Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Software Acceptance Test Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

NEEMO 15: Evaluation of Human Exploration Systems for Near-Earth Asteroids

The NASA Extreme Environment Mission Operations (NEEMO) 15 mission was focused on near-Earth Asteroid (NEA) exploration techniques evaluation. It began with a University of Delaware autonomous underwater vehicle (AUV) systematically mapping the coral reef for hundreds of meters surrounding the Aquarius habitat. This activity is akin to the type of "far field survey" approach that may be used by a robotic precursor in advance of a human mission to a NEA. Data from the far-field survey were then examined by the NEEMO science team and follow-up exploration traverses were planned, which used Deepworker single-person submersibles. Science traverses at NEEMO 15 were planned according to a prioritized list of scientific objectives developed by the science team based on review and discussion of previous related marine science research including previous marine science saturation missions conducted at the Aquarius habitat. AUV data was used to select several areas of scientific interest. The Deepworker science traverses were then executed at these areas of interest during 4 days of the NEEMO 15 mission and provided higher resolution data such as coral species distribution and mortality. These traverses are analogous to the "near field survey" approach that is expected to be performed by a multi mission space exploration vehicle (MMSEV) during a human mission to a NEA before conducting extravehicular activities (EVA)s. In addition to the science objectives that were pursued, the NEEMO 15 science traverses provided an opportunity to test newly developed software and techniques. Sample collection and instrument deployment on the NEA surface by EVA crew would follow the "near field survey" in a human NEA mission. Sample collection was not necessary for the purposes of the NEEMO science objectives; however, the engineering and operations objectives during NEEMO 15 were to evaluate different combinations of vehicles, crewmembers, tools, and equipment that could be used to perform these tasks on a NEA. Specifically, the productivity and acceptability of simulated NEA exploration activities were systematically quantified and compared when operating with different combinations of crew sizes and exploration systems including MMSEVs, EVA jet packs, and EVA translation devices.

Chappell, Steven P.↗

Full Life-Cycle Defect Management Assessment: Initial Inspection Data Collection Results and Research Questions for Further Study

It is often the case in software projects that when schedule and budget resources are limited, the Verification and Validation (V&V) activities suffer. Fewer V&V activities can be afforded and moreover, short-term challenges can result in V&V activities being scaled back or dropped altogether. As a result, too often the default solution is to save activities for improving software quality until too late in the life-cycle, relying on late-term code inspections followed by thorough testing activities to reduce defect counts to acceptable levels. As many project managers realize, however, this is a resource-intensive way of achieving the required quality for software. The Full Life-cycle Defect Management Assessment Initiative, funded by NASA s Office of Safety and Mission Assurance under the Software Assurance Research Program, aims to address these problems by: Improving the effectiveness of early life-cycle V&V activities to make their benefits more attractive to team leads. Specifically, we focus on software inspection, a proven method that can be applied to any software work product, long before executable code has been developed; Better communicating this effectiveness to software development teams, along with suggestions for parameters to improve in the future to increase effectiveness; Analyzing the impact of early life-cycle V&V on the effectiveness and cost required for late life-cycle V&V activities, such as testing, in order to make the tradeoffs more apparent. This white paper reports on an initial milestone in this work, the development of a preliminary model of inspection effectiveness across multiple NASA Centers. This model contributes toward reaching our project goals by: Allowing an examination of inspection parameters, across different types of projects and different work products, for an analysis of factors that impact defect detection effectiveness. Allowing a comparison of this NASA-specific model to existing recommendations in the literature regarding how to plan effective inspections. Forming a baseline model which can be extended to incorporate factors describing: the numbers and types of defects that are missed by inspections; how such defects flow downstream through software development phases; how effectively they can be caught by testing activities in the late stages of development. The model has been implemented in a prototype web-enabled decision-support tool which allows developers to enter their inspection data and receive feedback based on a comparison against the model. The tool also allows users to access reusable materials (such as checklists) from projects included in the baseline. Both the tool itself and the model underlying it will continue to be extended throughout the remainder of this initiative. As results of analyzing inspection effectiveness for defect containment are determined, they can be shared via the tool and also via updates to existing training courses on metrics and software inspections. Moreover, the tool will help satisfy key CMMI requirements for the NASA Centers, as it will enable NASA to take a global view across peer review results for various types of projects to identify systemic problems. This analysis can result in continuous improvements to the approach to verification.

