Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TENNESSEE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Peer Review Comments on the Authorized Limits Technical Document (OREM-19-2573) for Disposal of Waste Containing Residual Radioactive Material at the U.S. Department of Energy Industrial Landfill IV, Y-12 National Security Complex, Oak Ridge, Tennessee

Argonne National Laboratory is assigned responsibility by DOE/EM-4 to conduct a peer review of the proposed Authorized Limits (ALs) for disposal of waste containing residual radioactive material at the U.S. Department of Energy (DOE) Industrial Landfill IV, Y-12 National Security Complex, Oak Ridge, Tennessee. The ALs document package (Document Number OREM-19-2573, dated May 2020) was sent to Argonne by DOE on June 1, 2020 (Oak Ridge 2020a). Argonne started the review immediately and held several BlueJeans meetings with Oak Ridge and DOE to discuss review comments. The first BlueJeans meeting was June 17, 2020. Oak Ridge presented a briefing of the AL package, followed by discussion of the assumptions, methodology, and parameters used in the analysis. A follow-up BlueJeans meeting was held on June 24, 2020, at which Argonne presented both general and specific review comments in PowerPoint slides. This set of slides - Review Comments on the “Authorized Limits for Disposal of Waste Containing Residual Radioactive Material at DOE Industrial Landfill IV, Y-12 National Security Complex, Oak Ridge, Tennessee” - was then emailed to Oak Ridge and DOE after the BlueJeans meeting on June 24, 2020. A PDF version of this slide set is included as Appendix A.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensitive Resources Assessment and Forest Analysis for The SSP-2A Parcel and Proposed Oak Ridge Enhanced Technology and Training Center (ORETTC), Oak Ridge, Tennessee

This report summarizes current knowledge of natural and cultural resources associated with potential land use changes within an 81-acre (32.8-hectare) parcel, termed SSP-2A, on the US Department of Energy’s (DOE’s) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Figure 1). A primary goal for the work presented here was to evaluate potential impacts to sensitive resources within the SSP-2A parcel that might result from land disturbance and construction of the Oak Ridge Enhanced Technology and Training Center (ORETTC). In addition to on-the-ground surveys of the ORETTC footprint and SSP-2A parcel during summer 2020 (Figure 1), this report leverages historical (pre-1995) and contemporary (1995–present) data from additional sources such as the Tennessee Department of Environment and Conservation (TDEC). The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess, manage, and research sensitive resources on the ORR. This report should facilitate more environmentally sound decisions during planning and development of the ORETTC, provide a foundation for further assessment of sensitive and cultural resources associated with the broader SSP-2A parcel (should additional actions take place), and help project managers address regulatory guidance and DOE policy on sustainable development. Those who reference this report must consider that the timing of surveys does not permit complete delineation of resources. Data deficiencies are indicated where possible. Additional surveys may be required to account for seasonal patterns of various threatened and endangered species (e.g., bats), and additional assessment will be required if activities extend beyond the ORETTC site (Figure 2).

54 ENVIRONMENTAL SCIENCES↗

Operational and Performance Monitoring of East Tennessee Technology Park Ponds—2023 Results

Performance and operational monitoring are regulatory requirements associated with a non–time-critical removal action for three surface water bodies at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee: the K-1007-P1 Pond, the K-901-A Pond, and the K-720 Slough. This progress report summarizes the monitoring activities and results from fiscal year (FY) 2023. The goal of ecological enhancement of the K-1007-P1 and K-901-A Ponds is to reduce risk from polychlorinated biphenyl (PCB) contamination in fish to humans and wildlife. Lowering PCB concentrations in the water column and in the food that fish eat is expected to decrease PCB bioaccumulation in fish. Performance monitoring of the K-1007-P1 Pond focuses on annual PCB trends in water, clams, and fish. PCBs in fish also are sampled annually at the K-720 Slough. Operational monitoring ensures that ecological enhancement measures—including water quality, plant community, fish community, and wildlife actions—have been implemented as intended. Monitoring provides the information necessary to determine whether modifications are needed to attain the design end state (i.e., a heavily vegetated, clearwater pond dominated by sunfish with significantly diminished or at least downwardly trending PCB levels in fish). In FY 2023, fish removal efforts and vegetation planting primarily focused on the K-901-A Pond. These actions were implemented to help push the systems toward the desired end state. Descriptions of the various monitoring activities and preliminary 2023 results are provided in the following sections. An update on fish and plant management actions in FY 2023 is also included in this report. A summary of the more detailed information in this report will be presented as required in the upcoming Remediation Effectiveness Report.

