Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Risk Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Use of System Safety Risk Assessments for the Space Shuttle Reusable Solid Rocket Motor (RSRM)

This paper discusses the System Safety approach used to assess risk for the Space Shuttle Reusable Solid Rocket Motor (RSRM). Previous to the first RSRM flight in the fall of 1988, all systems were analyzed extensively to assure that hazards were identified, assessed and that the baseline risk was understood and appropriately communicated. Since the original RSRM baseline was established, Thiokol and NASA have implemented a number of initiatives that have further improved the RSRM. The robust design, completion of rigorous testing and flight success of the RSRM has resulted in a wise reluctance to make changes. One of the primary assessments required to accompany the documentation of each proposed change and aid in the decision making process is a risk assessment. Documentation supporting proposed changes, including the risk assessments from System Safety, are reviewed and assessed by Thiokol and NASA technical management. After thorough consideration, approved changes are implemented adding improvements to and reducing risk of the Space Shuttle RSRM.

Greenhalgh, Phillip O.↗

Roadmap for Assessing Fuel Reprocessing in Fluoride-Based Salts

This joint report assesses the pyroprocessing of used nuclear fuel from molten fluoride salts being conducted between Idaho National Laboratory and Argonne National Laboratory. The goal of this report is to identify the research and development gaps needed to reduce the technical risks of extending pyroprocessing technologies and unit operations to molten fluoride salts used in molten salt reactors (MSRs). Assessing and performing the tasks outlined in this report will help mitigate the technical risks and design appropriate flowsheets for reprocessing fuel and coolant salts. These suggested tasks will provide necessary data to implement the development of unit operations. Sections are highlighted to identify processes that need to be assessed and unit operations that may be used in fluoride-based chemistries. Research and development needs are listed and discussed including re-fluorination methods, electrowinning for separations, reference electrode development, materials compatibility, salt purification/re-fluorination, and waste disposition. This report will examine the technical challenges associated with pyroprocessing in molten fluoride-based salt and outline approaches to increase the technical readiness level of pyroprocessing in molten fluoride salts.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technology Readiness Assessment for Stirling Power Convertor

Stirling-based power conversion system could represent a critical enabling technology for future NASA missions, offering significantly enhanced power efficiency over traditional thermoelectric systems. To ensure the successful infusion of this technology into deep space and planetary surface missions, a rigorous evaluation of its maturity and associated risks is essential. The objective of this Technology Readiness Assessment (TRA) is to determine the current technology readiness level (TRL) of the Stirling power convertor and identify key technical risks and challenges associated with its maturation and potential infusion into a targeted flight system. The evaluation process will rigorously follow the NASA TRA procedure: (1) determining the requirements that underpin the design, function, and performance; (2) finding and listing all new technology elements (NTEs) and critical technology elements (CTEs); (3) identifying the level of integration assumed for the assessment; and (4) assessing the TRL for each NTE and CTE. The overall subassembly TRL will then be determined via a roll-up using the “weakest link” criterion, culminating in a final (5) assessment of risks to further progression of maturity. This paper will present the results of a comprehensive technology readiness assessment (TRA) conducted on the Stirling-based dynamic power conversion subassembly, excluding the radioisotope heat source. The paper will also describe a detailed breakdown of the TRL roll-up and a matrix of identified risks and recommended mitigation paths, along with identified key technical risks and challenges to achieve the required long-duration performance. Key Words: Radioisotope Power Conversion, Technology Readiness Assessment

Radioisotope Power Conversion↗

In-Kind Contributions: The PIP-II Project at Fermilab

The Proton Improvement Plan II (PIP-II) Project is the first U.S. accelerator project that has significant contributions from international partners. A project management framework was created to fully integrate and make consistent across all partners the design, development, and delivery of In-Kind Contributions (IKC) into PIP-II. This framework consists of planning documentation, procedures, and communication and assessment processes to control schedule, risk, quality, and technical integration over the lifetime of the project. The purpose of this paper is to present the PIP-II IKC model put in place to properly integrate the IKC deliverables into the PIP-II Linac and share experience and lessons learned from its early implementation.

