Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TRACKING STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART)

This report contains key findings from a project titled Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART), which was carried out through a collaborative effort of a team of researchers from Texas A&M Engineering Experiment Station, Temple University, and Quanta Technology, LLC. The in-kind support came from OSIsoft (acquired by AVEVA), which provided their PI Historian software to demonstrate the use case of streaming PMU data. The first section of the report describes the project goals and objectives related to the development of Machine Learning (ML) models capable of detecting and classifying events by processing phasor measurements captured in the field by Phasor Measurement Units (PMUs). The data for this study was contributed by the utilities/ISOs from the Western and Eastern interconnects and ERCOT, further referred to as Interconnect B (IC B), Interconnect A (IC A), and Interconnect C (IC C), respectively. The approach that the BDSMART Research Team proposed and the key research tasks defined by the team are outlined in this section. The next section describes the technical approach. We first discuss the data constraints related to the PMU measurements and data interpretation constraints imposed by the data contributors. They provided neither the topological information of the grid nor PMU placement locations and captured recorded data at very few locations in the system with the reporting rate of either 30 or 60 fps. The recordings are mostly positive sequence voltage, frequency, and ROCOF, and in some limited cases, three-phase voltages and currents. We then reflect on the bad data issues that stem from poor recording practices and vague definitions of the PMU status bits to supposedly be used for bad data identification. Finally, the data discovery points to imprecise time stamps with incomplete event start/end time, as well as inconsistent and incomplete event labeling, which combined make the implementation of the data models using supervising learning quite challenging. Following the data discovery study, we hypothesize that because the IC B data has the most complete labels, we should focus our model development on that data and then test it on data from other interconnects. We also define the common metrics used to evaluate the results from the ML algorithm tests. We concluded this section by summarizing the common ML models we used and explaining how we implemented and tested them. The issues from this section are expanded in the Training Dataset Report from this project. The final section of this report deals with the accomplishments and conclusions. As the accomplishments, we formulate the problem we are solving and what is achieved by solving the problem. We then reflect on each of the analytics tools we developed and point out the performance of each tool when applied to solving the mentioned problems. We reference this work for further details to the papers we published on each tool. In the conclusions, we give recommendations on how to improve future PMU recording practices to facilitate the ML algorithm implementation and guidance for the future standardization work aimed at clarifying the ambiguities associated with the PMU status bits. We finally list future tasks that can bring about further improvements in the proposed algorithms. The issues from this section are expanded in the Training, and Test Dataset Report filed at the project completion date.

97 MATHEMATICS AND COMPUTING↗

Monitoring Wildlife Interactions with Their Environment: An Interdisciplinary Approach

In a rapidly changing world, wildlife ecologists strive to correctly model and predict complex relationships between animals and their environment, which facilitates management decisions impacting public policy to conserve and protect delicate ecosystems. Recent advances in monitoring systems span scientific domains, including animal and weather monitoring devices and landscape classification mapping techniques. The current challenge is how to combine and use detailed output from various sources to address questions spanning multiple disciplines. WolfScout wildlife and weather tracking system is a software tool capable of filling this niche. WolfScout automates integration of the latest technological advances in wildlife GPS collars, weather stations, drought conditions, and severe weather reports, and animal demographic information. The WolfScout database stores a variety of classified landscape maps including natural and manmade features. Additionally, WolfScout’s spatial database management system allows users to calculate distances between animals’ location and landscape characteristics, which are linked to the best approximation of environmental conditions at the animal’s location during the interaction. Through a secure website, data are exported in formats compatible with multiple software programs including R and ArcGIS. The WolfScout design promotes interoperability in data, between researchers, and software applications while standardizing analyses of animal interactions with their environment.

Spatial database management system, Wildlife, Weat↗

Evolution of Plug-In Electric Vehicle Charging Infrastructure in the United States: Preprint

The U.S. Department of Energy’s Alternative Fuels Data Center (AFDC) has tracked alternative fueling and electric vehicle charging infrastructure in the United States since 1991. This paper explores the history of the AFDC Station Locator, which was launched in 1999, and discusses the growth of electric vehicle supply equipment. It also looks at how electric vehicle drivers access public charging, and evaluates challenges, gaps, and opportunities facing both electric vehicle drivers and the industry as a whole.

