Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Systems and equipment operational”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Broadcast control of air traffic

The development of a system of broadcast control for improved flight safety and air traffic control is discussed. The system provides a balance of equality between improved cockpit guidance and control capability and ground control in order to provide the pilot with a greater degree of participation. The manner in which the system is operated and the equipment required for safe operation are examined.

Litchford, G. B.↗

Managing Information On Costs

Cost Management Model, CMM, software tool for planning, tracking, and reporting costs and information related to costs. Capable of estimating costs, comparing estimated to actual costs, performing "what-if" analyses on estimates of costs, and providing mechanism to maintain data on costs in format oriented to management. Number of supportive cost methods built in: escalation rates, production-learning curves, activity/event schedules, unit production schedules, set of spread distributions, tables of rates and factors defined by user, and full arithmetic capability. Import/export capability possible with 20/20 Spreadsheet available on Data General equipment. Program requires AOS/VS operating system available on Data General MV series computers. Written mainly in FORTRAN 77 but uses SGU (Screen Generation Utility).

Taulbee, Zoe A.↗

Long path monitoring of tropospheric O3, NO2, H2CO and SO2

Concentrations of tropospheric O3, NO2, H2CO, and SO2 have been measured on the Campus of the 'Universite Libre de Bruxelles' on a routine basis since October 1990. The long path system consists of a source lamp, a first 30 cm f/8 Cassegrain type telescope which collimates the light onto a slightly parabolic mirror placed on the roof of a building situated 394 m away from the laboratory. The light is sent back into a second 30 cm Cassegrain telescope. This telescope has been modified so that the output beam is a 5 cm diameter parallel beam. This beam is then focused onto the entrance aperture of the BRUKER IFS120HR fourier transform spectrometer. The two telescopes are mounted on alignment devices and the external mirror is equipped with a driving system operated from the laboratory. The choice of the light source (either a 1000 W high pressure 'ozone free' xenon lamp or a 250 W tungsten filament) and of the detector (either a solar blind UV-diode or a silicon diode) depended on the spectral region studied. These regions lie respectively from 26,000 cm(exp -1) to 30,000 cm(exp -1) (260-380 nm) and from 14,000 cm(exp -1) to 30,000 cm(exp -1) (330-700 nm). The spectra have been recorded at the resolution of 16 cm(exp -1) and with a dispersion of 7.7 cm(exp -1). They have been measured during the forward and the backward movements of the mobile mirror, in double sided mode; each spectrum is an average of 2000 scans. The time required to record a spectrum is about 45 minutes. The shape of the raw spectra in the two investigated regions are represented.

Vandaele, A. C.↗

Lunar and Planetary Bases, Habitats, and Colonies

This special bibliography includes the design and construction of lunar and Mars bases, habitats, and settlements; construction materials and equipment; life support systems; base operations and logistics; thermal management and power systems; and robotic systems.

Source record↗

TCMS operations and maintenance philosophy

The purpose is to describe the basic philosophies of operating and maintaining the Test, Control, and Monitor System (TCMS) equipment. TCMS is a complex and sophisticated checkout system. Operations and maintenance processes developed to support it will be based upon current experience, but will be focused on the specific needs of TCMS in support of Space Station Freedom Program (SSFP) and related activities. An overview of the operations and maintenance goals and philosophies are presented. The assumptions, roles and responsibilities, concepts and interfaces for operation, on-line maintenance, off-line support, and Operations and Maintenance (O&M) personnel training on all TCMS equipment located at KSC are described.

Buehler, David P.↗

Emergency Communications Console

NASA has applied its communications equipment expertise to development of a communications console that provides, in a compact package only slightly larger than an electric typewriter, all the emergency medical services communications functions needed for a regional hospital. A prototype unit, built by Johnson Space Center, has been installed in the Odessa (Texas) Medical Center Hospital. The hospital is the medical control center for the 17-county Permian Basin Emergency Medical System in west Texas. The console project originated in response to a request to NASA from the Texas governor's office, which sought a better way of providing emergency medical care in rural areas. Because ambulance travel time is frequently long in remote areas of west Texas, it is important that treatment begin at the scene of the emergency rather than at the hospital emergency room. A radio and telephone system linking ambulance emergency technicians and hospital staff makes this possible. But earlier equipment was complex, requiring specialized operators. A highly reliable system was needed to minimize breakdowns and provide controls of utmost simplicity, so that the system could be operated by physicians and nurses rather than by communications specialists. The resulting console has both radio and telephone sections. With the radio equipment, hospital personnel can communicate with ambulance drivers and paramedics, receive incoming electrocardiagrams, consult with other hospitals, page hospital staff and set up a radio-to-telephone "patch." The telephone portion of the system includes a hotline from the Permian Basin Emergency Medical Service's resource control center, an automatic dialer for contacting special care facilities in the Permian Basin network, a hospital intercom terminal and a means of relaying cardioscope displays and other data between hospitals. The integrated system also provides links with local disaster and civil defense organizations and with emergency "Dial 911" control points.

