Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

GPM IMERG V07B and V06B: Evaluation Using Ground-Based Radar Observations and Application in Global Mesoscale Convective System Tracking

This study evaluates the latest Global Precipitation Measurement (GPM) Integrated Multi-satellitE Retrievals for GPM (IMERG V07B) against its predecessor V06B, for studying mesoscale convective systems (MCSs). Both versions are compared using ground-based radar and rain gauge data from five meteorologically diverse regions: the contiguous United States (including eastern coastlines), Amazon rainforest, central Argentina mountains, equatorial Indian Ocean, and northern Australia across multiple temporal (0.5–6 hours) and spatial scales (0.1°–0.25°). An updated global MCS tracking dataset is developed by integrating satellite-observed infrared brightness temperature with IMERG V07B. Comparation of IMERG against radar observations reveals that IMERG demonstrates better performance in capturing the probability distribution and quantitative contributions of rainfall (from no-rain to intense-rain conditions) over tropical oceans than over land, with marked improvements in IMERG V07B for heavy-to-intense rain (> 10 mm h-1). Over land, systematic biases persist: IMERG tends to overestimate light-to-moderate rain (1–10 mm h-1) while underestimating heavy-to-intense rain. Additionally, aggregating IMERG to coarser resolutions (3-hourly or 0.25°) improves consistency with radar observations, outperforming the 1-hourly/0.1° resolution. The new IMERG V07B-based global MCS dataset exhibits consistent statistical characteristics with the V06B-based dataset, despite lower mean rain rates and reduced heavy precipitation contributions. These findings offer valuable insights for utilizing IMERG V07B in global precipitation studies, MCS characterization, and model evaluation.

Zhang, Sihan↗

Optimizing fictitious states for Bell inequality violation in bipartite qubit systems with applications to the t t ¯ system

There is a significant interest in testing quantum entanglement and Bell inequality violation in high-energy experiments. Since the analyses in high-energy experiments are performed with events statistically averaged over phase space, the states used to determine observables depend on the choice of coordinates through an event-dependent basis and are thus not genuine quantum states, but rather “fictitious states.” We find that the basis which diagonalizes the spin-spin correlations is optimal for constructing fictitious states to test the violation of Bell’s inequality. This result is applied directly to the bipartite qubit system of a top and antitop produced at a hadron collider. We show that the beam axis is the optimal basis choice near the t t ¯ threshold production for measuring Bell inequality violation, while at high transverse momentum the basis that aligns along the momentum direction of the top is optimal. Published by the American Physical Society 2024

Astronomy & Astrophysics↗

Planar Transformer Systems for Modular Power Electronics in Long-Haul, Low-Cost PV Systems

This project successfully developed and verified a new approach for medium voltage (MV) planar transformers for use in emerging, utility-scale, modular PV systems. This approach simplifies their manufacture, improves their isolation capability, lowers their cost, and reduces their volume and loss, while also creating flexibility in the materials that can be used.

14 SOLAR ENERGY↗

Report of Viscosity Measurements on Reaction Simulant and 2-(methylamino) ethanol carbamate (NMEA carbamate) for the Explosives Destruction System (EDS) P3 System

The reaction products for the proposed chemistry for phosgene treatment in the Explosive Destruction System (EDS) are viscous. This will affect the time required to drain the EDS vessel. Viscosity measurements were made on two samples and the results for one sample have been fit to curves.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Recycling Wind Energy Systems in the United States Part 1: Providing a Baseline for America's Wind Energy Recycling Infrastructure for Wind Turbines and Systems

The U.S. investments in building this new wind energy capacity will not only mobilize millions of tons of raw and processed materials in existing supply chains, some of which are critical materials, but also create new types and large volumes of end-of-life (EOL) waste streams. Building efficient, cost-effective, and environmentally responsible EOL management infrastructure of wind energy system components is pivotal in diverting upcoming volumes of waste stream from landfills, recovery of critical materials and reducing life cycle emissions from production of primary commodity materials . The primary goal of this report is to organize and communicate findings from this assessment on how alternate materials, designs and manufacturing processes could enable more efficient, cost-effective, and environmentally responsible disassembly and resource recovery from wind energy technologies. The findings of this assessment could inform prioritization of RD&D investment spending to meet Energy Act of 2020 directions. This assessment focused on key RD&D recommendations for three main temporal phases: Short-term (2023-2026), medium-term (2026 through 2035) and long-term (beyond 2035).

17 WIND ENERGY↗

Ceramic Membrane Solar Desal: Pilot System Design and Full-Scale System Techno-Economic Analysis (CRADA Final Report)

This work is conducted in support of the American Made Challenges Solar Prize. The current scope addresses the Design portion of the overall prize competition. This team, led by the University of Connecticut, will design a solar powered, pilot scale, ceramic-based membrane distillation system that can operate on high salinity waters and propose that design for construction in the Test phase of the Prize competition.

14 SOLAR ENERGY↗

Economic Analysis of the NIF Optics Recycle Loop Systems Investment Options: SAE 560 - Economic Considerations for Systems Engineering at University of Southern California

The National Ignition Facility (NIF) relies on large-scale precision optics to deliver high-energy laser pulses for fusion and high-energy-density physics research; however, the NIF routinely operates above the damage threshold for those optics, decreasing their effectiveness with every experiment. A production line composed of several dozen highly specialized processing systems, collectively referred to as the ‘optics recycle loop’, was established to support refurbishment and re-use of these critical components to reduce reliance on high-cost and high-risk optic replacement strategies. This analysis aims to identify the most cost-effective investment options for improving recycle loop throughput by maximizing availability and production flexibility while minimizing the engineering and infrastructure efforts and cost.

