Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Informed Decision Making”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Development of Analysis Methods that Integrate Numeric and Textual Equipment Reliability Data

Within the Light Water Reactor Sustainability (LWRS) program, the Risk-Informed Systems Analysis (RISA) Pathway is performing collaborative research on the development and deployment of technologies designed to assist operating nuclear power plants (NPPs) to reduce operating costs improve plant reliability and availability. One of the RISA research areas is focusing on the development of methods and tools designed to optimize plant operations (e.g., maintenance/replacement schedules, optimal maintenance postures for plant structures, systems, and components [SSCs]) in a manner that is more cost effective than current approaches and makes better use of available SSC health data. The Risk-Informed Asset Management (RIAM) project targets this research area by creating a direct bridge between component equipment reliability (ER) data and system engineer decision making regarding maintenance activity scheduling and component aging management. In this respect, one challenge that NPP system engineers are facing is that the amount of ER data being continuously generated is not only extremely large in size, but it comes in different forms: textual (e.g., condition or maintenance reports) and numeric (e.g., generated by monitoring systems). All these data elements provide them with valuable insights and information regarding: 1) the discovery of anomalous behaviors or degradation trends, 2) the identification of the possible causes behind such behaviors/trends, and 3) the prediction of their direct consequences. However, several challenges have proved to be roadblocks to this process. While some of these challenges are technical in nature (i.e., data are often distributed over several physical servers/databases), others are conceptual in nature: data elements come in different formats (e.g., numeric or textual), and measured values have different scales (e.g., vibration spectra and oil temperature). The activities performed by the RIAM project during FY23 directly tackles the need to simultaneously integrate the analysis of ER data in all its forms, numeric and textual. Note that such task has never been performed before due to the complexity of the systems under consideration but, most importantly, because of the technical challenges behind the harmonization of ER data formats and the lack of adequate computational methods to analyze them. Our approach borrows ideas and concepts from the medical field where integration of several data sources is vital to assist medical practitioners to perform correct diagnosis and indicate optimal treatments. In our view a NPP asset is equivalent to a patient in a medical context. The main difference is the complexity of a human body is a magnitude more complex when compared to typical assets commonly present in NPPs (e.g., centrifugal pumps, or motor operated valves). This simplifies our first requirement when analyzing heterogenous ER data formats: to put data into “context”. Context is here intended as the additional piece of information that is needed by ER data analysis tools to understand what these data elements are referring to, i.e., which king of knowledge they are generating. In our context, this knowledge can be translated into models that capture the form and functional architecture of assets/systems, their dependencies, and how they interact. These models actually emulate the knowledge that that NPP system engineers possess about assets and systems; this is their key of success when analyzing ER data, their challenge is ability to handle large amount of data. Here, we employ model-based system engineering (MBSE) models of systems and assets to represent and capture their architecture and functional, i.e. cause-effect, relations. Then, ER data elements are processed by identifying first of all which elements of the developed MBSE elements they are referring to. For numeric ER data this task is fairly easy since it is possible to precisely pinpoint what MBSE elements the corresponding sensor are observing (e.g., bearing temperature of a centrifugal pump). Task is much harder for textual data since the information contained in issue or maintenance reports needs to “be understood” by a computational tool. Here we called this process as “knowledge extraction”. Once again, we borrow the experience in the medical field where methods to extract knowledge from textual data have been developed in the past decade. The missing element for us is the availability of a complete dictionary of NPP related concepts (in addition to the MBSE models presented earlier) that can put “text into context”. In FY23, such dictionary has been developed along with all the computational elements required for knowledge extraction. Lastly, once numeric and textual ER data elements have been processed and “understood”, then the last step is the discovery of possible cause-effect relations among them. This is performed by observing if a logical connection through the MBSE models exists, and if the

97 MATHEMATICS AND COMPUTING↗

The FLOod Probability Interpolation Tool (FLOPIT): A Simple Tool to Improve Spatial Flood Probability Quantification and Communication