ADVANCED PROPULSION SYSTEMS↗

Sandia National Laboratories, Tonopah Test Range Askania Tower (Building 02-00): Photographs and Written Historical and Descriptive Data

The Askania Tower (Building 02-00) was built in 1956 as part of the first wave of construction at the newly established Tonopah Test Range (TTR). Located at Station 2, near the primary target area at the range, the tower was one of the first four built to house Askania phototheodolites used in tracking test units dropped from aircraft. This report includes historical information, architectural information, sources of information, project information, maps, blueprints, and photographs.

99 GENERAL AND MISCELLANEOUS↗

Tonopah Test Range Air Monitoring: CY2017 Meteorological, Radiological, and Wind Transported Particulate Observations

In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The primary objective of the monitoring effort is to support the DOE Environmental Management Nevada Program (EM NV) in the safe cleanup of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites. The monitoring program underwent a significant change during 2017 with the decommissioning of one monitoring station and the establishment of three new stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center and was in operation the full calendar year. Stations 401 and 403 are located on the northwest and southeast perimeter fence lines, respectively, of the Clean Slate III site. Station 401 operated throughout 2017, whereas Station 403 began operation at the end of April 2017. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II and both began data collection at the end of April 2017. Also at the end of April, the Clean Slate I monitoring site, Station 402, was decommissioned. The stations are located to be generally downwind of the contaminated areas during either north-northwesterly or south-southeasterly winds, which are the predominant wind directions. The stations—which are similar in design to the Community Environmental Monitoring Program (CEMP) stations operating at locations surrounding the Nevada National Security Site and TTR—include meteorological instruments and continuous-flow, low-volume air samplers. Three pressurized ionization chambers for measuring gamma energy are in use at Stations 400, 401, and 403 (formerly at 402). Saltation sensors and saltation traps are deployed at the stations adjacent to the Clean Slate sites. Detailed meteorological data are recorded on data loggers, with periodic uploads via a satellite system to the Western Regional Climate Center (WRCC) at Desert Research Institute (DRI), to monitor instrument and site conditions. Air filter samples are collected every two weeks and the deposits in the saltation traps are collected when a sufficient sample mass for analysis has accumulated (generally a six- to eight-month interval). Dust transport by suspension and saltation is strongly dependent on wind speed. Concentrations of PM10 (particulate matter of aerodynamic diameter ≤10 micrometers [μm], a size fraction of small particles that are suspended in the air and can be easily inhaled) remain low until winds exceed approximately 32 km/hr (20 mph). Saltation particle counts also increase above the same general threshold wind speed. Wind speeds in excess of 32 km/hr (20 mph) occur less than three percent of the time. High winds are associated with two predominant directions: north-northwest and south. In 2017, the very highest winds were from the north, but all winds above 40 km/hr (25 mph) were approximately evenly split between south and northwest directions. The low-volume air samplers collect total suspended dust, and saltating particles are captured by the passive saltation traps, both for radiological analysis. Radionuclide monitoring at the ROC in TTR Area 3 (Station 400) found natural background levels of gross alpha and gross beta radiation. Similar background levels were found on filter samples analyzed using gamma and alpha spectroscopy. The gamma exposure rate data from pressurized ionization chambers (PIC) are comparable to those from the regional CEMP stations. Plutonium concentrations above background values were measured during 2017 from soil samples collected in passive saltation traps and on select air filters from the monitoring stations adjacent to the Clean Slate sites. The background for soils in the region is assumed to be 0.014 pCi/g plutonium-239+240 ( 239+240 Pu) as measured by Turner et al. (2003), whereas the background concentration of suspended 239+240Pu is assumed to be 9.5 x 10 -19 μCi/ml, which was determined by continuous air monitoring at the TTR airport in 1996 and 1997 (SNL, 1998). Background concentrations are exceeded by one to four orders of magnitude by the majority of samples from Clean Slate I, II, and III. The gross alpha and gross beta measurements of the air filters are also generally higher than those measured at the regional CEMP stations, although the gamma exposure rates determined by the PICs located at Clean Slate I and III are similar to CEMP measurements. The highest radionuclide concentrations of suspended dust are associated with individual filter samples from Clean Slate II Station 404 and Clean Slate III Station 401. Both of the stations are downwind of their respective sites during southerly winds, but they are also geographically closer to the highly contaminated detonation areas than the other monitoring stations. Considering all the analyzed samples, the 239+240Pu concentrations are generally higher for the Clean Slate II samples compared with those from Clean Slate III. The highest gross alpha and gross beta results are also observed for the Clean Slate II stations. The highest radionuclide concentrations are measured on the smaller (≤63 μm) saltation-sized particles and particulate matter collected downwind of each site. Nonetheless, traps oriented to collect dust moving toward the contamination areas also had plutonium concentrations significantly above background values, which is consistent with observations of low-level contamination dispersed beyond the fenced area. All the observed 239+240 Pu concentrations are below the risk-based action level (25 millirem per year, equivalent to a 239+240 Pu concentration of 4,120 pCi/g for an industrial worker scenario; U.S. DOE, 2014). The meteorological and particulate matter monitoring indicate that conditions for wind-borne contaminant movement exist at the Clean Slate sites, and that transport of radionuclide-contaminated soil by both suspension and saltation is occurring. The Corrective Action Unit (CAU) closure strategy uses a risk-based approach, whereby acceptable contaminant concentrations are determined as a function of anticipated human exposure. This strategy is consistent with the fence lines at the Clean Slate sites encircling areas of higher concentration and the observed presence of lower concentrations of contamination outside the fences.

