Project Management Implications and Implementation Roadmap of Human Readiness Levels.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
On a high level, the larger project in question, HydroGEN, aims to develop software used for finding equations of state (EOS) to optimize catalyst configuration for H 2 production through water splitting. In particular, this summer project focused on solving the nonlinear equations used in fitting the equations. This problem involved using Python to solve a linear system with nonlinear constraints. In order for this to be achieved, Pyomo was used to build a model and the solver Ipopt, interior point optimizer, was used. Pyomo is a Python-based language developed at Sandia; it is an optimization modeling language. Rather than solving the entire problem at once, a toy problem was created, simplifying the problem down to the most important focus. This problem had a known solution, comparable to the calculated solution to assess accuracy and as progress was made towards finding solutions, complexity was gradually added to the problem. After building and solving the toy problem, it was found that it gave reasonably accurate solutions, better compared to the two existing solvers previously used with this project in terms of functionality. The solver is now ready for implementation into the project’s main software.
An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.
In 2003 we proposed an effort to develop a core program of standardized training and verification practices and standards against which the implementation of these practices could be measured. The purpose was to provide another means of risk reduction for deep space missions to preclude the likelihood of a repeat of the tragedies of the 1998 Mars missions. We identified six areas where the application of standards and standardization would benefit the overall readiness process for flight projects at JPL. These are Individual Training, Team Training, Interface and Procedure Development, Personnel Certification, Interface and procedure Verification, and Operations Readiness Testing. In this paper we will discuss the progress that has been made in the tasks of developing the proposed infrastructure in each of these areas. Specifically we will address the Position Training and Certification Standards that are now available for each operational position found on our Flight Operations Teams (FOT). We will also discuss the MGSS Baseline Flight Operations Team Training Plan which can be tailored for each new flight project at JPL. As these tasks have been progressing, the climate and emphasis for Training and for V and V at JPL has changed, and we have learned about the expansion, growth, and limitations in the roles of traditional positions at JPL such as the Project's Training Engineer, V and V Engineer, and Operations Engineer. The need to keep a tight rein on budgets has led to a merging and/or reduction in these positions which pose challenges to individual capacities and capabilities. We examine the evolution of these processes and the roles involved while taking a look at the impact or potential impact of our proposed training related infrastructure tasks. As we conclude our examination of the changes taking place for new flight projects, we see that the importance of proceeding with our proposed tasks and adapting them to the changing climate remains an important element in reducing the risk in the challenging business of space exploration.
The ALS project plan goals are reducing cost, improving performance, and achieving flight readiness. ALS selects projects to advance the mission readiness of low cost, high performance technologies. The role of metrics is to help select good projects and report progress. The Equivalent Mass (EM) of a system is the sum of the estimated mass of the hardware, of its required materials and spares, and of the pressurized volume, power supply, and cooling system needed to support the hardware in space. EM is the total payload launch mass needed to provide and support a system. EM is directly proportional to the launch cost.
This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and how key performance parameters (KPPs) are being used to measure the degree of capability gap closure. KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the strategic approach to gap closure and provide references to additional technical details, progress, and KPPs.
This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and key performance parameters (KPPs). KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the projects that are supporting gap closure and provide references to additional technical details, progress, and KPPs.
This PowerPoint presentation supports the following paper submission's abstract (STRIVES 20210015025). This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and key performance parameters (KPPs). KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the projects that are supporting gap closure and provide references to additional technical details, progress, and KPPs.
The Aerospace Cell Test History Database was developed to provide project engineers and scientists ready access to the data obtained from testing of aerospace cell designs at Naval Surface Warfare Center, Crane Division. The database is intended for use by all aerospace engineers and scientists involved in the design of power systems for satellites. Specifically, the database will provide a tool for project engineers to review the progress of their test at Crane and to have ready access to data for evaluation. Additionally, the database will provide a history of test results that designers can draw upon to answer questions about cell performance under certain test conditions and aid in selection of a cell for a satellite battery. Viewgraphs are included.
NEPP program objectives are to: (1) Access the reliability of newly available electronic parts and packaging technologies for usage on NASA projects through validations, assessments, and characterizations, and the development of test methods/tools; (2)Expedite infusion paths for advanced (emerging) electronic parts and packaging technologies by evaluations of readiness for manufacturability and project usage consideration; (3) Provide NASA projects with technology selection, application, and validation guidelines for electronic parts and packaging hardware and processes; nd (4) Retain and disseminate electronic parts and packaging quality assurance, reliability validations, tools, and availability information to the NASA community.
