Optimization to Generate Equations of State for Hydrogen Production

On a high level, the larger project in question, HydroGEN, aims to develop software used for finding equations of state (EOS) to optimize catalyst configuration for H 2 production through water splitting. In particular, this summer project focused on solving the nonlinear equations used in fitting the equations. This problem involved using Python to solve a linear system with nonlinear constraints. In order for this to be achieved, Pyomo was used to build a model and the solver Ipopt, interior point optimizer, was used. Pyomo is a Python-based language developed at Sandia; it is an optimization modeling language. Rather than solving the entire problem at once, a toy problem was created, simplifying the problem down to the most important focus. This problem had a known solution, comparable to the calculated solution to assess accuracy and as progress was made towards finding solutions, complexity was gradually added to the problem. After building and solving the toy problem, it was found that it gave reasonably accurate solutions, better compared to the two existing solvers previously used with this project in terms of functionality. The solver is now ready for implementation into the project’s main software.

08 HYDROGEN↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Status of Readiness to Receive and Store Sister Rods from the R&D Project

While low burn-up fuel [that characterized as having a burn-up of less than 45 gigawatt days per metric ton uranium (GWD/MTU)] has been stored for nearly three decades, the storage of high burn-up used fuels is more recent. The DOE has funded a High Burn-Up (HBU) Confirmatory Data Project to confirm the behavior of used high burn-up fuel under prototypic conditions. The Electric Power Research Institute (EPRI) is leading a project team to develop and implement the Test Plan to collect this data from a UNF dry storage system containing high burn-up fuel. As part of that project, 25 “sister” fuel rods have been selected, removed from assemblies, and placed in a fuel container ready for shipment to a national laboratory. This report documents that status of readiness to receive the fuel if that fuel were to be sent to Idaho National Laboratory (INL).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Wire Arc Additive Manufacturing of Lightweight High Pressure Die Casting Tooling

Oak Ridge National Laboratory (ORNL) and Mercury Marine partnered to develop and test methods for additively manufactured tooling for aluminum die casting applications under CRADA agreement NFE-20-08193. Tooling is the largest capital expense for high production casting projects. The lead time for tooling is often measured in months with a typical project taking 9-12 months to realize Production Part Approval Process (PPAP) ready die cast samples. This project demonstrated the technical viability of rapidly produced steel components for high pressure die casting tooling via Wire Arc Additive Manufacturing (WAAM). A 410 stainless steel tool was redesigned and optimized with conformal cooling channels and additively manufactured. The finished tool was tested and used to produce over 4000 parts, which well surpassed expectations. A secondary objective was to evaluate the durability of multi-material additively manufactured (AM) components with conformal cooling. A large multi-material tool (H13 and 410SSNiMo) was manufactured using the same methods showing potential reductions in used material and cost. However, the H13 section sustained material cracking. Further analysis showed that the potential cause was the CTE mismatch of the two materials at higher temperatures. It is also suggested that the material mix can be used if the steel processing temperature does not exceed 600 ̊C.This project has shown high potential for using the WAAM technology for creating AM parts for aluminum dies casting. However, the multi-material approach requires extended study and tests.

99 GENERAL AND MISCELLANEOUS↗

Wire Arc Additive Manufacturing of Lightweight High Pressure Die Casting Tooling

Oak Ridge National Laboratory (ORNL) and Mercury Marine partnered to develop and test methods for additively manufactured tooling for aluminum die casting applications under CRADA agreement NFE- 20-08193. Tooling is the largest capital expense for high production casting projects. The lead time for tooling is often measured in months with a typical project taking 9-12 months to realize Production Part Approval Process (PPAP) ready die cast samples. This project demonstrated the technical viability of rapidly produced steel components for high pressure die casting tooling via Wire Arc Additive Manufacturing (WAAM). A 410 stainless steel tool was redesigned and optimized with conformal cooling channels and additively manufactured. The finished tool was tested and used to produce over 4000 parts, which well surpassed expectations. A secondary objective was to evaluate the durability of multi-material additively manufactured (AM) components with conformal cooling. A large multi-material tool (H13 and 410SSNiMo) was manufactured using the same methods showing potential reductions in used material and cost. However, the H13 section sustained material cracking. Further analysis showed that the potential cause was the CTE mismatch of the two materials at higher temperatures. It is also suggested that the material mix can be used if the steel processing temperature does not exceed 600 ˚C. This project has shown high potential for using the WAAM technology for creating AM parts for aluminum dies casting. However, the multi-material approach requires extended study and tests.

