Ares I-X Overview - The First Chapter in the Next Great Adventure

Ares I-X is the first flight of NASA's new Constellation Program. Ares I-X is a development test flight to provide engineering data to inform the design of the Ares I prior to CDR. Ares I will replace the Space Shuttle which is scheduled for 2010 retirement . Ares I-X is an uncrewed, sub-orbital development flight test . Ares I-X will provide opportunity to test ground facilities and operations at NASA's Kennedy Space Center. Ares I-X is on track for May 2009 launch date. Objectives include: (1) Demonstrate control of a dynamically similar, integrated Ares I/Orion, using Ares I relevant ascent control algorithms; (2) Perform an in-flight separation/staging event between a Ares I-similar First Stage and a representative Upper Stage; (3) Demonstrate assembly and recovery of a new Ares I-like First Stage element at KSC; (4) Demonstrate First Stage separation sequencing, and quantify First Stage atmospheric entry dynamics, and parachute performance; and (5) Characterize magnitude of integrated vehicle roll torque throughout First Stage flight.

Leahy, Bart↗

Ares I-X Management Office (MMO) Integrated Master Schedule (IMS)

Objectives: Demonstrate control of a dynamically similar, integrated Ares I/Orion, using Ares I relevant ascent control algorithms. Perform an in-flight separation/staging event between a Ares I-similar First Stage and a representative Upper Stage. Demonstrate assembly and recovery of a new Ares I-like First Stage element at KSC. Demonstrate First Stage separation sequencing, and quantify First Stage atmospheric entry dynamics, and parachute performance. Characterize magnitude of integrated vehicle roll torque throughout First Stage flight.

Heintzman, Keith↗

Ares I-X: Lessons for a New Era of Spaceflight

Since 2005, the Ares Projects at Marshall Space Flight Center (MSFC) have been developing the Ares I crew launch vehicle and Ares V cargo launch vehicle. On October 28, 2009, the first development flight test of the Ares I crew launch vehicle, Ares I-X, lifted off from a launch pad at Kennedy Space Center (KSC) on successful suborbital flight. Despite the President s intention to cancel the Constellation Program of which Ares is a part, this historic flight has produced a great amount of data and numerous lessons learned for any future launch vehicles. This paper will describe the accomplishments of Ares I-X and the lessons that other programs can glean from this successful mission. Ares I was designed to carry up to four astronauts to the International Space Station (ISS). It also was designed to be used with the Ares V cargo launch vehicle for a variety of missions beyond low-Earth orbit (LEO). The Ares I-X development flight test was conceived in 2006 to acquire early engineering and environment data during liftoff, ascent, and first stage recovery. The test achieved the following primary objectives: Demonstrated control of a dynamically similar, integrated Ares I/Orion, using Ares I relevant ascent control algorithms. Performed an in-flight separation/staging event between a Ares I-similar First Stage and a representative Upper Stage. Demonstrated assembly and recovery of a new Ares I-like First Stage element at KSC. Demonstrated First Stage separation sequencing, and quantify First Stage atmospheric entry dynamics, and parachute performance. Characterized the magnitude of integrated vehicle roll torque throughout First Stage flight.

Davis, Stephan R.↗

Space Launch System Block-1b USA Separation Analysis and Requirements Derivation From CLVTOPS Toolchain

Ensuring that rocket stage separation events provide positive clearance is critical to avoid loss of mission or crew. NASA's Marshall Space Flight Center (MSFC) has developed a cutting-edge toolchain to address this type of problem and it was used to set abstracted impulse requirements on, and to analyze the results of, the in-space separation event of the Universal Stage Adapter (USA) and the Exploration Upper Stage (EUS) of NASA's Space Launch System (SLS) Block-1B configuration. The toolchain is used as a hardware simulation to confirm positive body-to-body clearance during the separation event. It is also used to create a requirements-space simulation, which helps inform requirements as the hardware design matures.

