Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “VIBRATIONAL STRESS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Structural investigation of the C-O complex in GaAs

A carbon-oxygen complex occurring in gallium arsenide crystals after annealing at around 700 °C is studied. Fourier transform infrared absorption measurements on the associated vibrational band at 2060 cm-1 under uniaxial stress reveal that the center has tetragonal symmetry. From the intensity of the {sup 18}O-related satellite band it is concluded that four oxygen atoms are involved. Ab initio local density calculations show that a tetragonal CO{sub 4} molecule forms a stable entity in the gallium arsenide lattice.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

March 1971 wind tunnel tests of the Dorand DH 2011 jet flap rotor, volume 1

The results of wind tunnel tests, second series of tests performed in the NASA Ames 40 x 80 foot wind tunnel, of the DH 2011 jet-flap rotor are presented and analyzed. The tests have been focused on multicyclic effects and the capability of this rotor to reduce the vibratory loads and stresses in the blades. The reductions of the vibrations and stresses at tip speed ratio of 0.4 have attained 50%. The theory shows further reductions possible, reaching 80%. The results show that the performance characteristics after the modifications introduced since 1965 remained unchanged. The domain of investigation has been enlarged to include the tip speed ratios of 0.6 and 0.7. To analyze the complex aeroelastic phenomena a new analytical technique has been utilized to represent the mathematical model of the rotor. This technique, based on transfer matrices and transfer functions, appears very simple and it is believed that this analysis is applicable to many kinds of investigations involving large numbers of variables.

Kretz, M.↗

Simulating Vibrations in a Complex Loaded Structure

The Dynamic Response Computation (DIRECT) computer program simulates vibrations induced in a complex structure by applied dynamic loads. Developed to enable rapid analysis of launch- and landing- induced vibrations and stresses in a space shuttle, DIRECT also can be used to analyze dynamic responses of other structures - for example, the response of a building to an earthquake, or the response of an oil-drilling platform and attached tanks to large ocean waves. For a space-shuttle simulation, the required input to DIRECT includes mathematical models of the space shuttle and its payloads, and a set of forcing functions that simulates launch and landing loads. DIRECT can accommodate multiple levels of payload attachment and substructure as well as nonlinear dynamic responses of structural interfaces. DIRECT combines the shuttle and payload models into a single structural model, to which the forcing functions are then applied. The resulting equations of motion are reduced to an optimum set and decoupled into a unique format for simulating dynamics. During the simulation, maximum vibrations, loads, and stresses are monitored and recorded for subsequent analysis to identify structural deficiencies in the shuttle and/or payloads.

Cao, Tim T.↗

Forced Response Analysis of a Fan with Boundary Layer Inlet Distortion

Boundary layer ingesting propulsion systems have the potential to significantly reduce fuel burn for future generations of commercial aircraft, but these systems must be designed to overcome the challenge of high dynamic stresses in fan blades due to forced response. High dynamic stresses can lead to high cycle fatigue failures. High-fidelity computational analysis of the fan aeromechanics is integral to an ongoing effort to design a boundary layer ingesting inlet and fan for a wind-tunnel test. An unsteady flow solution from a Reynoldsaveraged Navier Stokes analysis of a coupled inlet-fan system is used to calculate blade unsteady loading and assess forced response of the fan to distorted inflow. Conducted prior to the mechanical design of a fan, the initial forced response analyses performed in this study provide an early look at the levels of dynamic stresses that are likely to be encountered. For the boundary layer ingesting inlet, the distortion contains strong engine order excitations that act simultaneously. The combined effect of these harmonics was considered in the calculation of the forced response stresses. Together, static and dynamic stresses can provide the information necessary to evaluate whether the blades are likely to fail due to high cycle fatigue. Based on the analyses done, the overspeed condition is likely to result in the smallest stress margin in terms of the mean and alternating stresses. Additional work is ongoing to expand the analyses to off-design conditions, on-resonance conditions, and to include more detailed modeling of the blade structure.

Vibrational stress↗

Adjustable-Torque Truss-Joint Mechanism

Threaded pin tightened or loosened; tedious trial-and-error procedure shortened. Mechanism joining strut and node in truss structure preloaded to desired stress to ensure tight, compressive fit preventing motion of strut during loading or vibration. Preload stress on stack of Belleville spring washers adjusted by tightening or loosening threaded Belleville-washer-alignment pin. Pin turned, by use of allen wrench, to adjust compression preload on Belleville washers and adjusts joint-operating torque.