Understanding flood probabilities is essential to making sound decisions about flood-risk management. Many people rely on flood probability maps to inform decisions about purchasing flood insurance, buying or selling real-estate, flood-proofing a house, or managing floodplain development. Current flood probability maps typically use flood zones (for example the 1 in 100 or 1 in 500-year flood zones) to communicate flooding probabilities. However, this choice of communication format can miss important details and lead to biased risk assessments. Here we develop, test, and demonstrate the FLOod Probability Interpolation Tool (FLOPIT). FLOPIT interpolates flood probabilities between water surface elevation to produce continuous flood-probability maps. FLOPIT uses water surface elevation inundation maps for at least two return periods and creates Annual Exceedance Probability (AEP) as well as inundation maps for new return levels. Potential advantages of FLOPIT include being open-source, relatively easy to implement, capable of creating inundation maps from agencies other than FEMA, and applicable to locations where FEMA published flood inundation maps but not flood probability. Using publicly available data from the Federal Emergency Management Agency (FEMA) flood risk databases as well as state and national datasets, we produce continuous flood-probability maps at three example locations in the United States: Houston (TX), Muncy (PA), and Selinsgrove (PA). We find that the discrete flood zones generally communicate substantially lower flood probabilities than the continuous estimates.

54 ENVIRONMENTAL SCIENCES↗

The Cybersecurity Value-at-Risk Framework: Informing Cybersecurity Decisions

The Cybersecurity Value-at-Risk Framework is a tool that can be used by hydropower plant manager to make more educated cybersecurity investments. Users can take a self guided assessment allowing the tools to generate risk, impact and cybersecurity scores and be given risk-based recommendations to enhance decision-making.

CVF↗

Probabilistic Groundwater Modeling of the RDX Plume at Los Alamos National Laboratory to Support Risk Assessment - 20359

A plume of the contaminant hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) with concentrations greater than the New Mexico tap water drinking standard (9.66 ppb) is present in the regional aquifer near the southwestern boundary of Los Alamos National Laboratory (LANL). A risk assessment is performed for exposure to regional aquifer groundwater, with long-term predictions of RDX concentrations provided by a calibrated, probabilistic, numerical fate and transport model. The structure of the model is hierarchical, with the RDX Regional Aquifer (RA) groundwater model acting as the primary tool for analysis of downgradient RDX concentrations. The RA model is deeply informed by the conceptual site model (CSM) and is calibrated using site RDX concentration data and hydraulic head measurements, along with other analyses. The model is calibrated using data through December 2019. Where data are scarce other lines of evidence are used to inform inputs, including the multiphase RDX Vadose Zone (VZ) model and Pipe and Disk analytical screening tool. Model inputs are described with informative prior distributions using a robust approach to development that incorporates all available lines of evidence for every parameter used as an input to the RA model. Calibration is performed using a classical nonlinear optimization routine, which is then used to initialize a Bayesian calibration. The Bayesian calibration constrains the uncertainty in the classical calibration, ultimately providing posterior distributions for all model parameters. The challenges of the calibration include high-dimensional parameter space, including spatially heterogeneous hydraulic conductivities, comparatively sparse data, and low RDX concentrations. Posterior parameter distributions developed in the calibration process are then used for stochastic predictive model runs into the future. The result of the forward runs is spatially and temporally explicit estimates of head and concentration with uncertainty at all points in space and time. The probabilistic modeling approach presented here includes innovative computational and statistical methods that leverage high-performance computing (HPC) resources. It makes use of prior modeling work performed at the chromium plume site in the central LANL area, with extensive updates. The risk assessment will ultimately be used to support decision-making at the site, using multiple appropriately weighted sources of information, as well as uncertainty, sensitivity, and value-of-information analyses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reimagining How Flood Warnings Can Inform Decision‐Making and Community Actions