Zachary T Muscha↗

SLS Block-1B USA Separation Analysis and Requirements Evaluation Using the CLVTOPS Toolchain

Ensuring that rocket stage separation events provide positive clearance is critical to avoid loss of mission or crew. NASA's Marshall Space Flight Center (MSFC) has developed a cutting-edge toolchain to address this type of problem and it was used to set abstracted impulse requirements on, and to analyze the results of, the in-space separation event of the Universal Stage Adapter (USA) and the Exploration Upper Stage (EUS) of NASA's Space Launch System (SLS) Block-1B configuration. The toolchain is used as a hardware simulation to confirm positive body-to-body clearance during the separation event. It is also used to create a requirements-space simulation, which helps inform requirements as the hardware design matures.

Zach Muscha↗

Ares I-X Separation and Reentry Trajectory Analyses

The Ares I-X Flight Test Vehicle was launched on October 28, 2009 and was the first and only test flight of NASA s two-stage Ares I launch vehicle design. The launch was successful and the flight test met all of its primary and secondary objectives. This paper discusses the stage separation and reentry trajectory analysis that was performed in support of the Ares I-X test flight. Pre-flight analyses were conducted to assess the risk of stage recontact during separation, to evaluate the first stage flight dynamics during reentry, and to define the range safety impact ellipses of both stages. The results of these pre-flight analyses were compared with available flight data. On-board video taken during flight showed that the flight test vehicle successfully separated without any recontact. Reconstructed trajectory data also showed that first stage flight dynamics were well characterized by pre-flight Monte Carlo results. In addition, comparisons with flight data indicated that the complex interference aerodynamic models employed in the reentry simulation were effective in capturing the flight dynamics during separation. Finally, the splash-down locations of both stages were well within predicted impact ellipses.

Tartabini, Paul V.↗

Design and Demonstration of Bolt Retractor Separation System for X-38 Deorbit Propulsion Stage

A separation system was designed for the X-38 experimental crew return vehicle program to allow the Deorbit Propulsion Stage (DPS) to separate from the X-38 lifting body during reentry operations. The configuration chosen was a spring-loaded plunger, known as the Bolt Retractor Subsystem (BRS), that retracts each of the six DPS-to-lifting body attachment bolts across the interface plane after being triggered by a separation nut mechanism. The system was designed to function on the ground in an atmospheric environment as well as in space. The BRS provides the same functionality as that of a completely pyrotechnic shear separation system that would normally be considered ideal for this application, but at a much lower cost. This system also could potentially be applied to future space station crew return vehicles. The design goal of 40 ms retraction time was successfully met in a series of demonstrations performed at the NASA Marshall Space Flight Center s Pyrotechnic Shock Facility (PSF) and Flight Robotics Laboratory (FRL). It must be emphasized that a full-scale test series was not performed on the BRS due to program schedule and cost constraints.

Ahmed, Raf↗

Aerodynamic control, recovery, and sensor design for a first stage flyback booster

The mission of the flyback group is to control and recover the first stage of a commercially developed winged booster launched from a B-52 at 40,000 ft and Mach 0.8. First-stage separation occurs at 210,000 ft and Mach 8.7; the second and third stages will continue deployment of their 600 lb payload into low Earth orbit. The job of the flyback group begins at this point, employing a modified control system developed to stabilize and maneuver the separated first-stage vehicle to a suitable landing site approximately 130 miles from the launch point over the Pacific Ocean. This multidisciplinary design was accomplished by four subgroups: aerodynamic design/vehicle configuration (ADVC), trajectory optimization, controls, and thermal management.

Source record↗

MARS Science Laboratory Post-Landing Location Estimation Using Post2 Trajectory Simulation

The Mars Science Laboratory (MSL) Curiosity rover landed safely on Mars August 5th, 2012 at 10:32 PDT, Earth Received Time. Immediately following touchdown confirmation, best estimates of position were calculated to assist in determining official MSL locations during entry, descent and landing (EDL). Additionally, estimated balance mass impact locations were provided and used to assess how predicted locations compared to actual locations. For MSL, the Program to Optimize Simulated Trajectories II (POST2) was the primary trajectory simulation tool used to predict and assess EDL performance from cruise stage separation through rover touchdown and descent stage impact. This POST2 simulation was used during MSL operations for EDL trajectory analyses in support of maneuver decisions and imaging MSL during EDL. This paper presents the simulation methodology used and results of pre/post-landing MSL location estimates and associated imagery from Mars Reconnaissance Orbiter s (MRO) High Resolution Imaging Science Experiment (HiRISE) camera. To generate these estimates, the MSL POST2 simulation nominal and Monte Carlo data, flight telemetry from onboard navigation, relay orbiter positions from MRO and Mars Odyssey and HiRISE generated digital elevation models (DEM) were utilized. A comparison of predicted rover and balance mass location estimations against actual locations are also presented.