54 ENVIRONMENTAL SCIENCES↗

Tonopah Test Range Air Monitoring: CY2018 Meteorological, Radiological, and Wind Transported Particulate Observations

In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The primary objective of the monitoring effort is to support the DOE Environmental Management Nevada Program (EM NV) in the safe remediation of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites, and to provide information for designing long-term monitoring of the sites. The monitoring program in 2018 included five stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center. Stations 401 and 403 are located on the northern and southeastern perimeter fence lines, respectively, of the Clean Slate III site. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II. The stations are generally downwind of the contaminated areas during either northwesterly or southerly winds, which are the predominant wind directions. The stations—which are similar in design to the Community Environmental Monitoring Program (CEMP) stations operating at locations surrounding the Nevada National Security Site and TTR—include meteorological instruments and continuous-flow, low-volume air samplers. Three pressurized ionization chambers for measuring gamma energy are in use at Stations 400, 401, and 403. Saltation sensors and saltation traps are deployed at the stations adjacent to the Clean Slate sites. Detailed meteorological data are recorded on data loggers, with periodic uploads via a satellite system to the Western Regional Climate Center (WRCC) at Desert Research Institute (DRI), to monitor instrument and site conditions. Air filter samples are collected every two weeks and the deposits in the saltation traps are collected when a sufficient sample mass for analysis has accumulated (generally a six- to eight-month interval). Monitoring at TTR in calendar year (CY) 2018 provided surveillance of both ambient conditions, and ground disturbance associated with remediation activities at Clean Slate II and III. The first half of CY2018 data from Stations 404 and 405 at Clean Slate II were collected during remediation activities at that site, and data collected during the final third of the year at Stations 401 and 403 at Clean Slate III coincided with remediation work at the site. Ambient conditions prevailed at Station 400 throughout the year. Dust transport by suspension and saltation is strongly dependent on wind speed. Concentrations of PM 10 (particulate matter of aerodynamic diameter ≤10 micrometers [μm], a size fraction of small particles that are suspended in the air and can be easily inhaled) remain low until winds exceed approximately 32 kilometers per hour (km/hr) (20 miles per hour [mph]). Saltation particle counts also increase above the same general threshold wind speed. Wind speeds in excess of 32 km/hr (20 mph) occur less than three percent of the time at the sites. Ground disturbing remediation activities were carried out at Clean Slate II from October 31, 2017, until July 26, 2018. Station 404 is located closest to the remediation area and is downwind of the area when winds are from the south. By late November, analysis of dust from the air sampler at Station 404 registered increases in plutonium-239+240 ( 239+240 Pu) concentrations. Peak plutonium concentrations, accompanied by elevated gross alpha concentrations and the detection of americium-241 ( 241 Am) by gamma spectroscopy, occurred between March and May 2018. During spring and early summer of 2018, elevated radionuclide concentrations were also measured in dust collected from the air sampler at Station 405, which is more than twice the distance from the remediation activity as Station 404. A minor but sustained increase in gross alpha concentration of suspended dust collected at Stations 400, 401, and 403 was also observed starting in May 2018 and continuing into August. Stations 401 and 403 are approximately 4.8 to 6.4 km (three to four miles) from Clean Slate II and Station 400 is approximately 13 km (eight miles) from that site. The radionuclide content of material that saltated into the passive Big Spring Number Eight (BSNE) traps during the Clean Slate II remediation period increased in both the traps facing toward and away from the fenced contamination area at Station 404, with the largest increases in concentration (almost five times the previous 239+240 Pu concentration) observed in the traps facing the fenced area. The radionuclide concentration in material in the trap facing away from the fence more than doubled from that measured in 2017. A similar increase was observed for the saltation trap facing away from the fenced area at Station 405, although no increase was observed for material captured in the trap facing the fenced area. Particles ranging in size from 50 to 500 µm generally move by saltation processes and are not expected to significantly contribute to dose for someone breathing in the standard respiratory zone for adult humans (1.5 to 1.7 m [4.9 to 5.6 ft] above ground level) because they are too large to be entrained in the air as suspended dust. Remediation activities at Clean Slate III began on September 5, 2018, and continued until