Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE PREPARATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

San Diego Tribal Energy Collaborative [Slides]

The project involves the installation and activation of 42 roof-top or ground mount solar photovoltaic systems. The system will use a combination of roof-top photovoltaic panels and ground-mounted panels that will be installed on 40 tribal homes and 2 tribal buildings throughout the three participating reservations. The scope of work includes site preparation, equipment installation, system testing, and inspection by a third-party inspector, system activation, troubleshooting, and final activation. It also includes any electrical system upgrades, which are anticipated to accommodate the new PV system. The system will displace at least 50% of the combined total of electricity needed by the participating structures. Implementing these systems will also provide hands-on solar installation training to at least 20 Tribal community volunteers and job trainees.

14 SOLAR ENERGY↗

ARM West Antarctic Radiation Experiment

The National Science Foundation provided Antarctic logistical support to the Department of Energy's Atmospheric Radiation Measurement (ARM) Climate Research Facility from October 2015 through May 2017. Specific support included commercial and military cargo transportation, site preparation and facilities installation at McMurdo Station and at the WAIS Divide field camp in West Antarctica, power and data transmission, and personnel support. NSF provided continuous facility operation in McMurdo from November 2015 through decommissioning in January 2017, and at WAIS Divide during the 2015-2016 austral summer research season, from November 2015 through January 2016.

54 ENVIRONMENTAL SCIENCES↗

Hawai‘i Play Fairway (Final Report)

Most of Hawai'i's geothermal resources are blind—their manifestations, such as hot springs and steam vents, do not appear on the ground surface because the heated water flows far below. With the exception of $K\bar{i}lauea East Rift Zone$, in most areas of Hawai'i, high lateral permeability in the first kilometer below ground surface prevents surface thermal features from developing. As a methodology for discovering these blind resources, Play Fairway Analysis (PFA) involves finding potential locations of blind hydrothermal systems and describing potential geothermal sources in rift-zone settings. Using the PFA to find Hawai'i's geothermal resources, the University of Hawai'i (UH) conducted the Hawai‘i Play Fairway Project, Hawai'i's first statewide geothermal resource assessment since 1985. Sponsored by the U.S. Department of Energy, the Hawai'i Play Fairway Project provided an updated resource assessment, a roadmap for additional exploration activities, and the identification of areas for further exploration. Benefitting from UH's core competency in earth sciences and experienced geothermal researchers, the project comprised three phases. During the first phase, the team identified, compiled, and ranked existing geologic, groundwater, and geophysical datasets relevant to subsurface heat, fluid and permeability. Using a Bayesian statistical approach, the team developed a statistical methodology to integrate these data into a resource probability map. The team evaluated the confidence in the probability value and considered development viability of areas with geothermal resources. With these analyses, the team identified 10 locations in the Hawaiian Islands for exploration activities. For the second phase, the team collected new groundwater data in 10 locations across the state and new geophysical data on $L\bar{a}na‘i, Maui$, and central Hawai'i Island and modeled topographically induced stress to better characterize subsurface permeability. Analyzing the subsurface stresses, the team evaluated the potential for fracture-induced permeability. The team inverted the MT and gravity data to produce 3D models of resistivity and density, respectively, on $L\bar{a}na‘i$, across $Haleakal\bar{a}'s$ SW rift (Maui), and surrounding Mauna Kea (Hawai‘i Island). The team developed and applied a new method for incorporating depth information about resistivity, density, and potential for fracture-induced permeability into the statistical method for computing resource probability in these three focus areas. The team incorporated the new groundwater results with the new geophysical results and the calculations of potential for fracture-induced permeability to produce updated maps of resource probability and confidence. Through combining data from the first and second phases, the team determined locations for further exploration during the third phase. For MT and gravity surveys, the team recommended $Kaua'i's$ $L\bar{i}hu'e$ $Basin$, the east rift of $Maui's$ $Haleakal\bar{a}$ volcano, and the southwest rift of Hawai'i Island's Mauna Loa volcano. The MT and gravity surveys aimed to enable improved confidence in the resource potential in these locations. For drilling deep groundwater well(s), the team recommended Southeast Mauna Kea and $L\bar{a}na's$ $P\bar{a}l\bar{a}wai$ $Basin$. During the third phase, further exploration involved drilling a groundwater well in $L\bar{a}na's$ $P\bar{a}l\bar{a}wai$ $Basin$ and performing more geophysical surveys. We deepened an existing water well proximal to our target area on $L\bar{a}na'i$ due to funding constraints that precluded us from spudding a new well that would exceed 1km depth. Drilling was preceded by a number of substantial elements including: writing an Environmental Assessment and the subsequent legal process, performance of deviation logging, lowering a camera down the well, coordinating site preparation with $P\bar{u}lama$ $L\bar{a}na'i$, shipping the UH-owned rig interisland, procuring supplies, and leading 3 community meetings on $L\bar{a}na'i$. Drilling occurred 24/7 the entire month of June 2019 over which time $L\bar{a}na'i$ $Well$ 10 was deepened from 427 m to 1057 m, with continuous core collected. We measured a roughly linear temperature gradient averaging 42°C/km and a maximum bottom hole temperature of 66°C. This gradient is more than twice the background for Hawai'i and within a range of gradients measured in this depth range for some exploration wells within KERZ. We consider these results encouraging for $L\bar{a}na'i's$ resource potential and recommend following with a slim hole within $L\bar{a}na'i's$ caldera (our target zone) to ~ 2 km. Further, the positive implications such results have for the island of O‘ahu are substantial - the shield stage of O'ahu's volcanoes ended 1-2 My earlier. However, O'ahu uses more electricity than the rest of the islands combined, and the utility recently called for 500-700MW of firm, dispatchable renewable electricity on O'ahu by 2033. In Phase 3, we also collected limited new encouraging groundwater data, and updated our thoughts on the probabilities of fluid and permeability at resource depths (Pr F = 1; Pr P = mostly unconstrained). Ultimately, we advocate for using our final probability of heat, and confidence in this probability, to drive the next phase of exploration. We contend further development of geothermal in Hawai‘i will enable the state to achieve its 100% renewable policy objective and Hawai'i to transition off of fossil fuels through geothermal discovery and development. The project not only produced a large amount of data and expanded the existing knowledge of Hawai'i's geothermal resources, but also produced publications, theses, presentations, core photos, datasets, media reports, television interviews, community events, and a blog. Students and new professionals benefitted from the project's hands-on research experiences and educational opportunities and earned awards and recognition.