Bush, Harold G.↗

The stress, surface spin and dipolar interaction in the diluted NiFe{sub 2}O{sub 4} nanoparticles by the SiO{sub 2} matrix: Characterization and analyses

Well-dispersed uniform NiFe{sub 2}O{sub 4} nanoparticles (NPs) with an average particle size of 15.4 nm were synthesized by thermal decomposition of a metal–organic salt, and then were diluted in a SiO{sub 2} matrix via a sol–gel method with different concentration. The magnetization (M) dependence of NiFe{sub 2}O{sub 4}/SiO{sub 2} on the temperature (T) and on the applied magnetic field (H) was systematically characterized by the Quantum Design superconducting quantum interference device (SQUID) PPMS system. The results of M ~ H/T divide the magnetic properties between 10 K and 300 K into two regions: the low temperature blocked-particle regime below the blocking temperature T{sub B} and the interacting superparamagnetic (ISP) regime above T{sub B}. In the ISP regime, all samples deviate from the ideal Langevin superparamagnetic behavior due to the effective anisotropy induced by the stress, surface spins and interparticle dipolar interaction. The Raman spectra indicate that the stress in all samples exhibits the vibration behavior, which leads to the effective anisotropy and hence coercivity vibration. - Graphical abstract: Display Omitted - Highlights: • Increase of NiFe{sub 2}O{sub 4} NPs' concentration elevates T{sub B} and broadens ZFC peak. • NiFe{sub 2}O{sub 4}/SiO{sub 2} samples do not exhibit the ideal superparamagnetism above T{sub B}. • Stress leads to the effective anisotropy and hence H{sub c} vibration. • Stress vibration was characterized in detail by the Raman spectra.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Maintaining Flatness of a Large Aperture Potassium Bromide Beamsplitter Through Mounting and Vibration

The Composite Infrared Spectrometer (CIRS) instrument on the Cassini Mission launched in October of 1997. The CIRS instrument contains a mid-infrared (MIR) and a far-infrared interferometer (FIR) and operates at 170 Kelvin. The MIR is a Michelson Fourier transform spectrometer utilizing a 76 mm (3 inch) diameter potassium bromide beamsplitter and compensator pair. The potassium bromide elements were tested to verify effects of cooldown and vibration prior to integration into the instrument. The instrument was then aligned at ambient temperatures, tested cryogenically and re-verified after vibration. 'Me stringent design optical figure requirements for the beamsplitter and compensator included fabrication errors, mounting stresses and vibration load effects. This paper describes the challenges encountered in mounting the elements to minimize distortion and to survive vibration.

Losch, Patricia↗

Maintaining Flatness of a Large Aperture Potassium Bromide Beamsplitter through Mounting and Vibration

The Composite Infrared Spectrometer (CIRS) instrument on the Cassini Mission launched in October of 1997. The CIRS instrument contains a mid-infrared and a far-infrared interferometer and operates at 170 Kelvin. The mid-infrared interferometer is a Michelson- type Fourier transform spectrometer utilizing a 3 inch diameter potassium bromide beamsplitter/compensator pair. The potassium bromide elements were tested to verify effects of cooldown and vibration prior to integration into the instrument. The instrument was then aligned at ambient temperatures, tested cryogenically and re-verified after vibration. The stringent design optical figure requirements for the beamsplitter and compensator included fabrication errors, mounting stresses and vibration load effects. This paper describes the challenges encountered in mounting the elements to minimize distortion and to survive vibration.

Losch, Patricia↗

Structural Tailoring of Advanced Turboprops (STAT). Theoretical manual

This manual describes the theories in the Structural Tailoring of Advanced Turboprops (STAT) computer program, which was developed to perform numerical optimizations on highly swept propfan blades. The optimization procedure seeks to minimize an objective function, defined as either direct operating cost or aeroelastic differences between a blade and its scaled model, by tuning internal and external geometry variables that must satisfy realistic blade design constraints. The STAT analyses include an aerodynamic efficiency evaluation, a finite element stress and vibration analysis, an acoustic analysis, a flutter analysis, and a once-per-revolution (1-p) forced response life prediction capability. The STAT constraints include blade stresses, blade resonances, flutter, tip displacements, and a 1-P forced response life fraction. The STAT variables include all blade internal and external geometry parameters needed to define a composite material blade. The STAT objective function is dependent upon a blade baseline definition which the user supplies to describe a current blade design for cost optimization or for the tailoring of an aeroelastic scale model.

