Optimal Coordination of Distance and Overcurrent Relays with Sparse Placement.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This presentation starts with the details of IEEE 2800-2022 requirements of IBR for balanced and unbalanced faults. Then, it shows how to design a droop based GFM control to be IEEE 2800-2022 compliant. An performance evaluation is carried out to see if three OEM GFM inverters 2800-2022 compliant or not. And finally we show how IEEE 2800-2022 complaint and non-compliant GFM inverter will impact the transmission line protection elements, such as directional element and FID. Finally, recommendations are made if the GFM is not IEEE 2800-2022 compliant to disable the protection elements that rely on reliable and regulated negative sequence current.
Explore the source record for details and available documents.
Increased penetration of power electronics interfaced Distributed Energy Resources (DER) like PV, electric vehicle and battery storage in the distribution system (both in numbers and sizes) may cause bi-directional power flows under normal operation. In addition, they contribute low fault current under short circuit conditions. These two changes can impact the proper operation of legacy protection systems. This can add additional challenges during weak grid and islanded operation. In this research, traveling wave (high frequency) signature based protection scheme is proposed for future distribution systems. Simulations are performed under different transient scenarios to provide insight into the high frequency signatures to show the traveling wave behavior. Finally, this paper discusses the importance of sensing and digital processing requirements for traveling-wave protection in distribution system.
Increased penetration of power electronics interfaced Distributed Energy Resources (DER) like PV, electric vehicle and battery storage in the distribution system (both in numbers and sizes) may cause bi-directional power flows under normal operation. In addition, they contribute low fault current under short circuit conditions. These two changes can impact the proper operation of legacy protection systems. This can add additional challenges during weak grid and islanded operation. In this research, traveling wave (high frequency) signature based protection scheme is proposed for future distribution systems. Simulations are performed under different transient scenarios to provide insight into the high frequency signatures to show the traveling wave behavior. Finally, this paper discusses the importance of sensing and digital processing requirements for traveling-wave protection in distribution system.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Cygnus is a dual beam high-energy radiographic x-ray source. Ten years ago, three large zoom lenses were assembled to collect images from 200 mm x 200 mm square scintillators. The zoom capability allows zooming down to a 60 mm x 60 mm picture from the scintillator. Current radiographic imaging needs now require larger 270 mm x 270 mm square scintillators and the capability to use both 92 mm x 92 mm and 62 mm x 62 mm CCD cameras, and a new lens design to meet these needs. This zoom lens incorporates 11 elements and is designed to be telecentric. It images a scintillator emitting light peaking at 435 nm, so special glass types are required for the lens elements. Much larger elliptical pellicles are needed to deflect the scintillator light out of the x-ray path into the lens. The optical axis of the imaging system must be colinear with the x-ray axis. Two scintillators are positioned in each of two Cygnus x-ray axes, for a total of four scintillators and four lens systems. An optional configuration will be shown, enabling two lens systems imaging opposite sides of a single scintillator, for a total of four lenses and two scintillators. Although this configuration has advantages, it suffers from crosstalk. Care must be taken to analyze the anti-reflection coatings applied to all the elements in the imaging chain, including the CCD array and
Presentation at the "Multi-Probe Radiography IV: Detectors and Image Analysis" workshop, to be held at LANL, in the Rosen Auditorium. Host is Bob Reinovsky, LANL, 505-699-1127. LANL Point of Contact: Mariana Alvarado Alvarez, LANL, 505-665-7994.
