Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “VABS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Development of Response Surface Models for Rapid Analysis & Multidisciplinary Optimization of Launch Vehicle Design Concepts

Multdisciplinary design optimization (MDO) is an important step in the design and evaluation of launch vehicles, since it has a significant impact on performance and lifecycle cost. The objective in MDO is to search the design space to determine the values of design parameters that optimize the performance characteristics subject to system constraints. Vehicle Analysis Branch (VAB) at NASA Langley Research Center has computerized analysis tools in many of the disciplines required for the design and analysis of launch vehicles. Vehicle performance characteristics can be determined by the use of these computerized analysis tools. The next step is to optimize the system performance characteristics subject to multidisciplinary constraints. However, most of the complex sizing and performance evaluation codes used for launch vehicle design are stand-alone tools, operated by disciplinary experts. They are, in general, difficult to integrate and use directly for MDO. An alternative has been to utilize response surface methodology (RSM) to obtain polynomial models that approximate the functional relationships between performance characteristics and design variables. These approximation models, called response surface models, are then used to integrate the disciplines using mathematical programming methods for efficient system level design analysis, MDO and fast sensitivity simulations. A second-order response surface model of the form given has been commonly used in RSM since in many cases it can provide an adequate approximation especially if the region of interest is sufficiently limited.

Unal, Resit↗

STS-31: Hubble Discovery Payload Doors Closing

The primary objective of mission STS-31 was to deploy the Hubble Space Telescope. The videotape shows the Hubble Space Telescope in Discovery's payload bay in the Vertical Assembly Building (VAB) clean room, while the payload bay's doors slowly close.

Source record↗

STS-35/Astro-1: Editors Work Tape

Live footage shows preparation for the Astro-1 mission. Scenes include Payload Bay door closing, Rollover to the Vehicle Assembly Building (VAB) from OPF, the STS-35/Astro rollout to Pad-A, Broad Band X-Ray Telescope (BBXRT) Servicing, and crew arrival for the Terminal Countdown Demonstration Tests (TCDT). The crewmembers of STS-35, Commander Vance D. Brand, Pilot Guy S. Gardner, and Mission Specialists Jeffrey A. Hoffman, John M. Lounge, Robert A. Parker, Samuel T. Durrance, and Ronald A. Parise, are shown participating in various training activities. Activities include driving the M113 vehicle, participating in emergency training, and addressing the press upon arrival at Kennedy Space Center.

Source record↗

Orbiter Umbilical Hinge Door Problem

During processing work on the orbiter Discovery at Pad A, significant cracks were found on all four lug hinges on the two external tank umbilical door drive mechanisms. NASA managers opted to roll back the vehicle to the Vehicle Assembly Building (VAB) on March 7, and then to the Orbiter Processing Facility (OPF) for repair. Hinges were replaced with units taken from orbiter COLUMBIA, and reinforced. Discovery returned to the pad on April 1. Shown are the cracked orbiter umbilical door hinges.

Source record↗

STS-39 Discovery Rollback to the OPF High Bay #2 (Shots of Doors)

Shown is Discovery rolling back to the Orbiter Processing Facility (OPF) High Bay 2 for repair. High Bay 2, located west of the Vehicle Assembly Building (VAB), is used for external tank (ET) checkout and storage and as a contingency storage area for orbiters.

Source record↗

Development of Response Surface Models for Rapid Analysis and Multidisciplinary Optimization of Launch Vehicle Design Concepts

Multidisciplinary design optimization (MDO) is an important step in the design and evaluation of launch vehicles, since it has a significant impact on performance and lifecycle cost. The objective in MDO is to search the design space to determine the values of design parameters that optimize the performance characteristics subject to system constraints. Vehicle Analysis Branch (VAB) at NASA Langley Research Center has computerized analysis tools in many of the disciplines required for the design and analysis of launch vehicles. Vehicle performance characteristics can be determined by the use of these computerized analysis tools. The next step is to optimize the system performance characteristics subject to multidisciplinary constraints. However, most of the complex sizing and performance evaluation codes used for launch vehicle design are stand-alone tools, operated by disciplinary experts. They are, in general, difficult to integrate and use directly for MDO.

