Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Short circuiting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Short Circuiting the Controller –Missteps in Maintenance and Inspection of Process and Wiring in STS-93

During the launch of the Chandra X-Ray Observatory in 1999, an in-flight anomaly occurred a few seconds after liftoff. A power fluctuation caused two Main Engine controllers to drop offline. Fortunately, due to redundancy, the Space Shuttle Columbia was able to successfully reach orbit and avoid an abort. After the successful deployment of Chandra and the safe return of the crew, in-vestigation revealed that the controller failure was due to a wire short in the pay-load bay. It was suspected that the Kapton insulation on the wire rubbed off against a burred screw head, the result of overtightening of the screw during a maintenance event 4 to 5 years prior to the STS-93 mission. Vibrations led the abraded wire to short during flight. The Space Shuttle Program was grounded for 4 months while a program-wide inspection and wire chafing mitigation effort of all orbiter wiring ensued.

Kristy S Yun↗

Short Circuiting the Controller – Missteps in Maintenance and Inspection of Process and Wiring in STS-93

The primary objective of the Space Transportation System mission 93 (STS-93) was to deploy the Chandra X-Ray Observatory. Chandra, the world's most powerful X-Ray telescope, allowed scientists from around the world to study some of the most distant and dynamic objects in the universe. Stripped of nearly 7,000 pounds of its own gear to make room for the payload, the orbiter assigned to this mission was Space Shuttle Columbia. Prior to STS-93, Columbia had flown 25 flights and was NASA's oldest and heaviest orbiter. On July 23, 1999, after two prior launch scrubs, Eileen Collins and her crew of four launched from Kennedy Space Center. About five seconds after launch, Mission Control at Johnson Space Center detected a voltage drop on one of Columbia's electrical buses. As a result of this power fluctuation, a primary and back-up Main Engine controller dropped offline. Given design redundancy, the two remaining controllers supported all three engines. If there had been any other AC bus issues, one engine of the three on the Orbiter would have shut down. The redundant set of digital computer units in each engine controller saved Columbia and her crew from a very risky contingency abort. Post-flight inspection revealed soot on a screw head and a hole in an adjacent Kapton insulated wire. The single strand of polyimide wire was located nearly half-way down the payload bay. The Shuttle Independent Assessment Team (SIAT) reported that the wire had rubbed and chaffed against a burred screw head. The burr was later determined to be the result of overtightening of the screw by a technician during a maintenance refurbishment. Alone, the burr may not have been problematic, but later, during another ground processing event, possibly years after, someone inadvertently stepped on the wiring harness. With the pressure and motion of unintended contact, some of the Kapton insulation rubbed off against the burred screw head. The SIAT suspected the wire damage was pre-existing and was caused 4 or 5 years prior to the flight. Finally, the intense vibrations during the launch sequence allowed contact between the exposed conductor and exposed metal area on the burred screw head, resulting in the arcing and shorting of the wire. Due to the quick turnaround times of Space Shuttle Orbiters, wiring issues caused from multiple maintenance events were often overlooked. Additionally, failing to incorporate thorough and early inclusion of human systems integration (HSI) applications as a crucial part of the decision process can result in these types of misshaps. In order to reduce human error associated with integrated manufacturing, maintenance, refurbishment and flight preparations, wire inspection criteria should be refined and standardized, visual inspection processes should be quantified, and technicians should be certified by specially trained instructors. This case, among many others, unveils why human error management and development of safety metrics is a vital piece in the development of complex systems, and why it should be supported aggressively and implemented program wide.

Human Systems Integration↗

Predictive Inverse Model for Advective Heat Transfer in a Short–Circuited Fracture: Dimensional Analysis, Machine Learning, and Field Demonstration

Identifying fluid flow maldistribution in planar geometries is a well–established problem in subsurface science/engineering. Of particular importance to the thermal performance of enhanced (or “engineered”) geothermal systems is identifying the existence of nonuniform (i.e., heterogeneous) permeability and subsequently predicting advective heat transfer. Here, machine learning via a genetic algorithm (GA) identifies the spatial distribution of an unknown permeability field in a two–dimensional Hele–Shaw geometry (i.e., parallel plates). The inverse problem is solved by minimizing the L2 norm between simulated residence time distribution (RTD) and measurements of an inert tracer breakthrough curve (BTC) (C–Dot nanoparticle). Principal component analysis (PCA) of spatially correlated permeability fields enabled reduction of the parameter space by more than a factor of 10 and restricted the inverse search to reservoir–scale permeability variations. Thermal experiments and tracer tests conducted at the mesoscale Altona Field Laboratory (AFL) demonstrate that the method accurately predicts the effects of extreme flow channeling on heat transfer in a single bedding–plane rock fracture. However, this is only true when the permeability distributions provide adequate matches to both tracer RTD and frictional pressure loss. Without good agreement to frictional pressure loss, it is still possible to match a simulated RTD to measurements, but subsequent predictions of heat transfer are grossly inaccurate. Here, the results of this study suggest that it is possible to anticipate the thermal effects of flow maldistribution, but only if both simulated RTDs and frictional pressure loss between fluid inlets and outlets are in good agreement with measurements.

42 ENGINEERING↗

Inter-cofactor protein remodeling rewires short-circuited transmembrane electron transfer

Intraprotein electron transfer (ET) requires explicit local control of the environment of cofactors to influence their intermolecular distances, relative orientations, and redox properties. Efficient, longer-range ET often utilizes molecular orbitals of aromatic residues present in the intervening space. Here, revitalization of a vestigial ET pathway in the bacterial photosynthetic reaction center is achieved by scanning with tryptophans to uncover markedly improved routes of electron conduction in a key stabilizing step spanning 15 Å between tetrapyrrole and quinone cofactors. This ET event is maximally enhanced by pairing one or more tryptophans with a threonine to influence quinone binding and/or redox potential. Synergistic effects of these substitutions increase the yield of that ET step to ~95%. Joining these substitutions with mutant residues that improve initial ET steps dramatically enhances transmembrane charge separation via this redesigned version of a pathway that is quantitatively inactive in the native protein-cofactor complex.

Biophysical chemistry↗