Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “assets”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Centralized Alert-Processing and Asset Planning for Sensorwebs

A software program provides a Sensorweb architecture for alert-processing, event detection, asset allocation and planning, and visualization. It automatically tasks and re-tasks various types of assets such as satellites and robotic vehicles in response to alerts (fire, weather) extracted from various data sources, including low-level Webcam data. JPL has adapted cons iderable Sensorweb infrastructure that had been previously applied to NASA Earth Science applications. This NASA Earth Science Sensorweb has been in operational use since 2003, and has proven reliability of the Sensorweb technologies for robust event detection and autonomous response using space and ground assets. Unique features of the software include flexibility to a range of detection and tasking methods including those that require aggregation of data over spatial and temporal ranges, generality of the response structure to represent and implement a range of response campaigns, and the ability to respond rapidly.

Castano, Rebecca↗

Asset Analysis and Operational Concepts for Separation Assurance Flight Testing at Dryden Flight Research Center

A preliminary survey of existing separation assurance and collision avoidance advancements, technologies, and efforts has been conducted in order to develop a concept of operations for flight testing autonomous separation assurance at Dryden Flight Research Center. This effort was part of the Unmanned Aerial Systems in the National Airspace System project. The survey focused primarily on separation assurance projects validated through flight testing (including lessons learned), however current forays into the field were also examined. Comparisons between current Dryden flight and range assets were conducted using House of Quality matrices in order to allow project management to make determinations regarding asset utilization for future flight tests. This was conducted in order to establish a body of knowledge of the current collision avoidance landscape, and thus focus Dryden s efforts more effectively towards the providing of assets and test ranges for future flight testing within this research field.

Costa, Guillermo J.↗

The Main Pillar: Assessment of Space Weather Observational Asset Performance Supporting Nowcasting, Forecasting and Research to Operations

Space weather forecasting critically depends upon availability of timely and reliable observational data. It is therefore particularly important to understand how existing and newly planned observational assets perform during periods of severe space weather. Extreme space weather creates challenging conditions under which instrumentation and spacecraft may be impeded or in which parameters reach values that are outside the nominal observational range. This paper analyzes existing and upcoming observational capabilities for forecasting, and discusses how the findings may impact space weather research and its transition to operations. A single limitation to the assessment is lack of information provided to us on radiation monitor performance, which caused us not to fully assess (i.e., not assess short term) radiation storm forecasting. The assessment finds that at least two widely spaced coronagraphs including L4 would provide reliability for Earth-bound CMEs. Furthermore, all magnetic field measurements assessed fully meet requirements. However, with current or even with near term new assets in place, in the worst-case scenario there could be a near-complete lack of key near-real-time solar wind plasma data of severe disturbances heading toward and impacting Earth's magnetosphere. Models that attempt to simulate the effects of these disturbances in near real time or with archival data require solar wind plasma observations as input. Moreover, the study finds that near-future observational assets will be less capable of advancing the understanding of extreme geomagnetic disturbances at Earth, which might make the resulting space weather models unsuitable for transition to operations.

Extreme events↗

Integrated Space Asset Management Database and Modeling

Effective Space Asset Management is one key to addressing the ever-growing issue of space congestion. It is imperative that agencies around the world have access to data regarding the numerous active assets and pieces of space junk currently tracked in orbit around the Earth. At the center of this issues is the effective management of data of many types related to orbiting objects. As the population of tracked objects grows, so too should the data management structure used to catalog technical specifications, orbital information, and metadata related to those populations. Marshall Space Flight Center's Space Asset Management Database (SAM-D) was implemented in order to effectively catalog a broad set of data related to known objects in space by ingesting information from a variety of database and processing that data into useful technical information. Using the universal NORAD number as a unique identifier, the SAM-D processes two-line element data into orbital characteristics and cross-references this technical data with metadata related to functional status, country of ownership, and application category. The SAM-D began as an Excel spreadsheet and was later upgraded to an Access database. While SAM-D performs its task very well, it is limited by its current platform and is not available outside of the local user base. Further, while modeling and simulation can be powerful tools to exploit the information contained in SAM-D, the current system does not allow proper integration options for combining the data with both legacy and new M&S tools. This paper provides a summary of SAM-D development efforts to date and outlines a proposed data management infrastructure that extends SAM-D to support the larger data sets to be generated. A service-oriented architecture model using an information sharing platform named SIMON will allow it to easily expand to incorporate new capabilities, including advanced analytics, M&S tools, fusion techniques and user interface for visualizations. In addition, tight control of information sharing policy will increase confidence in the system, which would encourage industry partners to provide commercial data. Combined with the integration of new and legacy M&S tools, a SIMON-based architecture will provide a robust environment that can be extended and expanded indefinitely.

