Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Trajectory Correction Maneuver”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Finding Acceptable James Webb Space Telescope Mission Orbits From a Fixed Ariane Flight Profile

The James Webb Space Telescope (JWST) will be launched into orbit about the Sun/Earth L2 libration point. Trajectory design was recently completed which included expected separation states from the Ariane launch vehicle, constraints such as eclipses, maximum orbit size, maximum Sun-Vehicle-Earth/Moon angles, and launch opportunities. The results of this trajectory design give a set of possible trajectories for JWST with bounded stray light zones and provide a complete launch window. This data is also used to design the initial trajectory correction maneuver such that a maneuver towards the Sun is not required.

Beckman, Mark↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗

In-flight propulsion system characterization for both Mars Exploration Rover Spacecraft

Two Mars Exploration Rover spacecraft were dispensed to red planet in 2003, culminating in a phenomenally successful prime science mission. Twin cruise stage propulsion systems were developed in record time, largely through heritage with Mars Pathfinder. As expected, consumable usage was minimal during the short seven-month cruise for both spacecraft. Propellant usage models based on pressure and temperature agreed with throughput models with in a few percent. Trajectory correction maneuver performance was nominal, allowing the cancellation of near-Mars maneuvers. Spin thruster delivered impulse was 10-12% high vs. ground based models for the intial spin-down maneuvers, while turn performance was XX-XX% high/low vs. expectations. No clear indications for pressure transducer drift were noted during the brief MER missions.

maneuvers↗

An Update of the Ground Testing of the Li-ion Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration (>9 months), both Rovers are equipped with rechargeable Lithium-ion batteries, which have enabled operation for over 854 and 834 Sols of operation, respectively, to date. Given that the batteries were required to support the mission for 90 Sols of operation by design, it is significant that the batteries have demonstrated over a nine fold increase in life over mission objectives. In addition to supporting the surface operations in conjunction with a triple-junction deployable solar arrays, the batteries were designed to aid in the launch and the EDL pyros, and allow for anomalies during cruise. In summary, the requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20 C to +30 C), withstand long storage periods (e.g., cruise period), operate in an inverted orientation, and support high current pulses (e.g., firing pyro events). In order to determine the viability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit (RBAU), consisting of two 8-cell 10 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The testing includes, (a) performing initial characterization tests (discharge capacity at different temperatures), (b) simulating the launch conditions, (c) simulating the cruise phase conditions (including trajectory correction maneuvers), (d) simulating the entry, decent, and landing (EDL) pulse load profile (required to support the pyros) (e) simulating the Mars surface operation mission simulation conditions, as well as, (f) assessing capacity loss and impedance characteristics as a function of temperature and life. This paper provides further detail to previously reported results1 of the RBAU testing program, especially with regard to the life characteristics. To date, the lithium-ion batteries (fabricated by Lithion/Yardney, Inc.) have been demonstrated to far exceed the requirements defined by the mission, both on Mars and on the ground, and are projected to support an extended mission (> 4 years).

Mars Exploration Rovers (MER) Mission↗

Mars Reconnaissance Orbiter Interplanetary Navigation

This viewgraph presentation reviews the Mars Reconnaissance Orbiter (MRO) interplanetary navigation. An interplanetary overview including dynamic models of outgassing, small force calibration and trending, solar radiation pressure and trajectory correction maneuvers are also described.

Mars Reconnaissance Orbiter (MRO)↗

NASA Constellation Program (CxP) Key Driving Requirements and Element Descriptions for International Architecture Working Group (IAWG) Functional Teams Human Transportation Cargo Transportation

The NASA Constellation uncrewed cargo mission delivers cargo to any designated location on the lunar surface (or other staging point) in a single mission. This capability is used to deliver surface infrastructure needed for lunar outpost construction, to provide periodic logistics resupply to support a continuous human lunar presence, and potentially deliver other assets to various locations.In the nominal mission mode, the Altair lunar lander is launched on Ares V into Low Earth Orbit (LEO), following a short Low Earth Orbit (LEO) loiter period, the Earth Departure Stage (EDS) performs the Trans Lunar Injection (TLI) burn and is then jettisoned. The Altair performs translunar trajectory correction maneuvers as necessary and performs the Lunar Orbit Insertion (LOI) burn. Altair then descends to the surface to land near a designated target, presumably in proximity to an Outpost location or another site of interest for exploration.Alternatively, the EDS and Altair Descent Stage could deliver assets to various staging points within their propulsive capabilities.

Martinez, Roland M.↗

Attitude Determination and Control Subsystem (ADCS) Preparations for the EPOXI Flyby of Comet Haley 2

On November 4, 2010 the already "in-flight" Deep Impact spacecraft flew within 700km of comet 103P/Hartley 2 as part of its extended mission EPOXI, the 5th time to date any spacecraft visited a comet. In 2005, the spacecraft had previously imaged a probe impact comet Tempel 1. The EPOXI flyby marked the first time in history that two comets were explored with the same instruments on a re-used spacecraft-with hardware and software originally designed and optimized for a different mission. This made the function of the attitude determination and control subsystem (ADCS) critical to the successful execution of the EPOXI flyby. As part of the spacecraft team preparations, the ADCS team had to perform thorough sequence reviews, key spacecraft activities and onboard calibrations. These activities included: review of background sequences for the initial conditions vector, sun sensor coefficients, and reaction wheel assembly (RWA) de-saturations; design and execution of 10 trajectory correction maneuvers; science calibration of the two telescope instruments; a flight demonstration of the fastest turns conducted by the spacecraft between Earth and comet point; and assessment of RWA health (given RWA problems on other spacecraft).

