Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Footprints of Worldwide Adaptation in Structured Populations of Drosophila melanogaster Through the Expanded DEST 2.0 Genomic Resource

Abstract Large-scale genomic resources can place genetic variation into an ecologically informed context. To advance our understanding of the population genetics of the fruit fly Drosophila melanogaster, we present an expanded release of the community-generated population genomics resource Drosophila Evolution over Space and Time (DEST 2.0; https://dest.bio/). This release includes 530 high-quality pooled libraries from flies collected across six continents over more than a decade (2009 to 2021), most at multiple time points per year; 211 of these libraries are sequenced and shared here for the first time. We used this enhanced resource to elucidate several aspects of the species' demographic history and identify novel signs of adaptation across spatial and temporal dimensions. For example, we showed that the spatial genetic structure of populations is stable over time, but that drift due to seasonal contractions of population size causes populations to diverge over time. We identified signals of adaptation that vary between continents in genomic regions associated with xenobiotic resistance, consistent with independent adaptation to common pesticides. Moreover, by analyzing samples collected during spring and fall across Europe, we provide new evidence for seasonal adaptation related to loci associated with pathogen response. Furthermore, we have also released an updated version of the DEST genome browser. This is a useful tool for studying spatiotemporal patterns of genetic variation in this classic model system.

Biochemistry & Molecular Biology↗

Climatic imprint on interfacially-controlled platinum-palladium resources

Abstract Iron oxide-rich laterites, soils, and regolith formed from the weathering of ultramafic rocks represent untapped unconventional resources for the critical minerals platinum and palladium, but the fundamental surficial geochemistry of these elements remains poorly understood. Depletion of Pd relative to Pt occurs in some weathering zones in semi-arid climates. The accepted model attributes this platinum-palladium chemical fractionation to preferential complexation of Pd by dissolved chloride. However, similar fractionation is not observed in laterites of humid equatorial regions despite substantial wet deposition of chloride. The established mechanistic model for Pt and Pd behavior during weathering thus inaccurately predicts the distribution of these critical minerals in many settings, hindering global resource assessment. We show through mineral-fluid partitioning experiments coupled to element-specific spectroscopy that this canonical explanation for platinum-palladium fractionation is invalid: chloride complexation does not differentially mobilize Pd versus Pt. Instead, mineral-specific interfacial reactions control Pd and Pt accumulation. Modeling of platinum-palladium fractionation in representative weathering zone profiles demonstrates sub-equal retention in goethite-rich settings and Pd depletion in hematite-rich zones, accurately predicting trends observed in soils and laterites. Iron oxide mineralogy, reflecting modern and past regional climate conditions, is likely the primary determinant of Pt and Pd endowment in weathering zone resources. This new model for Pt and Pd mobilization and accumulation behavior provides a mechanistic foundation for exploration and recovery of platinum group elements from novel ultramafic regolith deposits.

58 GEOSCIENCES↗

Interoperable, Inverter - Based Distributed Energy Resources Enable 100% Renewable and Resilient Utility Microgrids

As microgrids transition away from use of conventional generating resources and increasingly rely on renewable resources towards decarbonization goals, it is crucial to evaluate the capability inverter-based resources to provide microgrid stability and resilience. Particularly, microgrids with a high contribution of intermittent solar photo voltaic generation and higher load variability present unique challenges requiring fast voltage and frequency support. At the San Diego Gas & Electric Company(R) (SDG&E(R)) Borrego Springs Microgrid, a battery inverter was upgraded with grid-forming (GFM) capability to serve as island leader, transitioning responsibility away from diesel generators. An interoperable microgrid control scheme was developed, coordinating GFM and grid-following (GFL) inverters. Hardware-in-the-loop (HIL) simulations using relevant power and controller HIL interfaces between real-time simulators and field equipment are being conducted to de-risk field deployment.

battery energy storage↗

Flexible Resource Scheduler for FAST-DERMS (FRS-FASTDERMS) v0.9

The Flexible Resource Scheduler is a hierarchical controller that manages the distributed energy resources in a distribution substation or distribution feeder to provide a firm commitment of power flow at the substation or feeder head to be scheduled in transmission-level markets as an aggregated demand resource. It is the reference controller for the FAST-DERMS Architecture, developed in tandem with the architecture under the DOE FAST-DERMS project. It is comprised of a day-ahead stochastic optimization, which schedules substation power flow and reserves, a intra-hour MPC, which generates dispatch base points for DER, and a real-time PID controller maintaining that dispatches DER to maintain the substation power around the base points. The repository also includes a representative aggregator controller, and all of the necessary components to run a simulation using PNNL's GridAPPS-D software with the controller.