a brief hiatus started on December 20, 2018. Although Station 401 is much closer to the remediation area than Station 403, the first increase in gross alpha and 239+240 Pu concentrations was noted in dust from filters collected at Station 403 in early November 2018. The highest radionuclide concentrations of 2018 at the Clean Slate III stations were recorded in air samples taken from Stations 401 and 403 in late December 2018 and these concentrations were comparable between the two station locations. Gamma rate data measured by the PICs was slightly higher than the annual average at Stations 401 and 403 after remediation activities began, but no single measurement was outside of the range observed in 2018 prior to remediation activities. No increase in radionuclide concentration was observed for the Clean Slate III remediation time period on air filters collected from the other stations. Radiological monitoring at Station 400—which is located at the ROC, and therefore the closest regularly staffed work location to the Clean Slate sites—recorded a higher mean gross alpha activity from dust collected on air sampler filters than in previous years. The individual biweekly air filters yielded measurements of gross alpha that were at or below the mean plus one standard deviation measured in CY2017, except for the period from April 25, 2018, through September 12, 2018. Nonetheless, gamma spectroscopy of all air filters from Station 400 identified only naturally occurring radionuclides, with no detection of americium-241 ( 241 Am) (which is used as an indicator of plutonium-241[ 241 Pu]). Alpha spectroscopy of selected air filters collected at Station 400 did not detect plutonium-238 ( 238 Pu) or 239+240 Pu above the analytical detection limit. Gross beta and gamma exposure rate data were comparable to data from regional CEMP stations. No saltation traps are deployed at Station 400. Considering the ambient monitoring periods during CY2018, the monitoring stations adjacent to the Clean Slate sites recorded above-background 238 Pu and 239+240 Pu concentrations (SNL, 1998; Turner et al., 2003) in samples collected by passive saltation traps and on selected air filters. These observations were consistent with previous years and indicated that radionuclide movement occurred under ambient conditions by processes of both saltation and suspension. The presence of radionuclides in all saltation traps, both upwind and downwind of the fenced contamination areas, was consistent with previous radiological survey results (EG&G, 1979) that show lower concentration radiologically contaminated material dispersed outside the fenced area. Although 239+240 Pu concentrations in the air filter samples were sometimes orders of magnitude higher than background, the concentrations were below risk-based action levels defined for an industrial area worker scenario (U.S. DOE, 2014). The interception of airborne dust with above-background radionuclide concentrations demonstrates that dispersal processes are continuing. Strong winds are the driver for both suspension and saltation of dust and soil. The recorded wind speed and PM10 during remediation activities at Clean Slate II and III identified discrete wind events lasting approximately five to eight hours each, which accounted for the greatest PM 10 concentrations at the monitoring stations. These events captured the effect of winds from the northwest and from the south. The observed differences in dust loading and radionuclide concentrations for the monitoring stations when they were either upwind or downwind of the contamination area identify the remediation area as a source of plutonium contaminated dust. The increase in concentration of radionuclides in airborne dust during the remediation activities, compared with measurements under previous ambient conditions (mean 239+240 Pu concentrations during remediation activities are approximately nine to 40 times higher compared to pre-remediation concentrations, depending on monitoring station), highlights the impact of land disturbance on wind-borne contaminant transport from the Clean Slate test areas. The meteorological and particulate matter monitoring indicated that conditions for wind-borne contaminant movement exist at the Clean Slate sites, and that transport of radionuclide-contaminated soil by both suspension and saltation occurred under ambient conditions and accelerated when the sites were disturbed. The 239+240 Pu alpha spectroscopy results indicated that airborne concentrations during remediation activities ranged from 2 × 10-16 to 380 × 10-16 µCi/ml. These results can be compared to the derived air concentration limit for 239 Pu of 6 × 10-11 µCi/ml for occupational workers contained in Code of Federal Regulations 10 CFR 835, Occupational Radiation Protection. Even though the air sampling results document an increase in concentration during remediation activities, the observed concentrations are less than 0.06 percent of the occupational limit. The Corrective Action Unit (CAU) closure strategy uses a risk-based approach, whereby acceptable contaminant concentrations are determined as a function of anticipated human exposure.