43 PARTICLE ACCELERATORS↗

Utility-Scale Operational Consequences for Solar Grid Services

This report delves into the critical aspects of grid services provided by solar inverter-based resources (IBRs), with an emphasis on the evolving landscape of microgrids, virtual power plants (VPPs), aggregators, and distributed energy resource management systems (DERMS). As the energy sector undergoes a transformative shift towards more decentralized and resilient grid architectures, understanding the multifaceted risks associated with these technologies becomes paramount. The report categorizes these risks into organizational, technical, and procedural domains, providing a thorough risk assessment framework that stakeholders can utilize to anticipate and mitigate potential issues. In addressing the increasing complexity of grid interconnections, the report highlights the importance of Cyber-Informed Engineering (CIE). By embedding engineering controls and cybersecurity measures into the early stages of system design, this approach aims to fortify grid infrastructure against emerging cyber threats. The analysis includes an exploration of best practices and strategies for integrating CIE principles to enhance grid security and resilience. To provide practical insights, the report conducts a detailed consequence analysis of various grid services and cyber mitigations that can be applied through the interconnection process. This analysis evaluates the potential impacts of different failure modes and vulnerabilities, offering a clear understanding of the consequences that could arise from disruptions within the energy grid. The findings are further enriched by a series of case studies that illustrate real-world scenarios and lessons learned from past incidents. Through this comprehensive examination of grid services and their criticality, the report aims to prepare industry professionals with the knowledge and tools necessary to navigate the complexities of modern energy systems. By providing a comprehensive approach that includes risk assessment, cybersecurity, and consequence analysis, solar stakeholders can more effectively guarantee the reliability, efficiency, and security of the energy grid.

14 SOLAR ENERGY↗

Autonomous Rendezvous and Docking Conference, volume 2

Autonomous Rendezvous and Docking (ARD) will be a requirement for future space programs. Clear examples include satellite servicing, repair, recovery, and reboost in the near term, and the longer range lunar and planetary exploration programs. ARD will permit more aggressive unmanned space activities, while providing a valuable operational capability for manned missions. The purpose of the conference is to identify the technologies required for an on-orbit demonstration of ARD, assess the maturity of those technologies, and provide the necessary insight for a quality assessment of programmatic management, technical, schedule, and cost risks.

Source record↗

Autonomous Rendezvous and Docking Conference, volume 3

This document consists of the presentation submitted at the Autonomous Rendezvous and Docking (ARD) Conference. The document contains three volumes: ARD hardware technology; ARD software technology; and ARD operations. The purpose of this conference is to identify the technologies required for an on orbit demonstration of ARD, assess the maturity of these technologies, and provide the necessary insight for a quality assessment of programmatic management, technical, schedule, and cost risks.

Source record↗

NASA's Gravitational-Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consists of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance. Three mission concepts have been studied by Team-X, JPL's concurrent design facility, to refine the conceptual design, evaluate key performance parameters, assess risk and estimate cost and schedule. The status of the Study are reported.

Stebbins, Robin↗

NASA's Gravitational - Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser Interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consisted of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded were 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance by calculating the horizons. the detection rates and the accuracy of astrophysical parameter estimation for massive black hole mergers, stellar-mass compact objects inspiraling into central engines. and close compact binary systems. Three mission concepts have been studied by Team-X, JPL's concurrent design facility. to define a conceptual design evaluate kt,y performance parameters. assess risk and estimate cost and schedule. The Study results are summarized.

Stebbins, Robin↗

NASA Manufacturing and Test Requirements for Normally Closed Pyrovalves for Hazardous Flight Systems Applications

Pyrovalves (figure 1, Basic Pyrovalve Design and Features,) are typically lighter, more reliable, and in most cases less expensive than other types of valves. They also consume less electrical power. They are single-use devices that are used in propulsion systems to isolate propellants or pressurant gases. These fluids may be hazardous because of their toxicity, reactivity, temperature, or high pressure. Note that in the simplified block diagram below not all detail features are shown so that those of major interest are more prominent. The diagram is provided to point out the various features that are discussed in this Specification. Features of some NC parent metal valve designs may differ. In 2013, the NESC concluded an extensive study of the reliability and safety of NC parent metal valves used in payloads carried aboard ELVs. The assessment successfully evaluated technical data to determine the risk of NC parent metal valve leakage or inadvertent activation in ELV payloads. The study resulted in numerous recommendations to ensure personnel and hardware/facility safety during ground processing of ELV payloads. One of those recommendations was to establish a NASA specification for NC parent metal valves. This Specification is a result of that recommendation, which is documented in NESC-RP-10-00614.