Society faces increasingly severe flood hazards, intensifying demand for flood early warning systems (FEWS) that deliver accurate and actionable information. However, most existing FEWS remain prediction‐centric, treating decision‐making as a downstream consumer of hazard forecasts while offering limited support for uncertainty interpretation, risk communication, and real‐world response. This Perspective presents a vision and blueprint for a novel inland FEWS‐decision‐making (FEWS‐DM) framework that repositions decision‐making as an equal partner in the forecasting process—not a passive recipient of its outputs. The framework is built on three tightly coupled, co‐evolving thrusts: Physical Science (T1), which advances flood prediction with quantified uncertainty informed by decision relevance; Human Science (T2), which incorporates psychology, behavior, and cultural and institutional context; and Decision Science (T3), which unifies physical predictions and human factors through principled, utility‐based decision support with end‐to‐end uncertainty management. Rather than treating T1 as a solved problem, FEWS‐DM recognizes that forecast development itself must be shaped by decision needs through continuous bidirectional feedback. We identify key scientific, behavioral, and operational challenges limiting such integration and discuss the enabling role of AI, while emphasizing human‐centered design and community feedback as essential for building trust and improving flood risk management.

54 ENVIRONMENTAL SCIENCES↗

LandScan mosaic enables high-resolution gridded population estimates with explicit uncertainty

Gridded population datasets represent high-resolution distributions of human occupancy, enabling informed decision-making across a broad range of fields. These data products are valuable for assessing environmental risk, urban development, disaster preparedness and resource allocation—areas where accurate population estimates directly enhance policy effectiveness and optimize resource distribution. Despite the importance of gridded population datasets, traditional population modeling approaches often overlook inherent uncertainties in the estimation process. This limitation can create a false sense of certainty in population estimates, potentially leading to flawed decisions by those who rely on the data. To address this methodological gap, we introduce a probabilistic machine learning modeling framework, LandScan Mosaic, that explicitly incorporates uncertainty into the population modeling process. Our approach systematically quantifies uncertainty in three key modeling parameters of the LandScan HD gridded population dataset: building use types, floor counts, and occupancy rates. By employing Monte Carlo simulations, we propagate these uncertainties through the modeling process, yielding probability distributions of population counts in place of deterministic point estimates. We demonstrate the practical application of this framework in Iloilo City, Philippines, using structured decision-making techniques and our probabilistic estimates to identify and prioritize areas most affected by projected flooding, supporting targeted interventions that address both economic and social risks. In doing so, we propose a population-specific approach for incorporating confidence into structured decision making processes. Through a comparative analysis with conventional deterministic approaches and point estimate approaches, including LandScan HD and WorldPop, we evaluate how the incorporation of machine learning and uncertainty influences decision rankings. This research advances population distribution modeling by offering a robust, quantitative approach that explicitly accounts for uncertainty in the underlying data, along with guidance for how users can apply uncertainty in their decision-making.

Environmental sciences↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 6.0: Evaluation of Class VI Readiness

Introduction. Project OASIS is approximately 30 miles southeast of Birmingham, Alabama, and approximately 5 miles north-northwest of Alabama Power Company's Plant Gaston. Geologically, the Project area is in the Alabama fold and thrust belt province. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis that is not collocated with prospective storage geology (the Coastal Plain of the Southeastern US in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns to identify CO 2 storage opportunities in under explored areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The Project OASIS surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage in an under explored region. This initiative benefits the regions emitters as the data generated from this study can inform their own internal decision making. The field program included geological and geophysical evaluations, reservoir engineering analyses, and risk assessments. This report evaluates existing data, as well as a variety of modeling scenarios to evaluate project readiness. Importantly, the impact of this study is not limited to Alabama as there are numerous large emitters throughout Appalachia, in similar geologic settings, contemplating their decarbonization options.

20 FOSSIL-FUELED POWER PLANTS↗

Climate Services for Agriculture: Tools for Informing Decisions Relating to Climate Change and Climate Variability in the Wine Industry