Harley↗

Mars Science Laboratory Interplanetary Navigation Analysis

The Mars Science Laboratory (MSL) is a NASA rover mission that will be launched in late 2011 and will land on Mars in August of 2012. This paper describes the analyses performed to validate the navigation system for launch, interplanetary cruise, and approach. MSL will use guidance during its descent into Mars in order to minimize landing dispersions, and therefore will be able to use smaller landing zones that are closer to terrain of high scientific interest. This will require a more accurate delivery of the spacecraft to the atmospheric entry interface, and a late update of the state of the spacecraft at entry. During cruise and approach the spacecraft may perform up to six trajectory correction maneuvers (TCMs), to target to the desired landing site with the required flight path angle at entry. Approach orbit determination covariance analyses have been performed to evaluate the accuracy that can be achieved in delivering the spacecraft to the entry interface point, and to determine how accurately the state of the spacecraft can be predicted to initialize the guidance algorithm. In addition, a sensitivity analysis has been performed to evaluate which factors most contribute to the improvement or degradation of the navigation performance, for both entry flight path angle delivery and entry state knowledge.

orbit determination↗

Attitude Determination and Control Subsystem (ADCS) Preparations for the EPOXI Flyby of Comet Hartley 2

On November 4, 2010 the former "Deep Impact" spacecraft, renamed "EPOXI" for its extended mission, flew within 700km of comet 103P/Hartley 2. In July 2005, the spacecraft had previously imaged a probe impact of comet Tempel 1. The EPOXI flyby was the fifth close encounter of a spacecraft with a comet nucleus and marked the first time in history that two comet nuclei were imaged at close range with the same suite of onboard science instruments. This challenging objective made the function of the attitude determination and control subsystem (ADCS) critical to the successful execution of the EPOXI flyby.As part of the spacecraft flyby preparations, the ADCS operations team had to perform meticulous sequence reviews, implement complex spacecraft engineering and science activities and perform numerous onboard calibrations. ADCS contributions included design and execution of 10 trajectory correction maneuvers, the science calibration of the two telescopic instruments, an in-flight demonstration of high-rate turns between Earth and comet point, and an ongoing assessment of reaction wheel health. The ADCS team was also responsible for command sequences that included updates to the onboard ephemeris and sun sensor coefficients and implementation of reaction wheel assembly (RWA) de-saturations.

attitude determination and control↗

GRAIL TCM-5 Go/No-Go: Developing Lunar Orbit Insertion Criteria

The Gravity Recovery and Interior Laboratory (GRAIL) mission successfully completed mapping the Moon's gravity field to an unprecedented level. The mission success was critically dependent on the success of the Lunar Orbit Insertion (LOI). It was somewhat unfamiliar as it involved an elliptical approach from a low-energy trans-lunar cruise trajectory via Sun-Earth three-body region rather than a more conventional hyperbolic approach from a direct Earth-to-Moon transfer. In addition, how its delivery dispersion affected the science formation of the two spacecraft was not well understood. In this paper we establish a set of LOI criteria to meet all the requirements and we use these criteria to establish Go/No-Go boundaries of the last, statistical Trajectory Correction Maneuvers (TCM-5s) for operations. In the end both spacecraft were found to be within the established boundaries and TCM-5s of both spacecraft were cancelled.

Chung, Min-Kun J.↗

GRAIL TCM-5 Go/No-Go: Developing Lunar Orbit Insertion (LOI) Criteria

The Gravity Recovery and Interior Laboratory (GRAIL) mission successfully completed mapping the Moon's gravity field to an unprecedented level for a better understanding of the internal structure and thermal evolution of the Moon. The mission success was critically dependent on the success of the Lunar Orbit Insertion (LOI). In this paper we establish a set of LOI criteria to meet all the requirements and we use these criteria to establish Go/No-Go boundaries of the last, statistical Trajectory Correction Maneuvers (TCM-5s) for operations.

