Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Design Report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Expected tracking performance of the ATLAS Inner Tracker at the High-Luminosity LHC

The high-luminosity phase of LHC operations (HL-LHC), will feature a large increase in simultaneous proton-proton interactions per bunch crossing up to 200, compared with a typical leveling target of 64 in Run 3. Such an increase will create a very challenging environment in which to perform charged particle trajectory reconstruction, a task crucial for the success of the ATLAS physics program, and will exceed the capabilities of the current ATLAS Inner Detector (ID). A new all-silicon Inner Tracker (ITk) will replace the current ID in time for the start of the HL-LHC. To ensure successful use of the ITk capabilities in Run 4 and beyond, the ATLAS tracking software has been successfully adapted to achieve state-of-the-art track reconstruction in challenging high-luminosity conditions with the ITk detector. This paper presents the expected tracking performance of the ATLAS ITk based on the latest available developments since the ITk technical design reports.

47 OTHER INSTRUMENTATION↗

Operation and performance of the ATLAS Tile Calorimeter in Run 1

The Tile Calorimeter is the hadron calorimeter covering the central region of the ATLAS experiment at the Large Hadron Collider. Approximately 10,000 photomultipliers collect light from scintillating tiles acting as the active material sandwiched between slabs of steel absorber. This paper gives an overview of the calorimeter’s performance during the years 2008–2012 using cosmic-ray muon events and proton–proton collision data at centre-of-mass energies of 7 and 8 TeV with a total integrated luminosity of nearly 30 fb –1 . The signal reconstruction methods, calibration systems as well as the detector operation status are presented. The energy and time calibration methods performed excellently, resulting in good stability of the calorimeter response under varying conditions during the LHC Run 1. Lastly, the Tile Calorimeter response to isolated muons and hadrons as well as to jets from proton–proton collisions is presented. The results demonstrate excellent performance in accord with specifications mentioned in the Technical Design Report.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Operation and performance of the ATLAS tile calorimeter in LHC Run 2

The ATLAS tile calorimeter (TileCal) is the hadronic sampling calorimeter covering the central region of the ATLAS detector at the Large Hadron Collider (LHC). This paper gives an overview of the calorimeter’s operation and performance during the years 2015–2018 (Run 2). In this period, ATLAS collected proton–proton collision data at a centre-of-mass energy of 13 TeV and the TileCal was 99.65% efficient for data-taking. The signal reconstruction, the calibration procedures, and the detector operational status are presented. The performance of two ATLAS trigger systems making use of TileCal information, the minimum-bias trigger scintillators and the tile muon trigger, is discussed. Studies of radiation effects allow the degradation of the output signals at the end of the LHC and HL-LHC operations to be estimated. Finally, the TileCal response to isolated muons, hadrons and jets from proton–proton collisions is presented. The energy and time calibration methods performed excellently, resulting in good stability and uniformity of the calorimeter response during Run 2. The setting of the energy scale was performed with an uncertainty of 2%. The results demonstrate that the performance is in accordance with specifications defined in the Technical Design Report.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status Of the ILC Main Linac Design

International Linear collider (ILC) is a proposed accelerator facility which is primarily based on two 11-km long superconducting main linacs. In this paper we present recent updates on the main linac design and discuss changes made in order to meet specification outlined in the technical design report (TDR).