Australia’s changing climate is already impacting the agriculture sector and will continue to do so in the future. To help respond to these impacts, the Climate Services for Agriculture (CSA) platform presents readily accessible climate data, including future climate projections, relevant to specific agricultural commodities. This wine industry example aims to demonstrate the functionality and utility of the CSA for national use across a broad range of commodities. Methods and Results. The platform includes commodity-relevant climate indices designed in consultation with experts to ensure that they are as salient to producers as possible; the wine-grape specific indices include measures of growing season temperature, rainfall, extreme heat, and frost. Here, we describe the research behind the wine-grape specific indices and present sample outputs from the CSA platform for a site within a selected winegrowing region. We note the CSA platform has been developed through an extensive and continuing user engagement initiative, ensuring it meets the needs of the agriculture community as they grapple with how to make decisions based on longer term climate projections. Conclusions. Provision of past, seasonal outlook, and future climate information for Australia and for a range of important agricultural commodities can help improve on-farm planning and decision-making to respond to climate risks. The wine industry provides a leading example of how to use these data for decision-making, noting ongoing adjustments will be needed. Significance of the Study. The CSA platform brings together historical climate data, seasonal climate outlooks, and future climate projections to assist agricultural producers to better manage climate variability and climate change. It aims to nationalise this information for all major agricultural commodities in Australia. We use wine production as a demonstration case here.

54 ENVIRONMENTAL SCIENCES↗

Development of Dry Cask Risk Tools

The Nuclear Regulatory Commission (NRC) has repeatedly expressed a desire to increase the use of risk in its decision-making. The Probabilistic Risk Assessment (PRA) Policy Statement published in 1995 formalized the Commission’s commitment to risk-informed regulation through the expanded use of PRA. While a great deal of work has been done to incorporate risk insights into the regulatory framework for at-power nuclear reactors. Far less progress has been made to risk inform the dry-casks and nuclear waste transportation areas of the nuclear fuel cycle. INL was tasked with incorporating the information from the two completed dry cask PRAs as well as any additional available information into a tool that helps the NRC use those insights to identify levels of risk at various stages in the nuclear waste cycle. The first task was to address the License Amendment Request (LAR) Process for Dry Cask storage, the second task is for the incorporate transportation into the tool, and the third and final task will be incorporate any additional regulatory applications for dry cask storage. This report covers the first task of the tool and will eventually incorporate the remaining two tasks may be completed in the future and built off the model described here. Task 1 specifically asked to incorporate the risk insights into the process for determining and prioritizing review of license amendment changes related to storage applications by outlining a resource allocation strategy and defining recommendations of for the depth and breadth of the LAR review. It was requested that the tool be similar in design to the SDP notebooks/worksheets and contain quantitative, qualitative, or semi-quantitative approaches to assessing the risk of the change. The final tool that was selected by INL to be developed was a flowchart and associated rationale document that allows the reviewer to quickly assess potential LAR changes and their associated risks as well as the rationale behind the risk categorization. This risk categorization will lead to specific actionable recommendations to expect from a change of that specific category. This allows for a more consistent review process as well as improving the overall efficiency of the review itself.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Plant Water Profiler: A Water Balance and True Cost of Water Calculator for Manufacturing Plants

As the uncertainty of a sustained water supply, regulatory constraints, competition among end users, and public scrutiny increases, a growing number of manufacturing sectors are adapting to current and emerging water-related risks by optimizing productivity and reducing waste. As a step toward increasing water use efficiency and making informed business decisions, corporations must make an effort to understand and track their water demands, losses, and costs associated with each subsystem within their facilities. Manufacturers are often unaware of the “true cost of water” (i.e., the total costs associated with procurement, treatment, and consumption of water, and wastewater disposal), which reduces the visibility of the actual impact of water-saving measures. To help manufacturers account for water procurement and use in manufacturing operations, quantify the true cost of water, and identify potential areas for water and associated energy cost savings, an open access tool—Plant Water Profiler (PWP)—was developed. The tool is based on water mass balance analysis and has been adopted as the core analysis tool for plant water use assessments, Water In-Plant Training (Water INPLT), as part of the US Department of Energy’s Better Plants program. During three pilot INPLTs conducted in 2019 at three manufacturing facilities, the PWP tool allowed users to understand water flows within the facilities and provided additional capabilities to analyze their water use. This paper describes the methodology behind the PWP tool and its implementation through pilot Water INPLT trainings delivered in three manufacturing facilities in the United States. The three case studies demonstrate opportunities to improve water efficiency and reduce associated costs and the challenges encountered in three different manufacturing sectors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development and application of an environmental risk register for marine energy device and project developers