54 ENVIRONMENTAL SCIENCES↗

Operational and Performance Monitoring of East Tennessee Technology Park Ponds - 2024 Results

Performance and operational monitoring are regulatory requirements associated with a non–time-critical removal action for three surface water bodies at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee (Figure 1): the K-1007-P1 Pond, the K-901-A Pond, and the K-720 Slough. This progress report summarizes the monitoring activities and results from FY 2024. The goal of ecological enhancement of the K-1007-P1 and K-901-A Ponds is to reduce risk from polychlorinated biphenyl (PCB) contamination in fish to humans and wildlife. Lowering PCB concentrations in the water column and in the food that fish eat is expected to decrease PCB bioaccumulation in fish. Performance monitoring of the K-1007-P1 Pond focuses on annual PCB trends in water, clams, and fish. PCBs in fish also are sampled annually at the K-720 Slough.

54 ENVIRONMENTAL SCIENCES↗

Operational and Performance Monitoring of East Tennessee Technology Park Ponds—2025 Results

Performance and operational monitoring are regulatory requirements associated with a non–time-critical removal action for three surface water bodies at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee (Figure 1): the K-1007-P1 Pond, the K-901-A Pond, and the K-720 Slough. This progress report summarizes the monitoring activities and results from FY 2025. The goal of ecological enhancement of the K-1007-P1 and K-901-A Ponds is to reduce risk from polychlorinated biphenyl (PCB) contamination in fish to humans and wildlife. Lowering PCB concentrations in the water column and in the food that fish eat is expected to decrease PCB bioaccumulation in fish. Performance monitoring of the K-1007-P1 Pond focuses on annual PCB trends in water, clams, and fish. PCBs in fish also are sampled annually at the K-720 Slough. Operational monitoring ensures that ecological enhancement measures—including water quality, plant community, fish community, and wildlife actions—have been implemented as intended. Monitoring provides the information necessary to determine whether modifications are needed to attain the design end state (i.e., a heavily vegetated, clearwater pond dominated by sunfish with significantly diminished or at least downwardly trending PCB levels in fish). In FY 2025, fish removal efforts and vegetation planting primarily focused on the K-901-A Pond. These actions were implemented to help push the systems toward the desired end state. Descriptions of the various monitoring activities and preliminary 2025 results are provided in the following sections. An update on fish and plant management actions in FY 2025 is also included in this report. A summary of the more detailed information in this report will be presented as required in the upcoming Remediation Effectiveness Report.

54 ENVIRONMENTAL SCIENCES↗

Annual Report for 2008 - 2009 Detection Monitoring at the Environmental Management Waste Management Facility, Oak Ridge, Tennessee

