Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ThC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

PAGEMS

Glenn Research Center has extensive instrumentation developed for measuring particulate and gaseous emissions. The Particulate and Gaseous Emissions Measurement System (PAGEMS) is a mobile facility housing advanced instrumentation used for measuring combustion particulates and gaseous species. Particulates sizes ranging from 10 nm to 10 mm can be measured along with SO2, NO, NO2, CO, CO2, THC and O2 . Measurements can be made from subatmospheric up to 60 atm. Representative data from two engine tests will be discussed. In one test, the fuel sulfur content was changed, while the other test (T-63 engine) used various fuel additives. Probe design is essential to acquiring accurate particulate data. I will discuss the AEDC designed particulate probe, and the results of a University of Minnesota calibration study using the probe. Another suite of instrumentation, a tunable diode laser (TDL), enables in-situ real time gaseous species measurements. Representative TDL data from a T-38 aircraft will be presented. In conclusion, near term measurement opportunities will be discussed.

Bulzan, Dan↗

Summary of Resources for the International Space Station Environmental Control and Life Support System For Core Complete Modules

The Core Complete Environmental Control and Life Support (ECLS) System for the International Space Station (ISS) will consist of components and subsystems in both the United States (U.S.) and International Partner elements which together will perform the functions of Temperature and Humidity Control (THC), Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Water Recovery and Management (WRM), Fire Detection and Suppression (FDS), and Vacuum System (VS) for the station. Due to limited resources available on ISS, detailed attention is given to minimizing and tracking all resources associated with all systems, beginning with estimates during the hardware development phase through measured actuals when flight hardware is built and delivered. A summary of resources consumed by the addition of future U.S. ECLS system hardware to get to Core Complete is presented, including launch weight, average continuous and peak power loads, on-orbit volume and resupply logistics.

Williams, David E.↗

International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System Keep Out Zone On-Orbit Problems

The International Space Station (ISS) Environmental Control and Life Support (ECLS) system performance can be impacted by operations on ISS. This is especially important for the Temperature and Humidity Control (THC) and for the Fire Detection and Suppression (FDS) subsystems. It is also more important for Node 1 since it has become a convenient area for many crew tasks and for stowing hardware prior to Shuttle arrival. This paper will discuss the current requirements for ECLS keep out zones in Node 1; the issues with stowage in Node 1 during Increment 7 and how they impacted the keep out zone requirements; and the solution during Increment 7 and 8 for maintaining the keep out zones in Node 1.

Williams, David E.↗

Cardiovascular Countermeasures for Exploration-Class Space Flight Missions

Astronaut missions to Mars may be many years or even decades in thc future but current and planned efforts can be extrapolated to required treatments and prophylaxis for delerious efforts of prolonged space flight on the cardiovascular system. The literature of candidate countermeasures was considered in combination with unpublished plans for countermeasure implementation. The scope of cardiovascular countermeasures will be guided by assessments of the efficacy of mechanical, physiological and pharmacological approaches in protecting the cardiovascular capacities of interplanetary crewmembers. Plans for countermeasure development, evaluation and validation will exploit synergies among treatment modalities with the goal of maximizing protective effects while minimizing crew time and in-flight resource use. Protection of the cardiovascular capacity of interplanetary crewmembers will become more effective and efficient over the next few decades, but trade-offs between cost and effectiveness of efficiency are always possible if the increased level of risk can be accepted.

Charles, John B.↗

CHARGING OF DEVICES BY MICROWAVE POWER BEAMING

A system for providing wireless, charging power and/or primary power to electronic/electrical devices is described whereby microwave energy is employed. Microwave energy is focused by a power transmitter comprising one or more adaptively-phased microwave array emitters onto a device to be charged. Rectennas within the device to be charged receive and rectify the microwave energy and use it for battery charging and/or for primary power. A locator signal generated by the device to be charged is analyzed by the system to determine the location of the device to be charged relative to the microwave array emitters, permitting thc microwave energy to be directly specifically towards the device to be charged. Backscatter detectors respond to backscatter energy reflected off of any obstacle between the device to be charged and the microwave array emitters. Power to any obstructed microwave array emitter is reduced until the obstruction is removed. Optionally, data can be modulated onto microwave energy beams produced by the array emitter and demodulated by the device, thereby providing means of data communication from the power transmitter to the device. Similarly, data can be modulated onto the locator signal and demodulated in the power transmitter, thereby providing means of data communication from the device to the power transmitter.