36 MATERIALS SCIENCE↗

Building America Case Study: Northwest Energy Efficient Manufactured Housing Program High-Performance Test Homes; Whole-House Solutions for New Homes, Energy Efficiency & Renewable Energy (EERE)

?This project represents the third phase of a multi-year effort to develop and bring to market a High Performance Manufactured Home (HPMH). The scope of this project involved building four HPMH prototypes, resulting in what is expected to be a 30% savings relative to the Building America Benchmark. (The actual % savings varies depending on choice of heating equipment and climate zone). The HPMH home is intended to make significant progress toward performing as zero-net-energy ready. Previous phases of this project created a HPMH specification and prototyped individual measures from the package to obtain engineering approvals and develop preliminary factory construction processes. This report describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability during 2014. Monitoring is expected to continue into 2016. home is intended to make significant progress toward performing as zero-net-energy ready. Previous phases of this project created a HPMH specification and prototyped individual measures from the package to obtain engineering approvals and develop preliminary factory construction processes. This report describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability during 2014. Monitoring is expected to continue into 2016.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

U.S. Department of Energy Zero Energy Ready Home Implementation

The intention of this project is to assist home builders in the upper Midwest in achieving DOE Zero Energy Ready Home program certification, and to document the process and outcomes involved in meeting this rigorous standard. NorthernSTAR, in conjunction with our program partner Building Knowledge, Inc., provided technical support to the builders during the design and construction process. At the time of this publication, four qualifying homes have been completed and an additional three are currently under construction to be completed later this year. Three additional homes were excluded from certification due to the HVAC contractor not completing their required credentialing until after completion of the homes, though the energy performance would have otherwise qualified the homes for program certification. Both Amaris Homes and Cobblestone Homes note that participation in the ZERH program provides them with competitive advantage in the market place at reasonable construction costs that also result in extremely satisfied clients who are willing to recommend the builders to friends and family.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NGNP Infrastructure Readiness Assessment: Consolidation Report

The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

42 ENGINEERING↗

Final Report on HOLODEC 2 Technology Readiness Level

During the period of this project, the Holographic Detector for Clouds 2 (HOLODEC 2) instrument has advanced from a laboratory-proven instrument with some initial field testing to a fully flight-tested instrument capable of providing useful cloud microphysics measurements. This can be summarized as 'Technology Readiness Level 8: Technology is proven to work - Actual technology completed and qualified through test and demonstration.' As part of this project, improvements and upgrades have been made to the optical system, the instrument power control system, the data acquisition computer, the instrument control software, the data reconstruction and analysis software, and some of the basic algorithms for estimating basic microphysical variables like droplet diameter. Near the end of the project, the instrument flew on several research flights as part of the IDEAS 2011 project, and a small sample of data from the project is included as an example. There is one caveat in the technology readiness level stated above: the upgrades to the instrument power system were made after the flight testing, so they are not fully field proven. We anticipate that there will be an opportunity to fly the instrument as part of the IDEAS project in fall 2012.

24 POWER TRANSMISSION AND DISTRIBUTION↗

On the feasibility of future colliders: report of the Snowmass'21 Implementation Task Force

Colliders are essential research tools for particle physics. Numerous future collider proposal were discussed in the course of the US high energy physics community strategic planning exercise Snowmass'21. The Implementation Task Force (ITF) has been established to evaluate the proposed future accelerator projects for performance, technology readiness, schedule, cost, and environmental impact. Corresponding metrics has been developed for uniform comparison of the proposals ranging from Higgs/EW factories to multi-TeV lepton, hadron and ep collider facilities, based on traditional and advanced acceleration technologies. Here, this article describes the metrics and approaches, and presents evaluations of future colliders performed by the ITF.