Davis, J. L.↗

Black Brant X third stage dispersion dynamics

The successful development of the Black Brant X (BBX) launch vehicle resulted from the application of a gyroscopically stabilized, unguided third stage motor configuration. Design analyses indicated sufficient gyroscopic stability and acceptable impact dispersion could be realized by optimizing second/third stage separation time. By flying an unguided third stage motor, significant program cost savings were realized. One flight test and two operational missions demonstrated the feasibility of utilizing gyroscopic stability to achieve satisfactory trajectory dispersion on a high performance rocket. A detailed assessment of the major dispersion contributors identified for the first three BBX missions is presented, offering important insight into the dispersion sensitivity of unguided, spin-stabilized flight.

Montag, W. H.↗

Dynamics and Clearance Analysis of NASA's Space Launch System Block-1 and Block 1B Solid Rocket Booster Separation Event

NASA’s Space Launch System (SLS) solid rocket booster separation event is an essential area of study requiring high fidelity modelling to capture the complexity of an intra-atmospheric stage separation event. The setup and analysis for this event leveraged the NASA-developed CLVTOPS multi-body dynamics toolchain to model aerodynamics at the separation event, booster thrust tailoff, and Core Stage engine throttling in addition to the separation system itself (booster separation motors (BSMs), pyrotechnic bolts and struts). The approach documented here will give a brief background on the CLVTOPS toolchain, how key input models are integrated and verified, and how results are quantified using an ordered-statistics approach. Specific areas discussed herein address the performance-to-orbit realized by adjusting the delay time between the separation cue and the actual separation event, and how the orientation of the aft BSMs was tuned to address small clearances between the aft diagonal attach struts and the Core Stage. Post-flight results from the inaugural Artemis I flight are also shown, and validation is performed between predicted vs. actual separation dynamics and clearances. Challenging night launch conditions necessitated comparisons that were more qualitative in nature, but still showed very good agreement to pre-flight predictions.

Carole J Addona↗

Learning About Ares I from Monte Carlo Simulation

This paper addresses Monte Carlo simulation analyses that are being conducted to understand the behavior of the Ares I launch vehicle, and to assist with its design. After describing the simulation and modeling of Ares I, the paper addresses the process used to determine what simulations are necessary, and the parameters that are varied in order to understand how the Ares I vehicle will behave in flight. Outputs of these simulations furnish a significant group of design customers with data needed for the development of Ares I and of the Orion spacecraft that will ride atop Ares I. After listing the customers, examples of many of the outputs are described. Products discussed in this paper include those that support structural loads analysis, aerothermal analysis, flight control design, failure/abort analysis, determination of flight performance reserve, examination of orbit insertion accuracy, determination of the Upper Stage impact footprint, analysis of stage separation, analysis of launch probability, analysis of first stage recovery, thrust vector control and reaction control system design, liftoff drift analysis, communications analysis, umbilical release, acoustics, and design of jettison systems.

Hanson, John M.↗

Saturn V Aerothermodynamics Flight Evaluation Summary - AS-501 Through AS-503

A summary of measured Aerothermodynamic flight environments are presented for the first three flights of the Saturn V (AS-501 through AS-503). Flight data are compared to show the relative variation from flight to flight and also compared with predicted environments. The environments include vehicle internal compartment pressures, acoustics, base pressures, axial force characteristics, aerodynamic heating, base heating and stage separation heating and pressures. The S-IC stage, S-II stage, S-IVB stage, and Instrument Unit environments are analyzed.

Source record↗

Explosive Entrances

Explosive Technology, Inc. manufactured explosives first used by NASA to separate stages of the Gemini launch vehicle. When firemen need to get into a burning building or chop a hole to provide ventilation, axes can be devastatingly slow. Controlled explosives developed to separate manned upper stages of space rockets in case of mishap have been adapted to cutting emergency exits and demolishing unsafe buildings and bridges. Detonation cuts through thick steel girders or other materials more cleanly than torches or saws. This device can also cut emergency holes in airplanes and trains so surviving passengers can escape.

