Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TERMINAL FACILITIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Plans for a STRV-2 to AMOS High Data Rate Bi-Directional Optical Communications Link

The Ballistic Missile Defense Organization has developed a high-data rate (155 Mbps - 1 Gbps) optical communications terminal that will be flown on the STRV-2 satellite. The satellite is scheduled for launch in November 1999, and NASA/JPL has been asked to investigate the use of the AMOS facility as a backup ground terminal to a small transportable terminal constructed by Astroterra Corporation of San Diego. The ground terminal built by Astroterra is designed to support a links out to 2000 km, and will be located at the Table Mountain Facility in Wrightwood, California. Subject to BMDO approval, the demonstration from AMOS will begin in early 2000. For the demonstration, the beam-director tracker will serve as the uplink transmitter, and the 1.6-m telescope as the downlink receiver. It will support bi-directional links out to the 3500-km maximum slant range of the satellite's pass.

Wilson, K. E.↗

Conceptual Design of a MEDE Treatment System for Sodium Bonded Fuel

Unirradiated sodium bonded metal fuel and casting scrap material containing highly enriched uranium (HEU) is stored at the Materials and Fuels Complex (MFC) on the Idaho National Laboratory (INL). This material, which includes intact fuel assemblies and elements from the Fast Flux Test Facility (FFTF) and Experimental Breeder Reactor-II (EBR-II) reactors as well as scrap material from the casting of these fuels, has no current use under the terminated reactor programs for both facilities. The Department of Energy (DOE), under the Sodium-Bonded Spent Nuclear Fuel Treatment Record of Decision (ROD), has determined that this material could be prepared and transferred to an off-site facility for processing and eventual fabrication of fuel for commercial nuclear reactors. A plan is being developed to prepare, package and transfer this material to the DOE High Enriched Uranium Disposition Program Office (HDPO), located at the Y-12 National Security Complex in Oak Ridge, Tennessee. Disposition of the sodium bonded material will require separating the elemental sodium from the metallic uranium fuel. A sodium distillation process known as MEDE (Melt-Drain-Evaporate), will be used for the separation process. The casting scrap material needs to be sorted to remove any foreign material or fines that are not acceptable to the HDPO program. Once all elements have been cut and loaded into baskets, they are then loaded into an evaporation chamber as the first step in the MEDE process. The chamber will be sealed and the pressure reduced to approximately 200 mtorr. The chamber will then be heated as high as 650 ºC, causing the sodium to melt and then vaporize. The vapor phase sodium will be driven into an outlet line where it is condensed and drained into a receiver vessel. Once the evaporation operation is complete, the system is de-energized and returned to atmospheric pressure. This paper describes the MEDE process as well as a general overview of the furnace systems, as necessary, to complete the MEDE process.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A national voice network with satellite and small transceivers

A geostationary satellite utilizing a large multiple-beam UHF antenna is shown to be potentially capable of providing tens of thousands of voice channels for hundreds of thousands of mobile ground terminals using hand-held or vehicular-mounted transceivers with whip antennas. Inclusion of on-board network switching facilities permits full interconnection between any terminal pair within the continental United States (CONUS). Configuration tradeoff studies at selected frequencies from 150 to 1500 MHz, with antenna diameters ranging from 20 to 200 m, and CONUS-coverage multiple beams down to 0.3 deg beamwidth, establish that monthly system user costs in the range of $90 to $150, including leased and maintained ground equipment, are feasible.

Reilly, N. B.↗

Operational Test Results of the Final Approach Spacing Tool

A prototype decision support tool for terminal area air traffic controllers, referred to as the Final Approach Spacing Tool (FAST), was recently evaluated in operation with live air traffic at the Dallas/Fort Worth Terminal Radar Approach Control (TRACON) facility in the United States. Controllers utilized the FAST system's runway assignment and sequence advisories to manage and control arrival traffic during more than twenty five peak rush traffic periods. The system performed well resulting in capacity increases at the airport of 10-20% depending on weather and airport conditions. As a result of these tests, the US Federal Aviation Administration (FAA) is proceeding with plans to further develop the prototype FAST system for national deployment at five to ten TRACONs within the United States during the next five years. This paper will present the results of these tests including data on the FAST system impact on airport capacity, aircraft flight times in the terminal area, delay reduction, tower operations including ground movement, and human factors data including workload assessments.

