Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

GIF-VHTR Materials (Graphite) Project Plan: Progress since September 2021

¦1: Data, Design Methodology and Construction 1.1: Graphite Selection and Acquisition Strategy (Original tasks completed) 1.2: Graphite Properties (Virgin Materials) 1.3: Graphite Fracture Behaviour(Original tasks completed) 1.4: Graphite Oxidation Behaviour(Original tasks completed) 1.5: Graphite Component Testing 1.6: Graphite Irradiation Effects 1.7: Graphite Irradiation Induced Creep 1.8: Graphite Codes and Standards Development (ASME & ASTM) 1.9: Graphite BehaviourModels Development 1.10: Links to Existing Graphite Irradiation BehaviourDatabases 1.11: Materials Database ¦2: Operation and Inspection 2.1: Methodologies for determining requirements for inspection of graphite cores 2.2: Methodologies for ISI of graphite cores ¦3: Decommissioning and Disposal (New task added 2021) 3.1: Technical data for decommissioning and disposal issues

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cameco Corporation's Approach to Legacy and Ongoing Waste Management Within the Fuel Services Division - 19124

Since 2011, a Fuel Services Division (FSD) employee has been dedicated to oversee divisional waste management with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations in Blind River and Port Hope. The Blind River Refinery (BRR) and Port Hope Conversion Facility (PHCF) were previously owned by the federal Crown Corporation, Eldorado Nuclear, becoming part of Cameco in 1988 and Cameco Fuel Manufacturing (CFM), previously known as Zircatec Precision Industries, becoming part of Cameco in 2006. Accumulated legacy radioactive waste is stored at each of the facilities. This radioactive waste has accumulated from operations beginning in the 1930's in Port Hope and the 1980's in Blind River. Due to minimal commercially available outlets for the disposal and/or treatment of these wastes, the waste was managed onsite by storage in underutilized space in buildings, trailers and/or in the secured yard. This relatively low-cost practice meant that over decades, the inventory increased at an unsustainable rate until available space became a limiting factor. During this time, the labelling, inventory records, characterization details and other history of many of the waste materials was not maintained adequately. Due to the volume of waste that had accumulated, campaigns to address these deficiencies in information were not considered feasible, sustaining the issue of accumulation of low-level radioactive waste. Since 2011, FSD has completed annual campaigns to address the accumulated legacy waste, which has included processing of material for decontamination to meet the unrestricted release criteria under the Canadian Nuclear Substance and Radiation Devices Regulations (NSRDR), disposal of marginally contaminated wastes (<500 ppm uranium) at a permitted landfill in the United States, processing of contaminated materials to reduce the volume of low-level radioactive waste and disposal at a designated facility in Port Hope. In addition FSD has undertaken significant changes to radioactive waste management practices at each of the facilities. Multiple characterization techniques, including visual observation, review of process and other historical records, laboratory analysis and radiation scanning have been utilized in campaign planning to identify the scope and appropriate waste management technique(s) to reduce the inventory of stored material. This divisional waste management program has resulted in a significant change to how radioactive waste is generated, inventoried, characterized and managed within FSD and has increased the visibility within the leadership team of the opportunities and challenges of waste management, such as alignment with decommissioning planning, project planning and budgeting. The heightened awareness has led to better financial and physical resource planning to execute waste projects with a current projected elimination of the legacy waste within FSD by 2025. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Project Execution Plan for the TREAT LEU Fuel Conversion Project

This project execution plan for the Transient Reactor Test (TREAT) facility Low Enriched Uranium (LEU) Fuel Conversion Project informs the reader of a high-level path forward for conversion of TREAT facilities at Idaho National Laboratory and provides guidance for INL personnel regarding the TREAT LEU Fuel Conversion Project. This project is part of the National Nuclear Security Administration’s Global Threat Reduction Initiative Reactor Conversion Program.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

River Protection Project System Plan, Rev. 8 - 18661

The River Protection Project System Plan comprises a set of scenarios that evaluate options for safely treating the high-level radioactive waste stored in underground tanks at the DOE Hanford Site. It establishes a baseline case, used for communicating the DOE's strategy to various stakeholders, as well as ten alternative scenarios that evaluate initiatives to potentially accelerate cleanup and/or address risks. The scenarios were modeled using TOPSim, a custom flowsheet simulator that includes chemistry and mass transfer elements used to estimate operating durations and completion dates, quantities of waste treated through various processes, as well as the time required to complete treatment. The TOPSim results are aligned to a resource-loaded Oracle{sup R} Primavera P6 schedule to estimate the life cycle cost of the cleanup mission. This paper will outline the results of the System Plan, Rev. 8 modeling effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TCCSP Project Implementation Plan