This annual Environmental Monitoring Report (EMR) presents results of environmental monitoring performed during fiscal year (FY) 2009 (October 1, 2008 - September 30, 2009) at the Environmental Management Waste Management Facility (EMWMF). The EMWMF is an operating state-of-the-art hazardous waste landfill located in Bear Creek Valley (BCV) west of the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Appendix A, Fig. A.1). Opened in 2002 and operated by a DOE prime contractor, Bechtel Jacobs Company LLC (BJC), the EMWMF was built specifically to accommodate disposal of acceptable solid wastes generated from Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial actions for former waste sites and buildings that have been impacted by past DOE operations on the ORR and at DOE sites off the ORR within the state of Tennessee. Environmental monitoring at the EMWMF is performed to detect and monitor the impact of facility operations on groundwater, surface water, stormwater, and air quality and to determine compliance with applicable or relevant and appropriate requirements (ARARs) specified in governing CERCLA decision documents. Annually, the EMR presents an evaluation of the groundwater, surface water, stormwater, and air monitoring data with respect to the applicable EMWMF performance standards. The purpose of the evaluation is to: (1) identify monitoring results that indicate evidence of a contaminant release from the EMWMF to groundwater, surface water, stormwater, or air, and (2) recommend appropriate changes to the associated sampling and analysis requirements, including sampling locations, methods, and frequencies; field measurements; or laboratory analytes that may be warranted in response to the monitoring data. Sect. 2 of this annual EMR provides background information relevant to environmental monitoring at the landfill, including short descriptions of the facility, the hydrogeologic setting, CERCLA decision document requirements for environmental monitoring, and a summary of the EMWMF monitoring history to date. Sect. 3 identifies the respective groundwater, surface water, stormwater, and air monitoring locations at the EMWMF and outlines the associated sampling frequencies, field measurements, and laboratory analytes. Sect. 4 presents a concise technical evaluation of the groundwater, surface water, stormwater, and air monitoring data. Sect. 5 summarizes key monitoring results and data evaluation conclusions along with any recommended changes to groundwater, surface water, stormwater, or air monitoring at the EMWMF. Sect. 6 lists the documents and other technical reports referenced in the preceding narrative sections. Maps and other illustrations referenced in the narrative sections of this annual EMR are in Appendix A. Referenced summary tables of FY 2009 environmental monitoring data are in Appendix B (Groundwater), Appendix C (Surface Water), Appendix D (Stormwater), and Appendix E (Ambient Air).

54 ENVIRONMENTAL SCIENCES↗

A compilation of mineral occurrences and the relationship of occurrences to structural elements of the Kentucky and Tennessee region

A very prominent magnetic anomaly measured by MAGSAT over the eastern mid-continent of the United States was inferred to have a source region beneath Kentucky and Tennessee. Prominent aeromagnetic and gravity anomalies are also associated with the inferred source region. A crustal model constructed to fit these anomalies interpreted the complex as a large mafic plutonic intrusion of Precambrian age. The complex was named the Kentucky body. It was noticed that the Jessamine Dome, which is a locus of intense faulting and mineralization, occurs near the northern end of the Kentucky body, and that more generally there seemed to be a spatial relationship between mineral occurrence and the body. The relationship between mineral deposits in Kentucky and Tennessee and the Kentucky body was investigated. A compilation of mineral occurrences in the region, classified according to type and age, is presented.

Mayhew, M. A.↗

Implementation of Probabilistic Design Methodology at Tennessee State University

Engineering Design is one of the most important areas in engineering education. Deterministic Design Methodology (DDM) is the only design method that is taught in most engineering schools. This method does not give a direct account of uncertainties in design parameters. Hence, it is impossible to quantify the uncertainties in the response and the actual safety margin remains unknown. The desire for a design methodology tha can identify the primitive (random) variables that affect the structural behavior has led to a growing interest on Probabilistic Design Methodology (PDM). This method is gaining more recognition in industries than in educational institutions. Some of the reasons for the limited use of the PDM at the moment are that many are unaware of its potentials, and most of the software developed for PDM are very recent. The central goal of the PDM project at Tennessee State University is to introduce engineering students to the method. The students participating in the project learn about PDM and the computer codes that are available to the design engineer. The software being used of this project is NESSUS (Numerical Evaluation of Stochastic Structures Under Stress) developed under NASA probabilistic structural analysis program. NESSUS has three different modules which make it a very comprehensive computer code for PDM. A research in technology transfer through course offering in PDM is in effect a Tennessee State University. The aim is to familiarize students with the problem of uncertainties in engineering design. Included in the paper are some projects on PDM carried out by some students and faculty. The areas this method is being applied at the moment include, Design of Gears (spur and worm); Design of Shafts; Design of Statistically Indeterminate Frame Structures; Design of Helical Springs; and Design of Shock Absorbers. Some of the current results of these projects are presented.