Davis, Thomas J.↗

Design of a final approach spacing tool for TRACON air traffic control

This paper describes an automation tool that assists air traffic controllers in the Terminal Radar Approach Control (TRACON) Facilities in providing safe and efficient sequencing and spacing of arrival traffic. The automation tool, referred to as the Final Approach Spacing Tool (FAST), allows the controller to interactively choose various levels of automation and advisory information ranging from predicted time errors to speed and heading advisories for controlling time error. FAST also uses a timeline to display current scheduling and sequencing information for all aircraft in the TRACON airspace. FAST combines accurate predictive algorithms and state-of-the-art mouse and graphical interface technology to present advisory information to the controller. Furthermore, FAST exchanges various types of traffic information and communicates with automation tools being developed for the Air Route Traffic Control Center. Thus it is part of an integrated traffic management system for arrival traffic at major terminal areas.

Davis, Thomas J.↗

Using the Conceptual Site Model to Remediate Two Sites in New England and Reach License Termination and Site Reuse

The Conceptual Site Model (CSM) is a powerful tool for understanding the link between contamination sources, cleanup objectives, and ultimate site reuse. The CSM describes the site setting, geology, hydrogeology, potential sources, release mechanisms and migration pathways of contaminants. The CSM is needed to understand the extent of contamination and how receptors may be exposed to both radiological and chemical constituents. A key component of the CSM that is often overlooked concerns how the regulatory requirements drive remediation and how each has to be integrated into the CSM to ensure that all stakeholder requirements are understood and addressed. This paper describes how the use of the CSM helped reach closure and reuse at two facilities in Connecticut that are pursuing termination of their Nuclear Regulatory Commission (NRC) license. The two facilities are the Combustion Engineering Site, located in Windsor, Connecticut, (CE Windsor Site) and the Connecticut Yankee Atomic Power Company, located in Haddam Neck, Connecticut (CYAPCO). The closure of each of these facilities is regulated by four agencies: - Nuclear Regulatory Commission (NRC) - which requires cleanup levels for radionuclides to be protective of public health; - US Environmental Protection Agency (USEPA) - which requires cleanup levels for chemicals to be protective of public health and the environment; - Connecticut Department of Environmental Protection (CTDEP) Bureau of Air Management, Radiation Division - which requires cleanup levels for radionuclides to be protective of public health; and - Connecticut Department of Environmental Protection (CTDEP) Bureau of Water Protection and Land Reuse - which requires cleanup levels for chemicals to be protective of public health and the environment. Some of the radionuclides at the CE Windsor Site are also regulated under the Formerly Utilized Site Remedial Action Program (FUSRAP) under the Army Corps of Engineers. The remainder of this paper presents the similarities and differences between the CSMs for these two sites and how each site used the CSM to reach closure. Although each of these site have unique histories and physical features, the CSM approach was used to understand the geology, hydrogeology, migration and exposure pathways, and regulatory requirements to successfully characterize and plan closure of the sites. A summary of how these attributes affected site closure is provided.

54 ENVIRONMENTAL SCIENCES↗

Mine Flooding History of a Regional Below-Drainage Coalfield Dominated by Barrier Leakage (1970–2014)

A 44-year record of water level fluctuations in a series of adjacent closed underground mines documents the history of closure and mine flooding in the Fairmont Coalfield, one of the oldest coal mining districts in the Pittsburgh coal basin, West Virginia, USA. As closures proceeded and mines began to flood, US environmental regulations were first enacted mandating mine water control and treatment, rendering uncontrolled surface discharges unacceptable. The purpose of this study is to present this flooding history and to identify critical events that determined how mine pools evolved in this case. Also examined is the strategy developed to control and treat water from these mines. Flooding is visualized using both water level hydrographs and mine flooding maps with the latter constructed assuming mine water hydraulic continuity between one or more mines. The earliest flooding formed small pools within near-surface mines closed prior to 1962 yet still pumped following closure to minimize leaking into adjacent still-active workings. These subpools gradually enlarged and merged as more closures occurred and the need for protective pumping was removed, forming what is today referred to as the unconfined Fairmont Pool. Later, deeper mines, separated by intact updip barriers from the Fairmont Pool, were closed and flooded more gradually, supplied in large part by leakage from the Fairmont Pool. By 1985, all mines except 2 had closed and by 1994 all had fully flooded, with the Fairmont Pool interconnected to deeper single mine pools via barrier leakage. As protective pumping ceased, the Fairmont Pool rose to a water level 3 m higher than surface drainage elevation and in 1997 discharged from an undermined section of Buffalo Creek near the Monongahela River. The principal mine operator in the basin then designed a pumping system to transfer water from the Fairmont Pool to their existing treatment facilities to the north, thus terminating the discharge. It may be concluded that the progress of mine flooding was influenced by mining history and design, by the timing of closures, by barrier leakage conditions, and by geologic structure. A key element in how flooding proceeded was the presence of a series of intact barriers separating deep from shallow mines. The shallow mines closed and flooded early, but then lost sufficient water by barrier leakage into the deeper mines to delay the completion of flooding until after the deep mines had all closed and flooded as well. Intensive mine water control has continued from the 1997 breakout to the present. The final water control scheme was likely unanticipated and serendipitous; future district-wide mining efforts should be advised to consider in advance closeout strategies to control mine water postmining.