The state of technology readiness for the automated production of solar cells and modules is reviewed. Individual process steps and process sequences for making solar cells and modules were evaluated both technically and economically. High efficiency with a suggested cell goal of 15% was stressed. It is concluded that the technology exists to manufacture solar cells which will meet program goals.
Oak Ridge National Laboratory (ORNL) and Mercury Marine partnered to develop and test methods for additively manufactured tooling for aluminum die casting applications under CRADA agreement NFE-20-08193. Tooling is the largest capital expense for high production casting projects. The lead time for tooling is often measured in months with a typical project taking 9-12 months to realize Production Part Approval Process (PPAP) ready die cast samples. This project demonstrated the technical viability of rapidly produced steel components for high pressure die casting tooling via Wire Arc Additive Manufacturing (WAAM). A 410 stainless steel tool was redesigned and optimized with conformal cooling channels and additively manufactured. The finished tool was tested and used to produce over 4000 parts, which well surpassed expectations. A secondary objective was to evaluate the durability of multi-material additively manufactured (AM) components with conformal cooling. A large multi-material tool (H13 and 410SSNiMo) was manufactured using the same methods showing potential reductions in used material and cost. However, the H13 section sustained material cracking. Further analysis showed that the potential cause was the CTE mismatch of the two materials at higher temperatures. It is also suggested that the material mix can be used if the steel processing temperature does not exceed 600 ̊C.This project has shown high potential for using the WAAM technology for creating AM parts for aluminum dies casting. However, the multi-material approach requires extended study and tests.
Oak Ridge National Laboratory (ORNL) and Mercury Marine partnered to develop and test methods for additively manufactured tooling for aluminum die casting applications under CRADA agreement NFE- 20-08193. Tooling is the largest capital expense for high production casting projects. The lead time for tooling is often measured in months with a typical project taking 9-12 months to realize Production Part Approval Process (PPAP) ready die cast samples. This project demonstrated the technical viability of rapidly produced steel components for high pressure die casting tooling via Wire Arc Additive Manufacturing (WAAM). A 410 stainless steel tool was redesigned and optimized with conformal cooling channels and additively manufactured. The finished tool was tested and used to produce over 4000 parts, which well surpassed expectations. A secondary objective was to evaluate the durability of multi-material additively manufactured (AM) components with conformal cooling. A large multi-material tool (H13 and 410SSNiMo) was manufactured using the same methods showing potential reductions in used material and cost. However, the H13 section sustained material cracking. Further analysis showed that the potential cause was the CTE mismatch of the two materials at higher temperatures. It is also suggested that the material mix can be used if the steel processing temperature does not exceed 600 ˚C. This project has shown high potential for using the WAAM technology for creating AM parts for aluminum dies casting. However, the multi-material approach requires extended study and tests.
The Orion Thermal Protection System (TPS) ADP was a 3 1/2 year effort to develop ablative TPS materials for the Orion crew capsule. The ADP was motivated by the lack of available ablative TPS's. The TPS ADP pursued a competitive phased development strategy with succeeding rounds of development, testing and down selections. The Project raised the technology readiness level (TRL) of 8 different TPS materials from 5 different commercial vendors, eventual down selecting to a single material system for the Orion heat shield. In addition to providing a heat shield material and design for Orion on time and on budget, the Project accomplished the following: 1) Re-invigorated TPS industry & re-established a NASA competency to respond to future TPS needs; 2) Identified a potentially catastrophic problem with the planned MSL heat shield, and provided a viable, high TRL alternate heat shield design option; and 3) Transferred mature heat shield material and design options to the commercial space industry, including TPS technology information for the SpaceX Dragon capsule.
The Composites for Exploration Upper Stage (CEUS) was a 3-year, level III project within the Technology Demonstration Missions program of the NASA Space Technology Mission Directorate. Studies have shown that composites provide important programmatic enhancements, including reduced weight to increase capability and accelerated expansion of exploration and science mission objectives. The CEUS project was focused on technologies that best advanced innovation, infusion, and broad applications for the inclusion of composites on future large human-rated launch vehicles and spacecraft. The benefits included near- and far-term opportunities for infusion (NASA, industry/commercial, Department of Defense), demonstrated critical technologies and technically implementable evolvable innovations, and sustained Agency experience. The initial scope of the project was to advance technologies for large composite structures applicable to the Space Launch System (SLS) Exploration Upper Stage (EUS) by focusing on the affordability and technical performance of the EUS forward and aft skirts. The project was tasked to develop and demonstrate critical composite technologies with a focus on full-scale materials, design, manufacturing, and test using NASA in-house capabilities. This would have demonstrated a major advancement in confidence and matured the large-scale composite technology to a Technology Readiness Level 6. This project would, therefore, have bridged the gap for providing composite application to SLS upgrades, enabling future exploration missions.