Shull, Forrest↗

REALIZATION OF A AUTOMATED T-WAY COMBINATORIAL TESTING APPROACH FOR A SOFTWARE BASED EMBEDDED DIGITAL DEVICE

Under the Department of Energy’s Light Water Reactor Sustainability Program, within the Plant Modernization research pathway, the Digital I&C Qualification Project is identifying new methods that would be beneficial in qualifying digital I&C systems and devices for safety-related usage. One such method that would be useful in qualifying field components such as sensors and actuators is the concept of testability. The Nuclear Regulatory Commission (NRC) considers testability to be one of two design attributes sufficient to eliminate consideration of software-based or software logic-based common cause failure (the other being diversity). The NRC defines acceptable “testability” as follows: Testability – A system is sufficiently simple such that every possible combination of inputs and every possible sequence of device states are tested and all outputs are verified for every case (100% tested). [NUREG 0800, Chapter 7, Branch Technical Position (BTP) 7-19] This qualification method has never proven to be practical in view of the very large number of combinations of inputs and sequences of device states for a typical I&C device. However, many of these combinations are not unique in the sense that they represent the same state space or in that that they represent state space that would not affect the critical design basis functions of the device. Therefore, the state space of interest might possibly be reduced to a manageable dimension through such analysis. This project will focus on a representative I&C device similar in design, function, and complexity to the types of devices that would likely be deployed in nuclear power plants as digital or software based sensors and actuators (e.g. Smart Sensors). Analysis will be conducted to determine the feasibility of testing this device in a manner consistent with the NRC definition. This report describes the development of test process for Bounded Exhaustive Testing with respect to Combinatorial Test (CT) methods. The report describes the candidate Device Under Test SW – the VCU smart sensor, conceptual experimental methods for stated test objectives, description of the process, tools, resources, and computing. This information will be used to fully develop a detailed test plan (based on statistical measure needs) and test environment for conducting an I&C device testability demonstration study. The future planed experimental study of this project is to demonstrate digital qualification via Bounded Exhaustive Testability with respect to Common Cause Failure.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SU-F-T-586: Pre-Treatment QA of InCise2 MLC Plans On a Cyberknife-M6 Using the Delta4 System in SBRT

Purpose: Performing pre-treatment quality assurance (QA) with the Delta4 system (ScandiDos Inc., Madison, WI) is well established for linac-based radiotherapy. This is not true when using a Cyberknife (Accuray Inc., Sunnyvale, CA) where, typically film-based QA is applied. The goal of this work was to test the feasibility to use the Delta4 system for pre-treatment QA for stereotactic body radiation therapy (SBRT) using a Cyberknife-M6 equipped with the InCise2 multileaf collimator (MLC). Methods: In order to perform measurements without accelerator pulse signal, the Tomotherapy option within the Delta4 software was used. Absolute calibration of the Delta4 phantom was performed using a 10×10 cm{sup 2} field shaped by the InCise2 MLC of the Cyberknife-M6. Five fiducials were attached to the Delta4 phantom in order to be able to track the phantom before and during measurements. For eight SBRT treatment plans (two liver, two prostate, one lung, three bone metastases) additional verification plans were recalculated on the Delta4 phantom using MultiPlan. Dicom data was exported from MultiPlan and was adapted in order to be compatible with the Delta4 software. The measured and calculated dose distributions were compared using the gamma analysis of the Delta4 system. Results: All eight SBRT plans were successfully measured with the aid of the Delta4 system. In the mean, 98.0±1.9%, 95.8±4.1% and 88.40±11.4% of measured dose points passed the gamma analysis using a global dose deviation criterion of 3% (100% corresponds to the dose maximum) and a distance-to-agreement criterion of 3 mm, 2 mm and 1 mm, respectively, and a threshold of 20%. Conclusion: Pre-treatment QA of SBRT plans using the Delta4 system on a Cyberknife-M6 is feasible. Measured dose distributions of SBRT plans showed clinically acceptable agreement with the corresponding calculated dose distributions.