Donovan, Joseph J.↗

Hualapai Tribal Utility Development Project

The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Simulator evaluation of the final approach spacing tool

The design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course is described. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arrivals as well as sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a 4-D trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST was implemented on a high performance workstation. It can be operated as a stand-alone in the Terminal Radar Approach Control (TRACON) Facility or as an element of a system integrated with automation tools in the Air Route Traffic Control Center (ARTCC). FAST was evaluated by experienced TRACON controllers in a real-time air traffic control simulation. Simulation results show that FAST significantly reduced controller workload and demonstrated a potential for an increase in landing rate.

Davis, Thomas J.↗

Simulator evaluation of the Final Approach Spacing Tool

The design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course is described. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arrivals and sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a four-dimensional trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST has been implemented on a high-performance workstation. It can be operated stand-alone in the terminal radar approach control (TRACON) facility or as an element of a system integrated with automation tools in the Air Route Traffic Control Center). Simulation results show that FAST significantly reduced controller workload and demonstrated a potential for an increase in landing rate.

Davis, Thomas J.↗

Scheduling logic for Miles-In-Trail traffic management

This paper presents an algorithm which can be used for scheduling arrival air traffic in an Air Route Traffic Control Center (ARTCC or Center) entering a Terminal Radar Approach Control (TRACON) Facility . The algorithm aids a Traffic Management Coordinator (TMC) in deciding how to restrict traffic while the traffic expected to arrive in the TRACON exceeds the TRACON capacity. The restrictions employed fall under the category of Miles-in-Trail, one of two principal traffic separation techniques used in scheduling arrival traffic . The algorithm calculates aircraft separations for each stream of aircraft destined to the TRACON. The calculations depend upon TRACON characteristics, TMC preferences, and other parameters adapted to the specific needs of scheduling traffic in a Center. Some preliminary results of traffic simulations scheduled by this algorithm are presented, and conclusions are drawn as to the effectiveness of using this algorithm in different traffic scenarios.

Synnestvedt, Robert G.↗

Human Factors Assessment: The Passive Final Approach Spacing Tool (pFAST) Operational Evaluation

Automation to assist air traffic controllers in the current terminal and en route air traff ic environments is being developed at Ames Research Center in conjunction with the Federal Aviation Administration. This automation, known collectively as the Center-TRACON Automation System (CTAS), provides decision- making assistance to air traffic controllers through computer-generated advisories. One of the CTAS tools developed specifically to assist terminal area air traffic controllers is the Passive Final Approach Spacing Tool (pFAST). An operational evaluation of PFAST was conducted at the Dallas/Ft. Worth, Texas, Terminal Radar Approach Control (TRACON) facility. Human factors data collected during the test describe the impact of the automation upon the air traffic controller in terms of perceived workload and acceptance. Results showed that controller self-reported workload was not significantly increased or reduced by the PFAST automation; rather, controllers reported that the levels of workload remained primarily the same. Controller coordination and communication data were analyzed, and significant differences in the nature of controller coordination were found. Controller acceptance ratings indicated that PFAST was acceptable. This report describes the human factors data and results from the 1996 Operational Field Evaluation of Passive FAST.

Lee, Katharine K.↗

Supporting the Future Air Traffic Control Projection Process

In air traffic control, projecting what the air traffic situation will be over the next 30 seconds to 30 minutes is a key process in identifying conflicts that may arise so that evasive action can be taken upon discovery of these conflicts. A series of field visits in the Boston and New York terminal radar approach control (TRACON) facilities and in the oceanic air traffic control facilities in New York and Reykjavik, Iceland were conducted to investigate the projection process in two different ATC domains. The results from the site visits suggest that two types of projection are currently used in ATC tasks, depending on the type of separation minima and/or traffic restriction and information display used by the controller. As technologies improve and procedures change, care should be taken by designers to support projection through displays, automation, and procedures. It is critical to prevent time/space mismatches between interfaces and restrictions. Existing structure in traffic dynamics could be utilized to provide controllers with useful behavioral models on which to build projections. Subtle structure that the controllers are unable to internalize could be incorporated into an ATC projection aid.