43 PARTICLE ACCELERATORS↗

Waste Management Processing Projects in the PRC - 16551

EnergySolutions continues to provide waste treatment solutions in the Peoples Republic of China (PRC). In 2015 ES had completed installation of systems at two different Nuclear power sites (Haiyang, an AP-1000{sup TM} site and Yangjiang, a CPR1000 site). This paper discusses progress on these two projects, and provides new information regarding the operation of the systems. The Yangjiang project became operational in the fall of 2015 while the Haiyang project will be done is nearly done with commissioning and is waiting for reactor operations. Haiyang Project: In the Shandong Province on China's northeast coast, EnergySolutions, as part of a consortium with China Power Investment (CPI) and Yuanda Environmental Protection Engineering Company (a PRC state-owned company), has designed and constructed the site's Site Rad Waste Treatment Facility (SRTF). The SRTF provides solid waste processing services for up to 8 AP-1000s{sup TM}. The SRTF performs the following functions: 1. Five year storage for HICs containing spent resin and filters from the nuclear power plants' waste liquid systems (WLS); 2. Sorting and Compaction System for solid waste generated from Nuclear Power Plant (NPP) operations. This system implements: a) Real time radiography to screen 200 liter waste drums for prohibited items, b) Pre-compaction, c) High Resolution Gamma Spectrophotometry (HRGS) for waste characterization, d) Supercompaction, e) Solidification of compacted drums inside overpack drums which are filled with 60 MPa compressive strength grout, and f) Automatic drum lidding which crimps the drum lid to the drum body. 3. Laundry services for NPP anti-contamination clothing. 4. At the nuclear islands, EnergySolutions is providing mobile liquid waste processing systems that utilize EnergySolutions Advanced Liquid Processing System ALPS{sup TM}/Advanced Injection Method System AIM{sup TM} processing systems to supplement the NPP's WLS system when radionuclide concentrations exceed release criteria. The spent resins and filters from the nuclear power plants are placed in EnergySolutions supplied HICs, dewatered using EnergySolutions Self Engaging Dewatering System (SEDS{sup TM}), and then placed in EnergySolutions 8-120B Type B cask for the transport of the HIC between the NPP and the SRTF and, ultimately, to a disposal site once it is ready for operations Yangjiang Project: EnergySolutions is providing liquid waste treatment system (TEU) and solid waste treatment system (TES) for Yangjiang units 3 and 4 for the China Nuclear Power Engineering Company (CNPEC). The Yangjiang site is located approximately 300 kilometers west of Hong Kong. The TEU system processes floor drain, chemical drain, and process drain tanks liquids to achieve a release concentration less than 37 Bq/l. The TES system receives spent resin and filters into HIC containers which are dewatered and subsequently transported to the Yangjiang sites QT building where they are stored for a period of up to 5 years or until a disposal site are available. TEU (Liquid waste treatment) consists of the following unit operations: - ALPS{sup TM}/AIM{sup TM} system, which includes two separate 8 vessel water treatment systems that consist of granular activated carbon (GAC), cation, anion ion and mixed bed media ion exchange (IX) columns; and: - A reverse osmosis system for final polishing, - TES (solid waste system), - SEDS (Self Engaging Dewatering System), - Shielding for the loading and storage of HICs, - Shielded transport container for the transfer of HIC to the QT building for storage, - Shielded transfer bell for the transport of spent filters from the NPP operating area to HIC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Our Next Two Steps for Fukushima Daiichi Muon Tomography

After the vast disasters caused by the great earthquake and tsunami in eastern Japan, we proposed applying our Muon Tomography (MT) technique to help and improve the emergency situation at Fukushima Daiichi using cosmic-ray muons. A reactor-tomography team was formed at LANL which was supported by the Laboratory as a response to a request by the former Japanese Prime Minister, Naoto Kan. Our goal is to help the Japanese people and support remediation of the reactors. At LANL, we have carried out a proof-of-principle technical demonstration and simulation studies that established the feasibility of MT to image a reactor core. This proposal covers the next two critical steps for Fukushima Daiichi Muon Imaging: (1) undertake case study mock-up experiments of Fukushima Daiichi, and (2) system optimization. We requested funding to the US and Japanese government to assess damage of reactors at Fukushima Daiichi. The two steps will bring our project to the 'ready-to-go' level.