Source record↗

Technical Progress on the Ares I-X Flight Test

Ares I-X will be NASA's first test flight for a new human-rated launch vehicle since 1981, and the team is well on its way toward completing the vehicle's design and hardware fabrication for an April 2009 launch. This uncrewed suborbital development test flight gives NASA its first opportunities to: gather critical data about the flight dynamics of the integrated launch vehicle; understand how to control its roll during flight; better characterize the stage separation environments during future flight; and demonstrate the first stage recovery system. The Ares I-X Flight Test Vehicle (FTV) incorporates a mix of flight and mockup hardware. It is powered by a four-segment solid rocket booster, and will be modified to include a fifth, spacer segment; the upper stage, Orion crew exploration vehicle, and launch abort system are simulator hardware to make the FTV aerodynamically similar to the same size, shape, and weight of Ares I. The Ares IX first stage includes an existing Shuttle solid rocket motor and thrust vector control system controlled by an Ascent Thrust Vector Controller (ATVC) designed and built by Honeywell International. The avionics system will be tested in a dedicated System Integration Laboratory located at Lockheed Martin Space Systems (LMSS) in Denver, Colorado. The Upper Stage Simulator (USS) is made up of cylindrical segments that will be stacked and integrated at Kennedy Space Center (KSC) for launch. Glenn Research Center is already building these segments, along with their internal access structures. The active Roll Control System (RoCS) includes two thruster units harvested from Peacekeeper missiles. Duty cycle testing for RoCS was conducted, and fuel tanking and detanking tests will occur at KSC in early 2008. This important flight will provide valuable experience for the ground operations team in integrating, stacking, and launching Ares I. Data from Ares I-X will ensure the safety and reliability of America's newest launch vehicle.

Davis, S.R.↗

Rocketdyne - Lunar Ascent Engine

The ascent engine was the last one from the moon, and I want to focus on the idea of redundancy and teams in regard to the engine. By teams, I mean teamwork - not just within Rocketdyne. It was teamwork within Rocketdyne; it was teamwork within Grumman; it was teamwork within NASA. These were all important elements leading to the successful development of the lunar excursion module (LEM) engine. Communication, rapid response, and cooperation were all important. Another aspect that went into the development of the ascent engine was the integration of technology and of lessons learned. We pushed all the above, plus technology and lessons learned, into a program, and that led to a successful result. One of the things that I like to think about - again in retrospect - is how it is very "in" now to have integrated product and process teams. These are buzzwords for teamwork in all program phases. That s where you combine a lot of groups into a single organization to get a job done. The ascent engine program epitomized that kind of integration and focus, and because this was the mid- to late-1960s; this was new ground for Rocketdyne, Grumman, and NASA. Redundancy was really a major hallmark of the Apollo Program. Everything was redundant. Once you got the rocket going, you could even lose one of the big F-1 engines, and it would still make it to orbit. And once the first stage separated from the rest of the vehicle, the second stage could do without an engine and still make a mission. This redundancy was demonstrated when an early Apollo launch shut down a J-2 second-stage engine. Actually, they shut down two J-2 engines on that flight. Even the third stage, with its single J-2 engine, was backed up because the first two stages could toss it into a recoverable orbit. If the third stage didn't work, you were circling the earth, and you had time to recover the command module and crew. Remember how on the Apollo 13 flight, there was sufficient system redundancy even when we lost the service module. That was a magnificent effort. TRW Inc. really ought to be proud of their engine for that. (See Slide 2, Appendix I) We had planned for redundancy; we had landed on the moon. However, weight restrictions in the architecture said, "You can t have redundancy for ascent from the moon. You've got one engine. It s got to work. There is no second chance. If that ascent engine doesn't work, you re stuck there." It would not have looked good for NASA. It wouldn't have looked good for the country. There was a letter written that President Richard Nixon would read if the astronauts got stuck on the moon, expressing how sorry we were and so forth. It was a scary letter, really. The ascent engine was an engine that had to work. (See Slide 3, Appendix I).

Harmon, Tim↗