Source record↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 22: Compressed Air Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures (September 2011 - August 2020)

Compressed-air systems are used widely throughout industry for many operations, including pneumatic tools, packaging and automation equipment, conveyors, and other industrial process operations. Compressed-air systems are defined as a group of subsystems composed of air compressors, air treatment equipment, controls, piping, pneumatic tools, pneumatically powered machinery, and process applications using compressed air. A compressed-air system has three primary functional subsystems: supply, distribution, and demand. Air compressors are the primary energy consumers in a compressed-air system and are the primary focus of this protocol. The two compressed-air energy efficiency measures specifically addressed in this protocol are: high-efficiency/variable speed drive (VSD) compressor replacing modulating, load/unload, or constant-speed compressor; compressed-air leak survey and repairs. This protocol provides direction on how to reliably verify savings from these two measures using a consistent approach for each.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

How Autonomous Intelligent Systems Can Facilitate Earth-independent Medical Care: Going Beyond Telepresence

During the last decade, teleoperated robotic systems have extended humans’ sensorimotor competence to digitally fly beyond the physical barrier of distance and scale and thus transmit sensorimotor skills of the human through direct communication. Telepresence capabilities have enabled tele-physical remote access at small scales thanks to telerobotic mediums. Although the concept was initially motivated by space applications, such technologies quickly have expanded into the medical domain and resulted in teleoperated medical robots, including telerobotic surgical systems (such as the da Vinci surgical system). Effective telepresence fundamentally depends on an agile, reliable, and secure communication medium that can transmit real-time information between the operator and a remote device. However, direct telepresence may not be achievable for long-duration exploration spaceflight missions. Thus, autonomous systems and local intelligence represent potential solutions to the aforementioned issues. One example solution employs demonstration systems which enable learning from the pre-captured inputs of a skilled human operator. These will be computationally modeled and later probabilistically replicated toward the completion of remote physical tasks when direct telepresence is not viable - such as under communication blackout conditions. In other words, trained autonomous systems (e.g., robots) can perform remote operations that mimic the physical performance of experts during remote operations/training. Beyond learning the physics of the task, autonomous agents can also be used to conduct algorithmic decision-making that mimics the higher-level cognition of the expert. Thus, using an autonomous system, pre-trained cognitive and manipulation-based skills can be leveraged (acquired during pre-mission events) to produce digital twins of an intelligent operator. Such systems can be used for the real-time conduction of intricate tasks in complex and unstructured environments. Such systems will operationalize “cognitive digital twins” and can expand the reach of human cognition and manipulation through the power of data-driven learning from demonstration algorithms. This system category will be discussed as a fully autonomous operation in this talk. In addition to the above, we will also propose and discuss the possibility of partial-automation using remote intelligence and remote sensing. In contrast to full automation, partial automation can close the loop through a local operator equipped with augmented sensory awareness through wearable systems. Such technologies will allow the local operator to conduct delicate tasks while being guided using sensory augmentation and being monitored to gauge her/his level of cognitive focus and performance. The difference with the previous category is that a remote human will conduct the task. Further, rather than making a digital twin of human cognition, we will augment the control inputs of the local human to match those of the skilled expert operator who is not accessible in real-time. Going beyond classic telepresence and thus approaching intelligent telepresence, our vision is that autonomous agents will eventually enable the safe, consistent and efficient delivery of complex, remote and smart medical care during space exploration across operators in an Earth-independent fashion. We will discuss our collective vision from NASA and MERIIT@NYU lab in this talk.

Telepresence↗

Application of the Hardman methodology to the Army Remotely Piloted Vehicle (RPV)

The application of the HARDMAN Methodology to the Remotely Piloted Vehicle (RPV) is described. The methodology was used to analyze the manpower, personnel, and training (MPT) requirements of the proposed RPV system design for a number of operating scenarios. The RPV system is defined as consisting of the equipment, personnel, and operational procedures needed to perform five basic artillery missions: reconnaissance, target acquisition, artillery adjustment, target designation and damage assessment. The RPV design evaluated includes an air vehicle (AV), a modular integrated communications and navigation system (MICNS), a ground control station (GCS), a launch subsystem (LS), a recovery subsystem (RS), and a number of ground support requirements. The HARDMAN Methodology is an integrated set of data base management techniques and analytic tools, designed to provide timely and fully documented assessments of the human resource requirements associated with an emerging system's design.

Source record↗

Annual Report by Aerospace Safety Advisory Panel

Elements of the shuttle program that directly affect the mission success and crew safety were investigated. These elements included the shuttle orbiter, the main engine, the solid rocket boosters, avionic system, ground support equipment and the approach and landing operations. The thermal protection systems were studied in detail. Crew training and ground simulation test procedures were reviewed.