47 OTHER INSTRUMENTATION↗

SBIR Phase I Final Technical Report

The main purpose of this program, a Phase I SBIR effort, was to demonstrate the feasibility of constructing a fast void detector that can detect and localize voids with a quantifiable detection limit superior to a capacitive void sensor. The project used modeling and simulation of the radio- frequency (RF) sensor and environment, designed RF elements for the harsh environment, and fabricated the devices for temperature and pressure requirements. The project concluded with a demonstration of the system and feasibility of approach. First, the project performed theoretical work to simulate the system capabilities. Second, the project refined the RF sensor designs. Third, the effort fabricated devices. Fourth, the project demonstrated feasibility with a demonstration of the technology, individual components, and integrated elements. We assess that the project ended at Technology Readiness Level 3 (TRL-3) and demonstrated the feasibility of our concept.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Marine Energy Technology Development Risk Management Framework

Over the past decades, the global marine energy industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed a Marine Energy Risk Management Framework in 2015, with this revision published in 2024. This risk management framework shall be utilized on all DOE Water Power Technologies Office (WPTO) projects that require system testing in the open water. By addressing uncertainties, the Marine Energy Risk Management Framework increases the likelihood of successful development of marine energy converter technology. It covers projects of any technology readiness level technology performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over the development cycle. This risk framework is not a substitute for other risk management procedures that may be required for marine operations, such as installations at sea, hoisting and rigging, safe diver operations, and other safety requirements. This risk framework is intended to meet DOE's risk management expectations for marine energy technology research and development efforts from WPTO. It also provides an overview of other relevant risk management tools and documentation.

16 TIDAL AND WAVE POWER↗

Neutronics Analysis of TREAT Multi-SERTTA Calibration Test Vehicle (Multi-SERTTA CAL)

Transient testing is a necessary step in the performance evaluation of Accident Tolerant Fuels (ATF) developed as part of the Fuel Cycle Research and Development Advanced Fuels Campaign initiated and supported by the United States Department of Energy (DOE-NE). These advanced fuels are expected to be used in future reactors or replace the current fuel design used in existing power reactors for enhanced performance and safety. Upon completion of a process proscribed by the National Environmental Policy Act, the Transient Reactor Test (TREAT) facility, located at Idaho National Laboratory (INL), was chosen by DOE-NE to provide the desired specialized testing. TREAT has successfully operated from start-up in 1959 to 1994 when it was placed on operational stand-by. Careful preparations are being made for operational readiness and TREAT is projected to resume testing no later than 2018. Past TREAT testing primarily focused on sodium-cooled reactor fuels (SRF). Test vehicle designs varied to accommodate testing needs ranging from separate effects tests to integral tests approaching simulation of actual reactor environment conditions including forced convection cooling. The current focus on light water reactor (LWR) ATF requires design of new experiment vehicles to accommodate the water/steam environment and associated complexities regarding desired energy deposition into the specimen and proper containment. The first set of experiments in TREAT restart is expected to be conducted with the Multi-SERTTA (Static Environment Rodlet Transient Test Apparatuses). Difficult to quantify and calculate integral and time dependent effects inherent in transient testing limit predictive modeling capability; therefore, calibration testing in TREAT prior to the actual experiment is necessary to empirically determine the effectiveness of core-to-specimen power coupling in order to achieve the desired energy deposition into the test specimen during a nuclear power transient. This has been done in the past, in part, by evaluating the difference in energy deposition into dosimeter wires subjected to various TREAT time dependent power conditions. These calibration tests were typically conducted in a test vehicle neutronically similar to the actual test vehicle, but more simplistic in design in order to quickly retrieve and analyze dosimeter wires and minimize containment structure costs due to several trials. Prior calibration testing for SRF experiments could be conducted without coolant as sodium has no notable neutronic effect on the core-to-specimen power coupling factor (PCF). Such is not the case with LWR fuel where water serves as both moderator and coolant. This presents a design challenge as the calibration test vehicle must retain heated, high-pressure water to preserve neutronic equivalence representative of near prototypic reactor conditions while allowing for quick retrieval of dosimeters. The solution to this challenge comes in the form of a thin walled dry well positioned through the center of the basic Multi-SERTTA design. Test vehicle reactivity worth and PCF are two important factors with respect to ascertainment of neutronic equivalence. Similarity in test vehicle reactivity worth is desired to avoid the need to change operational core rod positions in TREAT which could significantly alter neutron flux distribution and consequently power distribution throughout the core and into the test specimen. The geometry and composition of various materials within the experiment containment structure can also significantly alter the quality of neutron signal delivery from the core to the test specimen. Introduction of an Inconel tube, albeit very thin, is expected to impact PCF. Simple modifications to the CAL design may compensate for the anticipated change. Evaluation of these factors and proposed modifications through neutronics analysis serves to inform experiment design and is a valuable tool towards achieving the optimal CAL design.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Fuels Campaign 2019 Accomplishments

