Apex Study: Compensating Transient Beam Loading in the RHIC 28 MHZ
With the EIC on the way, it is important that developments and strategies are in place to deal with the very high beam currents that the machine will feature. Specifically, the EIC will collide beams of up to 2.5 A, three times the beam current in RHIC. This higher beam current will cause significant voltage transients in the cavity fields which can lead to longitudinal instabilities and beam loss. In anticipation of these negative effects, studies were carried out on the RHIC 28 MHz cavities using newly developed firmware and software to diagnose and combat beam loading. Diagnostic tools such as the bunch-by-bunch (BbyB) ADC firmware and digital network analyzer (DNA) were used to characterize the closed loop system and transient on the cavity voltage magnitude and phase. Then, a one-turn delay feedback (OTFB) and adaptive feed-forward (aFFWD) were used to minimize the transient beam loading. The studies were carried out with beam during 2 accelerator physics experiements (APEXs) using one of the 28 MHz accelerating cavities here at RHIC.