60 APPLIED LIFE SCIENCES↗

Acceptance Testing of a Satellite SCADA Photovoltaic-Diesel Hybrid System

Savannah State University (SSU) and the Florida Solar Energy Center (FSEC) have been participating in the NASA Advanced Communications Technology Satellite (ACTS) program for the last five years. This program was designed by NASA to help maintain U.S. leadership in commercial space communications by funding high-risk research, and to flight-test next-generation digital satellite components. Launched in 1993, ACTS is an U.S. government funded technology test-bed that incorporates high power Ka-band transponders, small spot beams, and on-board digital storage and switching technology. Associated with the spacecraft, is a prototype satellite control center that supports various application experiments. The SSU/FSEC application experiment is to developing a Photovoltaic-Diesel Hybrid Power system complete with satellite Supervisory Control and Data Acquisition (SCADA). The hybrid system was design to demonstrate the feasibility of using SCADA to maintain and operate remote village power systems. This configuration would enable experts at a central location to provide technical assistance to local technicians while they acquire a measure of proficiency with the hybrid system operation and maintenance. Upon full mastery of the technology, similar SCADA arrangement are planned to remotely monitor and control constellation of hybrid systems scattered overlarge rural areas. Two Orion Energy APEX-1000 hybrid systems were delivered in 1998, one was installed at SSU in eastern Georgia and the other was installed at FSEC in Central Florida. The project was designed to: (1) evaluate the performance of ACTS in a SCADA arrangement, (2) monitor the health and performance of all major hybrid subsystems, (3) investigate load control and battery charging strategies to maximize battery capacity and lifetime, and (4) develop satellite communication protocol. Preliminary results indicate that the hybrid design is suitable for satellite Supervisory Control and Data Acquisition. A modification to the controller software has produced a robust communication link capable of real time control and long term data collection.

Kalu, Alex↗

Nuclear Materials Packaging, Transportation, and Systems Analysis Group Software Quality Assurance Plan: ANSYS Mechanical Finite Element Analysis Software Version 2023R1

ANSYS Inc. develops and markets engineering simulation software and services used in the aerospace, automotive, manufacturing, electronics, biomedical, energy, defense, and many other industries. ANSYS is dedicated to engineering simulation and is the world’s leading software provider. ANSYS was founded in 1970 and is headquartered in Canonsburg, Pennsylvania. ANSYS provides an engineering analysis tool combining structural, thermal, computational fluid dynamics, acoustic, and electromagnetic simulation capabilities. ANSYS has two main programs, which use the same solvers: (1) Mechanical APDL (ANSYS Design Parametric Language), a Fortran-based coding platform, and (2) ANSYS Workbench, which uses a graphical user interface to aid in finite element analysis implementation. This plan covers both APDL and Workbench. The ANSYS computer program is a large-scale, multipurpose finite element program that can be used to solve several classes of engineering analyses. The analysis capabilities of ANSYS include the ability to solve static and dynamic structural analyses, steady-state and transient heat transfer problems, mode-frequency and buckling eigenvalue problems, static or time-varying magnetic analyses, and various types of field and coupled-field applications. The program contains many special features that allow nonlinearities or secondary effects such as plasticity, large strain, hyperelasticity, creep, swelling, large deflections, contact, stress stiffening, temperature dependency, material anisotropy, and radiation to be included in the solution. As ANSYS has been developed, other special capabilities such as substructuring, submodeling, random vibration, kinetostatics, kinetodynamics, free convection fluid analysis, acoustics, magnetics, piezoelectrics, coupled-field analysis, and design optimization have been added to the program. These capabilities contribute further to making ANSYS a multipurpose analysis tool for varied engineering disciplines. The ANSYS program has been in commercial use for over 50 years and has been used extensively in the aerospace, automotive, construction, electronic, energy services, manufacturing, nuclear, plastics, oil, and steel industries. Additionally, many consulting firms and hundreds of universities have used ANSYS for analysis, research, and educational purposes. ANSYS is recognized worldwide as one of the most widely used and capable programs of its type. Ansys design analysis software is the first created within a quality system with ISO 9001 certification, the internationally accepted quality standard. Product development, testing, maintenance and support processes also meet the United States Nuclear Regulatory Commission's quality requirements, as they have for nearly four decades. The Quality Assurance Service Agreement is suitable for the customers working in the nuclear industry who need to meet specific federal regulations including 10CRF50 Appendix B and provisions of 10CFR21. ANSYS has retained its original International Organization for Standardization (ISO) 9001 accreditation certificate since1995-05-04, It’s current certificate is valid until 2027-05-29.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SU-E-T-50: Automatic Validation of Megavoltage Beams Modeled for Clinical Use in Radiation Therapy