The marine energy industry is steadily advancing as more devices are deployed worldwide. However, several challenges and barriers remain, such as lingering uncertainty regarding the potential environmental effects of marine energy devices on marine animals, habitats, and ecosystems. Concerns have led to difficulty navigating permitting and consenting processes and receiving authorization to deploy devices in the marine environment, including extended timelines and costs. Based on existing risk registers, a novel marine energy environmental risk register was created to help the marine energy industry move beyond these barriers. This risk register aims to aid marine energy device and project developers identify and assess potential environmental risks early in device design or project planning, document and track potential environmental interactions, prioritize risks and determine risk responses, and make decisions throughout device or project development. It can also be used as a tool to assist in communicating with regulators and advisors during permitting processes and to inform stakeholder and community engagement efforts. This paper details the methods and process to develop a risk register specific to environmental effects of marine energy and describes two use cases (one for wave energy and another for tidal energy) to highlight example results. Due to the tool's novelty, the paper showcases its application for the marine energy industry and acknowledges limitations and possible future improvements. Overall, the environmental risk register shows promise to support marine energy developers when identifying, tracking, and addressing potential environmental risks and to help successfully navigate permitting and deploy marine energy devices responsibly.

Environmental effects↗

A Bayesian Approach for In-Situ Stress Prediction and Uncertainty Quantification for Subsurface Engineering

Many subsurface engineering applications require accurate knowledge of the in-situ state of stress for their safe design and operation. Existing methods to meet this need primarily include field measurements for estimating one or more of the principal stresses from a borehole, or optimization methods for constructing a 3D geomechanical model in terms of geophysical measurements. These methods, however, often contain considerable uncertainty in estimating the state of stress. Here, in this paper, we build on a Bayesian approach to quantify uncertainty in stress estimations for subsurface engineering applications. This approach can provide an estimate of the 3D distribution of stress throughout the volume of interest and provide an estimate of the uncertainty arising from the stress measurement, the rheology parameters, and a paucity of measurements. The value of this approach is demonstrated using stress measurements from the In Salah carbon storage site, which was one of the world’s first industrial carbon capture and storage projects. This demonstration shows the application of this Bayesian approach for estimating the initial state of stress for In Salah and quantifying the uncertainty in the estimated stress. Also, an assessment of a maximum injection pressure to prevent geomechanical risks from CO 2 injection pressures is provided in terms of the probability distribution of the minimum principal stress quantified by the approach. With the In Salah case study, this paper demonstrates that using the Bayesian approach can provide additional insights for site explorations and/or project operations to make informed-site decisions for subsurface engineering applications.

58 GEOSCIENCES↗

Risk-Informed Approach for Regulatory Approval of Microreactor Transport

Pacific Northwest National Laboratory (PNNL) is addressing the challenges associated with safe transport of microreactors including the development and evaluation of regulatory options. PNNL developed a risk-informed regulatory framework for the licensing of the transportation of microreactors in which irradiated nuclear fuel is part microreactor transportation package. The framework lays out a viable regulatory pathway, including decision points for regulatory options and the supporting technical evaluations for those options in phases from near to long term. A microreactor and its contents will likely not be able to meet all the federal regulatory requirements as a Type B or fissile material transportation package under 10 CFR Part 71 (“Packaging and Transportation of Radioactive Material”). However, the regulatory framework developed by PNNL lays out a viable risk-informed licensing options that are safe and feasible. Risk assessment such as probabilistic risk assessment (PRA) can be used to show comparable safety to that provided by a Type B or fissile material package for surface transport. The framework includes guidance on applicable regulations and discusses historical precedence in using risk information for transportation licensing. The framework includes guidance for performing a microreactor transportation PRA, use and development of risk evaluation criteria, and factors such of defense-in-depth and safety margin concepts. Key advantages of using the approach are (1) increasing the likelihood of successfully obtaining regulatory transportation package approval, (2) informing the design on the relative risk significance of microreactor containment and shielding, and (3) informing the need for transportation compensatory measures. This paper focuses on two primary elements of the framework which are development of a transportation PRA for microreactor packages and development of the risk acceptance guidelines to assess the results of the PRA for regulatory decision-making.

