to the cold heat exchanger (HX) decreases. The heating capacity delivered by the TCHP was found to be 12 kW at -25°C. Finally, this final report identifies measures for obtaining further efficiency improvements.

42 ENGINEERING↗

ThermoLift – A Natural Gas Fired Air Conditioner and Heat Pump

ThermoLift is developing TC-Cycle™, a natural-gas driven air conditioner and cold-climate heat pump that can provide space heating, water heating, and air conditioning in a single device. Unlike traditional heat-pump system, the TC-Cycle system uses helium as working fluid in place of high global warming potential HFC refrigerant. The system has broad application as a combined HVAC solution and technology development throughout this program has advanced the Technology Readiness Level (TRL) from TRL-1 to TRL-5 achieved in the Gen 3.0 prototype. In August of 2013, the US Department of Energy (DOE) provided Research and Development funding through the Building Technologies Innovations Program Funding Opportunity Announcement DE-FOA-0000823. The statement of work (SOW) outlined a deliverable of testing at ORNL and a final test report prepared to include various heating cooling temperature ranges and performance analysis. Furthermore, a milestone of this effort was to analyze all test data to establish further efficiency improvements and consider optimum manufacturing methodologies to facilitate the next level improvements. ThermoLift’s Gen 3.0 gas-fired heat pump was shipped and installed into ORNL’s test facility with most of the data reported herein obtained on August 6, 2018. Uninterrupted operation demonstrated cycle Coefficient of Performance (COP) well exceeding DOE targets for cold-climate heat pumps. Furthermore, there was no degradation in capacity as inlet (ambient) temperature decreased.

03 NATURAL GAS↗

CSTI High Capacity Power

The SP-100 program was established in 1983 by DOD, DOE, and NASA as a joint program to develop the technology necessary for space nuclear power systems for military and civil application. During FY-86 and 87, the NASA SP-100 Advanced Technology Program was devised to maintain the momentum of promising technology advancement efforts started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for future space applications. In FY-88, the Advanced Technology Program was incorporated into NASA's new Civil Space Technology Initiative (CSTI). The CSTI Program was established to provide the foundation for technology development in automation and robotics, information, propulsion, and power. The CSTI High Capacity Power Program builds on the technology efforts of the SP-100 program, incorporates the previous NASA SP-100 Advanced Technology project, and provides a bridge to NASA Project Pathfinder. The elements of CSTI High Capacity Power development include Conversion Systems, Thermal Management, Power Management, System Diagnostics, and Environmental Interactions. Technology advancement in all areas, including materials, is required to assure the high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall program will develop and demonstrate the technology base required to provide a wide range of modular power systems as well as allowing mission independence from solar and orbital attitude requirements. Several recent advancements in CSTI High Capacity power development will be discussed.

Winter, Jerry M.↗

CSTI high capacity power

In FY-88, the Advanced Technology Program was incorporated into NASA's Civil Space Technology Initiative (CSTI). The CSTI Program was established to provide the foundation for technology development in automation and robotics, information, propulsion, and power. The CSTI High Capacity Power Program builds on the technology efforts of the SP-100 program, incorporates the previous NASA SP-100 Advanced Technology project, and provides a bridge to NASA Project Pathfinder. The elements of CSTI High Capacity Power development include Converrsion Systems, Thermal Management, Power Management, System Diagnostics, and Environmental Interactions. Technology advancement in all areas, including materials, is required to assure the high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems.

Winter, Jerry M.↗

The NASA CSTI High Capacity Power Program

The SP-100 program was established in 1983 by DOD, DOE, and NASA as a joint program to develop the technology necessary for space nuclear power systems for military and civil applications. During 1986 and 1987, the NASA Advanced Technology Program was responsible for maintaining the momentum of promising technology advancement efforts started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for future space applications. In 1988, the NASA Advanced Technology Program was incorporated into NASA's new Civil Space Technology Initiative (CSTI). The CSTI program was established to provide the foundation for technology development in automation and robotics, information, propulsion, and power. The CSTI High Capacity Power Program builds on the technology efforts of the SP-100 program, incorporates the previous NASA advanced technology project, and provides a bridge to the NASA exploration technology programs. The elements of CSTI high capacity power development include conversion systems: Stirling and thermoelectric, thermal management, power management, system diagnostics, and environmental interactions. Technology advancement in all areas, including materials, is required to provide the growth capability, high reliability, and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall program will develop and demonstrate the technology base required to provide a wide range of modular power systems while minimizing the impact of day/night operations as well as attitudes and distance from the Sun. Significant accomplishments in all of the program elements will be discussed, along with revised goals and project timelines recently developed.

Winter, Jerry M.↗

Net Zero Energy Manufactured Homes May Be on their Way

This article, published in Home Energy Magazine, describes a research project sponsored by the U.S. Department of Energy's Building America program, to construct and test the first manufactured home in the United States built to the performance criteria of DOE's Zero Energy Ready Home program. A 15-month study was conducted to compare the real-world performance of the DOE Zero Energy Ready home and two other manufactured homes - one built to just above industry standard construction and one built to the ENERGY STAR Certified Home criteria. The homes were built by Clayton Homes' Southern Energy Division and testing was sponsored by DOE's Building America program and conducted by the Levy Partnership. The DOE ZERH had increased initial construction costs of $6,607 compared to the standard home versus $4,340 for the ENERGY STAR home but reduced energy bills by $50 per month compared to a $33/month savings for the ENERGY STAR home, and monthly savings will continue for the life of the home. Savings were especially noticeable in the summer in this cooling-dominated test location. The DOE ZERH cut cooling costs in half compared to the ENERGY STAR home which performed only slightly better than the standard home in summer, while winter savings between the two advanced homes were more similar. Two technology advances were tested in the DOE ZERH home. Instead of the typical ducted heating and cooling system, the DOE ZERH home was equipped with a ductless heat pump; to condition the bedroom, holes were cut into bedroom walls and small fans were installed to pull air into those rooms, while door undercuts and transfer grilles provide return paths. A novel dense-pack attic insulation was also implemented.

