Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SCIENTIFIC PERSONNEL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Lessons Learned From the Construction of a Portable Cleanroom for NASA OSIRIS-REx Mission Deintegration

NASA Johnson Space Center (JSC) Infrastructure and Astromaterials Acquisition & Curation Office completed construction and commissioning of the OSIRIS-REx (OREx) Deintegration portable cleanroom at the Utah Test and Training Range (UTTR). The new portable cleanroom was designed to receive the OREx sample return capsule from the landing point on the range to an ISO7 environment. Scientists used the portable clean-room to deintegrate the sample canister from the sample return capsule. Once separated, the sample canister was put in a container under nitrogen purge for transportation to B31 at the Johnson Space Center for astromaterial sample extraction, preliminary analysis, and long-term curation. The portable cleanroom was built by a subcontractor at their facility and then deconstructed to be transported to the remote location at UTTR. Since construction was completed in a remote location all tools and materials had to be transported from contractor site in Dallas, TX. The cleanroom was constructed within an existing facility, which provided conditioned air, electric power, and protection from the elements. Careful coordination was required between the host facility, cleanroom contractor, mission scientists, and JSC facilities and curation personnel. An existing anteroom at JSC was transported to UTTR and added to the portable cleanroom after there was concern about contamination without one for personnel entry/exit. The scientific study of organics is critical for the mission, so a stringent contamination control plan was implemented for low organics. Given these mission requirements the cleanroom construction materials were carefully selected to not hinder the scientific search for amino acids and the study of organics in the samples. The same cleanroom contractor that built the long-term astromaterial curation cleanroom back at JSC Houston, TX was selected to build the portable cleanroom and instructed to use the same materials. The cleanroom had double doors to open and allow the sample return capsule to fit into the cleanroom on its stand and be transferred to a clean stand already in the cleanroom. The portable cleanroom successfully completed its mission and the sample canister was safely deintegrated and transported to JSC under nitrogen purge.

astromaterials curation↗

Portable Cleanroom for NASA OSIRIS-REx Mission Deintegration

NASA Johnson Space Center (JSC) Infrastructure and Astromaterials Acquisition & Curation Office completed construction and commissioning of the OSIRIS-REx (OREx) Deintegration portable cleanroom at the Utah Test and Training Range (UTTR). The new portable cleanroom was designed to receive the OREx sample return capsule from the landing point on the range to an ISO7 environment. Scientists used the portable clean-room to deintegrate the sample canister from the sample return capsule. Once separated, the sample canister was put in a container under nitrogen purge for transportation to B31 at the Johnson Space Center for astromaterial sample extraction, preliminary analysis, and long-term curation. The portable cleanroom was built by a subcontractor at their facility and then deconstructed to be transported to the remote location at UTTR. Since construction was completed in a remote location all tools and materials had to be transported from contractor site in Dallas, TX. The cleanroom was constructed within an existing facility, which provided conditioned air, electric power, and protection from the elements. Careful coordination was required between the host facility, cleanroom contractor, mission scientists, and JSC facilities and curation personnel. An existing anteroom at JSC was transported to UTTR and added to the portable cleanroom after there was concern about contamination without one for personnel entry/exit. The scientific study of organics is critical for the mission, so a stringent contamination control plan was implemented for low organics. Given these mission requirements the cleanroom construction materials were carefully selected to not hinder the scientific search for amino acids and the study of organics in the samples. The same cleanroom contractor that built the long-term astromaterial curation cleanroom back at JSC Houston, TX was selected to build the portable cleanroom and instructed to use the same materials. The cleanroom had double doors to open and allow the sample return capsule to fit into the cleanroom on its stand and be transferred to a clean stand already in the cleanroom. The portable cleanroom successfully completed its mission and the sample canister was safely deintegrated and transported to JSC under nitrogen purge.

astromaterials curation↗

I Asked 30,000 People in the Nuclear Industry About Safety Culture; This is What I Learned - 19204