microreactor, micro nuclear power plant, MNPP, ris↗

Data Driven Analysis for Modernization Program Management

NNSA is responsible for managing national nuclear security missions: ensuring a safe, secure, and reliable nuclear deterrent; supplying nuclear fuel to the Navy; and supporting the nation’s nuclear nonproliferation efforts. However, over half of NNSA’s facilities are more than 40 years old, and roughly one-third date back to the Manhattan Project. To execute its critical nuclear security missions, NNSA is making large investments to modernize its nuclear production capabilities. This ramp up represents NNSA’s largest modernization effort since the Cold War. Given the scale of these efforts, NNSA’s Office of Secondary Stage Production Modernization has implemented data driven techniques to prioritize investments and inform strategic decision making. NNSA, with support from its site managing contractors, has developed and implemented an integrated schedule and risk management system to address the issues and limitations with the traditional approach. The multi-year integrated schedules are key to identifying program linkages and managing large portfolios comprised of many different projects and efforts. In conjunction with the integrated schedule, a new program risk management system has also been developed and implemented, which manages program risks and opportunities, along with specific mitigation strategies to reduce or eliminate the risks per timelines that are tracked in the integrated schedule. This paper is supplemented with a follow-on presentation on effective management of program material and throughput modeling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk-Informed Approach for Event Selection and Component Classification

Develop a report summarizing a structured approach for the incorporation of risk insights when making facility safety assessments and regulatory decisions is proposed to supplement the deterministic approach, with the following expected benefits: Increased confidence that key safety issues have been fully identified and addressed Better understanding of safety margins Facilitates more structured dialogue among international regulators Reduced reliance on “expert judgement” through a rigorous, pre-defined process with more predictable outcomes Proposed outcome is development of a report summarizing the structure and key considerations for applying this approach that: Is inclusive of advanced reactor technologies Provides for flexible implementation recognizing unique and varying sovereign regulatory structures Builds upon existing/current GIF safety approaches (e.g., GIF Basic Safety Approach, Integrated Safety Assessment Methodology)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hierarchical Estimation For Planetary Protection

The software uses Bayes' theorem to describe the probability of an event based on prior knowledge of conditions that might be related to the event. The purpose of Bayesian analysis is to determine posterior probabilities based on prior probabilities where new information can be used in the decision-making process as additional data is gathered. The software will be used in Probabilistic Risk Assessments (PRAs) related to the Europa Clipper mission, which is one of NASA’s top priorities. Ultimately, the mission entails sending the Europa Clipper spacecraft to Jupiter’s Europa moon to orbit the planet and collect data for research and development. Europa is the smallest of the four Galilean moons orbiting Jupiter and is believed by researchers to be the most promising place to look for present-day environments suitable for life. Europa is thought to have an iron core, a rocky mantle, and a salt-water ocean covered by an ice-layered surface.

Gribok, Andrei [Idaho National Laboratory (INL), I↗

A Multi-Stage Stochastic Risk Assessment With Markovian Representation of Renewable Power

Probabilistic forecasts provide a distribution of possible outputs and so can capture the uncertainty and variability of Variable Renewable Energy (VRE). However, taking advantage of uncertainty information has practical challenges that make it difficult to integrate probabilistic forecasting into control room decision-making. This paper proposes a novel use-case for probabilistic forecasts by incorporating them into the hour-ahead operations for situational awareness via a risk-averse multi-stage stochastic program. We employ a Markovian representation of the probabilistic forecasts that enables the formulation of the multi-stage problem and avoids a scenario generation phase. We test the model on a realistically sized system to assess risk and showcase the capability of using probabilistic renewable forecast as input to produce probabilistic output forecasts of future system states. The results show that the model can capture time consistency in the reserves and Area Control Error (ACE) forecast. The solution times are adequate for risk profiling in hour-ahead timescales.

forecasting↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