Onwubiko, Chinyere↗

Leveraging High Resolution Remotely Sensed Evapotranspiration Data to Assess Water Availability and Vulnerability in the Memphis Aquifer Area in West Tennessee

The Memphis aquifer is an indispensable source of water for municipal, agricultural, and industrial use across west Tennessee. The aquifer's water is thousands of years old and in pristine condition due to the natural geological filtering by the aquifer’s confining clay layers. To sustain the aquifer’s water supply, recharge must happen at a rate efficient enough to keep up with pumping from the aquifer. In partnership with Protect Our Aquifer and the University of Memphis Center for Applied Earth Science and Engineering Research, this project examined multiple factors to discover thriving areas of recharge in west Tennessee. The team used Integrated Multi-satellite Retrievals for GPM (IMERG) precipitation data, ECOsystem Spaceborne Thermal Radiometer on Space Station (ECOSTRESS) evapotranspiration data, Landsat 8 and National Land Cover Database (NLCD) to track landcover change, and the North American Land Data Assimilation System (NLDAS) Noah land surface model to estimate monthly runoff. These factors were averaged seasonally from 2019 to 2022 to understand seasonal relationships within the study area. Precipitation and evapotranspiration data were used to create water balance maps and with the evaporative stress index (ESI), landcover, and runoff maps, the team pinpointed locations that are most conducive to recharge. The team determined that areas where the water balance is low, ESI is high, and where there is sufficient pervious landcover are locations where recharge happens most effectively. Identification of effective recharge locations may be used by the partners to prioritize areas in need of protection before they become impacted by industrialization and urbanization.

Lauren Webster↗

Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mitigation of Hexavalent Chromium in Storm Water Resulting from Demolition of Large Concrete Structure at the East Tennessee Technology Park - 12286

American Recovery and Reinvestment Act (ARRA) funding was provided to supplement the environmental management program at several DOE sites, including the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Demolition of the ETTP K-33 Building, the largest building to be demolished to date in Oak Ridge, was awarded to LSRS in FY-2010 under the ARRA program. The K-33 building was an 82 foot tall 2-story structure covering approximately 32 acres. Once this massive building was brought down to the ground, the debris was segregated and consolidated into piles of concrete rubble and steel across the remaining pad. The process of demolishing the building, tracking across concrete debris with heavy equipment, and stockpiling the concrete rubble caused it to become pulverized. During and after storm events, hexavalent chromium leached from the residual cement present in the large quantities of concrete. Storm water control measures were present to preclude migration of contaminants off-site, but these control measures were not designed to control hexavalent chromium dissolved in storm water from reaching nearby receiving water. The following was implemented to mitigate hexavalent chromium in storm water: - Steel wool was distributed around K-33 site catch basins and in water pools as an initial step in addressing hexavalent chromium. - Since the piles of concrete were too massive and unsafe to tarp, they were placed into windrows in an effort to reduce total surface area. - A Hach colorimetric field meter was acquired by the K-33 project to provide realtime results of hexavalent chromium in site surface water. - Three hexavalent chromium treatment systems were installed at three separate catch basins that receive integrated storm water flow from the K-33 site. Sodium bisulfite is being used as a reducing agent for the immobilization of hexavalent chromium while also assisting in lowering pH. Concentrations initially were 310 - 474 ppb of hexavalent chromium in surface water at the out-falls that discharge to nearby receiving water. After implementation of the actions described above, concentrations of hexavalent chromium have been effectively reduced to less than 25 ppb at the out-falls. The LSRS team completed demolition of K-33 five months ahead of schedule, and debris removal was completed three months ahead of schedule. A total of 164,000 tons of steel and concrete from the building demolition, accounting for 13,000 shipments, were disposed to the EMWMF. Because of the high toxicity of hexavalent chromium at low concentrations, hexavalent chromium had to be controlled at ppb levels. Hexavalent chromium contaminant concentrations were successfully reduced by over 90% in surface water discharged from the K-33 demolition site into nearby receiving water. Initial efforts of wind-rowing debris piles and obtaining real-time hexavalent chromium measurements to focus initiatives coupled with placement of steel wool in pools or catch basins had some effectiveness. More significant reductions were obtained as the debris piles were removed/disposed in EMWMF, and treatment of surface water with sodium bisulfite in integrated manholes occurred. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demolition of the K-27 Building at the East Tennessee Technology Park (ETTP) - 17423