54 ENVIRONMENTAL SCIENCES↗

Tonopah Test Range Air Monitoring: Meteorological, Radiological, and Wind Transported Particulate Observations (CY 2019)

In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The main objectives of the monitoring effort are to support the DOE Environmental Management Nevada Program (EM NV) in the safe remediation of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites, and providing information for designing long-term monitoring of the sites. The monitoring program in 2019 included five stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center. Stations 401 and 403 are located on the northern and southeastern perimeter fence lines, respectively, of the Clean Slate III site. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II. The stations are generally downwind of the contaminated areas during either northwesterly or southerly winds, which are the predominant wind directions.

54 ENVIRONMENTAL SCIENCES↗

Tonopah Test Range Air Monitoring: CY2020 Meteorological, Radiological, and Wind Transported Particulate Observations

In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The monitoring effort supports the DOE Office of Legacy Management in its stewardship of the Clean Slate sites as part of their mission to protect human health and the environment at sites of former nuclear device development and testing. Specific monitoring objectives include determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites, and providing information for planning long-term stewardship of the sites.

54 ENVIRONMENTAL SCIENCES↗

A New Approach to Space Situational Awareness using Small Ground-Based Telescopes

This report discusses a new SSA approach evaluated by Pacific Northwest National Laboratory (PNNL) that may lead to highly scalable, small telescope observing stations designed to help manage the growing space surveillance burden. Using the methods and observing tools described in this report, the team was able to acquire and track very faint satellites (near Pluto’s apparent brightness). Photometric data was collected and used to correlate object orbital position as a function of atomic clock-derived time. Object apparent brightness was estimated by image analysis and nearby star calibration. The measurement performance was only limited by weather conditions, object brightness, and the sky glow at the observation site. In the future, these new SSA technologies and techniques may be utilized to protect satellite assets, detect and monitor orbiting debris fields, and support Outer Space Treaty monitoring and transparency.

47 OTHER INSTRUMENTATION↗

Design and Manufacture of Tunable Permanent Magnet Based Quadrupole for Next Generation Electron-Ion Colliders [Slides]