Source record↗

An Integrated Unix-based CAD System for the Design and Testing of Custom VLSI Chips

A computer aided design (CAD) system that is being used at the Jet Propulsion Laboratory for the design of custom and semicustom very large scale integrated (VLSI) chips is described. The system consists of a Digital Equipment Corporation VAX computer with the UNIX operating system and a collection of software tools for the layout, simulation, and verification of microcircuits. Most of these tools were written by the academic community and are, therefore, available to JPL at little or no cost. Some small pieces of software have been written in-house in order to make all the tools interact with each other with a minimal amount of effort on the part of the designer.

Deutsch, L. J.↗

Developing, mechanizing and testing of a digital active flutter suppression system for a modified B-52 wind-tunnel model

A digital flutter suppression system was developed and mechanized for a significantly modified version of the 1/30-scale B-52E aeroelastic wind tunnel model. A model configuration was identified that produced symmetric and antisymmetric flutter modes that occur at 2873N/sq m (60 psf) dynamic pressure with violent onset. The flutter suppression system, using one trailing edge control surface and the accelerometers on each wing, extended the flutter dynamic pressure of the model beyond the design limit of 4788N/sq m (100 psf). The hardware and software required to implement the flutter suppression system were designed and mechanized using digital computers in a fail-operate configuration. The model equipped with the system was tested in the Transonic Dynamics Tunnel at NASA Langley Research Center and results showed the flutter dynamic pressure of the model was extended beyond 4884N/sq m (102 psf).

Matthew, J. R.↗

Monitoring Based Commissioning: Step-by-Step Approach to Implementation in Chiller Plants

Chilled water systems consume a significant portion of the energy in manufacturing, and inefficient operation could significantly influence utility bills and the environmental footprint of a facility. One way to ensure long-term energy-efficient plant operation is to ensure that chilled water system equipment, such as chillers, cooling towers, and pumps, are running at their best. Periodic operational assessments help to meet efficiency objectives for cooling plants. However, occasional set point and operational changes resulting from short-term fluctuations cause the plant operation to deviate from optimal. These changes accumulate over time, and operational efficiency deteriorates. Significant energy efficiency improvement potential in chilled water systems can be achieved by operational changes alone. Recent developments in information technology and the industrial internet of things data processing ability have overcome traditional problems and given rise to a new paradigm: monitoring-based commissioning (MBCx). Commissioning platforms and fault detection and diagnostics capabilities have evolved over time and presented more sophisticated abilities to efficiently control process cooling plants. The typical architectures of the MBCx process and a detailed approach to implement the process for chilled water systems are presented. A case study highlighting the energy-and cost-savings potential of MBCx systems is also presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Embedding CLIPS-based expert systems in a real-time object-oriented simulation

This paper describes our continuing work embedding CLIPS-based expert systems into the System Test Environment (STE). We are embedding simple, compact rule engines in STE to simulate the actions of Naval platform commanders and equipment operators. Our eventual goal is to implement expert system modules that will replace all human participants and some of the equipment present in the simulation. This paper will briefly describe STE and then discuss its structure and implementation in more detail. Next, we will consider how expert systems could enhance STE's current capabilities. This will be followed by the examination of a specific CLIPS-based expert system model to be embedded in STE. Finally, a summary of our experience and a discussion of anticipated work on this project will close this paper.

Mcconagha, Patrick↗

International Space Station (ISS) Environmental Control and Life Support (ECLS) System Overview of Events: 2010-2014

Nov 2, 2014 marked the completion of the 14th year of continuous human presence in space on board the International Space Station (ISS). After 42 expedition crews, over 115 assembly & utilization flights, over 180 combined Shuttle/Station, US & Russian Extravehicular Activities (EVAs), the post-Assembly-Complete ISS continues to fly and the engineering teams continue to learn from operating its systems, particularly the life support equipment. Problems with initial launch, assembly and activation of ISS elements have given way to more long term system operating trends. New issues have emerged, some with gestation periods measured in years. Major events and challenges for each U.S. Environmental Control and Life Support (ECLS) subsystem occurring during calendar years 2010 through 2014 are summarily discussed in this paper, along with look-aheads for what might be coming in the future for each U.S. ECLS subsystem.

Gentry, Gregory J.↗

Operating The Central Process Systems At Glenn Research Center

As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the SEB does not select the company receiving the contract, they can make recommendations based on their findings to the SSO, who actually awards the contract. The SEB began work for this contract in July 2003 by writing the SOW and the selection will tentatively occur July 30, 2004. Contract awarding will take place Aug. 15. Following the awarding, the winning company has a 30-day Phase-in Period beginning Sept. 1,2004 and full performance will begin October 1.

Weiler, Carly P.↗