Landis, Geoffrey A.↗

Central East Pacific Flight Routing

With the introduction of the Federal Aviation Administration s Advanced Technology and Oceanic Procedures system at the Oakland Oceanic Center, a level of automation now exists in the oceanic environment to potentially begin accommodating increased user preferred routing requests. This paper presents the results of an initial feasibility assessment which examines the potential benefits of transitioning from the fixed Central East Pacific routes to user preferred routes. As a surrogate for the actual user-provided routing requests, a minimum-travel-time, wind-optimal dynamic programming algorithm was developed and utilized in this paper. After first describing the characteristics (e.g., origin airport, destination airport, vertical distribution and temporal distribution) of the westbound flights utilizing the Central East Pacific routes on Dec. 14-16 and 19-20, the results of both a flight-plan-based simulation and a wind-optimal-based simulation are presented. Whereas the lateral and longitudinal distribution of the aircraft trajectories in these two simulations varied dramatically, the number of simulated first-loss-of-separation events remained relatively constant. One area of concern that was uncovered in this initial analysis was a potential workload issue associated with the redistribution of traffic in the oceanic sectors due to thc prevailing wind patterns.

Grabbe, Shon↗

Integrated Simulation Design Challenges to Support TPS Repair Operations

During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSMS during the ORM, simulation tools used for previous ‘nominal’ mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. Prevalent throughout this ORM operation is a dynamically varying topology. In other words, the ORM starts with the SRMS grappled to the mated Shuttle/ISS stack (closed loop topology), moves to an open loop chain topology consisting of the Shuttle, SRMS, and ISS, and then, at the repair configuration, extends the chain topology to one consisting of the Shuttle, SMS, ISS, and SSRMS/EVA crewman. The resulting long dynamic chain of vehicles and manipulators may exhibit significant motion between the Shuttle worksite and the EVA crewman due to the system flexibility throughout the topology (particularly within the SRMS/SSRMS joints and links). Since the attachment points of both manipulators span the flexible structure of the ISS, simulation analysis may also need to take that into consideration. Moreover, due to the lengthy time duration associated with the maneuver and repair, orbital effects become a factor and require the ISS vehicle control system to maintain active attitude control. Several facets of the ORM operation make the associated analytical efforts different from previous mission support, including: (1) the magnitude of the SRMS handled payload (Le., Orbiter class), (2) the orbital effects induced on the integrated system consisting of the large Shuttle and ISS masses connected by a light flexible SRMS, (3) long duration environmental consequences due to the lengthy operational times associated with the maneuver and repair of the TPS, (4) active attitude control (as opposed to free drift) interacting with the SRMS and SSRMS manipulators (also due to the length of the maneuver and repair), (5) relative dynamics between the EVA crewman and thc worksite influenced by the extended flexible topology. In order to meet these analysis challenges, an ORM simulation architecture was developed leveraging upon numerous pre-existing simulation elements to analyze the various subsystems individually. For example, core manipulator subsystem simulations for both the SRMS and SSRMS were originally combined to provide the dual-arm dynamics topology simulation (in the absence of orbital dynamics and vehicle control). This capability was later merged with the simulation used to analyze SRMS loading with a heavy payload in the orbital environment with an active payload control system (in this case, the ISS Attitude Control System (ACS)), configured for the ORM. The resulting worksite dynamics simulation, based off of the modified ORM simulation, provided the extended topological chain of vehicles and manipulators, while taking into account the orbital effects of both the Shuttle and ISS (as well as its ACS). Verification and validation (V&V) of these integrated simulations became a challenge in itself. A systematic approach needed to be developed such that integration simulation results could be tested against previous constituent simulations upon which these simulations were built. General V&V categories included: (1) core orbital state propagation, (2), stand-alone SRMS, (3) stand-alone SSRMS, (4) stand-alone ISS ACS, (5) integrated Shuttle, SRMS, ISS (with active ACS) in the orbital environment, and (5) dual-arm SRMS/SSRMS dynamics topology. Integrated simulation V&V run suites were created and correlated to verification runs from subsystem simulations, in order to establish the validity of the results. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

