Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Second Target Station”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Proton Beam Window In Situ Neutronics Analysis for the Preliminary Design for the Second Target Station

These analyses provide estimates for the residual dose rates for various geometric configurations related to proton beam window (PBW) removal and replacement maintenance events. This information will be used to plan a remote handling strategy for the replacement and maintenance of the PBW. The 5 and 100 mrem/h dose rate contour lines are of specific interest as they classify radiation areas (between 5 and 100 mrem/h) and high radiation areas (>100 mrem/h).

43 PARTICLE ACCELERATORS↗

Methodology to Generate the Decay Gamma Source for a Second Target Station Target Wedge

This report details the specifics of applying the Position-Averaged Method methodology for the calculation of the rotating lasagna-style target wedge activation and the resulting decay gamma source terms. The methodology uses MCNP® Code Version 6.2.0 with the RNUCS patch coupled with CINDER2008 from the AARE V1.0 package. The process begins with model preparations that include ensuring impurities are included in the materials in the regions of interest along with segmentation of the geometry in order to capture the decay gamma source gradients. This report also details the physics models and other MCNP®, CINDER2008, and ADVANTG 3.2.0 related options used to calculate the decay gamma source terms. ADVANTG 3.2.0 is used to generate a weight window set to aid in convergence of the neutron fluxes in the initial MCNP® protons-on-target particle transport calculation to calculate the neutron fluxes and spallation products in the regions of interest. The neutron fluxes and spallation products are then used in the CINDER2008 transmutation calculation, and the decay gamma sources are generated by the AARE_GAMMA_SOURCE_SCRIPT as a part of the AARE V1.0 package. These decay gamma sources include the energy distributions as well as the necessary distributions to sample the location of the source using the cell rejection method. The gamma sources that are produced using the methodology may be used for a wide variety of analysis involving the target wedge. This report includes the material specifications, physics options, proton source term description, geometrical configuration, and post-processing details.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Instrument performance study on the short and long pulse options of the second Spallation Neutron Source target station

The Spallation Neutron Source (SNS) facility at the Oak Ridge National Laboratory is designed with an upgrade option for a future low repetition rate, long wavelength second target station. This second target station is intended to complement the scientific capabilities of the 1.4 MW, 60 Hz high power first target station. Two upgrade possibilities have been considered, the short and the long pulse options. In the short pulse mode, proton extraction occurs after the pulse compression in the accumulator ring. The proton pulse structure is thus the same as that for the first target station with a pulse width of ∼0.7 μs. In the long pulse mode, protons are extracted as they are produced by the linac, with no compression in the accumulator ring. The time width of the uncompressed proton pulse is ∼1 ms. This difference in proton pulse structure means that neutron pulses will also be different. Neutron scattering instruments thus have to be designed and optimized very differently for these two source options which will directly impact the overall scientific capabilities of the SNS facility. In order to assess the merits of the short and long pulse target stations, we investigated a representative suit of neutron scattering instruments and evaluated their performance under each option. Our results indicate that the short pulse option will offer significantly better performance for the instruments and is the preferred choice for the SNS facility.

43 PARTICLE ACCELERATORS↗

Spallation Neutron Source Proton Power Upgrade Low-Level RF Control System Development

The Proton Power Upgrade (PPU) Project is approved for the Spallation Neutron Source at Oak Ridge National Laboratory and will double the proton beam power capability from 1.4 MW to 2.8 MW with 2 MW beam power available to the first target station. A second target station is planned and will utilize the remaining beam power in the future. The proton power increase will be supported with the addition of twenty-eight new superconducting cavities powered by 700 kW peak power klystrons to increase beam energy while increases to the beam current will be done with a combination of existing RF margin, and DTL HPRF upgrades. The original low-level RF control system has proven to be reliable over the past 15 years of operations, but obsolescence issues mandate a replacement system be developed for the PPU project. The replacement system is realized in a µTCA.4 platform using a combination of commercial off-the-shelf boards and custom hardware to support the requirements of PPU. This paper presents the prototype hardware, firmware, and software development activities along with preliminary testing results of the new system.