Davison, Hayley J.↗

Graphical User Interface Development and Design to Support Airport Runway Configuration Management

The objective of this effort was to develop a graphical user interface (GUI) for the National Aeronautics and Space Administration's (NASA) System Oriented Runway Management (SORM) decision support tool to support runway management. This tool is expected to be used by traffic flow managers and supervisors in the Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facilities.

Jones, Debra G.↗

Algorithm for Establishing Safeguards Termination Concentration Limits

This paper presents an algorithm for estimating the maximum concentration limits for terminating safeguards on nuclear materials. These limits are important because such material is no longer subject to accounting, reporting or inspections after the International Atomic Energy Agency (IAEA) has approved the termination of safeguards on nuclear material declared by a State to be waste.Maximum concentration limits for different waste forms generated within nuclear fuel cycle facilities must be sufficiently conservative such that termination of safeguards does not become a weak link in the safeguards system. The concentration limits must also remain practical in order to ensure IAEA resources are used effectively and efficiently to implement safeguards in the State. These termination limits should be technically-based while remaining objective and reasonable to implement by the State. In support of the original IAEA guidance on concentration limits for termination of safeguards prepared in the early 1990s, the U.S. developed an algorithm to estimate concentrations that would make recovery of nuclear material from waste on which safeguards had been terminated at least as unattractive as undeclared production from uranium ore or diversion of similar nuclear material. In 2016, the IAEA sought technical advice from a meeting of experts from selected member States to support updating its internal guidance on termination of safeguards. Their recommendations included extending the guidance to consider additional waste forms. The experts in the 2016 meeting recommended that the IAEA limits should more clearly reflect the technical difficulty and level of effort required to recover nuclear material from the various waste forms. This paper identifies and assesses the most likely techniques a State might use to recover nuclear material from the waste forms identified by the experts and determines how the safeguards termination algorithm could be revised to more accurately reflect the difficulty of recovering one significant quantity of nuclear material from these waste forms.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A multicharge ion source (Supernanogan) for the OLIS facility at ISAC/TRIUMF

The Off-Line Ion Source (OLIS) [K. Jayamanna, D. Yuan, T. Kuo, M. MacDonald, P. Schmor, and G. Dutto, Rev. Sci. Instrum. 67, 1061 (1996); K. Jayamanna, Rev. Sci. Instrum. 79, 02711 (2008)] facility consists of a high voltage terminal containing a microwave cusp ion source, either a surface ion source or a hybrid surface-arc discharge ion source [K. Jayamanna and C. Vockenhuber, Rev. Sci. Instrum. 79, 02C712 (2008)], and an electrostatic switch that allows the selection of any one of the sources without mechanical intervention. These sources provide a variety of +1 beams up to mass 30 for Isotope Separator and ACcelerator (ISAC) [R. E. Laxdal, Nucl. Instrum. Methods Phys. Res. B 204, 400 (2003)] experiments, commissioning the accelerators, setting up the radioactive experiments, and for tuning the beam lines. The radio frequency quadrupole (RFQ) [M. Marchetto, Z. T. Ang, K. Jayamanna, R. E. Laxdal, A. Mitra, and V. Zvyagintsev, Eur. Phys. J. Spec. Top. 150, 241 (2005)] injector accelerator is a constant velocity machine designed to accept only 2 keV/u and the source extraction energy is limited to 60 kV. Further stripping is then needed downstream of the RFQ to inject the beam into the drift tube linac [M. Marchetto, Z. T. Ang, K. Jayamanna, R. E. Laxdal, A. Mitra, and V. Zvyagintsev, Eur. Phys. J. Spec. Top. 150, 241 (2005)] accelerator that requires A/q up to 6. Base on this constraints a multicharge ion source capable to deliver beams above mass 30 with A/q up to 6 was needed in order to reach full capability of the ISAC facility. A Supernanogan [C. Bieth et al., Nucleonika 48, S93 (2003)] multicharge ion source was then purchased from Pantechnik and was installed in the OLIS terminal. Commissioning and performance of the Supernanogan with some results such as emittance dependence of the charge states as well as charge state efficiencies are presented.

43 PARTICLE ACCELERATORS↗

Flight experiments to improve terminal area operations

A brief description is given of the objectives and activities of the terminal configured vehicle (TCV) program and of some of the airborne facilities. A short analysis of some particular problems of CTOL operations in the terminal area is also presented to show how the program's technical objectives are related to the defined problems. The test aircraft was flown both manually and automatically with manual monitoring over paths including 130 deg intercepts and 2.0 km (1.1. n. mi.) and 0.8 km (0.44 n. mi.) finals. Some statistical data are presented from these and other flight profiles designed to address specific terminal in the next biennium and their application to the terminal area. A description of work being undertaken to study the addition of adjacent traffic information to present map displays is also given.

Salmirs, S.↗