Purpose: To automatically validate megavoltage beams modeled in XiO™ 4.50 (Elekta, Stockholm, Sweden) and Varian Eclipse™ Treatment Planning Systems (TPS) (Varian Associates, Palo Alto, CA, USA), reducing validation time before beam-on for clinical use. Methods: A software application that can automatically read and analyze DICOM RT Dose and W2CAD files was developed using MatLab integrated development environment.TPS calculated dose distributions, in DICOM RT Dose format, and dose values measured in different Varian Clinac beams, in W2CAD format, were compared. Experimental beam data used were those acquired for beam commissioning, collected on a water phantom with a 2D automatic beam scanning system.Two methods were chosen to evaluate dose distributions fitting: gamma analysis and point tests described in Appendix E of IAEA TECDOC-1583. Depth dose curves and beam profiles were evaluated for both open and wedged beams. Tolerance parameters chosen for gamma analysis are 3% and 3 mm dose and distance, respectively.Absolute dose was measured independently at points proposed in Appendix E of TECDOC-1583 to validate software results. Results: TPS calculated depth dose distributions agree with measured beam data under fixed precision values at all depths analyzed. Measured beam dose profiles match TPS calculated doses with high accuracy in both open and wedged beams. Depth and profile dose distributions fitting analysis show gamma values < 1. Relative errors at points proposed in Appendix E of TECDOC-1583 meet therein recommended tolerances.Independent absolute dose measurements at points proposed in Appendix E of TECDOC-1583 confirm software results. Conclusion: Automatic validation of megavoltage beams modeled for their use in the clinic was accomplished. The software tool developed proved efficient, giving users a convenient and reliable environment to decide whether to accept or not a beam model for clinical use. Validation time before beam-on for clinical use was reduced to a few hours.

60 APPLIED LIFE SCIENCES↗

NEAMS Update: Quarterly report for January - March 2012

Quarterly highlights are: (1) The integration of Denovo and AMP was demonstrated in an AMP simulation of the thermo-mechanics of a complete fuel assembly; (2) Bison was enhanced with a mechanistic fuel cracking model; (3) Mechanistic algorithms were incorporated into various lower-length-scale models to represent fission gases and dislocations in UO2 fuels; (4) Marmot was improved to allow faster testing of mesoscale models using larger problem domains; (5) Component models of reactor piping were developed for use in Relap-7; (6) The mesh generator of Proteus was updated to accept a mesh specification from Moose and equations were formulated for the intermediate-fidelity Proteus-2D1D module; (7) A new pressure solver was implemented in Nek5000 and demonstrated to work 2.5 times faster than the previous solver; (8) Work continued on volume-holdup models for two fuel reprocessing operations: voloxidation and dissolution; (9) Progress was made on a pyroprocessing model and the characterization of pyroprocessing emission signatures; (10) A new 1D groundwater waste transport code was delivered to the used fuel disposition (UFD) campaign; (11) Efforts on waste form modeling included empirical simulation of sodium-borosilicate glass compositions; (12) The Waste team developed three prototypes for modeling hydride reorientation in fuel cladding during very long-term fuel storage; (13) A benchmark demonstration problem (fission gas bubble growth) was modeled to evaluate the capabilities of different meso-scale numerical methods; (14) Work continued on a hierarchical up-scaling framework to model structural materials by directly coupling dislocation dynamics and crystal plasticity; (15) New 'importance sampling' methods were developed and demonstrated to reduce the computational cost of rare-event inference; (16) The survey and evaluation of existing data and knowledge bases was updated for NE-KAMS; (17) The NEAMS Early User Program was launched; (18) The Nuclear Regulatory Commission (NRC) Office of Regulatory Research was introduced to the NEAMS program; (19) The NEAMS overall software quality assurance plan (SQAP) was revised to version 1.5; and (20) Work continued on NiCE and its plug-ins and other utilities, such as Cubit and VisIt.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preparing for Veg-04 and Veg-05: Improving Pick-And-Eat Food Capabilities for the International Space Station