Unal, Resit↗

STS-45 Atlas-1 Compiled Processing Footage

Compiled footage shows shots of the Atmospheric Laboratory for Applications and Science's (Atlas-1's) move to the test stand at the Operations and Checkout (O&C) Building, the sharp edge inspection, and the Atlas-1 press showing. The STS-45 Atlantis rollover to the Vehicle Assembly Building (VAB) and subsequent rollout to Pad A are seen.

Source record↗

STS-101 Meal - Suit Up - Depart O&C Launch - On Orbit - Landing - Crew Depart

The STS-101 Space Shuttle Atlantis Assembly Flight International Space Station (ISS) -2A-2a mission begins with Commander Jim Halsell, and mission specialists Jeff Williams and Yuri Usachev talking briefly to the media. Pilot Scott Horowitz, and Mission Specialists Susan Helms, James Voss, and Mary Ellen Weber are shown arriving later to take crew photos. Footage of the entire STS-101 crew is shown getting suited and departing the Operations and Checkout (O&C) Building. Views of the actual launch of the Space Shuttle Atlantis are presented from the vehicle assembly building (VAB), PAD-A, Tower 1, Universal Camera Sites (UCS) 15 and 23 and Press sites. Jeff Williams and James Voss are shown on orbit performing a single space walk to complete maintenance to the International Space Station. A nighttime touchdown of the Space Shuttle Atlantis is also presented.

Source record↗

STS-100 Photo-op/Shut-up/Depart O&C/Launch Endeavour On Orbit/Landing/Crew Egress

This video shows an overview of crew activities from STS-100. The crew of Space Shuttle Shuttle Endeavour includes: Commander Kent Rominger; Pilot Jeffrey Ashby; and Mission Specialists Chris Hadfield, John Phillips, Scott Parazynski, Umberto Guidoni, and Yuri Lonchakov. Sections of the video include: Photo-op; Suit-up; Depart O&C; Ingress; Launch with Playbacks; On-orbit; Landing with Playbacks; Crew Egress & Departure. Voiceover narration introduces the astronauts at their pre-flight meal, and continues during the video, except for the launch and landing sequences. Launch playback views include: NEXT; Beach Tracker; VAB; PAD-A; Tower-1; UCS-15; Grandstand; OTV-60; OTV-70; OTV-71; DOAMS; UCS-10 Tracker; UCS-23 Tracker; On-board Ascent Camera. The On-orbit section of the video shows preparations for an extravehicular activity (EVA) to install Canadarm 2 on the International Space Station (ISS). Preparation for docking with the ISS, and the docking of the orbiter and ISS are shown. The attachment of Canadarm 2 and the Raffaello Logistics Module, a resupply vehicle, are shown. The crew also undertakes some maintenance of the ISS. Landing playback views include: TV-1; TV-2; LRO-1; LRO-2; PPOV.

Source record↗

STS-98 Meal - Suit up - Depart O and C - Launch Atlantis On Orbit - Landing - Crew Egress

The crewmembers of the STS-98 include: Pilot Mark Polansky, Commander Kenneth Cockrell, and Mission Specialists Robert Curbeam, Thomas Jones, and Marsha Ivins. The astronauts are shown during suitup, departure of the Operations and Check-Out (O&C) Building and Ingress. Also, the launch of the STS-98 Atlantis is presented from various vantage points such as the Shuttle Landing Facility (SLF) Convoy, Beach Tracker, Vehicle Assembly Building (VAB) Roof, Pad-A Perimeter, Tower-1, and Grandstand. Live footage of the docking of Atlantis with the International Space Station (ISS) is shown and the opening of the Atlantis/ISS hatch is also presented. Mission Specialists Robert Curbeam and Thomas Jones are shown performing On Orbit Extravehicular Activities (EVA's) during this mission. A camera view of the undocking of the Space Shuttle Atlantis and the landing of the Space Shuttle Atlantis at the Dryden Flight Research Facility along with flight crew Egress is also presented.