Thermal Protection System↗

Challenges to modeling the Sun-Earth System: A Workshop Summary

This special issue of the Journal of' Atmospheric and Solar-Terrestrial Physics is a compilation of 23 papers presented at The 2004 Huntsville Modeling Workshop: Challenges to Modeling thc San-Earth System held in Huntsville, AB on October 18-22, 2004. The title of the workshop appropriately captures the theme of what was presented and discussed by the 120 participants. Currently, end-to-end modeling of the Sun-Earth system is a major goal of the National Space Weather and NASA living with a star (LWS) programs. While profound advances have been made in modeling isolated regions of the Sun-Earth system, minimal progress has been achieved in modeling the end-to-end system. The transfer of mass, energy and momentum through the coupled Sun-Earth system spans a wide range of scales inn time and space. The uncertainty in the underlying physics responsible for coupling contiguous regions of the Sun-Earth system is recognized as a significant barrier to progress

Spann, James F.↗

International Space Station Atmosphere Control and Supply, Atmosphere Revitalization, and Water Recovery and Management Subsystem - Verification for Node 1

The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the nominal operation of the Node 1 ACS, AR, and WRM design and detailed Element Verification methodologies utilized during the Qualification phase for Node 1.

Williams, David E.↗

International Space Station Environmental Control and Life Support System: Verification for the Pressurized Mating Adapters

The International Space Station (ISS) Pressurized Mating Adapters (PMAs) Environmental Control and Life Support (ECLS) System is comprised of three subsystems: Atmosphere Control and Supply (ACS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). PMA 1 and PMA 2 flew to ISS on Flight 2A and PMA 3 flew to ISS on Flight 3A. This paper provides a summary of the PMAs ECLS design and the detailed Element Verification methodologies utilized during the Qualification phase for the PMAs.

Williams, David E.↗

A Comparison of Methods Used to Estimate the Height of Sand Dunes on Mars

The collection of morphometric data on small-scale landforms from other planetary bodies is difficult. We assess four methods that can be used to estimate the height of aeolian dunes on Mars. These are (1) stereography, (2) slip face length, (3) profiling photoclinometry, and (4) Mars Orbiter Laser Altimeter (MOLA). Results show that there is good agreement among the methods when conditions are ideal. However, limitations inherent to each method inhibited their accurate application to all sites. Collectively, these techniques provide data on a range of morphometric parameters, some of which were not previously available for dunes on Mars. They include dune height, width, length, surface area, volume, and longitudinal and transverse profiles. Thc utilization of these methods will facilitate a more accurate analysis of aeolian dunes on Mars and enable comparison with dunes on other planetary surfaces.

Bourke, M. C.↗

International Space Station Environmental Control and Life Support System Acceptance Testing for the Pressurized Mating Adapters

The International Space Station (ISS) Pressurized Mating Adapters (PMAs) Environmental Control and Life Support (ECLS) System is comprised of three subsystems: Atmosphere Control and Supply (ACS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). PMAs 1 and 2 flew to ISS on Flight 2A and Pressurized Mating Adapter (PMA) 3 flew to ISS on Flight 3A. This paper provides a summary of the PMAs ECLS design and a detailed discussion of the ISS ECLS Acceptance Testing methodologies utilized for the PMAs.