The goal of this project is to design and construct of a prototype of quadrupole permanent magnet for the magnet transport lattice for an electron-ion collider. The technical objectives are not only to achieve the field gradient of 34.42T/m in the region of interest, at a radius 16.0mm, relative to the quadrupole axis (z-axis), but also lower the unwanted field harmonics below one unit out of 10,000, especially for Sextupole, Octupole, and Decapole components. The innovation is 1) modular design for cost saving, and 2) adjusting mechanism of each modular magnet for field tuning. The 300-mm long, quadrupole magnet assembly consists of 12 modules of 100-mm long magnet. The magnetic field tuning was implemented by two ways: first, adjusting mechanically the pole tip position for a majority of field tuning, and second, applying the passive shims for a fine field tuning. The magnetic design and optimization of the quadrupole magnet was performed using finite element analysis. The permanent magnet choice was EEC-N44SH grade with the minimum coercivity of 987kA/m (12.4kOe), which has enhanced resistance to demagnetization due to the radiation. The 3D computer-aided design of quadrupole magnet assembly was created based on the magnetic design results. The overall dimensions are 514x500x300mm and its weight is ~470kg (1,050lbs). The weight and volume were minimized through the optimization. Electron Energy Corporation’s vertically integrated manufacturing capability and over 48-years magnet production experience enabled us to implement a “fast prototyping” process and build two quadrupole magnets. Using wire EDM machines, the pole tip profile was precisely fabricated within ±25µm tolerance. The field gradient 34.22T/m was measured using the real time data acquisition system and a 3D Hall probe mounted on the precision XYZ station with the resolution of 1µm (0.00004”). The magnetic field harmonics were measured using a harmonic coil at the Brookhaven National Laboratory, Upton, NY. Faro® laser tracker was used to track the position of each quadrupole while adjusting the pole location mechanically. The normal harmonics were measured up to 20-poles. Overall the 2 nd magnet test data is better than the 1st magnet because of a better symmetry. The adjusting pole technique was proved effective to lower the Sextupole harmonics from -3.14 to -0.71 unit. The Octupole harmonics was improved from -5.67 to -3.45 unit, still not satisfactory. It is found that the proposed approach is not practical and efficient in terms of the mass production although the modular concept can save the manufacturing cost. Another finding is in reality it is hard to adjust mechanically due to the limit of laser tracker resolution .001” and tweak magnetically the field due to the limited harmonics data. Importantly the Brookhaven National Laboratory’s harmonics data doesn’t indicate where the strong/weak field position, which requires another field map test at each measurement. To resolve these, two alternative solutions are introduced; 1) electromagnet correcting coils and 2) 8-pieces quadrupole magnet.

43 PARTICLE ACCELERATORS↗

Electron Cloud Studies at Fermilab

The presence of unwanted electrons in an accelerator vacuum chamber, known as E-cloud (E-cloud) can potentially cause operational problems in the Fermilab Main Injector (MI) and Recycler Ring (RR). E-cloud has caused instability in the RR in the past, and although it is not currently a problem, there is measurable E-cloud in the MI accelerator. There are planned beam intensity increases due to upgrades of the Fermilab accelerator complex, so E-cloud could become a problem. Some work has been done by others previously to understand how low SEY (Secondary Electron Yield coefficient) coatings might mitigate production of E-cloud, and to model the mechanism whereby E-cloud causes beam instability. Using previous studies as a base, this research took several approaches toward understanding the risk of E-cloud at Fermilab. The evolution of the SEY of the SS316L (stainless steel), TiN coated SS316L, and amorphous carbon coated SS316L were measured in-situ using a SEY meas urement station in the MI tunnel. The SEY of these materials change over time either due to bombardment of the E-cloud, or disruption of vacuum conditions. The SEY evolution was tracked over a several year period to find out how long it takes for the SEY of each material to reach its lowest level, and how much the SEY rises during deconditioning periods of poor vacuum. The SEY measurement results can be used to determine whether the SS316L will be a problem at upgrade intensities, and if so, whether or not TiN and A-Carbon coatings can mitigate E-cloud related problems sufficiently. Direct measurements of the E-cloud were done as well, and compared to simulation. The E-cloud bombardment rate was measured at different beam intensities and bunch lengths. It was possible to get detailed information on how the E-cloud varies over the acceleration cycle, where sensitivity to bunch length is reflected in the evolution of the E-cloud. The Retarding Field Analyzer (RFA) measuring th e E-cloud bombardment rate was near the instrument that is u! sed to measure the SEY of the beam pipe material. This proximity provided an accurate SEY value for simulations, so that the simulated E-cloud bombardment rate could be better compared to measurement. Bunch length measurements and computations generated accurate bunch length information also needed as input for simulations. After this careful control of the input parameters, the POSINST simulations of E-cloud were a good match to direct measurements. This gave confidence that predictions could be made concerning the E-cloud densities at upgrade intensities. These densities were compared against corresponding proton densities to predict the SEY required to avoid instabilities. That prediction and the information provided by the SEY measurements provide helpful information regarding the risks of E-cloud effects at future beam intensities at Fermilab.