The capability to grow nutritious, palatable food for crew consumption during spaceflight has the potential to provide health-promoting, bioavailable nutrients, enhance the dietary experience, and reduce launch mass as we move toward longer-duration missions. Studies of edible produce during spaceflight have been limited, leaving a significant knowledge gap in the methods required to grow safe, acceptable, nutritious crops for consumption in space. Researchers from Kennedy Space Center, Johnson Space Center, Purdue University and ORBITEC have teamed up to explore the potential for plant growth and food production on the International Space Station (ISS) and future exploration missions. Ground testing of Chinese cabbage and dwarf tomato crops under different LED lighting and fertilizer conditions is being conducted to allow for a preliminary down selection of the two best lighting recipes and the best fertilizer treatment. Two trials of Chinese cabbage and one trial on dwarf tomato have been completed in on-going ground tests. Horticultural data on crop growth and productivity and chemical data on specific nutrients have been collected and are being analyzed to allow preliminary down selection. Taste test evaluations are planned on the preliminary down selection treatments to allow a final down selection for flight testing. Microbial assessment for hazard analysis critical control points (HACCP) evaluation is also underway to enable implementation of food consumption. Following down selection flight preparation will commence for testing these crops in the Veggie vegetable-production system on the ISS. A crew questionnaire has been developed to better understand the impact of crop growth in Veggie on crew behavioral health. A single Veggie plant growth chamber is currently installed on ISS, and preparations are underway to launch a second Veggie, allowing side-by-side testing under different lighting conditions. Veg-04 will be the first mission that will use this dual-Veggie capability, where the selected cultivar of Tokyo bekana Chinese cabbage will be grown under two different red-to-blue light ratios. ORBITEC has developed custom lighting software allowing independent selection of red and blue light levels. The VEG-05 experiment will test similar light treatments using Red Robin dwarf tomato. These tests offer an opportunity to develop a pick-and-eat fresh vegetable component to the ISS food system as a first step to regular supplemental food production. Our work will help define light colors, levels, and horticultural best practices to achieve high yields of safe, nutritious leafy greens and tomatoes to supplement a space diet of prepackaged food. With this work we will continue the synergistic research to help close gaps in the human research roadmap, and enable humans to venture to Mars and beyond. This research was co-funded by the Human Research Program and Space Biology (MTL1075) in the ILSRA 2015 NRA call.

International Space Station↗

SU-F-T-180: Evaluation of a Scintillating Screen Detector for Proton Beam QA and Acceptance Testing

Purpose: To test the performance of a commercial scintillating screen detector for acceptance testing and Quality Assurance of a proton pencil beam scanning system. Method: The detector (Lexitek DRD 400) has 40cm × 40cm field, uses a thin scintillator imaged onto a 16-bit scientific CCD with ∼0.5mm resolution. A grid target and LED illuminators are provided for spatial calibration and relative gain correction. The detector mounts to the nozzle with micron precision. Tools are provided for image processing and analysis of single or multiple Gaussian spots. Results: The bias and gain of the detector were studied to measure repeatability and accuracy. Gain measurements were taken with the LED illuminators to measure repeatability and variation of the lens-CCD pair as a function with f-stop. Overall system gain was measured with a passive scattering (broad) beam whose shape is calibrated with EDR film placed in front of the scintillator. To create a large uniform field, overlapping small fields were recorded with the detector translated laterally and stitched together to cover the full field. Due to the long exposures required to obtain multiple spills of the synchrotron and very high detector sensitivity, borated polyethylene shielding was added to reduce direct radiation events hitting the CCD. Measurements with a micro ion chamber were compared to the detector’s spot profile. Software was developed to process arrays of Gaussian spots and to correct for radiation events. Conclusion: The detector background has a fixed bias, a small component linear in time, and is easily corrected. The gain correction method was validated with 2% accuracy. The detector spot profile matches the micro ion chamber data over 4 orders of magnitude. The multiple spot analyses can be easily used with plan data for measuring pencil beam uniformity and for regular QA comparison.

60 APPLIED LIFE SCIENCES↗

Software Quality Assurance Plan ANSYS LSDYNA Version 2023R1

ANSYS Inc. develops and markets engineering simulation software and services used in the aerospace, automotive, manufacturing, electronics, biomedical, energy, defense, and many other industries. ANSYS is dedicated to engineering simulation and is the world’s leading software provider. ANSYS was founded in 1970 and is headquartered in Canonsburg, Pennsylvania. ANSYS provides an engineering analysis tool combining structural, thermal, computational fluid dynamics, acoustic and electromagnetic simulation capabilities. ANSYS LS-DYNA is the most used explicit simulation program capable of simulating the response of materials to short periods of severe loading. Its many elements, contact formulations, material models, and other controls can be used to simulate complex models with control over all the details of the problem. ANSYS LS-DYNA has a vast array of capabilities to simulate extreme deformation problems using its explicit solver. Engineers can tackle simulations involving material failure and look at how the failure progresses through a part or through a system. Models with large amounts of parts or surfaces interacting with each other are also easily handled, and the interactions and load passing between complex behaviors are modeled accurately. Using computers with higher numbers of CPU cores can drastically reduce solution times. In addition, many consulting firms and hundreds of universities use ANSYS for analysis, research, and educational purposes. ANSYS is recognized worldwide as one of the most widely used and capable programs of its type. ANSYS has successfully passed over 100 customer quality system audits against American Society of Mechanical Engineers (ASME) NQA-1 and 10 CFR Part 50, Appendix B, since the company was founded, over 60 of which have been since 1997. ANSYS has successfully passed over 100 International Organization for Standardization (ISO) 9001 assessments. ANSYS design analysis software is the first created within a quality system with ISO 9001 certification, which is the internationally accepted quality standard. Product development, testing, maintenance, and support processes also meet the US Nuclear Regulatory Commission’s (NRC’s) quality requirements, as they have for nearly four decades. ANSYS staff perform more than 60,000 software verification tests before releasing each new product. ASME NQA-1-2012 (Subpart 2.7 is specific to software) is the industry- and NRC-accepted approach (consensus standard) for meeting 10 CFR Part 50, Appendix B, requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SU-E-T-502: Biometrically Accepted Patient Records