MacDonald, Jason [Lawrence Berkeley National Labor↗

Ground Source Heat Pump Screening Tool and Related Resources

This archive contains both a link to Oak Ridge National Laboratory's Ground Source Heat Pump (GSHP) Screening Tool and related resources documenting its development, technical features, and applications. The web-based screening tool is a techno-economic analysis resource designed to evaluate the feasibility, costs, and benefits of implementing GSHP systems in buildings across various U.S. climate zones. It is intended for use by building owners, HVAC system designers, and installers to support decision-making in residential and commercial applications, incorporating advanced modeling capabilities such as ground heat exchanger design. The included resources detail the tool's creation and use, covering topics such as innovative ground heat exchanger design methodologies, the development of an open library of g-functions for borehole configurations, and studies on GSHP performance and economic viability in retrofitting single-family homes.

15 GEOTHERMAL ENERGY↗

Model Formulations: Integrating Distributed Energy Resources (DER) using Advanced Unit Commitment Models and DER Aggregation Methodologies

A distribution energy resource aggregator (DERA) constitutes a group of distribution energy resources with small generation capacities which meet the threshold to participate in the electricity wholesale market. This document provides the proposed DERA model formulation that will be implemented in the SCUC simulation’s architecture for the SCUC-DER project. Different economical assessment methodologies have been developed to incorporated bids for individual distributed resources, which include solar cost dispatch and cost model, BESS opportunity cost offer algorithm, and price sensitive demand response model. Detailed methods are proposed to aggregate individual cost offers to a DERA cost curve to bid in SCUC market while three methods are proposed to simulate DER actual dispatch. Based on the DERA models in this document, the SCUC-DER project will be able to assess the impacts of DERA on the distribution system’s operation and reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Basin-Scale Structural Features Database: Spatial Datasets to Support Carbon Storage Resource Assessments

Presentation slides on "Basin-Scale Structural Features Database: Spatial Datasets to Support Carbon Storage Resource Assessments" for CCUS 2025 Annual Meeting. The Basin-Scale Structural Features database contains a series of basin-scale spatial datasets representing structural features, including faults, fractures, folds, and earthquakes. Designed to support carbon storage feasibility and resources assessments for Carbon Capture and Storage (CCS) projects, the database leverages publicly available data resources from authoritative sources (e.g. US Geological Survey, State Geologic Surveys), and aims to help users better understand basin-scale structural features, as well as potential data gaps in areas with sparse information.

basin scale↗

Resource Recovery for the Wastewater Industry

This information sheet discusses the technology pillar, Resource Recovery, as a pathway toward improving wastewater infrastructure sustainability and resiliency. To supplement existing literature on current technologies and policies for improving resiliency at wastewater (WW) treatment plants, this document aims to accomplish the following: • Summarize wastewater sludge recovery methods • Summarize biogas production and codigestion methods • Serve as a comprehensive (though not exhaustive) repository for resource recovery for wastewater utilities The Resource Recovery Technical Information Sheet should be viewed as a general guide to established best practices for the water and wastewater (W/WW) sector when considering implementing energy capture technologies. Additional details on associated energy capture avenues such as combined heat and power (CHP), renewable energy, and inline hydropower from tertiary effluent in W/WW facilities are presented in the Energy Capture Technology Information Sheet.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Resource Characterization for Community Scale Tidal Instream Energy in Maine [Abstract]