MacLeod, Todd↗

USED NUCLEAR MATERIALS AT SAVANNAH RIVER SITE: ASSET OR WASTE?

The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable (“assets”) to worthless (“wastes”). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or – in the case of high level waste – awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site’s (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as “waste” include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national interest.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fleet-Wide Prognostic and Health Management Suite: Asset Fault Signature Database

Proactive online monitoring in the nuclear industry is being explored using the Electric Power Research Institute’s Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software. The FW-PHM Suite is a set of web-based diagnostic and prognostic tools and databases that serves as an integrated health monitoring architecture. The FW-PHM Suite has four main modules: (1) Diagnostic Advisor, (2) Asset Fault Signature (AFS) Database, (3) Remaining Useful Life Advisor, and (4) Remaining Useful Life Database. The paper focuses on the AFS Database of the FW-PHM Suite, which is used to catalog asset fault signatures. A fault signature is a structured representation of the information that an expert would use to first detect and then verify the occurrence of a specific type of fault. The fault signatures developed to assess the health status of generator step-up transformers are described in the paper. The developed fault signatures capture this knowledge and implement it in a standardized approach, thereby streamlining the diagnostic and prognostic process. This will support the automation of proactive online monitoring techniques in nuclear power plants to diagnose incipient faults, perform proactive maintenance, and estimate the remaining useful life of assets.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Critical Asset Management at the Start of the Pandemic

COVID-19 has changed the daily lives of so many people and forced many companies to examine their way of doing business, including their Asset Management programs. This virus has given way to an unprecedented set of challenges to continue conducting business as usual when everything is unusual. On June 16, 2020, members of the Northern California Chapter of the Association of Asset Management Professionals came together for a panel discussion on Critical Asset Management during the COVID-19 pandemic and beyond. Participants were representatives from health care, water, and national security, which are all considered essential industries.

Administration and management↗

On the use of genetic algorithm to optimize industrial assets lifecycle management under safety and budget constraints

The purpose of this paper is to describe the method and tool dedicated to optimize investments planning for industrial assets. These investments may either be preventive maintenance tasks, asset enhancements or logistic investments such as spare parts purchases. The two methodological points to investigate in such an issue are: 1. The measure of the profitability of a portfolio of investments 2. The selection and planning of an optimal set of investments 3. The measure of the risk of a portfolio of investments The measure of the profitability of a set of investments in the IPOP tool is synthesised in the Net Present Value indicator. The NPV is the sum of the differences of discounted cash flows (direct costs, forced outages...) between the situations with and without a given investment. These cash flows are calculated through a pseudo-Markov reliability model representing independently the components of the industrial asset and the spare parts inventories. The component model has been widely discussed over the years but the spare part model is a new one based on some approximations that will be discussed. This model, referred as the NPV function, takes for input an investments portfolio and gives its NPV. The second issue is to optimize the NPV. If all investments were independent, this optimization would be an easy calculation, unfortunately there are two sources of dependency. The first one is introduced by the spare part model, as if components are indeed independent in their reliability model, the fact that several components use the same inventory induces a dependency. The second dependency comes from economic, technical or logistic constraints, such as a global maintenance budget limit or a safety requirement limiting the residual risk of failure of a component or group of component, making the aggregation of individual optimum not necessary feasible. The algorithm used to solve such a difficult optimization problem is a genetic algorithm. After a description of the features of the software a test case is presented showing the influence of the optimization algorithm parameters on its efficiency to find an optimal investments planning. (authors)

97 MATHEMATICS AND COMPUTING↗

Nuclear Materials: Reconsidering Wastes and Assets - 13193

The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable ('assets') to worthless ('wastes'). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or - in the case of high level waste - awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site's (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as 'waste' include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national interest. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canadian Nuclear Laboratories: An Asset Management Journey - 19438