15 GEOTHERMAL ENERGY↗

Hydrogen Production Cost with Alkaline Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Liquid Alkaline (LA) electrolysis. Projected high-volume, untaxed levelized cost of hydrogen (LCOH) range from 2020US $\$ 1.84$ to $\$ 2.88$/kg-H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$ 0.03$/kWh. The total installed capital cost for a LA electrolysis plant was estimated from bottom-up stack and installed cost models that account for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the LA electrolysis plant is assumed to be a stick-built, greenfield project developed by an EPC firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H 2 A) production model, a peer-reviewed national laboratory-developed discounted cash flow model, were used to calculate the LCOH production in 2020$/kg-H 2 . The baseline electricity price case ($\$ 0.03$/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN↗

Economic Evaluation of a Coupled Nuclear Power Plant and Hydrogen Production Facility: A Case Study

This study optimized the design sizes and operation of a power-to-hydrogen-to-power integrated energy system to allow a baseload power plant to operate flexibly in the energy market. In collaboration with a utility industry partner, the system, consisting of an electrolyzer, compressors, storage tank, and fuel cell, was optimized under conditions specific to the proposed project at the site of a nuclear power plant. The Design Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems (DISPATCHES) maximized net present value by optimizing sizing of components and dispatch decisions. Revenues included sale of electricity, capacity payments typical of the New York Independent System Operator, and the section 45V hydrogen production tax credit of the Inflation Reduction Act of 2022 (the tax credit was assumed to be available to legacy plants in the absence of clear guidance at present). Under default assumptions which excluded many capital expenditures, the base case optimized solution had a net present value of $\$$1.4 million over a 30 year lifetime, with a 0.365 MW fuel cell operating nearly continuously and 85% of revenues supplied by the hydrogen production tax credit (which was counted as a revenue regardless of profit, thus assuming credit monetization or offset of taxes within the larger firm was possible in all years). Beyond the base case, a sensitivity study elucidated drivers of the economics as capacity payment rate and hydrogen production tax credit rate vary. Additional sensitivity studies also extended results to variation of other, previously fixed parameters, including the fuel cell capital cost, and to imposition of further constraints. Optimization was also repeated for the default assumptions but recognizing tax credits upon use of hydrogen rather than upon its production, producing no change in the optimal solution. Most notably, capacity payments above $\$$15/kW-month drove optimal fuel cells multiple times larger than those with the default estimated capacity payment of $\$$2.5/kW-month (approaching 11 vs. 0.365 MW), and these larger fuel cells operated rarely (capacity factors of ~0.03). Furthermore, when the hydrogen production tax credit was provided for only 10 years, under the specific assumptions of this study (e.g., neither site preparation costs nor electrolyzer capital cost counted), the optimal solution avoided economic loss by ceasing system operation after the 10th year. Viewed broadly, this study demonstrated the capabilities of DISPATCHES, which can be user-adapted to serve other industrial case studies.