Coastal and island communities in Maine are seeking solutions to increase the resiliency of their electrical grid while also reducing their carbon footprint. Unfortunately, many community scale tidal resources identified on the Maine coast have not been rigorously evaluated; previous studies identified numerous hot spots but left many of them unevaluated or under evaluated (e.g., only power density was assessed in many cases). The primary objective of this TEAMER project is to evaluate selected community scale tidal instream resources to demonstrate their potential for contributing to the renewable energy needs of nearby coastal communities. The methods developed in this study will enable the total community scale tidal instream energy resource along the Maine coast to be evaluated in follow-on studies. The study will also enable turbine developers to understand how to scale and optimize their devices for deployment in turbine farms at community scale sites. Data from the study will be shared publicly through MHKDR or relevant community websites.

16 TIDAL AND WAVE POWER↗

A Forward-Looking Dataset of EV Managed Charging Resource and Costs

This presentation summarizes a high-resolution, forward-looking dataset of EV adoption, EV charging, and managed charging resource. Vehicle-level data are grounded in current adoption and charging patterns, and ~200,000 real-world vehicle-weeks of travel data covering all on-road segments (i.e., light-duty, transit and school buses, local, regional and long-haul medium- and heavy-duty). The data, which include multiple charging profiles per vehicle to bound flexibility, are then processed and aggregated to describe baseline charging and charge management resource by county, hour, year, scenario, and vehicle type. Coupled with one of four scenarios of how EV managed charging costs might evolve over time, the dataset enables a power sector capacity expansion model to select cost-optimal quantities of EV managed charging and supply-side resources to reliably satisfy demand. Five integration strategies: Baseline, Daytime and Flat (passive), Flex (active), and Stress (anti-strategy), illustrate how baseline charging and flexibility potential changes with EVSE build-out and charging preferences.

33 ADVANCED PROPULSION SYSTEMS↗

A Cultural Resource Survey of 661.5 Acres on the Tonopah Test Range (TTR), Nellis Air Force Base, Nye County, Nevada

This report presents the results of a Section 110 cultural resource survey of Pedro Lake and the surrounding area. Sandia National Laboratories’ (Sandia) cultural resources program, in collaboration with personnel from the cultural resource department from the Northern Ranges of the Nevada Test and Training Range (NTTR), Nellis Air Force Base (NAFB) surveyed 267.71 hectares (ha) (661.50 acres [ac]) for the project, located on the Tonopah Test Range (TTR) at Nellis Air Force Base, Nye County, Nevada. The survey resulted in the update of two previously recorded archaeological sites, the documentation of 15 newly discovered archaeological sites, and 18 isolated occurrences. The results of the survey are presented herein.

54 ENVIRONMENTAL SCIENCES↗

Novel Zwitterionic Chromatography to Separate Lithium from Unconventional Resources

Since lithium (Li) is a key element for clean energy technologies, the global lithium demand is anticipated to increase rapidly. As a result, efficient lithium extraction technologies that allow the exploitation of unconventional lithium resources, such as geothermal brines and inland brine streams, are essentially needed to meet the Li demand and keep supply chains stable. However, because of low Li concentration, low ratio of Li/Mg or Li/Ca, and complex feed compositions in these feedstocks, using conventional hydrometallurgy or current Direct Lithium Extraction (DLE) processes are often chemical-intensive, requiring substantial amounts of reagent chemicals to recover Li at scale, resulting in large chemical footprints. Therefore, we developed a novel Zwitterionic Chromatography (ZIC) process to separate Li from these resources. Because Li can be partitioned from divalent salts on ZIC under water elution without using chemicals, exploiting the unconventional resources via a ZIC approach can be environmentally benign and sustainable. In this work, we will present the development of the ZIC process for DLE applications. Simulation studies for the Li separation mechanism in ZIC and the demonstration of a continuous ZIC process to separate Li from domestic inland brine and mining wastewater will be presented. Finally, the chemical and energy footprints of ZIC in comparison to other DLE processes will be discussed.