Purpose: To implement a clinically useful palm vein pattern recognition biometric system to treat the correct treatment plan to the correct patient each and every time and to check-in the patient into the department to access the correct medical record. Methods: A commercially available hand vein scanning system was paired to Aria and utilized an ADT interface from the hospital electronic health system. Integration at two points in Aria, version 11 MR2, first at the appointment tracker screen for the front desk medical record access and second at the queue screen on the 4D treatment console took place for patient daily time-out. A test patient was utilized to check accuracy of identification as well as to check that no unintended interactions take place between the 4D treatment console and the hand vein scanning system. This system has been in clinical use since December 2013. Results: Since implementation, 445 patients have been enrolled into our biometric system. 95% of patients learn the correct methodology of hand placement on the scanner in the first try. We have had two instances of patient not found because of a bad initial scan. We simply erased the scanned metric and the patient enrolled again in those cases. The accuracy of the match is 100% for each patient, we have not had one patient misidentified. We can state this because we still use patient photo and date of birth as identifiers. A QA test patient is run monthly to check the integrity of the system. Conclusion: By utilizing palm vein scans along with the date of birth and patient photo, another means of patient identification now exits. This work indicates the successful implementation of technology in the area of patient safety by closing the gap of treating the wrong plan to a patient in radiation oncology. FOJP Service Corporation covered some of the costs of the hardware and software of the palm vein pattern recognition biometric system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design, implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Design implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Supervisory Control with Dual Tasking in Post G-Transition Vehicle Landings

BACKGROUND Landing during exploration spaceflight may consist of both planned automated supervisory control and unplanned crew override. Supervisory control, particularly when performed under cognitive load with additional monitoring tasks, is essential for ensuring overall mission success during landing contingencies. Evaluating performance in a relevant Human Landing System (HLS) supervisory landing task after long-duration microgravity exposure can help identify potential risks from human error and sensorimotor alterations. Adaptive changes in the sensorimotor system can manifest during g-transitions as spatial disorientation. Although training and landing aids facilitate successful landings despite disorientation, these adaptive changes may heighten cognitive demand, which must be considered in the landing strategy. It is important to characterize these effects as soon as possible following the G-transition while the sensorimotor system remains in a state of adaptive flux to inform appropriate countermeasures. METHODS A Multi-attribute Lunar Table Battery (MALTB) task was developed for an iOS tablet device to provide flexible crew testing and training capabilities in-flight and on the ground. Elements of the tablet task were derived from the Multi-Attribute Task Battery (MATB, Cegarra et al. 2020). The task requires crew members to study a map of a planned landing site and memorizing the terrain and surface landmarks to inform potential divert maneuvers during landing. The user will oversee a series of approaches through touchdown simulations on the tablet with an external camera view of the Lunar surface. The primary responsibility of the crew member will be to execute a divert if the guidance recommended site is erroneous (e.g., the guidance projected landing target is not within 10m of the planned landing site center), or the projected landing site is no longer suitable due to surface obstacles. Considering vehicle maneuverability and fuel reserves, the divert capabilities will diminish as the task progresses. In cases where a divert is initiated, a new landing target will need to be designated by the user and will be evaluated for the proximity to the original pre-planned site. A secondary operational monitoring task will challenge the user's cognitive reserve by requiring the user to maintain several gauges within acceptable limits and respond to a visual indicator while completing the landing approach. Outcome measures include distance from the planned landing site to the user-initiate divert landing location, ground slope at the new landing site, time to divert, the ability to accomplish the secondary monitoring tasks, and perceived workload. The tablet task is being evaluated in a ground-based study to determine the learning effect of first-time users. The tablet task will be utilized in a flight study to test performance multiple times postflight. Future potential testing in-flight have been identified for capsules with iOS tablet devices. Multi-attribute Lunar Table Battery Task MALTB comprises video footage of thirty distinct landing conditions. The landing scenarios feature various landing sites (n = 3), hazardous object sizes (n = 6), sun azimuth degrees (n = 4), camera modes (i.e., fixed or gimbaled), and navigation bias (i.e., true or false). Each seventy second trial uses a sixty-degree constant glideslope trajectory. The application architecture and layout include user identification setup and data storing, a guided walkthrough of the task and interface components, practice mode for task familiarization, and a modified Bedford workload scale administered following task completion. The time-based dependent measures are saved locally to the iOS Files application and post-processing scripts have been developed to evaluate the remaining measures of performance. RELEVANCE This project will deliver an operational demonstration of crew monitoring capability following spaceflight and identify potential deficits that may require remediation. Comparison of individual vestibular and cognitive changes with crew performance will help better characterize the landing risks associated with sensorimotor alterations. ACKNOWLEDGEMENTS: This project is funded by NASA’s Human Research Program Human Health Countermeasures Element. REFERENCES Cegarra J, Valery B, Avril E, Calmettes C, Navarro J (2020) OpenMATB: A Multi-Attribute Task Battery promoting task customization, software extensibility and experiment replicability. Behav Res Methods 52:1980-1990 doi: 10.3758/s13428-020-01364-w