U.S. Department of Energy Building Technologies Pr↗

Net Zero Energy Manufactured Homes May Be on their Way

This article, published in Home Energy Magazine, describes a research project sponsored by the U.S. Department of Energy's Building America program, to construct and test the first manufactured home in the United States built to the performance criteria of DOE's Zero Energy Ready Home program. A 15-month study was conducted to compare the real-world performance of the DOE Zero Energy Ready home and two other manufactured homes - one built to just above industry standard construction and one built to the ENERGY STAR Certified Home criteria. The homes were built by Clayton Homes' Southern Energy Division and testing was sponsored by DOE's Building America program and conducted by the Levy Partnership. The DOE ZERH had increased initial construction costs of $6,607 compared to the standard home versus $4,340 for the ENERGY STAR home but reduced energy bills by $50 per month compared to a $33/month savings for the ENERGY STAR home, and monthly savings will continue for the life of the home. Savings were especially noticeable in the summer in this cooling-dominated test location. The DOE ZERH cut cooling costs in half compared to the ENERGY STAR home which performed only slightly better than the standard home in summer, while winter savings between the two advanced homes were more similar. Two technology advances were tested in the DOE ZERH home. Instead of the typical ducted heating and cooling system, the DOE ZERH home was equipped with a ductless heat pump; to condition the bedroom, holes were cut into bedroom walls and small fans were installed to pull air into those rooms, while door undercuts and transfer grilles provide return paths. A novel dense-pack attic insulation was also implemented.

DOE Zero Energy Ready Home↗

A Path to Zero Energy Ready Home Construction

This paper will be presented at the 5th Residential Building Design & Construction Conference in State College, Pennsylvania. While the number of zero energy homes constructed in the U.S. has grown dramatically, increasing nearly 400% since 2015, zero energy homes still accounted for less than 1% of all U.S. homes constructed as of December 2018. Concerns about high costs or implementation challenges have kept many builders from attempting zero energy home construction. However, builders participating in the U.S. Department of Energy’s Zero Energy Ready Home Program are showing that zero energy ready home construction can be achieved simply and cost effectively with off-the-shelf equipment and materials and common construction techniques. Construction methods used by builders in the DOE program are compared with those used in just-to-code new homes and existing homes for several key components, including wall assemblies and HVAC systems. Examples of cost-effective assemblies used in the Mid Atlantic states are provided.

U.S. Department of Energy Building Technologies Pr↗

Zero Energy Ready Out of the Box

In this conference paper for the ASHRAE Buildings XV conference, December 2022, PNNL staff share key metrics for companies who are combining off site construction with certification to the U.S. Department of Energy’s Zero Energy Ready Home program to create homes that are both cost effective to construct and high performance to live in. Key performance metrics and measures for modular, panelized, and SIP homes are compared against all homes in the DOE Zero Energy Ready Home program and against new homes built to code. These metrics show that off-site construction homes got similar or better energy performance to site-built homes, and in the case of modular and panelized, at considerably lower average cost than site-built homes. The paper also highlights the experiences of two DOE Zero Energy Ready Home builders who employ offsite construction methods. One builder constructs production homes using pre-assembled panels. The other builder designs and ships kit homes all over the United States. The paper will focus on the optimum value engineering aspects of the panelized construction processes used by each builder to identify management and production practices employed by the builders to operate profitably while meeting high energy performance goals, despite a year marked by skyrocketing materials costs and supply chain and labor shortages. Cost and labor savings methods will be discussed in the context of these two unique business models.

U.S. Department of Energy Building Technologies Pr↗

Building America Best Practices Series - Volume 12: Builders Challenge Guide to 40% Whole-House Energy Savings in the Cold and Very Cold Climates

This best practices guide is the twelfth in a series of guides for builders produced by PNNL for the U.S. Department of Energy’s Building America program. This guide book is a resource to help builders design and construct homes that are among the most energy-efficient available, while addressing issues such as building durability, indoor air quality, and occupant health, safety, and comfort. With the measures described in this guide, builders in the cold and very cold climates can build homes that have whole-house energy savings of 40% over the Building America benchmark with no added overall costs for consumers. The best practices described in this document are based on the results of research and demonstration projects conducted by Building America’s research teams. Building America brings together the nation’s leading building scientists with over 300 production builders to develop, test, and apply innovative, energy-efficient construction practices. Building America builders have found they can build homes that meet these aggressive energy-efficiency goals at no net increased costs to the homeowners. Currently, Building America homes achieve energy savings of 40% greater than the Building America benchmark home (a home built to mid-1990s building practices roughly equivalent to the 1993 Model Energy Code). The recommendations in this document meet or exceed the requirements of the 2009 IECC and 2009 IRC and thos erequirements are highlighted in the text. This document will be distributed via the DOE Building America website: www.buildingamerica.gov.

Builders Challenge↗

Field Test Protocol: Standard Internal Load Generation in Unoccupied Test Homes

This document describes a simple and general way to generate House Simulation Protocol (HSP)-consistent internal sensible and latent loads in unoccupied homes. It is newly updated based on recent experience, and provides instructions on how to calculate and set up the operational profiles in unoccupied homes. The document is split into two sections: how to calculate the internal load magnitudeand schedule, and then what tools and methods should be used to generate those internal loads to achieve research goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