McDougle, Stephen H.↗

The Quest for an OCO (Orbiting Carbon Observatory) Re-Flight

The objective of the OCO (Orbiting Carbon Observatory) mission was to make the first space-based measurements of atmospheric carbon dioxide with the accuracy needed to quantify sources and sinks of this important greenhouse gas. Unfortunately, the observatory was lost as a result of a launch vehicle failure on 24 February 2009. The JPL (Jet Propulsion Laboratory) was directed to assess the options for the re-flight of the OCO instrument and recovery of the carbon-related measurement, and to understand and quantitatively assess the cost, schedule, and technical and programmatic risks of the identified options. The two most likely solutions were (1) a shared platform with the TIRS (Thermal Infrared Sensor) instrument and (2) a dedicated OSC (Orbital Sciences Corporation) LEOStar-2 spacecraft bus similar to that utilized for the original OCO mission. A joint OCO-TIRS mission study was commissioned and two specific options were examined. However, each presented technical challenges that would drive cost. It was determined that the best option was to rebuild the OCO observatory to the extent possible including another LEOStar-2 spacecraft bus. This lowest risk approach leverages the original OCO design and provides the shortest path to launch, which is targeted for no later than the February 2013 timeframe.

carbon↗

Nasa Conjunction Assessment Risk Analysis Updated Requirements Architecture

The NASA Conjunction Assessment Risk Analysis (CARA) program has been performing routine on-orbit satellite conjunction risk analysis for unmanned NASA spacecraft since 2005, and has developed a robust operations procedure and set of recommended best practices for operational conjunction assessment. However, a number of recent developments in Space Situational Awareness and commercial space operations conduct, such as the immanent deployment of much more sensitive space sensing systems and the launching of much larger satellite constellations, have begun to challenge these standard collision risk parameters and calculations. In response CARA has pursued a multi-year evaluation initiative to re-examine risk assessment algorithms and techniques, to develop needed improvements, and to assemble analysis-based operational requirements. This paper gives an overview of the principal parts of the Conjunction Assessment (CA) risk assessment process used at CARA, outlines the technical challenges that each part presents, surveys the possible solutions, and then indicates which particular solution is being recommended for NASA.

Newman, Lauri K.↗

NASA Conjunction Assessment Risk Analysis (CARA) Updated Requirements Architecture

The NASA Conjunction Assessment Risk Analysis (CARA) program has been performing routine on-orbit satellite conjunction risk analysis for unmanned NASA spacecraft since 2005, and has developed a robust operations procedure and set of recommended best practices for operational conjunction assessment. However, a number of recent developments in Space Situational Awareness and commercial space operations conduct, such as the immanent deployment of much more sensitive space sensing systems and the launching of much larger satellite constellations, have begun to challenge these standard collision risk parameters and calculations. In response CARA has pursued a multi-year evaluation initiative to re-examine risk assessment algorithms and techniques, to develop needed improvements, and to assemble analysis-based operational requirements. This paper gives an overview of the principal parts of the Conjunction Assessment (CA) risk assessment process used at CARA, outlines the technical challenges that each part presents, surveys the possible solutions, and then indicates which particular solution is being recommended for NASA.

Newman, L. K.↗

Aggregate Risk Tool for Human Space Flight

This project utilized Data fusion capabilities developed from the 2020-2022 Information Fusion (IFDA) IRAD to enhance functionality of a Human Spaceflight (HSF) Aggregate Risk Product developed by the JSC Flight Safety Office. The tool compiles and presents risk data from multiple Program and Commercial Provider vehicles to provide a holistic assessment of residual risk to Program Managers and Technical Authorities prior to HSF Launches. The aggregation or coupling of risks from multiple sources (Examples: PRA, variances, anomaly data bases, Program Risk Management data bases, technical review board minutes, Hazard Analysis, etc.) when analyzed, identify potential areas of elevated risk in components, systems or mission phases that would otherwise be undetected by nonintegrated program risk management tools and possesses.