Matthew McDonnell↗

Electronics Upgrades to the Green is Clean Phoswich Detector Systems and Programmatic Implementation at LANL - Phase II Completion - 18403

Los Alamos National Laboratory (LANL) radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to verify that GIC candidate low-density waste contains no radioactivity above background. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. The electronics currently in use by the systems are out of date and some components are no longer manufactured. In 2015, phase I upgrades to the GIC detector systems were completed. Phase I objectives included identifying more modern commercially available electronics that could replace the NIM electronics. A pulse shape discriminator (PSD) module, the Digital Gamma Finder (DGF) Pixie-4 made by XIA LLC, that fits in a compact National Instruments{sup TM} PXI chassis was identified to replace the majority of the original NIM bin electronics - a single Pixie-4 module replaces four NIM amplifiers and four NIM pulse shape analyzers (PSAs). Another phase I objective was to show that that new PSD could separate out the NaI and CsI detector signals in a manner equivalent to or better than the NIM electronics. Proof of concept was achieved in 2015 when a prototype upgrade system on ZEUS was built and tested and gating parameter settings were determined that successfully separated the NaI and CsI signals. Phase II required establishing a LabVIEW software interface with Pixie-4 electronics in lieu of the manufacturer provided Pixie-4 software called the Pixie Viewer. In addition, phase II included 1) final optimization of the gating parameters on the prototype Pixie-4 ZEUS system, 2) finalizing Requirements, Design and Test Plan documents, 3) LabVIEW software interface quality assurance (QA) testing, 4) setting up the HERCULES system with the Pixie-4 upgrade electronics, 5) check source and background calibration of both systems, 6) absolute efficiency determination on both systems and 7) procedure revisions and implementation of both systems into routine operations. In 2017 phase II was completed including the preparation of detailed Requirements, Design and Test Plan documents. The LabVIEW interface software that communicates and controls the Pixie-4 has been completed, merged with the preexisting LabVIEW operations software and fully tested. Gating parameter optimization, configuration of HERCULES with the Pixie-4 electronics, check source and background calibrations and absolute efficiency determinations have all been performed - quantitative results are presented in the full paper. For performance validation, comparison measurements of actual GIC bags on both the HERCULES system using the old NIM Bin electronics and the ZEUS system using the upgraded Pixie-4 electronics have been done and evaluated. Finally, procedure revisions and implementation of both systems into routine operations is currently in process and planned to be complete by the end of calendar year 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2015 First Quarterly Report