Williams, David E.↗

JWST ISIM Harness Thermal Evaluation

The James Webb Space Telescope (JWST) will be a large infrared telescope with a 6.5-meter primary mirror. Launch is planned for 2013. JWST wl1 be the premier observatory of the next decade serving thousands of astronomers worldwide. The Integrated Science Instrument Module (ISIM) is the unit that will house thc four main JWST instruments. The ISIM enclosure passively cooled to 37 Kelvin and has a tightly managed thermal budget. A significant portion of the ISIM heat load is due to parasitic heat gains from the instrument harnesses. These harnesses provide a thermal path from the Instrument Electronics Control (IEC) to the ISIM. Because of the impact of this load to the ISIM thermal design, understanding the harness parasitic heat gains is critical. To this effect, a thermal test program has been conducted in order to characterize these parasitic loads and verify harness thermal models. Recent parasitic heat loads tests resulted in the addition of a dedicated multiple stage harness radiator. In order for the radiator to efficiently reject heat from the harness, effective thermal contact conductance values for multiple harnesses had to be determined. This presentation will describe the details and the results of this test program.

Kobel, Mark↗

Twentieth Century Moon: The Evolution of Lunar Science, 1955 - 2002

Here we discuss thc bibliographic record of Lunar Science as published in refereed journals from 1955 to 2002. New tools in bibliometrics, i.e. the study of publications and citations, reveal the structure of this scientific field by measuring and visualizing connections between published papers. This approach is especially powerful when applied to a well defined field such as Lunar Science, which is strongly affected by policy and the actions resulting from policy, most obviously gathering samples from the Moon. This poster presents some results obtained by processing a dataset of lunar science bibliographic records through a bibliographic visualization program.

Templeton, T. C.↗

LISA and NASA's Physics of the Cosmos Theme

In the past year, the LISA Project at NASA has completed a major review and has thoroughly reviewed its cost estimates. This talk will summarize the conclusions of the Beyond Einstein Program Assessment, and review the main conclusions of the cost estimation work done at NASA, including reduced mission concepts. Astro2010, the decadal review which sets priorities for astronomy and astrophysics projects in the U.S., is getting organized. Preparing for and participating in Astro2010 will be a crucial activity for the NASA side of the LISA Project in thc next 18 months.

Stebbins, Robin T.↗

An Experimental System for a Global Flood Prediction: From Satellite Precipitation Data to a Flood Inundation Map

Floods impact more people globally than any other type of natural disaster. It has been established by experience that the most effective means to reduce the property damage and life loss caused by floods is the development of flood early warning systems. However, advances for such a system have been constrained by the difficulty in estimating rainfall continuously over space (catchment-. national-, continental-. or even global-scale areas) and time (hourly to daily). Particularly, insufficient in situ data, long delay in data transmission and absence of real-time data sharing agreements in many trans-boundary basins hamper the development of a real-time system at the regional to global scale. In many countries around the world, particularly in the tropics where rainfall and flooding co-exist in abundance, satellite-based precipitation estimation may be the best source of rainfall data for those data scarce (ungauged) areas and trans-boundary basins. Satellite remote sensing data acquired and processed in real time can now provide the space-time information on rainfall fluxes needed to monitor severe flood events around the world. This can be achieved by integrating the satellite-derived forcing data with hydrological models, which can be parameterized by a tailored geospatial database. An example that is a key to this progress is NASA's contribution to the Tropical Rainfall Measuring Mission (TRMM), launched in November 1997. Hence, in an effort to evolve toward a more hydrologically-relevant flood alert system, this talk articulates a module-structured framework for quasi-global flood potential naming, that is 'up to date' with the state of the art on satellite rainfall estimation and the improved geospatial datasets. The system is modular in design with the flexibility that permits changes in the model structure and in the choice of components. Four major components included in the system are: 1) multi-satellite precipitation estimation; 2) characterization of land surface including digital elevation from NASA SRTM, topography-derived hydrologic parameters such as flood direction. flow accumulation, basin, and river network etc.; 3) spatially distributed hydrological models to infiltrate rainfall and route overland runoff; and 4) an implementation interface to relay thc input data to the models and display the flood inundation results to the users and decision-makers. Early results appear reasonable in terms of location and frequency of events. Case studies of this experimental system are evaluated with surface runoff data and other river monitoring systems. such as Dartmouth Flood Observatory's "Surface Water Watch" array of river reaches that are measured daily via other satellite remote sensing data. A major outcome of this progress will be the availability of a global overview of flood alerts that should consequently improve the performance of Decision Support System. We expect these developments in utilization of satellite remote sensing technology to offer a practical solution to the challenge of building a cost-effective early warning system for data scarce and under-developed areas.