43 PARTICLE ACCELERATORS↗

Damping Ring R&D at CESR-TA

Accelerators that collide high energy beams of matter and anti-matter are essential tools for the investigation of the fundamental constituents of matter, and the search for new forms of matter and energy. A “Linear Collider” is a machine that would bring high energy and very compact bunches of electrons and positrons (anti-electrons) into head-on collision. Such a machine would produce (among many other things) the newly discovered Higgs particle, enabling a detailed study of its properties. Among the most critical and challenging components of a linear collider are the damping rings that produce the very compact and intense beams of electrons and positrons that are to be accelerated into collision. Hot dilute particle beams are injected into the damping rings, where they are compressed and cooled. The size of the positron beam must be reduced more than a thousand fold in the damping ring, and this compression must be accomplished in a fraction of a second. The cold compact beams are then extracted from the damping ring and accelerated into collision at high energy. The proposed International Linear Collider (ILC), would require damping rings that routinely produce such cold, compact and intense beams. The goal of the Cornell study was a credible design for the damping rings for the ILC. Among the technical challenges of the damping rings; the development of instrumentation that can measure the properties of the very small beams in a very narrow window of time, and mitigation of the forces that can destabilize the beams and prevent adequate cooling, or worse lead to beam loss. One of the most pernicious destabilizing forces is due to the formation of clouds of electrons in the beam pipe. The electron cloud effect is a phenomenon in particle accelerators in which a high density of low energy electrons, build up inside the vacuum chamber. At the outset of the study, it was anticipated that electron cloud effects would limit the intensity of the positron ring, and that an instability associated with residual gas in the beam pipe would limit the intensity of the electron ring. It was also not clear whether the required very small beam size could be achieved. The results of this study are important contributions to the design of both the electron and positron damping rings in which all of those challenges are addressed and overcome. Our findings are documented in the ILC Technical Design Report, a document that represents the work of an international collaboration of scientists. Our contributions include design of the beam magnetic optics for the 3 km circumference damping rings, the vacuum system and surface treatments for electron cloud mitigation, the design of the guide field magnets, design of the superconducting damping wigglers, and new detectors for precision measurement of beam properties. Our study informed the specification of the basic design parameters for the damping rings, including alignment tolerances, magnetic field errors, and instrumentation. We developed electron cloud modelling tools and simulations to aid in the interpretation of the measurements that we carried out in the Cornell Electron-positron Storage Ring (CESR). The simulations provide a means for systematic extrapolation of our measurements at CESR to the proposed ILC damping rings, and ultimately to specify how the beam pipes should be fabricated in order to minimize the effects of the electron cloud. With the conclusion of this study, the design of the essential components of the damping rings is complete, including the development and characterization (with computer simulations) of the beam optics, specification of techniques for minimizing beam size, design of damping ring instrumentation, R&D into electron cloud suppression methods, tests of long term durability of electron cloud coatings, and design of damping ring vacuum system components.

43 PARTICLE ACCELERATORS↗

ILC Operating Scenarios: ILC Parameters Joint Working Group

The ILC Technical Design Report documents the design for the construction of a linear collider which can be operated at energies up to 500 GeV. This report summarizes the outcome of a study of possible running scenarios, including a realistic estimate of the real time accumulation of integrated luminosity based on ramp-up and upgrade processes. The evolution of the physics outcomes is emphasized, including running initially at 500 GeV, then at 350 GeV and 250 GeV. The running scenarios have been chosen to optimize the Higgs precision measurements and top physics while searching for evidence for signals beyond the standard model, including dark matter. In addition to the certain precision physics on the Higgs and top that is the main focus of this study, there are scientific motivations that indicate the possibility for discoveries of new particles in the upcoming operations of the LHC or the early operation of the ILC. Follow-up studies of such discoveries could alter the plan for the centre-of-mass collision energy of the ILC and expand the scientific impact of the ILC physics program. It is envisioned that a decision on a possible energy upgrade would be taken near the end of the twenty year period considered in this report.

43 PARTICLE ACCELERATORS↗

Spallation Neutron Source Second Target Station Integrated Systems Update

The Spallation Neutron Source (SNS) was designed from the beginning to accommodate both an accelerator upgrade to increase the proton power and a second target station (STS). Four workshops were organized in 2013 and 2014 to identify key science areas and challenges where neutrons will play a vital role [1-4]. Participants concluded that the addition of STS to the existing ORNL neutron sources was needed to complement the strengths of High Flux Isotope Reactor (HFIR) and the SNS first target station (FTS). To address the capability gaps identified in the workshops, a study was undertaken to identify instrument concepts that could provide the required new science capabilities. The study outlined 22 instrument concepts and presented an initial science case for STS [5]. These instrument concepts formed the basis of a planning suite of instruments whose requirements determined an initial site layout and moderator selection. An STS Technical Design Report (TDR) documented the STS concept based on those choices [6]. Since issue of the TDR, the STS concept has significantly matured as described in this document.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Qubit Based Single-Photon Sensors for Dark Matter Searches