Chung, Min-Kun J.↗

In-Flight Operation of the Dawn Ion Propulsion System: Status at One Year from the Vesta Rendezvous

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The Dawn ion thruster [I thought we only called it a thruster. Both terms are used in the paper, but I think a replacement of every occurrence of "engine" with "thruster" would be clearer.] design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. Since resumption of cruise to Vesta IPS has been operated at throttled power levels, most of the time at full power, and with a duty cycle of approximately 93%, leading to an arrival at Vesta in July of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through one year from the spacecraft's rendezvous with Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗

Mission and Navigation Design for the 2009 Mars Science Laboratory Mission

NASA s Mars Science Laboratory mission will launch the next mobile science laboratory to Mars in the fall of 2009 with arrival at Mars occurring in the summer of 2010. A heat shield, parachute, and rocket-powered descent stage, including a sky crane, will be used to land the rover safely on the surface of Mars. The direction of the atmospheric entry vehicle lift vector will be controlled by a hypersonic entry guidance algorithm to compensate for entry trajectory errors and counteract atmospheric and aerodynamic dispersions. The key challenges for mission design are (1) develop a launch/arrival strategy that provides communications coverage during the Entry, Descent, and Landing phase either from an X-band direct-to-Earth link or from a Ultra High Frequency link to the Mars Reconnaissance Orbiter for landing latitudes between 30 deg North and 30 deg South, while satisfying mission constraints on Earth departure energy and Mars atmospheric entry speed, and (2) generate Earth-departure targets for the Atlas V-541 launch vehicle for the specified launch/arrival strategy. The launch/arrival strategy employs a 30-day baseline launch period and a 27-day extended launch period with varying arrival dates at Mars. The key challenges for navigation design are (1) deliver the spacecraft to the atmospheric entry interface point (Mars radius of 3522.2 km) with an inertial entry flight path angle error of +/- 0.20 deg (3 sigma), (2) provide knowledge of the entry state vector accurate to +/- 2.8 km (3 sigma) in position and +/- 2.0 m/s (3 sigma) in velocity for initializing the entry guidance algorithm, and (3) ensure a 99% probability of successful delivery at Mars with respect to available cruise stage propellant. Orbit determination is accomplished via ground processing of multiple complimentary radiometric data types: Doppler, range, and Delta-Differential One-way Ranging (a Very Long Baseline Interferometry measurement). The navigation strategy makes use of up to five interplanetary trajectory correction maneuvers to achieve entry targeting requirements. The requirements for cruise propellant usage and atmospheric entry targeting and knowledge are met with ample margins.

Mission design↗

Transfer Trajectory Design for the Mars Atmosphere and Volatile Evolution (MAVEN) Mission

The Mars Atmosphere and Volatile Evolution (MAVEN) mission will determine the history of the loss of volatiles from the Martian atmosphere from a highly inclined elliptical orbit. MAVEN will launch from Cape Canaveral Air Force Station on an Atlas-V 401 during an extended 36-day launch period opening November 18, 2013. The MAVEN Navigation and Mission Design team performed a Monte Carlo analysis of the Type-II transfer to characterize; dispersions of the arrival B-Plane, trajectory correction maneuvers (TCMs), and the probability of Mars impact. This paper presents detailed analysis of critical MOI event coverage, maneuver constraints, deltaV-99 budgets, and Planetary Protection requirements.

Folta, David↗

Solar Sail Attitude Control System for the NASA Near Earth Asteroid Scout Mission

An Attitude Control System (ACS) has been developed for the NASA Near Earth Asteroid (NEA) Scout mission. The NEA Scout spacecraft is a 6U cubesat with an eighty-six square meter solar sail for primary propulsion that will launch as a secondary payload on the Space Launch System (SLS) Exploration Mission 1 (EM-1) and rendezvous with a target asteroid after a two year journey, and will conduct science imagery. The spacecraft ACS consists of three major actuating subsystems: a Reaction Wheel (RW) control system, a Reaction Control System (RCS), and an Active Mass Translator (AMT) system. The reaction wheels allow fine pointing and higher rates with low mass actuators to meet the science, communication, and trajectory guidance requirements. The Momentum Management System (MMS) keeps the speed of the wheels within their operating margins using a combination of solar torque and the RCS. The AMT is used to adjust the sign and magnitude of the solar torque to manage pitch and yaw momentum. The RCS is used for initial de-tumble, performing a Trajectory Correction Maneuver (TCM), and performing momentum management about the roll axis. The NEA Scout ACS is able to meet all mission requirements including attitude hold, slews, pointing for optical navigation and pointing for science with margin and including flexible body effects. Here we discuss the challenges and solutions of meeting NEA Scout mission requirements for the ACS design, and present a novel implementation of managing the spacecraft Center of Mass (CM) to trim the solar sail disturbance torque. The ACS we have developed has an applicability to a range of potential missions and does so in a much smaller volume than is traditional for deep space missions beyond Earth.

Orphee, Juan↗

In-Flight Operation of the Dawn Ion Propulsion System Through Survey Science Orbit at Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta V of 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in September 2012 and concluded with the start of the approach to Ceres phase on December 26, 2015, leading to orbit capture on March 6, 2015. Deterministic thrusting continued during approach to place the spacecraft in its first science orbit, called RC3, which was achieved on April 23, 2015. Following science operations at RC3 ion thrusting was resumed for twenty-five days leading to arrival to the next science orbit, called survey orbit, on June 3, 2015. The IPS will be used for all subsequent orbit transfers and trajectory correction maneuvers until completion of the primary mission in approximately June 2016. To date the IPS has been operated for over 46,774 hours, consumed approximately 393 kg of xenon, and provided a delta V of over 10.8 km/s to the spacecraft. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through arrival at the second science orbit at Ceres.

Garner, Charles E.↗