43 PARTICLE ACCELERATORS↗

Resilience Analytics for Interdependent Power and Water Distribution Systems

The occurrence of large-scale outages in power distribution systems (PDSs) caused, for instance, by extreme weather events has raised concerns on the cascading impact of the power outages on the resilience of other critical infrastructures, including water distribution systems (WDSs), whose healthy operation highly relies on the availability of power from PDSs. Here, this paper proposes an analytics model for quantifying the interdependence between the resilience of power and water distribution systems. The proposed model first performs spatio-temporal outage analysis on the PDS and WDS to determine the PDS power serving capability and the resulting cascading impact on the WDS water serving capability during the occurrence of disruptions. The resilience interdependence is then determined by a proposed set of six metrics calculated using the power and water serving capability profiles, which trace and quantify the cascading impacts of power outages in the operation of WDSs during the degradation and recovery stages. The proposed analytics model is implemented on the IEEE 33-bus power distribution system supplying power for pumping stations of a 15-node test WDS, considering multiple cases of water storage capacity, single and multiple outage scenarios, and availability of distributed generation. The numerical results demonstrate that the proposed metrics track the temporal and spatial interdependence between the resilience of power and water distribution systems, providing a mechanism to identify weak spots, and assess options to enhance the resilience of the critical water infrastructure.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optics and Systems Design of the Ring-to-Second Target Transport Beam-Line for the SNS Second Target Station

The Second Target Station (STS) project at the Spallation Neutron Source (SNS) is being developed to provide world-leading cold neutron brightness for next-generation neutron scattering experiments. The STS Accelerator Systems (AS) scope includes the design and implementation of the Ring-to-Second Target (RTST) proton beam transport line, which extracts 1.3 GeV proton beam pulses from the existing Ring-to-Beam Transport (RTBT) system and delivers them to the STS target. The RTST design emphasizes operational reliability [high reliability], low activation [minimum activation of components and the tunnel], maintainability, and compatibility with existing SNS infrastructure through extensive reuse of proven RTBT systems and components. The beamline includes a new extraction region, a transport lattice consisting of dipole, quadrupole, and corrector magnets, beam instrumentation systems, vacuum systems, personnel protection systems, and radiation shielding systems. Beam optics and particle tracking studies were performed using PyORBIT to validate extraction trajectories, beam transport, and target beam spot requirements [60–90 cm² beam spot area]. This paper presents the optics design philosophy, extraction system architecture, transport lattice design, instrumentation strategy, vacuum system approach, and radiation protection integration for the RTST beamline. Particle tracking simulations indicate successful beam transport without beam loss under nominal operating conditions. The RTST is designed to transport 1.3 GeV proton beam pulses at repetition rates up to 15 Hz, delivering nominal beam power of 700 kW to the Second Target Station.

Baron, Alex [ORNL]↗

A Cask Processing Enclosure for the TRU Waste Processing Center - 13408

This paper will discuss the key elements considered in the design, construction, and use of an enclosure system built for the TRU Waste Processing Center (TWPC). The TWPC system is used for the repackaging and volume reduction of items contaminated with radioactive material, hazardous waste and mixed waste. The modular structural steel frame and stainless steel skin was designed for rapid field erection by the use of interchangeable self-framing panel sections to allow assembly of a sectioned containment building and for ease of field mobility. The structure was installed on a concrete floor inside of an outer containment building. The major sections included an Outer Cask Airlock, Inner Cask Airlock, Cask Process Area, and Personnel Airlocks. Casks in overpacks containing transuranic waste are brought in via an inter-site transporter. The overpack lid is removed and the cask/overpack is transferred into the Outer Cask Airlock. A contamination cover is installed on the overpack body and the Outer Cask Airlock is closed. The cask/overpack is transferred into the Inner Cask Airlock on a cask bogie and the Inner Cask Airlock is closed. The cask lid is removed and the cask is transferred into the Cask Process Area where it is placed on a cask tilting station. Once the Cask Processing Area is closed, the cask tilt station is activated and wastes are removed, size reduced, then sorted and re-packaged into drums and standard waste boxes through bag ports. The modular system was designed and built as a 'Fast Track' project at IP Systems in Broomfield Colorado and then installed and is currently in use at the DOE TWPC located near Oak Ridge, Tennessee. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Construction and Design of a full size sTGC prototype for the ATLAS New Small Wheel upgrade