In this paper, Canadian Nuclear Laboratories (CNL) outlines key tools, strategies and lessons learned from development of their Asset Management Program. Canadian Nuclear Laboratories is a 60-year old site in the midst of a C$1.2B redevelopment that includes construction of six new facilities and demolition of over 120 buildings and structures. The presentation outlines CNL's progress in creating an efficient and effective asset management program that leverages and optimizes current good practices while creating a consistent, disciplined and information-based approach for the maintenance and management of assets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification of the accident-related critical digital assets based on probabilistic safety analysis results - 225

Digital I and C systems have been developed and installed in nuclear power plants, and due to installation of the digital I and C systems, cyber security concerns are increasing in nuclear industry. However, there are too many critical digital assets (CDAs) to be inspected in digitalized NPPs. In order to reduce the inefficiency of regulation in nuclear facilities, the critical digital assets that are directly related to an accident are elicited by using the probabilistic safety assessment results. Target initial events are selected, and their heading are analyzed through event tree analysis. Among the headings, the headings that can be proceeded directly to the core damage by the cyber-attack are finally selected as the target of deriving the minimum cut-sets. Based on success criteria of each heading, we analyze the fault trees and derive the minimum set-cuts. In terms of original PSA, the value of probability for the cut-sets is important but the probability is not important in terms of cyber security of NPPs. The important factors is the number of basic events consisting of the minimal cut-sets that is proportional to vulnerability. Finally, the process for identifying accident-related CDAs is suggested based on PSA results. The results of this study are expected to be used to derive the linkage between cyber-attack and accident, and to develop the final core digital asset identification methodology and effective regulatory method. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Effect of Micrometeoroid and Orbital Debris Impact on Modal Response of Persistent Assets

Protecting the infrastructure and payload components of persistent assets (PAs) from damage caused by MicroMeteoroid and/or Orbital Debris (MMOD) impacts is a significant design consideration. The impact resistance to MMOD will need to be provided by the robustness of the structural configuration such that the asset does not suffer loss of function or catastrophic failure. Finite element modelling (FEM) can be used to investigate the effects of MMOD impact on the overall structural behavior of the PA. The models are being used here to investigate the structural response to ‘missing’ truss members, and parametric studies are being performed to identify the worst-case scenario of an impact catastrophically damaging a truss element. These models will be used to determine which truss members are the most critical to the structural performance, and thus, which may require a higher degree of protection or robustness to ensure they can withstand an MMOD impact without causing catastrophic effects on the entire structure. Initial results have been generated indicating a reduction in the global frequency due to missing truss members as a result of MMOD impact.

in-space assembly (ISA)↗

Development of building energy asset rating using stock modelling in the USA

The US Building Energy Asset Score helps building stakeholders quickly gain insight into the efficiency of building systems (envelope, electrical and mechanical systems). A robust, easy-to-understand 10-point scoring system was developed to facilitate an unbiased comparison of similar building types across the country. The Asset Score does not rely on a database or specific building baselines to establish a rating. Rather, distributions of energy use intensity (EUI) for various building use types were constructed using Latin hypercube sampling and converted to a series of stepped linear scales to score buildings. A score is calculated based on the modelled source EUI after adjusting for climate. A web-based scoring tool, which incorporates an analytical engine and a simulation engine, was developed to standardize energy modelling and reduce implementation cost. This paper discusses the methodology used to perform several hundred thousand building simulation runs and develop the scoring scales.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Asset Monitoring using Smart Sensing and Advanced Analytics for the Distribution Network

As the electric grid transitions into a highly distributed and intelligent grid, electric utilities are becoming increasingly concerned with monitoring the health and performance of their distribution assets. As Internet of Things technologies and data analytics become inexpensive and ubiquitous, low-cost asset monitoring becomes more feasible. Moreover, using edge analytics, computations can be off-loaded to these intelligent sensors to report only actionable information to the cloud. This needs to be done in a highly distributed manner using non-intrusive sensors and device physics that seamlessly integrates with legacy infrastructure. Here, this paper reviews existing sensor based solutions, identifies t heir issues, proposes a novel solution by exploring the required attributes and proposes an approach for low-cost distribution transformer health monitoring.