During the first quarter of FY 2015, the following technical progress has been made toward project milestones: 1) Autodesk delivered a new research version of ASMI to PNNL. This version includes the improved 3D fiber orientation solver, and the reduced order model (ROM) for fiber length distribution using the proper orthogonal decomposition (POD) implemented in the mid-plane, dual-domain and 3D solvers. 2) Autodesk coordinated a conference paper with PNNL reporting ASMI mid-plane fiber orientation predictions compared with the measured data for two PlastiComp plaques. This paper was accepted for presentation at the 2015 Society for Plastics Engineers (SPE) ANTEC conference. 3) The University of Illinois (Prof. Tucker) assisted team members from Purdue with fiber orientation measurement techniques, including interpretation of off-axis cross sections. 4) The University of Illinois assisted Autodesk team members with software implementation of the POD approach for fiber length modeling, and with fiber orientation modeling. 5) The University of Illinois co-authored in the SPE ANTEC paper, participated with the team in discussions of plaque data and model results, and participated in the definition of go/no-go experiments and data. 6) Purdue University (Purdue) conducted fiber orientation measurements for 3 PlastiComp plaques: fast-fill 30wt% LCF/PP center-gated, fast-fill 50wt% LCF/PA66 edge-gated and fast-fill 50wt% LCF/PA66 center-gated plaques, and delivered the fiber orientation data for these plaques at the selected locations (named A, B, and C) to PNNL. However, the data for the fast-fill 50wt% LCF/PA66 edge-gated plaque exhibited unusual variations and could not be used for the model validation. Purdue will re-measure fiber orientation for this plaque. 7) Based on discussions with the University of Illinois Purdue explained the ambiguity in the measurements of the fiber orientation components. 8) PNNL discussed with team members to establish a go/no-go decision plan for the project and submitted the established plan to DOE. 9) PNNL performed ASMI mid-plane analyses for the fast-fill center-gated 30wt% LCF/PP and 50wt% LCF/PA66 plaques and compared the predicted fiber orientations with the measured data provided by Purdue at Locations A, B, and C on these plaques. 10) Based on discussions with the University of Illinois and Autodesk, PNNL proposed a procedure to adjust fiber orientation data for Location A of the center-gated plaques so that the data can be expressed and interpreted in the flow/cross-flow direction coordinate system. 11) PNNL tested the new ASMI version received from Autodesk, examined and discussed 3D fiber orientation predictions for PlastiComp plaques. 12) PlastiComp, Inc. (PlastiComp), Toyota Research Institute North America (Toyota) and Magna Exteriors and Interiors Corp. (Magna) participated in discussions with team members on the go/no-go plan and the issues related to fiber length measurements. Toyota continued the discussion with Magna on tool modification for molding the complex part in order to achieve the target fiber length in the part.

42 ENGINEERING↗

XML: James Webb Space Telescope Database Issues, Lessons, and Status

This paper will present the current concept using extensible Markup Language (XML) as the underlying structure for the James Webb Space Telescope (JWST) database. The purpose of using XML is to provide a JWST database, independent of any portion of the ground system, yet still compatible with the various systems using a variety of different structures. The testing of the JWST Flight Software (FSW) started in 2002, yet the launch is scheduled for 2011 with a planned 5-year mission and a 5-year follow on option. The initial database and ground system elements, including the commands, telemetry, and ground system tools will be used for 19 years, plus post mission activities. During the Integration and Test (I&T) phases of the JWST development, 24 distinct laboratories, each geographically dispersed, will have local database tools with an XML database. Each of these laboratories database tools will be used for the exporting and importing of data both locally and to a central database system, inputting data to the database certification process, and providing various reports. A centralized certified database repository will be maintained by the Space Telescope Science Institute (STScI), in Baltimore, Maryland, USA. One of the challenges for the database is to be flexible enough to allow for the upgrade, addition or changing of individual items without effecting the entire ground system. Also, using XML should allow for the altering of the import and export formats needed by the various elements, tracking the verification/validation of each database item, allow many organizations to provide database inputs, and the merging of the many existing database processes into one central database structure throughout the JWST program. Many National Aeronautics and Space Administration (NASA) projects have attempted to take advantage of open source and commercial technology. Often this causes a greater reliance on the use of Commercial-Off-The-Shelf (COTS), which is often limiting. In our review of the database requirements and the COTS software available, only very expensive COTS software will meet 90% of requirements. Even with the high projected initial cost of COTS, the development and support for custom code over the 19-year mission period was forecasted to be higher than the total licensing costs. A group did look at reusing existing database tools and formats. If the JWST database was already in a mature state, the reuse made sense, but with the database still needing to handing the addition of different types of command and telemetry structures, defining new spacecraft systems, accept input and export to systems which has not been defined yet, XML provided the flexibility desired. It remains to be determined whether the XML database will reduce the over all cost for the JWST mission.

Detter, Ryan↗