This experimental program will adapt low-noise qubit readout techniques for use in particle physics experiments. As an end goal, this research will deliver a technical demonstration of low-noise quantum sensors, as well as the results of a proof-of-principle axion search in a narrow but previously unexamined mass range. This program would form the basis for a technical design report outlining a next-generation axion dark matter search.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The European Spallation Source

The European Spallation Source (ESS) is a 5 MW, 2.5 GeV long pulse proton linac, to be built and commissioned in Lund, Sweden. The Accelerator Design Update (ADU) project phase is under way, to be completed at the end of 2012 by the delivery of a Technical Design Report. Improvements to the 2003 ESS design will be summarised, and the latest design activities will be presented.

43 PARTICLE ACCELERATORS↗

Present Status of the ILC Project and Development

The Technical Design of the International Linear Collider (ILC) Project will be finished in late 2012. The Technical Design Report (TDR) will include a description of the updated design, with a cost estimate and a project plan, and the results of research and development (R & D) done in support of the ILC. Results from directed ILC R & D are used to reduce the cost and risk associated with the ILC design. We present a summary of key challenges and show how the global R & D effort has addressed them. The most important activity has been in pursuit of very high gradient superconducting RF linac technology. There has been excellent progress toward the goal of practical industrial production of niobium sheet-metal cavities with gradient performance in excess of 35 MV/m. In addition, three purpose-built beam test facilities have been constructed and used to study and demonstrate high current linac performance, electron-cloud beam dynamics and precision beam control. The report also includes a summary of component design studies and conventional facilities cost optimization design studies.

43 PARTICLE ACCELERATORS↗

The SuperB Accelerator: Overview and Lattice Studies

SuperB aims at the construction of a very high luminosity (10{sup 36} cm{sup -2} s{sup -1}) asymmetric e{sup +}e{sup -} Flavour Factory, with possible location at the campus of the University of Rome Tor Vergata, near the INFN Frascati National Laboratory. In this paper the basic principles of the design and details on the lattice are given. SuperB is a new machine that can exploit novel very promising design approaches: (1) large Piwinski angle scheme will allow for peak luminosity of the order of 10{sup 36} cm{sup -2} s{sup -1}, well beyond the current state-of-the-art, without a significant increase in beam currents or shorter bunch lengths; (2) 'crab waist' sextupoles will be used for suppression of dangerous resonances; (3) the low beam currents design presents reduced detector and background problems, and affordable operating costs; (4) a polarized electron beam can produce polarized {tau} leptons, opening an entirely new realm of exploration in lepton flavor physics. SuperB studies are already proving useful to the accelerator and particle physics communities. The principle of operation is being tested at DAFNE. The baseline lattice, based on the reuse of all PEP-II hardware, fits in the Tor Vergata University campus site, near Frascati. A CDR is being reviewed by an International Review Committee, chaired by J. Dainton (UK). A Technical Design Report will be prepared to be ready by beginning of 2010.

43 PARTICLE ACCELERATORS↗

Laser beam delivery at ELI-NP

The Laser Beam Delivery (LBD) system technical design report covers the interface between the High Power Laser System (HPLS) and the experiments, together with the pulse quality management. Here, the laser transport part of the LBD has a number of subsystems as follows: the beam transport lines for the six main outputs of HPLS, the additional short and long pulses and the synchronization system including the timing of the laser pulses with the Gamma Beam System (GBS) and the experiments on femtosecond timescale. Pulse quality management, discussed further here, consist in the generation and delivery of multiple HPLS pulses, coherent combining of the HPLS arms, laser pulse diagnostics on target, laser beam dumps, shutters and output energy adaption.

