Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Waste Isolation Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Krypton-81 in groundwater of the Culebra Dolomite near the Waste Isolation Pilot Plant, New Mexico

TheWaste Isolation Pilot Plant (WIPP) in New Mexico is the first geologic repository for disposal of transuranic nuclear waste fromdefense-related programs of the US Department of Energy. It is constructed within halite beds of the Permian-age Salado Formation. The Culebra Dolomite, confined within Rustler Formation evaporites overlying the Salado Formation, is a potential pathway for radionuclide transport from the repository to the accessible environment in the human-disturbed repository scenario. Although extensive subsurface characterization and numerical flow modeling of groundwater has been done in the vicinity of theWIPP, few studies have used natural isotopic tracers to validate the flow models and to better understand solute transport at this site. The advent of Atom-Trap Trace Analysis (ATTA) has enabled routine measurement of cosmogenic 81Kr (half-life 229,000 yr), a near-ideal tracer for long-term groundwater transport. We measured 81Kr in saline groundwater sampled from two Culebra Dolomite monitoring wells near the WIPP site, and compared 81Kr model ages with reverse particle-tracking results of well-calibrated flow models. The 81Kr model ages are ~130,000 and ~330,000 yr for high-transmissivity and low-transmissivity portions of the formation, respectively. Compared with flow model results which indicate a relatively young mean hydraulic age (~32,000 yr), the 81Kr model ages imply substantial physical attenuation of conservative solutes in the Culebra Dolomite and provide limits on the effective diffusivity of contaminants into the confining aquitards.

Sturchio, Neil C.↗

Waste Isolation Pilot Plant Flammable Gas Analysis (Rev. 4)

This document describes and implements the process to determine the concentration of flammable gas/volatile organic compounds (VOCs), hydrogen, and methane in a waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II), HalfPACT, TRUPACT-III, or RH-TRU72-B packagings. An aliquot of headspace gas (HSG) is sampled from a waste container and analyzed using a gas chromatograph (GC) with two detectors: a mass spectrometer (MS), and a thermal conductivity detector (TCD). The sample analyzed in the GC is split and half is sent to the MS for volatile organic compound (VOC) analysis while the other half is sent to the TCD for hydrogen and methane analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brine Availability Test in Salt, a Heated Borehole Experiment at the Waste Isolation Pilot Plant, New Mexico, USA - 20233

The Brine Availability Tests in Salt is a US Department of Energy Office of Nuclear Energy supported activity as part of the Spent Fuel and Waste Disposition Campaign where we are performing simultaneous heated and control experiments in adjacent horizontal boreholes in the WIPP Salt Disposal Investigation drifts as part of experimental Phase 1. Phase 1a of BATS, a low-cost, small spatial-scale experiment performed in order to design instrumentation and methods for further experimentation in the URL, has been completed (June 2018 - May 2019) and is described elsewhere. In coincidence with multiple physical parameters that will be measured over the duration of the experiment, we will be measuring the liquid and vapor phases of H{sub 2}O as well as its isotopic content (not measured in Phase 1a). Three different forms of water occur in natural salts: as fluid in macro scale (mm size) inclusions, as intergranular free H{sub 2}O and as H{sub 2}O incorporated in hydrous minerals. Each of these forms has potentially different stable isotope signatures and will be influenced differentially by heat induced transport and by interaction with introduced tracers. Continuous measurement of vapor phase H{sub 2}O isotopes during borehole heating will be impacted by several effects: 1) evaporation as liquid brine flows into the borehole and evaporates completely or partially into the dry N{sub 2} stream; 2) steam from dehydration of hydrous minerals, that may enter the borehole; and 3) hydrous minerals that may form in the borehole (preferentially incorporating heavier isotopes). The continuous time series collected over the course of the heating test will be combined with analyses of pre-test and post-test collected samples of test site salt to investigate the contributions of each of the three water types as H{sub 2}O is mobilized due to the effects of heating. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spatiotemporal Distribution of {sup 241}Am in the Vicinity of the Waste Isolation Pilot Plant - 19543