Organizations in the nuclear industry place a high value on maintaining the safety of the workforce and community. Some of these organizations do a better job than others when it comes to developing and sustaining a healthy safety culture. We spent six years studying nuclear organizations to better understand the factors that influence safety culture. We used mixed methods to evaluate perceptions of safety culture in these organizations including administering a valid and reliable safety culture survey, conducting one-on-one interviews with managers, and facilitating focus groups with members of the workforce. We analyzed the quantitative and qualitative data collected from more than 30,000 workers in U.S. based organizations. All of the organizations had a nuclear component to their operations. They operated nuclear reactors, processed nuclear materials, decontaminated and decommissioned buildings with radiological contamination, cleaned-up hazardous/mixed waste, and conducted basic science research and development. We talked to craft workers, technicians, engineers, scientific professionals, support personnel, production workers, supervisors and managers. We conducted extensive statistical analysis and learned that, with rare exception, there is a gap between the perceptions of managers and the workforce that they manage. Managers almost always have a more positive perception of safety culture than the people that are actually performing the work. It is not a question of whether there will be a gap; it is simply a matter of the magnitude of the gap. We also learned through exploratory factor analysis that there is one dominant factor that accounted for almost all (75%) of the variance in the perceptions of safety culture. It was the behavior of the leaders, the decisions they made, and the systems they implemented that most influenced the workforce's perception of safety culture. Personal accountability for safety accounted for 14% of the variance, communication and reporting accounted for another 6%. Everything else accounted for the remaining 5%. Management systems, decision making and behavior is the dominant factor and managers almost always have a more positive perception than the people that work for them. People that work in organizations where management exhibits positive decision-making and safety-related behaviors tend to have more positive perceptions of safety culture. Based upon these results, we developed a theory that there were a few important factors on which management could focus on if they sought to influence the safety culture in their organization. Our experience and research suggests that management often fails to recognize five root causes of employee discontent. Employees seek: - To be recognized as an individual; - To be respected; - A sense of stability; - Fairness; - To make a difference. Understanding the perceptions of the workforce is critical because perceptions influence attitudes, which contribute to behaviors that determine individual performance. An organisation's performance is simply the sum of the performance of all of the members of that organization. To change an organisation's safety culture, interventions should target management behavior and decision making for the greatest return on investment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Ares Project: Building an Exploration Culture from the Inside Up

NASA is building its first new human-rated space exploration vehicles in nearly 40 years. This marks an important operational and cultural change from the Space Shuttle. In the wake of the Columbia disaster, the agency and the nation realized that NASA's goals and culture needed to change. The Ares Project, which is building the launch vehicles that will power human beings to the Moon, Mars, and beyond, is taking a page from the Saturn playbook by having NASA lead both the overall integration and the development of the Ares I upper stage. Ares is also creating a new culture of cooperation, openness, and informed risk taking as we set our sights on other worlds. Ares has established a team environment where issues can be discussed, information is shared, fun and teamwork are encouraged, and constructive conflict and accountability are expected. Following a "One NASA" philosophy, Ares is taking steps to strengthen cooperation among space centers, contractor partners, engineering and scientific communities, and headquarters personnel. As we learn lessons from things that went wrong with the Space Shuttle, we are also borrowing best practices from what has gone right with that program and others. All of these cultural elements will be necessary as we take the next steps beyond Earth orbit.

Cook, Stephan A.↗

The Ares Projects Office: Building an Exploration Culture from the Inside Up

NASA is building its first new human-rated space exploration vehicles in nearly 40 years. This marks an important operational and cultural change from the Space Shuttle. In the wake of the Columbia disaster, the agency and the nation realized that NASA's goals and culture needed to change. The Ares Projects Office (APO), which is building the launch vehicles that will power human beings to the Moon, Mars, and beyond, is taking a page from the Saturn playbook by having NASA lead both the overall integration and the development of the Ares I upper stage. APO is also creating a new culture of cooperation, openness, and informed risk taking as we set our sights on other worlds. APO has established a team environment where issues can be discussed, information is shared, fun and teamwork are encouraged, and constructive conflict and accountability are expected. Following a "One NASA" philosophy, APO is taking steps to strengthen cooperation among space centers, contractor partners, engineering and scientific communities, and headquarters personnel. As we learn lessons from things that Went wrong with the Space Shuttle, we are also borrowing best practices from what has gone right with that program and others. All of these cultural elements will be necessary as we take the next steps beyond Earth orbit.