Source record↗

STS-92 Meal - Suit up - Depart O&C - Launch Discovery On Orbit - Landing - Crew Egress

The video begins with the introduction of the crew of Space Shuttle Discovery on STS-92, at their customary pre-flight meal. The crew consists of Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Leroy Chiao, William McArthur, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and Koichi Wakata. The introduction and suit-up of the astronauts, and their departure in the Astrovan are shown at a quick pace. The video shows in detail the seating of the crew and each astronaut's final preparations in the White Room prior to boarding. Views of Discovery's night launch include: SLF Convoy, Beach Tracker, VAB, Pad Perimeter, Tower-1, UCS-15, Press Site, UCS-23, OTV-61, OTV-70, OTV-71, and the In-Cabin Ascent Camera. While in orbit, the Discovery orbiter docks with the International Space Station (ISS). The docking is shown in a series of still images. The video includes clips from four extravehicular activities (EVAs). The crew members who performed the EVAs comment on them while speaking to Mission Control. During the EVAs, the Z1 Truss and an antenna are attached to the ISS. The crew members on the fourth EVA test jet packs. Views of landing include: TV-1, TV-2, TV-3, LRO-1, and HUD.

Source record↗

STS-103 Photo-op/Suit-up/Depart O&C/Launch Discovery On-Orbit/Landing/Crew Egress

The crew of the STS-103 space mission are shown as they prepare for launch and landing of the space shuttle discovery. The crew includes: Commander Curtis L. Brown, Pilot Scott J. Kelly, and Mission Specialists: Steven L. Smith, C. Michael Foale, John M. Grunsfeld, Claude Nicollier and Jean-francois Clervoy. Footage of these astronauts during suit-up, Ingress, Egress and Operations and Checkout (O&C) is presented. Live footage of the countdown and launch of the space shuttle discovery is shown from various vantage points such as the Tower 1, Vehicle Assembly Building (VAB), and pad perimeter. Once in orbit, a presentation of Steven Smith, John Grunsfield, Michael Foale and Claude Nicollier performing three spacewalks to repair the HST is shown. The landing of the space shuttle discovery at the Kenndy Space Center is shown.

Source record↗

STS-111/Endeavour/ISS UF2 Pre-Launch Activities: Launch with Playbacks

This video of the preflight preparations for and launch of Space Shuttle Endeavour on STS-111 begins with a view of Endeavour on the launch pad. Additional launch pad views leading up to liftoff are interspersed with footage from the Firing Room at Kennedy Space Center, the crew's prelaunch activities, and inspection of the crew members in the White Room before boarding Endeavour. The crew is introduced by a narrator during the preflight banquet and suiting up, and a later clip shows them departing to the launch site. The crew consists of Commander Kenneth Cockrell, Pilot Paul Lockhart, Mission Specialists Philippe Perrin and Franklin Chang-Diaz, and the Expedition 5 crew of the International Space Station (ISS) (Commander Valery Korzun and Flight Engineers Peggy Whitsun and Sergei Treschev). The nozzles on Endeavour's Space Shuttle Main Engine (SSME) are swiveled before liftoff, and the launch is shown past the separation of the solid rocket boosters. After a brief clip from the Mission Control Center at Johnson Space Center, the following launch replays are shown: Beach Tracker, VAB, Pad A, Tower 1, UCS-15, Grandstand, Cocoa Beach DOAMS, Playalinda DOAMS, UCS-23, and OTV-070.