On February 8, 2016, URS - CH2M Oak Ridge LLC (UCOR) initiated the demolition of the East Tennessee Technology Park's (ETTP's) final gaseous diffusion building in DOE's Oak Ridge Environmental Management program. Building K-27 was a 35,582 m{sup 2} (383,000 ft{sup 2}) gaseous diffusion building that contained approximately 92,903 m{sup 2} (1 million ft{sup 2}) of floor space. It was one of five gaseous diffusion buildings at the site, formerly known as the Oak Ridge Gaseous Diffusion Plant. The actual demolition of this facility took approximately seven months to complete; however, planning and preparation took more than three years. The deactivation process was a critical element in preparing the building for demolition. UCOR's K-27 deactivation activities began in April 2012 with the installation of safe walking paths and fall protection systems to allow safe work access. Next, all mechanical and electrical systems associated with the facility were shut down and isolated, a process known as 'cold and dark.' More than 19.3 km (12 mi) of process piping and components were marked and measured. Additionally, workers performed nondestructive assay (NDA) and vent-purge-and-drain activities and applied foam to piping and components as needed [1]. Based on characterization results, approximately 4.8 km (3 mi) of process piping, and 372 converters and compressors were removed and shipped offsite prior to demolition. Lower-hazard materials and equipment were demolished with the building structure and transported to onsite disposal facilities. Upfront waste characterization and ongoing monitoring were key to the successful disposal of demolition debris at onsite facilities. Due to process improvements in waste loading recommended by work crews, the project achieved a 50 percent improvement in the daily hauling rate during the 9,000-truckload shipping campaign. Crews worked in high-risk, high-hazard conditions and were exposed to radiological and chemical contaminants, extreme temperatures, and deteriorating infrastructure. However, the hazard controls that were put in place, based on the Integrated Safety Management System (ISMS) walk-downs and hazard determination, made the effort manageable. The overall safety performance during demolition of the facility was excellent, with no significant injuries, and exceeded industry standards and DOE target levels. Outstanding safety performance was a testament to the dedication of the workforce, given the significant hazards presented by the demolition of the Hazard Category 2 nuclear facility. Another key element to the success of the K-27 demolition was the support and approval of all stakeholders involved in this effort, including DOE, the surrounding communities, the State of Tennessee, the UCOR management team, and, most importantly, the workforce that performed this highly hazardous work. This $52 million demolition project was completed ahead of schedule with no significant injuries and in compliance with all DOE orders, site procedures, and environmental controls. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benefits of less intrusive remediation alternatives; A review of case studies in Oak Ridge, Tennessee - 15482