Leahy, Bartholomew↗

BOREAS AES Campbell Scientific Surface Meteorological Data

Canadian AES personnel collected data related to surface and atmospheric meteorological conditions over the BOREAS region. This data set contains 15-minute meteorological data from 14 automated meteorology stations located across the BOREAS region. Included in this data are parameters of date, time, mean sea level pressure, station pressure, temperature, dew point, wind speed, resultant wind speed, resultant wind direction, peak wind, precipitation, maximum temperature in the last hour, minimum temperature in the last hour, pressure tendency, liquid precipitation in the last hour, relative humidity, precipitation from a weighing gauge, and snow depth. Temporally, the data cover the period of August 1993 to December 1996. The data are provided in tabular ASCII files, and are classified as AFM-Staff data.

Atkinson, G. Barrie↗

A Framework for International Collaboration on ITER Using Large-Scale Data Transfer to Enable Near-Real-Time Analysis

The global nature of the ITER project along with its projected ~ petabyte per day data generation presents a unique challenge, but also an opportunity for the fusion community to rethink, optimize, and enhance our scientific discovery process. Recognizing this, collaborative research with computational scientists was undertaken over the past several years to create a framework for large-scale data movement across wide-area networks (WANs), to enable global near-real time analysis of fusion data. This would broaden the available computational resources for analysis/simulation, and increase the number of researchers actively participating in experiments. An official demonstration of this framework for fast, large data transfer and real-time analysis was carried out between the KSTAR tokamak in Daejeon, Korea and PPPL in Princeton, USA. Streaming large data transfer, with near real-time movie creation and analysis of the KSTAR Electron Cyclotron Emission imaging (ECEI) data, was performed using the I/O framework ADIOS, and comparisons made at PPPL with simulation results from the XGC1 code. These demonstrations were made possible utilizing an optimized network configuration at PPPL, which achieved over 8.8 Gbps (88% utilization) in throughput tests from NFRI to PPPL. This demonstration showed the feasibility for large-scale data analysis of KSTAR data, and provides a nascent framework to enable use of globally distributed computational and personnel resources in pursuit of scientific knowledge from the ITER experiment.

43 PARTICLE ACCELERATORS↗

NASA high performance computing and communications program

The National Aeronautics and Space Administration's HPCC program is part of a new Presidential initiative aimed at producing a 1000-fold increase in supercomputing speed and a 100-fold improvement in available communications capability by 1997. As more advanced technologies are developed under the HPCC program, they will be used to solve NASA's 'Grand Challenge' problems, which include improving the design and simulation of advanced aerospace vehicles, allowing people at remote locations to communicate more effectively and share information, increasing scientist's abilities to model the Earth's climate and forecast global environmental trends, and improving the development of advanced spacecraft. NASA's HPCC program is organized into three projects which are unique to the agency's mission: the Computational Aerosciences (CAS) project, the Earth and Space Sciences (ESS) project, and the Remote Exploration and Experimentation (REE) project. An additional project, the Basic Research and Human Resources (BRHR) project exists to promote long term research in computer science and engineering and to increase the pool of trained personnel in a variety of scientific disciplines. This document presents an overview of the objectives and organization of these projects as well as summaries of individual research and development programs within each project.