The intention of this project is to assist home builders in the upper Midwest in achieving DOE Zero Energy Ready Home program certification, and to document the process and outcomes involved in meeting this rigorous standard. NorthernSTAR, in conjunction with our program partner Building Knowledge, Inc., provided technical support to the builders during the design and construction process. At the time of this publication, four qualifying homes have been completed and an additional three are currently under construction to be completed later this year. Three additional homes were excluded from certification due to the HVAC contractor not completing their required credentialing until after completion of the homes, though the energy performance would have otherwise qualified the homes for program certification. Both Amaris Homes and Cobblestone Homes note that participation in the ZERH program provides them with competitive advantage in the market place at reasonable construction costs that also result in extremely satisfied clients who are willing to recommend the builders to friends and family.
As part of the Game Changing Development (GCD) Program, funded by NASA’s Space Technology Mission Directorate (STMD), the development of simulation capability for the prediction of extra-terrestrial Plume Surface Interaction (PSI) environments has been undertaken by the Fluid Dynamics Branch at NASA/MSFC. The Predictive Simulation Capability (PSC) Element is focused on creating simulation capability for the reliable and accurate prediction of PSI in Martian (~650 Pa) and Lunar (vacuum) ambient environments. In addition to the predictive simulation capability, the GCD Program also contains a companion Ground Testing Element for development of focused datasets for validation of predictive capability as well as a Flight-focused Instrumentation Element. This paper will present the status of implementing and maturing particle-particle interaction constituent physics models essential in simulating the landing surface granular material flow under PSI effects. This gas-particle multi-phase interaction modeling of plume impingement flow on the extra-terrestrial soil material is performed with the Gas-Granular Flow Solver (GGFS) addressed in a companion paper. The response of regolith particle flow induced by lander PSI requires accurate representation of the regolith granular material fluidic behavior and gas-granular interactions. The lunar regolith, as the extreme example, is poorly sorted with broad particle size distributions and large fines content. It has significant cohesion, due to interlocking particle shapes for the very jagged particles. The combination of particle shape and size distribution has been identified as major drivers in the complex particle flow response and resulting crater shape characteristics of extraterrestrial granular material. Constituent models for spherical particles can be formulated directly from particle kinetics theory. Complex particle shapes can be modeled by gluing together elemental spherical shapes into composite particles, requiring a Discrete Element Model (DEM) particle kinetics modeling approach to extract data and formulate constituent models. Mixture constituent models for poly-disperse mixtures (i.e, containing distribution of particle sizes) have recently been developed. The required non-spherical particle mixture granular material response closure models are then obtained through small-scale unit physics DEM simulations for the range of particle shapes, mixtures and packing densities. The granular material response closure models are then implemented in the Eulerian granular flow formulation. This DEM-based constituent model extraction process and formulation of poly-disperse particle mixtures has been successfully developed by small business and academic partners in the development of the Gas-Granular Flow Solver (GGFS) simulation program simulation framework. The currently implemented capabilities have reached the capability level of modeling bi-disperse, non-spherical particle mixtures is being continuously extended towards computational modeling of full range irregular particle mixtures. Under the GCD project, this technology is being further developed, transferred to NASA analysts, and matured towards application readiness. The predictive simulation capability team under the GCD project has acquired the modeling tools and processes of the DEM based constituent model formulation from the GGFS development team and is developing the capability to replicate the existing process. This is the first important step towards the ability of the NASA team to independently perform such model development in a production setting. Further efforts are underway to migrate the DEM based model simulation process performed with the academic based tools to more capable Open Source, highly parallelized simulation tools for efficient operation on NASA HPC assets. Evaluation of the currently implemented (such as mono-disperse and bi-disperse spherical and irregular shape particle constituent model applications) and continuously evolving full-range particle physics models in the GGFS tool is performed by the NASA team to advance application readiness of the simulations. Application testing for complex PSI erosions and cratering scenarios such as the Apollo LM is performed for axi-symmetric and full 3D simulations to aid the tool developers in achieving practical application readiness for NASA projects. Important validation and application testing will further be performed against experimental data generated under the GCD PSI project experimental component.