08 HYDROGEN↗

Hydrogen Production Cost with Anion Exchange Membrane Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Anion Exchange Membrane (AEM) electrolysis. Projected high-volume, untaxed and unsubsidized levelized cost of hydrogen (LCOH)1 range from 2020 $\$$1.78 to $\$$3.68/kg H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$$0.03/kWh and a capacity factor of 97%. The total installed capital cost for an AEM electrolysis plant was estimated from bottom-up stack and process plant cost models. The stack cost model accounts for manufacturing equipment, equipment maintenance, material, tooling, cycle time, yield, labor, utilities and general overhead. The process plant cost model accounts for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the AEM electrolysis plant is assumed to be a stick-built, greenfield project developed by an engineering, procurement, and construction (EPC) firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H2A) production model, a peer-reviewed national laboratory-developed discounted cash flow (DCF) model, were used to calculate the production LCOH in 2020 $\$$/kg H 2 . The baseline electricity price case ($\$$0.03/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN↗

Hydrogen Production Cost from Proton-Conducting Solid Oxide Electrolysis

Rigorous stakeholder-vetted techno-economic analysis (TEA) was conducted to estimate the cost of hydrogen (H 2 ) production using Proton-Conducting Solid Oxide (PSO) electrolysis. The analysis evaluates Current (2025) and Future (2035) technology cases at centralized plant scales of 50 and 500 metric tonnes per day (MTD), assuming electricity, water, and air as the only system inputs. Untaxed, unsubsidized levelized cost of hydrogen (LCOH) is projected to range from 2020 $\$$1.81 to $\$$2.47/kg H 2 at an electricity price of $\$$0.03/kWh and 97% capacity factor under Nth-of-a-kind (NOAK) deployment assumptions. Total installed capital cost was developed using bottom-up Design for Manufacture and Assembly (DFMA) stack cost modeling and detailed balance-of-plant estimates, including mechanical and electrical subsystems, installation, site preparation, engineering, and contingency. Stack performance assumptions include thermoneutral operation, degradation over time, and periodic replacement. LCOH was calculated using the Hydrogen Analysis (H2A) discounted cash flow model in constant 2020 dollars. Results indicate PSO electrolysis has potential for competitive hydrogen production costs under low-cost electricity and mature manufacturing conditions.

08 HYDROGEN↗

Decontamination Strategy for Large Area and/or Equipment Contaminated with Chemical and Biological Agents using a High Energy Arc Lamp (HEAL)

A strategy for the decontamination of large areas and or equipment contaminated with Biological Warfare Agents (BWAs) and Chemical Warfare Agents (CWAs) was demonstrated using a High Energy Arc Lamp (HEAL) photolysis system. This strategy offers an alternative that is potentially quicker, less hazardous, generates far less waste, and is easier to deploy than those currently fielded by the Department of Defense (DoD). For example, for large frame aircraft the United States Air Force still relies on the combination of weathering (stand alone in environment), air washing (fly aircraft) and finally washing the aircraft with Hot Soapy Water (HSW) in an attempt to remove any remaining contamination. This method is laborious, time consuming (upwards of 12+ hours not including decontamination site preparation), and requires large amounts of water (e.g., 1,600+ gallons for a single large frame aircraft), and generates large amounts of hazardous waste requiring disposal. The efficacy of the HEAL system was demonstrated using diisopropyl methyl phosphonate (DIMP) a G series CWA simulant, and Bacillus globigii (BG) a simulant of Bacillus anthracis. Experiments were designed to simulate the energy flux of a field deployable lamp system that could stand-off 17 meters from a 12m2 target area and uniformly expose a surface at 1360 W/m2. The HEAL system in the absence of a catalyst reduced the amount of B. globigii by five orders of magnitude at a starting concentration of 1.63 x 107 spores. In the case of CWA simulants, the HEAL system in the presence of the catalyst TiO2 effectively degraded DIMP sprayed onto a 100mm diameter Petri dish in 5 minutes.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Benefits and Critical Knowledge Gaps in Determining the Role of Floating Photovoltaics in the Energy-Water-Food Nexus