Holcomb, Lee↗

NASA High Performance Computing and Communications program

The National Aeronautics and Space Administration's HPCC program is part of a new Presidential initiative aimed at producing a 1000-fold increase in supercomputing speed and a 1(X)-fold improvement in available communications capability by 1997. As more advanced technologies are developed under the HPCC program, they will be used to solve NASA's 'Grand Challenge' problems, which include improving the design and simulation of advanced aerospace vehicles, allowing people at remote locations to communicate more effectively and share information, increasing scientists' abilities to model the Earth's climate and forecast global environmental trends, and improving the development of advanced spacecraft. NASA's HPCC program is organized into three projects which are unique to the agency's mission: the Computational Aerosciences (CAS) project, the Earth and Space Sciences (ESS) project, and the Remote Exploration and Experimentation (REE) project. An additional project, the Basic Research and Human Resources (BRHR) project, exists to promote long term research in computer science and engineering and to increase the pool of trained personnel in a variety of scientific disciplines. This document presents an overview of the objectives and organization of these projects, as well as summaries of early accomplishments and the significance, status, and plans for individual research and development programs within each project. Areas of emphasis include benchmarking, testbeds, software and simulation methods.

Holcomb, Lee↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Louisiana NASA EPSCoR Project

In 1994, the National Aeronautics and Space Administration issued a Cooperative Agreement (CA) to the State of Louisiana, through the Louisiana Board of Regents (BOB), for the performance of scientific research under the Experimental Program to Stimulate Competitive Research (EPSCoR) Project. Originally constructed as a three-year program with an optional two-year follow on, this federal-state partnership culminated on 31 October 2001, including two CA extensions. The total value of the project reached $3.3M in NASA funding, matched by $2.75M in BOB funds, and supplemented by several million dollars in institutional contributions. Three Research Clusters comprised the state-wide research effort coupled with scientific/technical management and a teacher involvement component. The three research clusters addressed the Enterprises of Space Science, Earth Science and Aerospace Technology with research in High Energy Astrophysics, the Global Carbon Cycle, and Propulsion. Ten universities, over two dozen faculty, over 150 students and numerous support personnel were involved. All of the scientific and technical objectives were met or exceeded. In aggregate, the clusters generated about $18M in outside support, better than a 2:1 return on investment (better than 5:1 considering only the NASA investment). Moreover, two of the clusters have advanced to the level of applying for major NSF research center designation. This project was a trial of the model of building research infrastructure through mentoring. While not completely successful, the results at the smaller institutions were, none the less, positive. Faculty were engaged in major research and involved their students. Administrations improved their capabilities to handle grants and contracts. Faculty release time was granted, research space was provided and, in some cases, equipment was made available for the research. Some of the faculty at these schools have remained involved in research and/or formed collaborations for new endeavors, demonstrating that the mentoring model can be successful.

Wefel, John P.↗

A review and evaluation of the Langley Research Center's scientific and technical information program. Results of phase 1: Knowledge and attitudes survey, LaRC research personnel

The effectiveness of the Langley STI program was assessed using feedback obtained from Langley engineers and scientists. A survey research procedure was conducted in two stages. Personal interviews with 64 randomly selected Langley engineers and scientists were used to obtain information for questionnaire development. Data were then collected by means of the questionnaire which covered various aspects of the Langley STI program, utilized both open and closed ended questions and was pretested for finalization. The questions were organized around the six objectives for Phase 1. The completed questionnaires were analyzed. From the analysis of the data, recommendations were made for improving the Langley STI program.

Pinelli, T. E.↗

Gamma ray astronomy

The Burst and Transient Source Experiment (BATSE) is one of four instruments on the Compton observatory which was launched by the space shuttle Atlantis on April 5, 1991. As of mid-March, 1994, BATSE detected more than 925 cosmic gamma-ray bursts and more than 725 solar flares. Pulsed gamma rays have been detected from at least 16 sources and emission from at least 28 sources (including most of the pulsed sources) has been detected by the earth occultation technique. UAH participation in BATSE is extensive but can be divided into two main areas, operations and data analysis. The daily BATSE operations tasks represent a substantial level of effort and involve a large team composed of MSFC personnel as well as contractors such as UAH. The scientific data reduction and analysis of BATSE data is also a substantial level of effort in which UAH personnel have made significant contributions.

