Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Unbalanced load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

76 records · Page 5

Safe Deep Reinforcement Learning for Active Distribution System Model Predictive Control with EVs and DERs

The temporal and spatial mismatch between PV generation and electric vehicle (EV) charging and discharging may cause voltage violations in active distribution networks. Despite the widespread use of deep reinforcement learning (DRL) in power system optimization and control, it lacks guarantees on constraint satisfaction during both training and deployment. This paper proposes a Lagrangian-based safe DRL approach for model predictive control (MPC) of active distribution systems with large-scale integration of PVs, EVs, and energy storage systems (ESSs). A Transformer-LSTM time-series model is proposed to forecast EV charging demand, which is then formulated as a constraint to ensure charging requirements are met. Using this prediction, a Lagrangian-based safe soft actor-critic (SAC) framework is developed for real-time control in a three-phase unbalanced distribution system, enforcing voltage safety constraints while optimizing the cumulative net reward. By integrating the forecasting model with multi-period constraints, the proposed framework jointly coordinates PV systems, EV charging and discharging, and ESS scheduling within the MPC horizon. Numerical experiments on a modified IEEE 123-bus system with real-world data show that, under a high PV penetration scenario, the proposed method increases the net reward by 30.74% and reduces average voltage violations from 0.0011 p.u. to 0.0002 p.u. compared with standard SAC. Compared with the optimal power flow (OPF) approach, it achieves similar voltage security while yielding lower line losses. It also maintains real-time control capability, reducing operation latency to 53.21 ms per 15-minute control interval. The proposed method remains effective under varying PV/EV penetrations and load conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Iterative Linearization for Phasor-Defined Optimal Power Dispatch

Optimal power flow (OPF) problems, which dispatch power targets to controllable generating units across a network, must generally account for non-convex constraints on power flow. Furthermore, adapting those problems so as to make them solvable with convex optimization techniques is an area of much academic and operational interest. In this paper, we present a method for solving OPF as a quadratic program by iteratively refining and re-initializing a linearized model of power flow based on the outputs of an associated nonlinear solver. The linear model on which we demonstrate this method is an adapted version of an approximation designed for use with unbalanced distribution networks. As an important benefit, the model allows for the explicit inclusion of nodal voltage phasor values in both the OPF problem's objective and its constraints, which opens the door to the idea of phasor-based control (PBC) design. We show in simulations on the IEEE 13-node test feeder that our method quickly converges to a set of phasor targets that are sufficiently precise for use in operations at the distribution level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effect of Accurate Modeling of Converter Interfaced Generation (CIG) on a Practical Bulk Power System

With increased penetration of converter interfaced generation (CIG) in power systems, it becomes imperative to adequately model them in both steady-state and dynamic simulations. There are several modeling approaches and simulation platforms for CIG. In addition, it is noted that suitability of modeling approaches and models is also dependent on the system conditions. However, their suitability has yet to be systematically analyzed, and this becomes a challenge in the industry without a systemic method. To tackle these challenges, in this paper, we first develop a methodology for identifying the maximum penetration of aggregated rooftop sources that can be represented as negative loads in both the steady state and dynamic analysis. Then we verify the suitability of positive-sequence performance-based model and detailed electromagnetic transient (EMT) model for utility-scale PV plants under different fault conditions. Based on the results, we perform dynamic simulations on a large practical system with both positive-sequence transient stability(TS) and EMT-TS hybrid simulation. Our study shows that positive-sequence performance based PV plant model is more suitable for study cases with faults relatively far away from the point of connection, and that positive-sequence models and TS simulation approach can produce comparable results with reference to EMT-TS hybrid simulation for normally-cleared single-line-to-ground faults, but the inadequacy of positive-sequence based model and simulation approach becomes obvious for prolonged-tripping of unbalanced faults in proximity of the PV plants.

Huang, Qiuhua↗

Hierarchical, Grid-Aware, and Economically Optimal Coordination of Distributed Energy Resources in Realistic Distribution Systems

Renewable portfolio standards are targeting high levels of variable solar photovoltaics (PV) in electric distribution systems, which makes reliability more challenging to maintain for distribution system operators (DSOs). Distributed energy resources (DERs), including smart, connected appliances and PV inverters, represent responsive grid resources that can provide flexibility to support the DSO in actively managing their networks to facilitate reliability under extreme levels of solar PV. This flexibility can also be used to optimize system operations with respect to economic signals from wholesale energy and ancillary service markets. Here, we present a novel hierarchical scheme that actively controls behind-the-meter DERs to reliably manage each unbalanced distribution feeder and exploits the available flexibility to ensure reliable operation and economically optimizes the entire distribution network. Each layer of the scheme employs advanced optimization methods at different timescales to ensure that the system operates within both grid and device limits. The hierarchy is validated in a large-scale realistic simulation based on data from the industry. Simulation results show that coordination of flexibility improves both system reliability and economics, and enables greater penetration of solar PV. Discussion is also provided on the practical viability of the required communications and controls to implement the presented scheme within a large DSO.

distribution network↗