Crofford, Mark↗

Progress on the Proton Power Upgrade of the Spallation Neutron Source

The Proton Power Upgrade Project is underway at the Spallation Neutron Source at Oak Ridge National Labor-atory and will double the proton beam power capability from 1.4 MW to 2.8 MW to provide increased neutron intensity at the first target station and to support future operation of the second target station. This will be ac-complished by increasing the beam energy to 1.3 GeV and the beam current to 38 mA (average during the macropulse). Installation of 28 additional superconduct-ing cavities and their associated technical systems will provide for the energy increase. Increased beam loading throughout the accelerator will be accommodated primar-ily through the use of existing margin in the RF systems and the installation of 700 kW klystrons to power the new superconducting cavities. Upgrades of a few existing RF stations may also be needed. The injection and ex-traction regions of the accumulator ring will be upgraded, a ring to second target station tunnel stub will be con-structed, and a 2 MW target will be developed for the first target station. The project anticipates attainment of Criti-cal Decision 1 in 2017 to ratify the project conceptual design and cost range.

Champion, Mark S↗

A D$_2$O detector for flux normalization of a pion decay-at-rest neutrino source

We report on the technical design and expected performance of a 592 kg heavy-water-Cherenkov detector to measure the absolute neutrino flux from the pion-decay-at-rest neutrino source at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL). The detector will be located roughly 20 m from the SNS target and will measure the neutrino flux with better than 5% statistical uncertainty in 2 years. This heavy-water detector will serve as the first module of a two-module detector system to ultimately measure the neutrino flux to 2–3% at both the First Target Station and the planned Second Target Station of the SNS. This detector will significantly reduce a dominant systematic uncertainty for neutrino cross-section measurements at the SNS, increasing the sensitivity of searches for new physics.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A look ahead: Status of the SNS external antenna ion source and the new RFQ test stand

The U.S. Spallation Neutron Source (SNS) now operates with ∼1 MW of beam power to target with the near-term goal of delivering 1.4 MW. Plans are being considered to incorporate a second target station into the facility which will require ∼2.8 MW of beam power. Presently, H{sup −} beam pulses (∼1 ms, 60 Hz) are produced by an RF-driven, Cs-enhanced, multi-cusp ion source which injects beam into an RFQ (Radio Frequency Quadrupole) accelerator that, in turn, feeds the SNS Linac. Currently the source/RFQ system delivers ∼35 mA of pulsed current to the linac which is mostly sufficient for 1.4 MW operations while ∼50 mA are needed for the second target station upgrade. This paper provides a look forward for the SNS by providing (i) the present and future SNS source/RFQ beam requirements and our plans to achieve these, (ii) a description and status of the external antenna ion source being developed for the replacement of the current internal antenna ion source, and (iii) a description and status of the newly constructed RFQ test facility.

43 PARTICLE ACCELERATORS↗

Design and structural assessment of the Spallation Neutron Source 2.0 MW target

The Proton Power Upgrade (PPU) project is underway at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory. The project will double the proton accelerator power from 1.4 MW to 2.8 MW, increase power to the First Target Station (FTS), and enable a future Second Target Station (STS). The power increase partly comes from raising proton energy from 1.0 GeV to 1.3 GeV. The STS will operate at 0.7 MW at 15 Hz when completed. Until then, PPU will provide the capability to operate the FTS at 2.0 MW at 60 Hz. Maximum power at the FTS to date has been 1.4 MW at 60 Hz with 1.0 GeV protons. A new mercury target module design to operate reliably under PPU conditions has been completed after a multi-year effort. The design philosophy and assessment of the structural analysis are described here. This target underwent an unprecedented design and analysis process for SNS using the latest engineering techniques and incorporating years of operating lessons and outcomes from R&D to meet structural design criteria. Finally, it also incorporates high-flow gas injection to further mitigate pulse fatigue stresses as well as cavitation damage to the mercury vessel.

47 OTHER INSTRUMENTATION↗