Various alternative cleanup strategies have been utilized at Department of Energy facilities in Oak Ridge, Tennessee to avoid costly and potentially ineffective removal of contaminants in soil and sediments, transportation by truck, and long-term storage in landfills. One such example is a remedial decision in the 1990's to not conduct large-scale removal of PCB-contaminated sediments from a large downstream reservoir, and instead implement sediment disturbance controls and monitoring requirements. Monitoring results suggest the decision was a good one with PCB concentrations in fish decreasing substantially over the last 20 years, presumably due to recent cleaner sediments overlying historical sediment layers. At the East Tennessee Technology Park an innovative remediation strategy was developed to reduce human and ecological risks associated with a PCB-contaminated pond, while also enhancing the site's natural resources. Termed the 'Ecological Management and Enhancement' strategy, this remediation option provided an alternative approach to more conventional pond remediation options like sediment and soil removal, draining and capping, and point source/discharge actions. The basic premise of this option is that ecological management, including fish and wildlife management and vegetation management, can interrupt the contaminant exposure pathways that lead to ecological or human receptors. Recent monitoring results have demonstrated both risk reduction and increased natural resource value. Currently under investigation is the use of watershed management approaches that may help ameliorate mercury methylation and bioaccumulation in East Fork Poplar Creek. There is increased recognition that mercury source reduction alone will not achieve the human health risk target level in fish in the downstream environment, where water chemistry and ecological processes are conducive to mercury methylation. Additionally, significant losses in natural resource values are anticipated if major soil and sediment source removal activities are implemented. The Oak Ridge experience suggests that alternative approaches to the conventional 'muck and truck' options to sediment contamination are worth pursuing in some cases. Taking advantage of natural attenuation processes and/or implementing less intrusive water and ecological manipulations could be especially advantageous at contaminated sites where there are multiple or complex sources that are difficult to remediate, conventional source removal is costly, the contaminant of concern is highly bio-accumulative, or where natural resource values could be preserved or enhanced. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deactivation of the K-27 building at the east Tennessee Technology Park - 15554

In 1942, nearly 24,280 hectares (60,000 acres) of east Tennessee landscape became part of the most significant defense strategy in the history of the United States - the Manhattan Project. Three methods of uranium separation were pursued at the site in the effort to end World War II. What became the K-25 site, now known as the East Tennessee Technology Park, focused on the gaseous diffusion method of uranium enrichment. This paper focuses on the deactivation of the second of five gaseous diffusion plants built on the site. The four-level, rectangular-shaped K-27 came online in 1945 and was tied to the site's original gaseous diffusion plant, K-25. K-27 extended K-25's enriching stages to increase production. The plant supported weapons production and other security strategies until 1964. K-27 spans 35,582 square meters (383,000 square feet) and contains approximately 92,903 square meters (one million square feet) of floor space. During deactivation, workers will use an assembly line process to tackle the 540 process stages housed in 90 cells. While often the less publicized, less visible aspect of building decontamination and decommissioning, deactivation takes more than three times longer than demolition. Crews work in high-risk, high-hazard environments - exposed to extreme temperatures, radiological and chemical contaminants, and deteriorating infrastructure. Therefore, worker safety becomes the most rigorous task performed. K-27 is the fifth and final gaseous diffusion building in the Department of Energy's Oak Ridge Environmental Management program to be demolished. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Cap Design Expands Capacity of DOE Environmental Management Waste Management Facility (EMWMF) Oak Ridge, Tennessee - 19185

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park (ETTP) for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The ETTP site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. Onsite waste disposal is a key component of DoE's cleanup strategy. Less expensive onsite disposal allows remaining funding to be used to accelerate cleanup activities. The initial cover design was intended to be revised and updated as the Environmental Management Waste Management Facility (EMWMF) neared closure. However, accelerating review and modification of the design resulted in additional waste disposal volume that will extend the life of the EMWMF. Two design modifications were implemented: 1) reducing the final cover thickness from 14 ft to 11 ft while maintaining protectiveness, and 2) changing the height of the landfill by reducing the width of the top deck. These two design changes resulted in an additional 130,000 cubic yards of landfill capacity for Oak Ridge Reservation (ORR) demolition and remediation waste and extended the expected life of the EMWMF by approximately 2 years. The addition of more inexpensive onsite waste disposal capacity will continue to facilitate cost-effective cleanup activities at the ORR. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