Brown, K. W.↗

Spacecraft environmental testing

Physical testing of Relay I satellite to approximate environment and stress during handling, launch, and orbital flight

RELAY I SATELLITE↗

Wind Turbine Gearbox Condition Monitoring Vibration Analysis Benchmarking Datasets

Wind turbine condition monitoring (CM) can potentially help the wind industry reduce turbine downtime and operation and maintenance (O&M) cost. NREL CM research has investigated various condition-monitoring techniques such as acoustic emission (AE specifically stress wave), vibration, electrical signature, lubricant and debris monitoring based on the Gearbox Reliability Collaborative dynamometer and field tests, and other test turbines and resources accessible by NREL. During the past several years, NREL CM research has shown that there are very few validation and verification efforts on commercial wind turbine CM systems. One of the reasons might be limited benchmarking datasets accessible by stakeholders. To fill this gap, NREL executed a data collection effort. The targeted users of these datasets include those investigating vibration-based wind turbine CM research, evaluating commercially available vibration-based CM systems, or testing prototyped vibration-based CM systems. NREL collected data from a healthy and a damaged gearbox of the same design tested by the GRC. Vibration data were collected by accelerometers along with high-speed shaft RPM signals during the dynamometer testing. The healthy gearbox was only tested in the dynamometer. The damaged gearbox was first tested in the dynamometer and later sent to a wind farm close to NREL for field testing. In the field test, it experienced two loss-of-oil events that damaged its internal bearings and gear elements. The gearbox was brought back to NREL and it was retested in the dynamometer with CM systems deployed under controlled loading conditions that would not cause catastrophic failure of the gearbox. The objective of releasing these datasets to the public along with information about the real damage that occurred to the damaged gearbox is to provide the wind industry with some benchmarking datasets. These datasets will benefit research, development, validation, verification, and advancement of vibration-based wind condition-monitoring techniques. By accessing this data you acknowledge the terms outlined in the "License Information" document. Please contract Shawn Sheng (NREL) if you have any questions on the data or would like to collaborate on publications based on the datasets.

Array↗

Helicopter rotor blade design for minimum vibration

The importance of blade design parameters in rotor vibratory response and the design of a minimum vibration blade based upon this understanding are examined. Various design approaches are examined for a 4 bladed articulated rotor operating at a high speed flight condition. Blade modal shaping, frequency placement, structural and aerodynamic coupling, and intermodal cancellation are investigated to systematically identify and evaluate blade design parameters that influence blade airloads, blade modal response, hub loads, and fuselage vibration. The relative contributions of the various components of blade force excitation and response to the vibratory hub loads transmitted to the fuselage are determined in order to isolate primary candidates for vibration alleviation. A blade design is achieved which reduces the predicted fuselage vibration from the baseline blade by approximately one half. Blade designs are developed that offer significant reductions in vibration (and fatigue stresses) without resorting to special vibration alleviation devices, radical blade geometries, or weight penalties.

Taylor, R. B.↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Experimental and analytical evaluation of dynamic load and vibration of a 2240-kW (300-hp) rotorcraft transmission

A dynamic analysis of a 2240-kW (3000-hp) helicopter planetary system is presented. Results from both analytical and experimental studies show good correlation in gear-tooth loads. A parametric study indicates that the mesh damping ratio has a significant effect on maximum gear tooth load, stress, and vibration. Correlation with experimental results indicates that the Sun-planet mesh damping ratio can significantly differ from the planet ring mesh damping ratio. A numerical fast Fourier transform (FFT) procedure was applied to examine the mesh load components in the frequency domain and the magnitudes of multiple tooth pass frequencies excited by nonsynchronous meshing of the planets. Effects of tooth-spacing errors and tooth-profile modifications with tip relief are examined. A general discussion of results and correlation with the experimental study are also presented.

Choy, Fred K.↗