Asset monitoring↗

Solar Asset Management Software (Final Report)

Ra Power Management (RPM) has developed a cloud based software platform that manages the financial and operational functions of third party financed solar projects throughout their lifecycle. RPM’s software streamlines and automates the sales, financing, and management of a portfolio of solar assets. The software helps solar developers automate the most difficult aspects of asset management, leading to increased transparency, efficiency, and reduction in human error. More importantly, our platform will help developers save money by improving their operating margins

14 SOLAR ENERGY↗

Solar Asset Management Software

Ra Power Management (RPM) has developed a cloud based software platform that manages the financial and operational functions of third party financed solar projects throughout their lifecycle. RPM’s software streamlines and automates the sales, financing, and management of a portfolio of solar assets. The software helps solar developers automate the most difficult aspects of asset management, leading to increased transparency, efficiency, and reduction in human error. More importantly, our platform will help developers save money by improving their operating margins.

14 SOLAR ENERGY↗

Integration of Superconducting Magnetic Energy Storage (SMES) Systems Optimized with Second-Generation, High-Temperature Superconducting (2G-HTS) Technology with a Major Fossil-Fueled Asset

Utility companies and fossil fueled generation assets are seeking combinations of “hybrid energy storage” to allow power to be provided in advance of, and to otherwise complement, peaking natural gas-fired generation. American Maglev Technology of Florida Inc. (AMT) learned during the Phase I program based on interactions with NRG Energy (NRG) that energy storage such as superconducting magnetic energy storage (SMES) can qualify as a Black Start unit in most markets, ensuring orderly re-start of grid operations and fossil fueled power plants and serving as an important asset of hybrid energy storage technology. In conjunction with the University of Houston (UH), AMT and NRG are working together to scale up low-cost, high- efficiency, second-generation high-temperature superconducting (2G-HTS) technology for deployment across several markets, with a primary focus on the commercial development of utility grid-scale SMES (g-SMES) systems. Ultimately the program confirmed that the novel g-SMES design can meet the performance and financial requirements of the fossil power plant industry, while exhibiting continuous grid-voltage regulation; cost-effective, peak-hour energy storage with almost infinite life; increased input/output efficiency; and the capability to undergo millions of charging cycles, without degradation, representing a significant improvement over lithium ion and other conventional storage technologies. We believe wide scale deployment of this technology is feasible and practical when compared to the higher life cycle cost and relatively short lifespan of chemical batteries. Based on these findings, the future for deployment of SMES at many fossil-fueled power plants exceeding 100MW capability is bright. Further de-risking g-SMES technology would pave the way for the construction of a subscale prototype. Eventually, scaled-down versions of SMES are expected to be competitive with the multi-billion-dollar lithium-ion market for a wide range of commercial, industrial, and transportation uses. There is long-term potential for commercialization and widespread deployment of this disruptive technology, which would spawn a new worldwide supply chain and create domestic, high-tech manufacturing jobs in the green industry.

20 FOSSIL-FUELED POWER PLANTS↗

DOE Commercial Building Asset Rating: An Application of Centralized Modeling Tools

This paper presents a novel approach used to develop the U.S. Department of Energy (DOE) Commercial Building Asset Rating, which is intended to help building owners better understand the installed system performance and the total energy use. A simplified data collection and energy-modeling method is employed to disaggregate building energy information. Furthermore, the approach outlined will also include a mechanism for identifying energy improvement opportunities. A detailed modeling approach to formulate an Asset Rating would most likely provide the greatest flexibility and accuracy. Such an approach would, however, require a substantial amount of user investment for collecting the energy audit, data and hiring a professional to perform energy modeling and analysis. A simplified model approach requires fewer input combinations, which could reduce opportunities for error and allow an inexperienced user to quickly develop energy models. However, the accuracy of the results is often questionable. To address the above issue, the method presented in this paper separates model inputs into categories based on overall energy impact, difficulty to obtain, and variability among buildings. We outline an approach that will allow great flexibility in terms of how many and which of the different categories of variables must be found to produce an accurate energy model. The approach will allow all key variables to be inferred from some minimum set of variables while at the same time allowing a user to enter many more variables if he or she has reliable values for them. The approach outlined will also provide constant values for some variables and algorithms for finding those which are very difficult to determine in the field. The whole of this approach will reduce modeling time and expertise required while maintaining accuracy and the ability to support the variability and complexity that exist in buildings. Therefore, the goals of facilitating cost-effective investment in energy efficiency and reducing energy use in the commercial building sector are met.

Asset Rating↗