Patrick Huckaby↗

Recent Experiences of the NASA Engineering and Safety Center (NESC) Guidance Navigation and Control (GN and C) Technical Discipline Team (TDT)

The NASA Engineering and Safety Center (NESC) is an independently funded NASA Program whose dedicated team of technical experts provides objective engineering and safety assessments of critical, high risk projects. NESC's strength is rooted in the diverse perspectives and broad knowledge base that add value to its products, affording customers a responsive, alternate path for assessing and preventing technical problems while protecting vital human and national resources. The Guidance Navigation and Control (GN&C) Technical Discipline Team (TDT) is one of fifteen such discipline-focused teams within the NESC organization. The TDT membership is composed of GN&C specialists from across NASA and its partner organizations in other government agencies, industry, national laboratories, and universities. This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA.

Dennehy, Cornelius J.↗

TCCSP Task 6 Risk Assessment Report

For this Risk Assessment Plan, TCCSP has conducted a site-based risk assessment that quantifies the risk of CO 2 and/or brine leakage as a result of CO 2 injection at TCCSP. The risk assessment covers project planning, construction, injection, post-injection periods and closure of TCCSP. Key technical and non-technical Project risks are identified as part of the Risk Workshop and include a thorough evaluation of related scenarios. Mitigation strategies for the identified risk scenarios are defined to develop a scientifically sound, and community acceptable CO 2 storage Project.

58 GEOSCIENCES↗

Practical Application of PRA as an Integrated Design Tool for Space Systems

This paper presents the application of the first comprehensive Probabilistic Risk Assessment (PRA) during the design phase of a joint NASA/NOAA weather satellite program, Geostationary Operational Environmental Satellite Series R (GOES-R). GOES-R is the next generation weather satellite primarily to help understand the weather and help save human lives. PRA has been used at NASA for Human Space Flight for many years. PRA was initially adopted and implemented in the operational phase of manned space flight programs and more recently for the next generation human space systems. Since its first use at NASA, PRA has become recognized throughout the Agency as a method of assessing complex mission risks as part of an overall approach to assuring safety and mission success throughout project lifecycles. PRA is now included as a requirement during the design phase of both NASA next generation manned space vehicles as well as for high priority robotic missions. The influence of PRA on GOES-R design and operation concepts are discussed in detail. The GOES-R PRA is unique at NASA for its early implementation. It also represents a pioneering effort to integrate risks from both Spacecraft (SC) and Ground Segment (GS) to fully assess the probability of achieving mission objectives. PRA analysts were actively involved in system engineering and design engineering to ensure that a comprehensive set of technical risks were correctly identified and properly understood from a design and operations perspective. The analysis included an assessment of SC hardware and software, SC fault management system, GS hardware and software, common cause failures, human error, natural hazards, solar weather and infrastructure (such as network and telecommunications failures, fire). PRA findings directly resulted in design changes to reduce SC risk from micro-meteoroids. PRA results also led to design changes in several SC subsystems, e.g. propulsion, guidance, navigation and control (GNC), communications, mechanisms, and command and data handling (C&DH). The fault tree approach assisted in the development of the fault management system design. Human error analysis, which examined human response to failure, indicated areas where automation could reduce the overall probability of gaps in operation by half. In addition, the PRA brought to light many potential root causes of system disruptions, including earthquakes, inclement weather, solar storms, blackouts and other extreme conditions not considered in the typical reliability and availability analyses. Ultimately the PRA served to identify potential failures that, when mitigated, resulted in a more robust design, as well as to influence the program's concept of operations. The early and active integration of PRA with system and design engineering provided a well-managed approach for risk assessment that increased reliability and availability, optimized lifecyc1e costs, and unified the SC and GS developments.

Kalia, Prince↗