The TCCSP CarbonSAFE Phase II efforts focused on developing the technical, community, and economic foundation for a commercial-scale regional geologic storage complex for CO 2 captured. TCCSP has conducted a thorough evaluation of the regional, local, and site-specific geology, legacy well infrastructure, injection site design, and project planning as part of the CarbonSAFE Phase II TCCSP. Specially, the work performed under the CarbonSAFE Phase II has significantly furthered the advancement towards the commerciality of the TCCSP storage complex by delivering on the following objectives: Objective 1: Acquire site-specific characterization data to validate carbon dioxide (CO 2 ) storage estimates of reservoir units and the competency of confining layers in the region to prevent CO 2 leakage to develop a commercial-scale CO 2 project. Objective 2: Assess technical, economic, regulatory, and stakeholder aspects of the TCCSP.

54 ENVIRONMENTAL SCIENCES↗

The Port Hope Area Initiative's Port Granby Project: From Planning to Execution - 17451

The Port Hope Area Initiative's Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of some 450,000 m{sup 3} of LLRW and marginally contaminated soil from the former Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Presented is an overview of the Port Granby Project and a description of the planning needed to execute the project successfully. A comprehensive suite of approximately 40 pre-construction submittals were developed and submitted for review and approval by Canadian Nuclear Laboratories (CNL), the project authority. Importantly, comprehensive training programs were developed and implemented to ensure all project staff fully understood the scope of the planning documents (covering such things as Quality Control, Environmental Monitoring, Radiation Protection, Dust Management, Noise, Radiation Protection etc.) and possess the appropriate competencies for completing the work to which they have been assigned. The effective planning that has been invested in the Port Granby project, from initial design to project planning and implementation, has allowed this complex project to proceed with minimal difficulty. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Project Execution Plan for the Remote Handled Low-Level Waste Disposal Project

As part of ongoing cleanup activities at the Idaho National Laboratory (INL), closure of the Radioactive Waste Management Complex (RWMC) is proceeding under the Comprehensive Environmental Response, Compensation, and Liability Act (42 USC 9601 et seq. 1980). INL-generated radioactive waste has been disposed of at RWMC since 1952. The Subsurface Disposal Area (SDA) at RWMC accepted the bulk of INL’s contact and remote-handled low-level waste (LLW) for disposal. Disposal of contact-handled LLW and remote-handled LLW ion-exchange resins from the Advanced Test Reactor in the open pit of the SDA ceased September 30, 2008. Disposal of remote-handled LLW in concrete disposal vaults at RWMC will continue until the facility is full or until it must be closed in preparation for final remediation of the SDA (approximately at the end of fiscal year FY 2017). The continuing nuclear mission of INL, associated ongoing and planned operations, and Naval spent fuel activities at the Naval Reactors Facility (NRF) require continued capability to appropriately dispose of contact and remote handled LLW. A programmatic analysis of disposal alternatives for contact and remote-handled LLW generated at INL was conducted by the INL contractor in Fiscal Year 2006; subsequent evaluations were completed in Fiscal Year 2007. The result of these analyses was a recommendation to the Department of Energy (DOE) that all contact-handled LLW generated after September 30, 2008, be disposed offsite, and that DOE proceed with a capital project to establish replacement remote-handled LLW disposal capability. An analysis of the alternatives for providing replacement remote-handled LLW disposal capability has been performed to support Critical Decision-1. The highest ranked alternative to provide this required capability has been determined to be the development of a new onsite remote-handled LLW disposal facility to replace the existing remote-handled LLW disposal vaults at the SDA. Several offsite DOE and commercial disposal options exist for contact-handled LLW; however, offsite disposal options are either not currently available (i.e., commercial disposal facilities), practical, or cost-effective for all remote-handled LLW streams generated at INL. Offsite disposal of all INL and tenant-generated remote-handled waste is further complicated by issues associated with transporting highly radioactive waste in commerce; and infrastructure and processing changes at the generating facilities, specifically NRF, that would be required to support offsite disposal. The INL Remote-Handled LLW Disposal Project will develop a new remote handled LLW disposal facility to meet mission-critical, remote-handled LLW disposal needs. A formal DOE decision to proceed with the project has been made in accordance with the requirements of National Environmental Policy Act (42 USC§ 4321 et seq.). Remote-handled LLW is generated from nuclear programs conducted at INL, including spent nuclear fuel handling and operations at NRF and operations at the Advanced Test Reactor. Remote-handled LLW also will be generated by new INL programs and from segregation and treatment (as necessary) of remote handled scrap and waste currently stored in the Radioactive Scrap and Waste Facility at the Materials and Fuels Complex.