Source record↗

Chest wall mechanics in sustained microgravity

We assessed the effects of sustained weightlessness on chest wall mechanics in five astronauts who were studied before, during, and after the 10-day Spacelab D-2 mission (n = 3) and the 180-day Euromir-95 mission (n = 2). We measured flow and pressure at the mouth and rib cage and abdominal volumes during resting breathing and during a relaxation maneuver from midinspiratory capacity to functional residual capacity. Microgravity produced marked and consistent changes (Delta) in the contribution of the abdomen to tidal volume [DeltaVab/(DeltaVab + DeltaVrc), where Vab is abdominal volume and Vrc is rib cage volume], which increased from 30.7 +/- 3. 5 (SE)% at 1 G head-to-foot acceleration to 58.3 +/- 5.7% at 0 G head-to-foot acceleration (P < 0.005). Values of DeltaVab/(DeltaVab + DeltaVrc) did not change significantly during the 180 days of the Euromir mission, but in the two subjects DeltaVab/(DeltaVab + DeltaVrc) was greater on postflight day 1 than on subsequent postflight days or preflight. In the two subjects who produced satisfactory relaxation maneuvers, the slope of the Konno-Mead plot decreased in microgravity; this decrease was entirely accounted for by an increase in abdominal compliance because rib cage compliance did not change. These alterations are similar to those previously reported during short periods of weightlessness inside aircrafts flying parabolic trajectories. They are also qualitatively similar to those observed on going from upright to supine posture; however, in contrast to microgravity, such postural change reduces rib cage compliance.

manned↗

STS-114: Discovery Tanking Operations for Launch

Jessica Rye from NASA Public Affairs is the narrator for the tanking operations for the launch of the Space Shuttle Discovery. She presents a video of the arrival and processing of the new external tank at the Kennedy Space Center. The external tank is also shown entering the Vehicle Assembly Building (VAB). The external tank underwent new processing resulting from its redesign including inspection of the bipod heater and the external separation camera. The changes to the external tank include: 1) Electric heaters to protect from icing; and 2) Liquid Oxygen feed line bellows to carry fuel from the external tank to the Orbiter. Footage of the external tank processing facility at NASA's Michoud Assembly Facility in New Orleans, La. prior to its arrival at Kennedy Space Center is shown and a video of the three key modifications to the external tank including the bipod, flange and bellows are shown.

Source record↗

STS-114: Crew Training Clip from JSC

STS-114 Discovery crew is shown in various training exercises at Johnson Space Center. The crew consists of Eileen Collins, Commander; James Kelley, Pilot; Charles Camarda, Mission Specialist; Wendy Lawrence, Mission Specialist; Soichi Noguchi, Mission Specialist; Steve Robinson, Mission Specialist; and Andy Thomas, Mission Specialist. The exercises include: 1) EVA training in the VR lab; 2) Neutral Buoyancy Laboratory (NBL) EVA Training; 3) Walk to Motion Base Simulator; 4) EVA Preparations in ISS Airlock; and 7) Emergency Egress from Crew Compartment Trainer (CCT). A crew photo session is also presented. Footage of The Space Shuttle Atlantis inside the Kennedy Space Center Vehicle Assembly Building (VAB) after its demating from the Solid Rocket Booster and External Tank is shown. The video ends with techniques for inspecting and repairing Thermal Protection System tiles, a video of external tank production at the Michoud Assembly Facility (MAF) and redesign of the foam from the bipod ramp at Michoud Assembly Facility (MAF).

Source record↗

ESTIMATION OF THE SPACE SHUTTLE ROLLOUT FORCING FUNCTION

The Space Shuttle Vehicle is assembled in the Vertical Assembly Building (VAB) at Kennedy Space Flight Center in Florida. The Vehicle is stacked on a Mobile Launch Platform (MLP) that weighs eight million pounds. A Crawler Transporter (CT) then carries the MLP and the stacked vehicle (12 million pounds total weight) to the launch complex located 5 miles away. This operation is performed at 0.9 mph resulting in a 4.5-hour transport. A recent test was performed to monitor the dynamic environment that was produced during rollout. It was found that the rollout is a harmonic-rich dynamic environment that was previously not understood. This paper will describe work that has been performed to estimate the forcing function that is produced in the transportation process. The rollout analysis team has determined that there are two families of harmonics of the drive train, which excite the system as a function of CT speed. There are also excitation sources, which are random or narrow-band in frequency and are not a function of CT speed. This presentation will discuss the application of the Sum of Weighted Accelerations Technique (SWAT) to further refine this understanding by estimating the forces and moments at the center-of-mass.

James, George H., III↗