42 ENGINEERING↗

The International Linear Collider. A Global Project

A large, world-wide community of physicists is working to realise an exceptional physics program of energy-frontier, electron-positron collisions with the International Linear Collider (ILC). This program will begin with a central focus on high-precision and model-independent measurements of the Higgs boson couplings. This method of searching for new physics beyond the Standard Model is orthogonal to and complements the LHC physics program. The ILC at 250 GeV will also search for direct new physics in exotic Higgs decays and in pair-production of weakly interacting particles. Polarised electron and positron beams add unique opportunities to the physics reach. The ILC can be upgraded to higher energy, enabling precision studies of the top quark and measurement of the top Yukawa coupling and the Higgs self-coupling. The key accelerator technology, superconducting radio-frequency cavities, has matured. Optimised collider and detector designs, and associated physics analyses, were presented in the ILC Technical Design Report, signed by 2400 scientists. There is a strong interest in Japan to host this international effort. A detailed review of the many aspects of the project is nearing a conclusion in Japan. Now the Japanese government is preparing for a decision on the next phase of international negotiations, that could lead to a project start within a few years. The potential timeline of the ILC project includes an initial phase of about 4 years to obtain international agreements, complete engineering design and prepare construction, and form the requisite international collaboration, followed by a construction phase of 9 years.

43 PARTICLE ACCELERATORS↗

A MIP Timing Detector for the CMS Phase-2 Upgrade

This document is the Technical Design Report (TDR) of the MIP Timing Detector (MTD), a new detector planned for CMS during the High Luminosity LHC (HL-LHC) era. This device will bring a completely new capability to CMS: the ability to measure precisely the production time of minimum ionizing particles (MIP) for use in disentangling the approximately 200 nearly-simultaneous pileup interactions that will occur in each bunch crossing of the LHC. It also provides new capabilities for charged hadron identification and the search for long-lived particles.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Phase-2 Upgrade of the CMS Level-1 Trigger

This Technical Design Report describes the ongoing developments and plans towards the upgrade of the CMS Level-1 trigger for the High-Luminosity Large Hadron Collider.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Neutrinos from Stored Muons nuSTORM: Expression of Interest

The nuSTORM facility has been designed to deliver beams of electron and muon neutrinos from the decay of a stored muon beam with a central momentum of 3.8 GeV/c and a momentum spread of 10%. The facility is unique in that it will: serve the future long- and short-baseline neutrino-oscillation programmes by providing definitive measurements of electron-neutrino- and muon-neutrino-nucleus cross sections with percent-level precision; allow searches for sterile neutrinos of exquisite sensitivity to be carried out; and constitute the essential first step in the incremental development of muon accelerators as a powerful new technique for particle physics. Of the world's proton-accelerator laboratories, only CERN and FNAL have the infrastructure required to mount nuSTORM. Since no siting decision has yet been taken, the purpose of this Expression of Interest (EoI) is to request the resources required to: investigate in detail how nuSTORM could be implemented at CERN; and develop options for decisive European contributions to the nuSTORM facility and experimental programme wherever the facility is sited. The EoI defines a two-year programme culminating in the delivery of a Technical Design Report.

43 PARTICLE ACCELERATORS↗

Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Summary Technical Report for Conceptual Design of MARCH-SERTTA

The Transient Reactor Test facility (TREAT) was constructed in the late 1950’s, provided thousands of transient irradiations before being placed in standby in 1994, and resumed reactor operations in 2017 in order to reclaim its crucial role in nuclear-heated safety research [1]. Starting in September of 2018, TREAT performed its first series of new fueled transient experiments using a novel modular irradiation vehicle, termed the Minimal Activation Retrievable Capsule Holder (MARCH) system. The MARCH system was developed to support high throughput testing and post transient examination by using fresh fuel samples arranged in low-activation hardware materials. Deployment of this irradiation vehicle system was supported by the Accident Tolerant Fuels (ATF) program. These initial experiments used inert gas atmosphere capsules (referred to as the Separate Effects Test Holder, SETH) containing small rodlets composed of UO2 pellets in zirconium alloy cladding with temperature measurement instruments. The initial SETH campaign was conducted in order to commission irradiation capabilities and deepen the understanding of specimen to core energy coupling. Building upon the successes of the initial SETH campaign, an evolution of the capsule design has been conceptualized in order to support the same kind of high throughput, cost effective, rodlet scale testing, but with the notable improvement of being able to immerse specimens in liquid water for testing conditions better representing Light Water Reactors (LWR). This capsule is referred to as the MARCH system Static Environment Rodlet Transient Test Apparatus (MARCH-SERTTA).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