09 BIOMASS FUELS↗

Control Parameter Sensitivity Study for Inverter-Based-Resource Dominated Grids: A Small Signal Stability Approach and Framework

The growing adoption of renewable energy is driving the prevalence of inverter-based resources (IBRs) within power grids. Future power grids will integrate both grid-following IBRs (GFM-IBRs) and grid-forming IBRs (GFL-IBRs) alongside synchronous generators. Therefore, it is crucial to perform stability studies that account for all components and especially control interactions related to IBRs. Extensive research has performed to study the IBR-related stability, however, the sensitivity study of IBRs' control parameters on system stability has not been adequately studied yet, especially from a systematic way. Therefore, this paper conducts a small signal stability analysis for a generic grid with multiple types of resources and develops an analytical framework for assessing the sensitivity of control parameters affecting stability margins. To achieve that, the non-autonomous reduced-order non-linear dynamic model is developed for a generic power system with multiple synchronous generator-based resources (SGBRs), GFM-IBRs, and GFL-IBRs. Based on the analytic model, a systematic framework for parametric sensitivity on systems' asymptotic stability is developed. A parameter sensitivity analysis based on eigenvalue methods is proposed. The impact of the droop controllers of GFM-IBRs, PQ-dispatch and the PLL controller of GFL-IBR on the system asymptotic stability is discussed. This sensitivity study is aiming to provide deep insights on control parameters' impact on system stability, and gives direction for parameter tuning in case of instability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Congestion Management Solutions for Enhanced Distribution System Operations with Aggregated Distribution Grid Resources Providing Grid Services and Market Participation

Microgrids and other aggregations of distribution grid resources (DGRs) are poised to actively participate in electricity markets and provide essential grid services in the coming years. In fact, DGRs already play such a role through behind-the-meter (BTM) demand response programs and small-scale BTM dispatchable generation initiatives. At the same time, the rapid growth of artificial intelligence (AI) and cryptocurrency datacenters imposes significant, often unpredictable, demands on the power distribution system. Aggregated DGRs can serve as flexible resources that help mitigate these pressures by using available transmission and distribution capacity more efficiently, supporting resource adequacy and other reliability services, and providing bridge strategies while long-term transmission infrastructure is being developed. The impacts this activity will have on distribution networks are not fully understood and could present significant challenges for distribution utilities due to capacity constraints and the need for congestion management. Technical issues include reverse power flow, variability and possible degradation of equipment integrity, voltage violations, and customer power quality concerns. These issues will likely intensify as electricity market operators across the United States implement Federal Energy Regulatory Commission Order 2222 over the next few years.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory↗

C-HER Metadata Overview: Approach, Standards, and Rigor for the Centralized Health and Exposomic Resource

The Centralized Health and Exposomic Resource (C-HER) unifies environmental, demographic, geographic, and health-related data for exposomic research. The source data differ in format, geographic coverage, time period, resolution, terminology, and documentation. We use a common metadata framework to describe those differences and to record how each data resource has been processed, documented, and ingested. This document relates only to the C-HER metadata framework. It explains the information that is recorded for each resource, the standards used to organize that information, the conditions for metadata completeness, and the relationship between metadata and quality review. It is intended for those who need to understand what C-HER metadata communicates and how it supports appropriate use of the data. It is not an implementation specification or procedure. It does not document the database schema, source code, deployment configuration, transformation algorithms, or dataset-specific QA/QC thresholds. Those materials are maintained separately.

MacFarland, Midgie [ORNL] (ORCID:0009000807354078)↗

Evaluating the potential of short-term instrument deployment to improve distributed wind resource assessment