The mission of the Advanced Fuels Campaign (AFC) is to perform or support research, development, and demonstration (RD&D) activities to identify and mature innovative fuels and cladding materials and associated technologies with the potential to improve the performance and safety of current and future reactors; increase the efficient utilization of nuclear energy resources; contribute to enhancing proliferation resistance of the nuclear fuel cycle; and address challenges related to waste management and ultimate disposal. AFC pursues its mission objectives using a goal-oriented, science-based approach that seeks to establish a fundamental understanding of fuel and cladding behaviors under conditions that arise during fabrication, normal steady-state irradiation, off-normal transient scenarios, and storage/disposal. This approach includes advancing the theoretical understanding of fuel behavior, conducting fundamental and integral experiments, and supporting the mechanistic, multi-scale modeling of nuclear fuels to inform and guide fuel development projects, advance the technological readiness of promising fuel candidates, and ultimately support fuel qualification and licensing initiatives. In the area of advanced tools for the modeling and simulation of nuclear fuels, the AFC works in close partnership with the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, participating with NEAMS in developing mechanistic fuel behavior models and providing experimental data to inform and validate its most advanced tools. Specifically, AFC objectives in thecoming five year horizon include: 1. support the industry-led development of Accident Tolerant Fuel (ATF) technologies with improved reliability and performance under normal operations and enhanced tolerance during hypothetical accident scenarios, with implementation of lead test rods/assemblies of one or more ATF concepts in commercial reactor(s) by or before 2022 and batch reloads of near-term concept(s) in the 2023-2026 timeframe; 2. lead research and development on innovative fuel and cladding technologies for applications to future advanced reactors, especially fast-spectrum reactors, including reactors that utilize both once-through and recycle scenarios; 3. continue the development and demonstration of a multi-scale,science-based approach to fuel development and testing, andcontribute to the establishment of a state-of-the-art R&D infrastructure necessary to accelerate the development of new fuel concepts; and collaborate with NEAMS on the development and validation of multi-scale, multi-physics, and increasingly predictive fuel performance models and codes. 4. collaborate with NEAMS on the development and validation of multi-scale, multi-physics, and increasingly predictive fuel performance models and codes.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of the Computing Systems for Yucca Mountain Repository TSPA-LA Model Operational Readiness

Sandia National Laboratories (SNL) was tasked to conduct an evaluation of the legacy computing systems of the now-closed Yucca Mountain Project (YMP) to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, in the event that the License Application (LA) review by the U.S. Nuclear Regulatory Commission (NRC) is re-started and involves additional requests for information (RAIs). Six problem areas or components of the computing system were identified and subsequently resolved or improved to ensure the operational readiness of the TSPA-LA model capability on the server cluster. As part of this readiness review, the legacy TSPA computational cluster that was relocated from the SNL YMP Lead Lab Project Office in Las Vegas, Nevada to the SNL offices in Albuquerque, New Mexico was replaced with new hardware. Three floating licenses of Goldsim Version 9.60.300 were installed on the new cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software was tested and installed to support the TSPA- type analysis on the server cluster. TSPA-LA modeling cases were tested and verified for the model reproducibility on the current server cluster. All test runs were executed on multiple processors on the server cluster utilizing the Goldsim distributed processing capability, and all runs were completed successfully. The model reproducibility verification was evaluated by two approaches: numerical value comparison and graphical comparison, and the analysis demonstrated an excellent reproducibility of the TSPA-LA model runs on the server cluster. The current server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

97 MATHEMATICS AND COMPUTING↗

DOE SNF Packaging Demonstration Project: Worktable and Canister Loading Sleeve Design [Slides]

This presentation is a briefing for summer interns and others outside the project, to give them a summary of ongoing design activities. The DOE SNF Packaging Demonstration Project is an effort to develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed spent nuclear fuel (SNF) for road ready dry storage (RRDS). The project is to remotely load and seal two types of DOE-managed SNF from the CPP-603 facility into DOE Standard Canisters, place the sealed DOE Standard Canisters into commercial vendor over-canisters (equivalent to commercial MPCs), seal and place the over-canisters into commercial vendor storage overpacks, and place the storage system (over-canister and storage overpack) onto the CPP-2707 cask pad.

42 ENGINEERING↗