42 ENGINEERING↗

Getting brighter: Impacts of improved day-ahead solar forecasts in high-solar, high-storage electricity systems

This paper analyzes the impacts of improved day-ahead solar forecasts on costs and dispatch in the solar-rich Southeast U.S. It uses an optimized high-solar, high-storage resource portfolio in which solar generation capacity accounts for 45 % of total installed capacity (34 %–36 % of generation) and energy storage capacity (43 GW) is equivalent to 33 % of peak demand. In a base scenario, improved day-ahead solar forecasts reduce production costs by $\$87$ million per year ($\$0.13$ per MWh load, $2023$$). This level of savings is within the range or lower than earlier studies of solar forecast improvements at lower levels of solar generation (<25 % of total generation). In this study, solar expansion was accompanied by two important sources of flexibility for managing solar forecast error: energy storage and day-ahead solar curtailment. Furthermore, the analysis finds that regional coordination complements day-ahead solar forecast improvements while natural gas commitment flexibility is a substitute for forecast improvements, as the improved solar forecast leads to sub-optimal commitment of thermal units. Day-ahead solar forecast improvements reduce reserves required to manage forecast error by 30 %. Fewer reserves to manage large, infrequent solar forecast errors could be an important benefit of improved solar forecasts.

14 SOLAR ENERGY↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

System-of-systems optimization of hydrogen infrastructure for heavy-duty freight corridors: The interstate 10 case study

Medium and heavy-duty freight transportation requires hydrogen energy infrastructure that is cost-effective, operationally reliable, spatially coherent, and resilient to demand variability along major corridors. This paper presents an integrated hydrogen corridor planning framework using Oak Ridge National Laboratory's OR-AGENT that couples freight-driven, route-resolved hydrogen demand modeling with optimized station siting, sizing, and station-level techno-economic analysis. The framework is demonstrated for the Interstate 10 freight corridor and the Houston-to-Los-Angeles region. Hydrogen demand is derived from high-resolution origin–destination freight data, duty-cycle characterization, and physics-based energy consumption modeling. Candidate refueling sites are selected from existing heavy-duty diesel fueling locations and optimized subject to onboard storage and station capacity constraints. Resulting station throughputs are evaluated using established techno-economic models for electrolytic hydrogen production and dispensing infrastructure. Results show that a regional, portfolio-level aggregation, average dispensed electrolytic hydrogen cost of $6.87–$7.26/kg is currently feasible, and is strongly influenced by demand density and utilization.

Sujan, Vivek [ORNL] (ORCID:0000000269882342)↗

Surprising Relationship between Silicon Anode Calendar Aging and Electrolyte Components in a Localized High-Concentration Electrolyte System

Although localized high-concentration electrolytes (LHCEs) have been shown to improve the calendar lifetime of silicon anodes, the roles of the electrolyte constituents in calendar aging are not well understood. Here, in this work, we utilize a voltage hold protocol and an LHCE with varying molar ratios of lithium bis(fluorosulfonyl)imide (LiFSI), tetramethylene sulfone (TMS), and 1,1,2,2-tetrafluoroethyl-2,2,3,3-tetrafluoropropyl ether (TTE) to probe the component roles during aging. Interestingly, the estimated calendar lifetime and irreversible lithium losses from the V-hold experiments are independent of the electrolyte formulations. Contrarily, the solid electrolyte interphase (SEI) composition depends on the electrolyte formulation. X-ray photoelectron spectroscopy shows that TMS-coordinated species decompose to form insoluble alkanes and lithium hydroxide (LiOH), while lithium fluoride (LiF) originates from the anion-coordination complex. The SEI composition does not appear to play a significant role in the silicon anode passivity, as measured by parasitic current, suggesting that the SEI-electrolyte interactions dictate the calendar aging mechanisms.

Si anode↗

The generation of a multiphase medium in ‘Splash’ bridge systems: towards an understanding of star formation suppression in turbulent galaxy systems

ABSTRACT Cloud–cloud collisions in splash bridges produced in gas-rich disc galaxy collisions offer a brief but interesting environment to study the effects of shocks and turbulence on star formation rates in the diffuse intergalactic medium, far from the significant feedback effects of massive star formation and active galactic nucleus. Expanding on our earlier work, we describe simulated collisions between counter-rotating disc galaxies of relatively similar mass, focusing on the thermal and kinematic effects of relative inclination and disc offset at the closest approach. This includes essential heating and cooling signatures, which go some way towards explaining the luminous power in H$_2$ and [C ii] emission in the Taffy bridge, as well as providing a partial explanation of the turbulent nature of the recently observed compact CO-emitting clouds observed in Taffy by the Atacama Large Millimeter Array (ALMA). The models show counter-rotating disc collisions result in swirling, shearing kinematics for the gas in much of the post-collision bridge. Gas with little specific angular momentum due to collisions between counter-rotating streams accumulates near the centre of mass. The disturbances and mixing in the bridge drive continuing cloud collisions, differential shock heating, and cooling throughout. A wide range of relative gas phases and line-of-sight velocity distributions are found in the bridges, depending sensitively on initial disc orientations, and the resulting variety of cloud collision histories. Most cloud collisions can occur promptly or persist for quite a long duration. Cold and hot phases can largely overlap throughout the bridge or can be separated into different parts of the bridge.

79 ASTRONOMY AND ASTROPHYSICS↗