For the forthcoming Phase-I upgrade to the LHC (2018/19), the first station of the ATLAS muon end-cap system, Small Wheel, will need to be replaced. The New Small Wheel (NSW) will have to operate in a high background radiation region while reconstructing muon tracks with high precision as well as furnishing information for the Level-1 trigger. In particular, the precision reconstruction of tracks requires a spatial resolution of about 100 μm, and the Level-1 trigger track segments have to be reconstructed with an angular resolution of approximately 1 mrad. The NSW will have two chamber technologies, one primarily devoted to the Level-1 trigger function the small-strip Thin Gap Chambers (sTGC) and one dedicated to precision tracking, Micromegas detectors, (MM). The single sTGC planes of a quadruplet consists of an anode layer of 50 μm gold plated tungsten wire sandwiched between two resistive cathode layers. Behind one of the resistive cathode layers, a PCB with precise machined strips (thus the name sTGC's) spaced every 3.2 mm allows to achieve the position resolution that ranges from 70 to 150 μm, depending on the incident particle angle. Behind the second cathode, a PCB that contains an arrangement of pads, allows for a fast coincidence between successive sTGC layers to tag the passage of a track and reads only the corresponding strips for triggering. To be able to profit from the high accuracy of each of the sTGC planes for trigger purposes, their relative geometrical position between planes has to be controlled to within a precision of about 40 μm in their parallelism, as well (due to the various incident angles), to within a precision of 80 μm in the relative distance between the planes to achieve the overall angular resolution of 1 mrad. The needed accuracy in the position and parallelism of the strips is achieved by machining brass inserts together when machining the strip patterns into the cathode boards in a single step. The inserts can then be used as external references on a granite table. Precision methods are used to maintain high accuracy when combining four single detector gaps first into two doublets and then into a quadruplet. We will present results on the ongoing construction of full size (∼1 x 1 m) sTGC quadruplet prototypes before full construction starts in 2015. (authors)

43 PARTICLE ACCELERATORS↗

Hazard Detection Detector Cards

This report presents a comprehensive summary of five advanced anomaly detection tools developed and deployed by Oak Ridge National Laboratory in support of the VA’s Health Information Technology modernization. These detectors—Order Path Tracker, Trend Watcher, Pain Pointer, Performance Monitor, and Patient Record Flag Detector—leverage statistical and machine learning methods to monitor workflow disruptions, detect anomalies in care sequences and volumes, identify bottlenecks, and track system-level performance metrics across VistA and Millennium systems. All detectors have been integrated into the Health Data Analytics Platform (HDAP), with most having completed deployment and testing using live data from targeted stations in cardiology and oncology domains. This work enhances VA’s capacity for proactive system surveillance, promotes patient safety, and informs data-driven operational improvements across the EHR ecosystem.

97 MATHEMATICS AND COMPUTING↗

Deuterium retention in NSTX with lithium conditioning

We report high (≈90%) deuterium retention was observed in NSTX gas balance measurements both with- and without lithiumization of the carbon plasma-facing components. The gas retained in ohmic discharges was measured by comparing the vessel pressure rise after a discharge to that of a gas-only pulse with the pumping valves closed. For neutral beam heated discharges the gas input and gas pumped by the NB cryopanels were tracked. The discharges were followed by outgassing of deuterium that reduced the retention. The relationship between retention and surface chemistry was explored with a new plasma–material interface probe connected to an in vacuo surface science station that exposed four material samples to the plasma. XPS and TDS analysis demonstrated that binding of D atoms in graphite is fundamentally changed by lithium – in particular atoms are weakly bonded in regions near lithium atoms bound to either oxygen or the carbon matrix. This is in contrast to the strong ionic bonding that occurs between D and pure Li.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Deuterium Retention in NSTX with Lithium Conditioning

High (approximate to 90%) deuterium retention was observed in NSTX gas balance measurements both with- and without lithiumization of the carbon plasma-facing components. The gas retained in ohmic discharges was measured by comparing the vessel pressure rise after a discharge to that of a gas-only pulse with the pumping valves closed. For neutral beam heated discharges the gas input and gas pumped by the NB cryopanels were tracked. The discharges were followed by outgassing of deuterium that reduced the retention. The relationship between retention and surface chemistry was explored with a new plasma-material interface probe connected to an in vacuo surface science station that exposed four material samples to the plasma. XPS and TDS analysis demonstrated that binding of D atoms in graphite is fundamentally changed by lithium - in particular atoms are weakly bonded in regions near lithium atoms bound to either oxygen or the carbon matrix. This is in contrast to the strong ionic bonding that occurs between D and pure Li. (C) 2010 Elsevier B.V. All rights reserved.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