Distributed wind projects, which are connected at the distribution level of an electricity system or in off-grid applications to serve specific or local energy needs, often rely solely on wind resource models to establish wind speed and energy generation expectations. Historically, anemometer loan programs have provided an affordable avenue for more accurate onsite wind resource assessment, and the lowering cost of lidar systems has shown similar advantages for more recent assessments. While a full 12 months of onsite wind measurement is the standard for correcting model-based long-term wind speed estimates for utility-scale wind farms, the time and capital investment involved in gathering onsite measurements must be reconciled with the energy needs and funding opportunities that drive expedient deployment of distributed wind projects. Much literature exists to quantify the performance of correcting long-term wind speed estimates with 1 or more years of observational data, but few studies explore the impacts of correcting with months-long observational periods. This study aims to answer the question of how short you can go in terms of the observational time period needed to make impactful improvements to model-based long-term wind speed estimates. Three algorithms, multivariable linear regression, adaptive regression splines, and regression trees, are evaluated for their skill at correcting long-term wind resource estimates from the European Centre for Medium-Range Weather Forecasts Reanalysis version 5 (ERA5) using months-long periods of observational data from 66 locations across the US. On average, correction with even 1 month of observations provides significant improvement over the baseline ERA5 wind speed estimates and produces median bias magnitudes and relative errors within 0.22 m s −1 and 4 percentage points of the median bias magnitudes and relative errors achieved using the standard 12 months of data for correction. However, in cases when the shortest observational periods (1 to 2 months) used for correction are not well correlated with the overlapping ERA5 reference, the resultant long-term wind speed errors are worse than those produced using ERA5 without correction. Summer months, which are characterized by weaker relative wind speeds and standard deviations for most of the evaluation sites, tend to produce the worst results for long-term correction using months-long observations. The three tested algorithms perform similarly for long-term wind speed bias; however, regression trees perform notably worse than multivariable linear regression and adaptive regression splines in terms of correlation when using 6 months or less of observational data for correction. Translating the analysis to wind energy, median relative errors in the capacity factor are on average within 10 % using 1 month of training. If the observation period used for correction is not well correlated with the reference data, however, misrepresentation of the observed capacity factor can be substantial. The risk associated with poor correlation between the observed and reference datasets decreases with increasing training period length. In the worst-correlation scenarios, the median capacity factor relative errors from using 1, 3, and 6 months are within 47 %, 26 %, and 16 %, respectively.

17 WIND ENERGY↗

Assessing Photovoltaic Capacity Factor Variability Using Long-Term Satellite Derived Solar Resource Data Under Brazilian Climate

Accurate estimation of photovoltaic (PV) energy yield and its variability is essential for reducing financial risk and supporting reliable system planning for rapidly expanding PV markets. In Brazil, high solar adoption and increasing levels of distributed energy resources are beginning to introduce operational challenges such as curtailment and evolving grid requirements. Understanding how natural variability in solar resource propagates into PV system performance is therefore increasingly important for both project design and grid integration. Modern PV yield assessments commonly rely on multi-year meteorological datasets and probabilistic exceedance metrics (e.g., P50/P90) to quantify energy yield uncertainty for project financing. However, the implications of long-term solar resource variability for PV system design choices and high-adoption grid conditions remain less well characterized for rapidly expanding markets such as Brazil. In particular, understanding how weather-driven variability propagates into PV production distributions and capacity factor expectations is important for evaluating curtailment exposure, deployment strategies, and storage requirements in regions experiencing rapid growth of distributed and utility-scale PV. Seasonal and interannual variability in atmospheric conditions can produce substantial fluctuations in monthly PV energy production, which propagate into uncertainty in annual energy yield and capacity factor expectations. Characterizing this variability using long-term meteorological datasets allows probabilistic estimation of PV system performance and provides improved insight into the range of expected PV energy outcomes. This study explores the use of long-term satellite-derived meteorological data from the National Solar Radiation Database (NSRDB) to evaluate the variability of photovoltaic system performance across multiple locations in Brazil. Using a 27-year dataset (1998-2024), PV system simulations are performed to characterize the distribution of annual and seasonal capacity factors and energy yield outcomes, while propagating key sources of meteorological variability and model uncertainty through the PV modeling chain. The analysis also investigates the sensitivity of PV performance outcomes to key system design assumptions within the PV modeling chain, including tracking configuration and system sizing parameters. The resulting probabilistic performance characterization provides insight into how weather-driven variability influences PV production expectations and capacity factor distributions. These results provide a foundation for evaluating how weather-driven variability interacts with high PV adoption and potential storage or curtailment mitigation strategies.

14 SOLAR ENERGY↗