Adler, Robert↗

Interactions Between Vestige Atlantic Tropical Cyclones and Mid-Latitude Storms Over Mediterranean Basin

One of the more interesting tropical-mid-latitude interactions is one that has important effects on precipitation within the Mediterranean basin. This interaction consists of an Atlantic tropical cyclone vestige whose original disturbance travels eastward and northward across Atlantic basin, eventually intermingling with a mid-latitude cyclone entering southern Europe and/or the \bestern Mediterranean Sea. The period for these interactions is from mid-September through November. If the tropical cyclone and its vestige is able to make the eastward Atlantic transit within the low to mid-levels, or if an upper level potential vorticity perturbation Cjet streak) emitted by a Hurricane in its latter stages within the central Atlantic is able to propagate into and along the longwave pattern affecting the western Mediterranean Sea (MED), then there is the prospect for the tropical cyclone remnant to produce a major modification of the mid-latitude storm system preparing to affect the MED region. For such an occurrence to take place, it is necessary for an amplifying baroclinic perturbation to be already situated to the rear of a longwave trough, or to be excited by the emitted jet streak to the rear of a longwave trough -- in either case, preparing to affect the western MED. The Algiers City flood of 9-10 November 2001, which killed some 700 people, was produced by a Mediterranean cyclone that had been influenced by two vestige Atlantic tropical cyclones, 1,orenzo and Noel. A published modeling study involving various of this study's authors has already described the dynamical development of the Algiers storm as it amplified from a developing baroclinic disturbance in the Rossby wave train, into a northern Africa hazardous flood system, then lingered in the western MED as a semi-intense warm core cyclone. In our new modeling experiments, we investigate the impact of what might have happened in the eventual precipitation field. had the main features of the tropical cyclones NOT interacted with thc developing baroclinic disturbance as it penetrated the western MED. To do so, we first remove the moisture and dynamical features of the two vestigial tropical cyclones from the large scale meteorological fields used to initialize the Mediterranean cyclone simulation. This is done through depletion of the moisture front associated with the two tropical cyclones, accomplished by relaxation to the suppressed east Atlantic conditions. The dynamical effects are removed through energetic destruction of the latter stages of the eastward traveling tropical cyclones, accomplished by lowering the underlying sea surface temperatures. A precipitation-distribution impact experiment is then run by initializing with the customized large-scale fields. The final precipitation-impact field is described by differencing the "impact" run from the "control" run -- the latter defined as the original simulation which intrinsically includes the effects of the two vestigial tropical cyclones.

Smith, Eric A.↗

The Swift-XRT imaging Performances and Serendipitous Survey

We are exploiting thc Swift X-ray Telescope (XRT) deepest GR.B follow-up observations to study the cosmic X-Ray Background (XRB) population in the 0.2-10 keV energy band. We present some preliminary results of a serendipitous survey performed on 221 fields observed with exposure longer than 10 ks. We show that the XRT is a profitable instrument for surveys and that it is particularly suitable for the search and observation of ext,ended objects like clusters of galaxies. We used the brightest serendipitous sources and the longest observations to test. the XRT optics performance and the background characteristics all over the field of view, in different energy bands during the first 2.5 years of fully operational missions.

Moretti, A.↗