Floating solar photovoltaic (FPV) systems have become an increasingly attractive application of photovoltaics (PV) because of land-use constraints, the cost of land and site preparation, and the perceived energy and environmental co-benefits. Despite the increasing interest in FPV systems, a robust validation of their suggested co-benefits and impacts on the nexus of energy, water, and food (EWF) systems is lacking. This information gap makes it challenging for decision makers to justify its adoption—potentially suppressing FPV deployment. To address this gap and to help de-risk this PV deployment opportunity, we (1) review the suggested co-benefits of FPV systems with a focus on the impacts that could alleviate pressures on EWF systems and (2) identify areas where further research is needed to reduce uncertainty around FPV system performance. Our review reveals that EWF nexus-relevant co-benefits, such as improved panel efficiency and reduced land usage, are corroborated in the literature, whereas others, such as water quality impacts, lack empirical evidence. Our findings indicate that further research is needed to quantify the water-related and broader economic, environmental, social, sustainability, justice, and resilience co-benefits and impacts of FPV systems.

14 SOLAR ENERGY↗

Hydrologic calibration of paired watersheds using a MOSUM approach

Paired watershed studies have historically been used to quantify hydrologic effects of land use and management practices by concurrently monitoring two neighboring watersheds (a control and a treatment) during the calibration (pre-treatment) and post-treatment periods. This study characterizes seasonal water table and flow response to rainfall during the calibration period and tests a change detection technique of moving sums of recursive residuals (MOSUM) to select calibration periods for each control-treatment watershed pair when the regression coefficients for daily water table elevation (WTE) were most stable to reduce regression model uncertainty. The control and treatment watersheds included 1–3 year intensively managed loblolly pine ( Pinus taeda L. ) with natural understory, same age loblolly pine intercropped with switchgrass ( Panicum virgatum ), 14–15 year thinned loblolly pine with natural understory (control), and switchgrass only. Although monitoring during the calibration period spanned 2009 to 2012, silvicultural operational practices that occurred during this period such as harvesting of existing stand and site preparation for pine and switchgrass establishment may have acted as external factors, potentially shifting hydrologic calibration relationships between control and treatment watersheds. Results indicated that MOSUM was able to detect significant changes in regression parameters for WTE due to silvicultural operations. This approach also minimized uncertainty of calibration relationships which could otherwise mask marginal treatment effects. All calibration relationships developed using this MOSUM method were quantifiable, strong, and consistent with Nash–Sutcliffe Efficiency (NSE) greater than 0.97 for WTE and NSE greater than 0.92 for daily flow, indicating its applicability for choosing calibration periods of paired watershed studies.

54 ENVIRONMENTAL SCIENCES↗

Outline for an exploratory study on the design of lunar base habitats

The paper is concerned with the design of pneumatic structures which can be sent to the surface of the moon in a relatively small package and then opened to provide a large pressurized volume with life support systems to support a population of 12 people. A proposed system consists primarily of a Kevlar membrane which will support the internal pressures of the environment, a rigid pallet which will house all the life-support systems, and wall foam which provides sound and temperature insulation. The modules would be covered by three meters of lunar soil for radiation and temperature insulation. Site preparation, module connection, and characteristics of different modules are considered.

Trotti, G.↗

Impact of Demographic Siting Criteria and Environmental Suitability on Land Availability for Nuclear Reactor Siting

The effect of population and certain environmental characteristics on the availability of land for siting nuclear power plants was assessed. The study area, consisting of the 48 contiguous states, was divided into 5 kilometer (km) square grid cells yielding a total of 600,000 cells. Through the use of a modern geographic information system, it was possible to provide a detailed analysis of a quite large area. Numerous maps and statistical tables were produced, the detail of which were limited only by available data. Evaluation issues included population density, restricted lands, seismic hardening, site preparation, water availability, and cost factors.