Environmental monitoring around nuclear facilities is essential for characterizing the baseline conditions that are critical for identifying releases and quantifying their effects, should they occur, and for assessing post-closure performance. The spatiotemporal distribution and transport behavior of {sup 241}Am in the vicinity of a deep geologic repository for transuranic waste were assessed using data spanning the pre-operational phase to the present, including an accidental radionuclide release in 2014. The {sup 241}Am background values of 0.027±0.109 μBq/m{sup 3} (aerosols), and 0.061±0.065 Bq/kg (soil), as well as the {sup 241}Am/{sup 239+240}Pu ratios of 0.41±0.06 (aerosols) and 0.38±0.04 (soil), are similar to global fallout values. Pre-operations concentrations of {sup 241}Am show a strong seasonal dependence, attributed to resuspension of soils contaminated by global fallout, with no contribution from the upwind Project Gnome site ({sup 241}Am/{sup 239+240}Pu =0.24±0.08). During the 2014 accidental release, aerosol concentrations of {sup 241}Am briefly increased to 115.2 μBq/m{sup 3} at an onsite monitoring station, and 81.4 μBq/m{sup 3} at a station ∼1 km downwind of the exhaust shaft, changing the {sup 241}Am/{sup 239+240}Pu from ∼0.37 to ∼10. However, some four years later, conditions have returned to background. Almost 90% of the {sup 241}Am inventory is the 0-5 cm soil layer and there is no evidence of concentrations above regulatory standards, or that can be attributed to waste disposal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of the Brine Availability Test in Salt (BATS), Including Extended Plan for Experiments at the Waste Isolation Pilot Plant (WIPP)

This document lays out a set of near-future investigations in salt, the third phase of BATS (BATS 3). This phase is planned to answer the few remaining issues from the first two phases of BATS (BATS 1 and BATS 2), and to prepare for a subsequent large-scale demonstration phase. The BATS experiments are the first part of a larger plan to conduct field experiments to answer specific technical questions, improve the technical basis for disposal of heat-generating radioactive waste in salt (Stauffer et al., 2015; SNL et al., 2020), and demonstrate readiness for disposal of radioactive waste in salt, including large, hot waste packages.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

The purpose of this report is to provide information needed by the DOE to assess WIPP facility environmental performance and to make WIPP Project environmental information available to members of the public. This report has been prepared in accordance with DOE Order 231.1A, Environment, Safety, and Health Reporting. This report documents the WIPP facility environmental monitoring and results for CY 2010.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Environmental Monitoring Plan (Rev. 6)

This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the Environmental Monitoring Program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. This EMP describes radiological environmental monitoring, nonradiological environmental monitoring, and land management and surveillance programs during the facility's operational life.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Standard Analysis Report INV-SAR-81, Revision 0 Chemical and Cement Components 2023 Inventory Estimates for the Interim State Performance Assessment of the Waste Isolation Pilot Plant

This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2023. These estimates will be included in a Performance Assessment Inventory Report developed for the U.S. Department of Energy (DOE) interim state repository configuration performance assessment (PA) for the 2026 Compliance Recertification Application (CRA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 25: DOE Waste Isolation Pilot Plant (WIPP) Update 2020

This panel focused on the WIPP operational efficiencies and capital improvement progress in the year 2020. Because WIPP is a key component of the US DOE EM cleanup strategy, the progress on returning WIPP to full design capacity and throughput by 2021 is of importance. Panelists with presentations: Status of WIPP Capital Asset Projects (Stephen Smith); WIPP Update (Sean Dunagan); CBFO Update (Greg Sosson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 9)

This Ground Control Annual Plan (GCAP) is a guidance document for short- and long-term planning for the Washington TRU Solutions LLC (WTS) underground ground control operations. Because ground conditions are dynamic, the data collected for the plan and the evaluation of these data are most useful when used or considered immediately after collection. Use of the data becomes more difficult and less certain with time. This plan is updated annually, and each successive document supersedes the previous document. The data, evaluations, and support plans may be updated more frequently. This document is not intended to be used as a final plan for construction. Detailed plans and work instructions are developed specifically for that purpose.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