In this study is presented two power system applications with distributed ledger technology (DLT) and smart contracts (SC) that were assessed in a Cyber-Grid-Guard System (CGGS) advanced testbed, with protective relays, power meters, communication devices, DLT devices, synchronized time source, clock displays and real time simulator. This CGGS testbed was set in the Advanced Protection Lab, 252 lab space of the Grid Research Integration and Deployment Center (GRID- C), at Oak Ridge National Laboratory. In power grids, customer-owned distributed energy resources (DERs) are more frequent than in the past, and the numbers of points of interconnection (POI) with customer-owned DERs have increased. Disruptive operation from DERs presents a risk to grid operations, and protective relays located at the POI are used to isolate out-of-tolerance or poorly behaving of DERs. Ensuring the integrity of data from the relays at the POI, and DLT could enhance the security of the power grids. The first application is a SC to define and control the allowable total power factor (TPF) of the DER (wind farm) output, and the terms of the SC are implemented using DLT with a CGGS for a customer-owned DER. The TPF SC was implemented by the CGGS using DLT. The experimental model was performed with a real-time simulator using a CGGS and relay in-the-loop. The data collected from the CGGS were used to execute the TPF SC. The TPF limits were between +0.9 and +1.0, and the breakers’ operation in the POI was controlled by the relay using the SC. The events were collected from the real-time simulator, CGGS, and SEL 700GT relay to validate a successful application of the TPF SC using DLT. The second application is a SC to measure and control the allowable voltage service limits (VSL) by the CGGS using DLT. The tests were performed by using a real-time simulator, CGGS and relay in-the-loop. The data was collected from the CGGS that executed the SC. The main constraints were defined based on ANSI C84.1 service voltage limits, and the operation of the breakers in the POI. The events were collected from the CGGS, and SEL 700GT relay to assess a successful operation of the VSL SC using DLT.
In modern electrical grids, the numbers of customer-owned distributed energy resources (DERs) have increased, and consequently, so have the numbers of points of common coupling (PCC) between the electrical grid and customer-owned DERs. The disruptive operation of and out-of-tolerance outputs from DERs, especially owned DERs, present a risk to power system operations. A common protective measure is to use relays located at the PCC to isolate poorly behaving or out-of-tolerance DERs from the grid. Ensuring the integrity of the data from these relays at the PCC is vital, and blockchain technology could enhance the security of modern electrical grids by providing an accurate means to translate operational constraints into actions/commands for relays. This study demonstrates an advanced power system application solution using distributed ledger technology (DLT) with smart contracts to manage the relay operation at the PCC. The smart contract defines the allowable total power factor (TPF) of the DER output, and the terms of the smart contract are implemented using DLT with a Cyber Grid Guard (CGG) system for a customer-owned DER (wind farm). This article presents flowcharts for the TPF smart contract implemented by the CGG using DLT. The test scenarios were implemented using a real-time simulator containing a CGG system and relay in-the-loop. The data collected from the CGG system were used to execute the TPF smart contract. The desired TPF limits on the grid-side were between +0.9 and +1.0, and the operation of the breakers in the electrical grid and DER sides was controlled by the relay consistent with the provisions of the smart contract. The events from the real-time simulator, CGG, and relay showed a successful implementation of the TPF smart contract with CGG using DLT, proving the efficacy of this approach in general for implementing electrical grid applications for utilities with connections to customer-owned DERs.
The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.
This paper examines the impact of inverter-based resource (IBR) momentary cessation timing on transmission system protection relays. IEEE Std. 2800 mandates voltage ride-through, requiring IBRs to remain online during voltage disturbances. However, for severe voltage dips (|V| = 0.1 p.u.), the standard permits current blocking. In practice, vendors implement momentary cessation with varying delays, potentially affecting relay operation if IBRs cease too early. This article studies the impact of the time IBRs enter momentary cessation on transmission line protective relays. Using an electromagnetic transient (EMT) simulation, this study models IBR momentary cessation with tunable delays in a realistic transmission network. COMTRADE files generated from EMT simulations are analyzed in MATLAB using detailed protective relay models. Results indicate that IBRs must sustain operation for at least one cycle to ensure proper relay response; otherwise, relays may fail to oper- ate. These findings guide IBR vendors in optimizing momentary cessation settings to enhance transmission line protection.
Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible trouble-shooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.
Digital real time simulators (DRTS) are increasingly being used for the evaluation of power hardware and controller hardware in the laboratory prior to field deployment. Although DRTS are capable of simulating large models in real-time, it is challenging to visualize the results of large models without overdrawing or confounding the viewer. This paper provides an open-source framework for users to visualize their DRTS-based hardware-in-the-loop (HIL) experimental results in real-time. This proposed framework can be used by experimental test beds that can push data through an internet protocol based network. The proposed framework includes three main components. First, it includes the DRTS that generates and pushes the data to a relay. Second, it includes an application that serves multiple purposes, from data storage, testing, and translation of the data to a publisher/subscriber protocol. Finally, it includes libraries and applications that can be used to visualize the data by subscribing to the relay. This framework is available in open source, and it is tested using the HIL platform developed for testing advanced distribution management systems.