Hansen, K. L.↗

MOD-2 wind turbine development

The development of the Mod-2 turbine, designed to achieve a cost of electricity for the 100th production unit that will be competitive with conventional electric power generation is discussed. The Mod-2 wind turbine system (WTS) background, project flow, and a chronology of events and problem areas leading to Mod-2 acceptance are addressed. The role of the participating utility during site preparation, turbine erection and testing, remote operation, and routine operation and maintenance activity is reviewed. The technical areas discussed pertain to system performance, loads, and controls. Research and technical development of multimegawatt turbines is summarized.

Gordon, L. H.↗

Full-Scale Transport controlled Impact Demonstration

The controlled impact demonstration (CID) test of a transport aircraft took place on December 1, 1984, crashing at a prepared site on Rogers Dry Lakebed, Edwards Air Force Base, California. The demonstration was a setback for the antimisting kerosene (AMK) researchers. The impact conditions, considerably different from the planned scenario, exposed large quantities of degraded AMK and hydraulic fluid and caused unexpectedly hot ignition sources, bulk loss of fuel from the right wing, airflow patterns over the wings and fuselage that were untested on AMK, and fuel intrusion into the lower fuselage. The test was much more severe than planned and is generally considered to be unrepresentative of the type of survivable crash that would benefit from AMK. Ninety-seven percent of the sensors on the fuselage and wing structure, seats, dummies, restraint systems, galley, and bins were active at impact. A wealth of sensor data was collected from this once-in-a-lifetime research test. The flight data recorder experiments on board were also generally successful.

Hayduk, R. J.↗

Timber Resources Inventory and Monitoring Joint Research Project

Primary objectives were to develop remote sensing analysis techniques for extracting forest related information from LANDSAT Multispectral Scanner (MMS) and Thematic Mapper data and to determine the extent to which International Paper Company information needs can be addressed with remote sensing information. The company actively manages 8.4 million acres of forest land. Traditionally, their forest inventories, updated on a three year cycle, are conducted through field surveys and aerial photography. The results reside in a digital forest data base containing 240 descriptive parameteres for individual forest stands. The information in the data base is used to develop seasonal and long range management strategies. Forest stand condition assessements (species composition, age, and density stratification) and identification of silvicultural activities (site preparation, planting, thinning, and harvest) are addressed.

Hill, C. L.↗

Lunar construction utility vehicle

The lunar construction utility vehicle (LCUV) is an all-purpose construction vehicle which will aid in the robotic assembly of a lunar outpost. The LCUV will have the following capabilities: (1) must be self supporting including repairs; (2) must offload itself from a lunar lander; (3) must be telerobotic and semi-autonomous; (4) must be able to transport one space station common module; (5) must allow for man-rated operation; and (6) must be able to move lunar regolith for site preparation. This study recommends the use of an elastic tracked vehicle. Detailed material analyses of most of the LCUV components were accomplished. The body frame, made of pinned truss elements, was stress analyzed using NASTRAN. A track connection system was developed; however, kinematic and stress analyses are still required. This design recommends the use of hydrogen-oxygen fuel cells for power. Thermal control has proven to be a problem which may be the most challenging technically. A tentative solution has been proposed which utilizes an onboard and towable radiator. Detailed study of the heat dissipation requirements is needed to finalize radiator sizing. Preliminary work on a man-rated cabin has begun; however, this is not required during the first mission phase of the LCUV. Finally, still in the conceptual phases, are the communication, navigation and mechanical arm systems.

Source record↗

Three legged walking mobile platform: Kinematic and dynamic analysis and simulation

The three legged walker is proposed as a mobile work platform for numerous tasks associated with lunar base site preparation and construction. It is seen as one of several forms of surface transportation, each of which will be best suited for its respective tasks. Utilizing the principle of dynamic stability and taking advantage of the Moon's gravity, it appears to be capable of walking in any radial direction and rotating about a point. Typical curved path walking could involve some combination of the radial and rotational movements. Comprised mainly of a body, six actuators, and six moving parts, it is mechanically quite simple. Each leg connects to the body at a hip joint and has a femur, a knee joint, and a tibia that terminates at a foot. Also capable of enabling or enhancing the dexterity of a series of implements, the walker concept provides a mechanically simple and weight efficient means of drilling, digging, mining, and transporting cargo, and performing other like tasks. A proof of principle machine demonstrated the feasibility of the walking concept.

Mcmurray, Gary V.↗