Paciesas, William S.↗

Development of observational and instrumental techniques in hard X-ray and medium energy gamma-ray astronomy

The technical activities, scientific results, related space hardware projects and personnel of the high energy astrophysics program are reported. The development of observational and instrumental techniques in hard X-ray (0.001 to 100 keV) and medium energy gamma-ray (0.1 to 10 MeV) astronomy are examined. Many of these techniques were developed explicitly for use on high altitude balloons where most of the scientific results were obtained. The extensive observational activity using balloons are tabulated. Virtually every research activity will eventually result in a major space hardware development effort.

Pelling, M.↗

A review and evaluation of the Langley Research Center's Scientific and Technical Information Program. Results of phase 4: Knowledge and attitudes survey, academic and industrial personnel

Feedback from engineers and scientists in the academic and industrial community provided an assessment of the usage and perceived quality of NASA Langley generated STI and the familiarity and usage of selected NASA publications and services and identified ways to increase the accessibility of Langley STI. The questionnaire utilized both open and closed ended questions and was pretested for finalization. The questions were organized around the seven objectives for Phase IV. From a contact list of nearly 1,200 active industrial and academic researchers, approximately 600 addresses were verified. The 497 persons who agreed to participate were mailed questionnaires. The 381 completed questionnaires received by the cutoff date were analyzed. Based on the survey findings, recommendations were made for increasing the familiarity with and use of NASA and Langley STI and selected NASA publications and services. In addition, recommendations were made for increasing the accessibility of Langley STI.

Pinelli, T. E.↗

Development of FRET clusters for CBRN Detection

Advanced sensor capabilities for the simultaneous on-site detection of specific chemical, biological, and radiological/nuclear (CBRN) threats is important to significantly limit the risk of exposure to personnel and allow the rapid collection of essential scientific data and critical evidence. Commercially available sensor capabilities are generally complex, and/or require highly specific and ultra-sensitive methods that are often power demanding or require offsite post-analysis for positive detection, leaving personnel vulnerable. The goal of this project is to develop a portable sensor capable of simultaneously detecting CBRN signatures using a multiplexed Förster Resonance Energy Transfer (FRET) based sensor. FRET sensors are tailorable, specific, and highly dependent on the donor-acceptor distance. In this project, nanoparticles were functionalized with aptamers that were designed for the detection of methylphosphonate, a sarin metabolite. FRET was measured between quantum dot donors and dye and metal nanoparticle acceptors using optical spectroscopy.

61 RADIATION PROTECTION AND DOSIMETRY↗

Chemistry Science Investigation: Dognapping Workshop, An Outreach Program Designed To Introduce Students to Science through a Hands-On Mystery

The Chemistry Science Investigation: Dognapping Workshop was designed to (i) target and inspire fourth grade students to view themselves as Junior Scientists before their career decisions are solidified; (ii) enable hands-on experience in fundamental scientific concepts; (iii) increase public interaction with science, technology, engineering, and mathematical personnel by providing face-to-face opportunities; (iv) give teachers a pathway forward for scientific resources; (v) meet the New Mexico K–5 Science Benchmark Performance Standards; (vi) most importantly, ensure everyone has fun! For this workshop, the students are told they will be going to see a Chemistry Magic Show, but the performance is stopped when the Chemistry Dog is reportedly stolen. The students first clear their names using a series of interactive stations and then apply a number of science experiments to solve the mystery. This report describes the workshop in detail, which is suitable for large (~100 students per day) audiences but has flexibility to be modified for much smaller groups. An identical survey was given three times (before, immediately after, and 2 months after the workshop) to determine the impact on the students’ perception of science and scientists as well as determine the effectiveness in relaying scientific concepts through retention time. As a result, survey responses indicate that scientific information pertaining to the workshop is retained for up to 2 months.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