99 GENERAL AND MISCELLANEOUS↗

SAPHIRE 8 Software Quality Assurance Oversight

The software quality assurance oversight consists of updating and maintaining revision control of the SAPHIRE 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, SDP Interface Training Manual, and the SAPHIRE 8, "New Features and Capabilities Overview".

42 ENGINEERING↗

October 2019 SAPHIRE 8 Software Quality Assurance Oversight Status Report

The software quality assurance oversight consists of updating and maintaining revision control of the System Analysis Program for Hands-on Integrated Reliability Evaluations (SAPHIRE) Version 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE Version 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, Significance Determination Process (SDP) Interface Training Manual, and the SAPHIRE 8 “New Features and Capabilities Overview.” These documents are referred to and can be transmitted upon request of the Nuclear Regulatory Commission (NRC) Contracting Officer’s Representative (COR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Global wave energy resource classification system for regional energy planning and project development

Efforts to streamline and codify wave energy resource characterization and assessment for regional energy planning and wave energy converter (WEC) project development have motivated the recent development of resource classification systems. Given the unique interplay between WEC absorption and resource attributes, viz, available wave power frequency, directionality, and seasonality, various consensus resource classification metrics have been introduced. However, the main international standards body for the wave energy industry has not reached consensus on a wave energy resource classification system designed with clear goals to facilitate resource assessment, regional energy planning, project site selection, project feasibility studies, and selection of WEC concepts or archetypes that are most suitable for a given wave energy climate. In this work, a primary consideration of wave energy generation is the available energy that can be captured by WECs with different resonant frequency and directional bandwidths. Therefore, the proposed classification system considers combinations of three different wave power classifications: the total wave power, the frequency-constrained wave power, and the frequency-directionally constrained wave power. The dominant wave period bands containing the most wave power are sub-classification parameters that provide useful information for designing frequency and directionally constrained WECs. The bulk of the global wave energy resource is divided into just 22 resource classes representing distinct wave energy climates that could serve as a common language and reference framework for wave energy resource assessment if codified within international standards.

16 TIDAL AND WAVE POWER↗

LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)

The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this document to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.

97 MATHEMATICS AND COMPUTING↗

Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

Federal agency leaders are expressing growing interest in using innovative fuel cell combined heat and power (CHP) technology at their sites, motivated by both executive branch sustainability targets and a desire to lead by example in the transition to a clean energy economy. Fuel cell CHP can deliver reliable electricity and heat with 70% to 85% efficiency. Implementing this technology can be a high efficiency, clean energy solution for agencies striving to meet ambitious sustainability requirements with limited budgets. Fuel cell CHP systems can use natural gas or renewable fuels, such as biogas. Procuring Stationary Fuel Cells for CHP: A Guide for Federal Facility Decision Makers presents an overview of the process for planning and implementing a fuel cell CHP project in a concise, step-by-step format. This guide is designed to help agency leaders turn their interest in fuel cell technology into successful installations. This guide concentrates on larger (100 kW and greater) fuel cell CHP systems and does not consider other fuel cell applications such as cars, forklifts, backup power supplies or small generators (<100 kW). Because fuel cell technologies are rapidly evolving and have high up front costs, their deployment poses unique challenges. The electrical and thermal output of the CHP system must be integrated with the building s energy systems. Innovative financing mechanisms allow agencies to make a make versus buy decision to maximize savings. This guide outlines methods that federal agencies may use to procure fuel cell CHP systems with little or no capital investment. Each agency and division, however, has its own set of procurement procedures. This guide was written as a starting point, and it defers to the reader s set of rules if differences exist. The fuel cell industry is maturing, and project developers are gaining experience in working with federal agencies. Technology improvements, cost reductions, and experienced project developers are making fuel cell projects easier to put into service. In this environment, federal decision makers can focus on being smart buyers of fuel cell energy instead of attempting to become experts in fuel cell technology. For agencies that want to pursue a fuel cell CHP this guide presents a four step process for a successful project. 1. Perform a preliminary screening of the energy needs energy costs and incentives. 2. Compare a detailed project plan. 3. Make a financing and contracting decision. 4. Execute the project plan including financing, installation, and operation. The simplest procurement method is designated funding for the outright purchase of the fuel cell CHP system, although this is usually not the most cost-effective option. This guide describes the following financing options: Power purchase agreement Energy savings performance contract Utility energy services contract Enhanced use lease Fuel cell CHP technology can help federal facility managers comply with agency objectives for reducing energy consumption and air pollution emissions. Fuel cells do not generate particulate pollutants, unburned hydrocarbons or the gases that produce acid rain. Fuel cells emit less carbon dioxide (CO 2 ) than other, less efficient technologies and use of renewable fuels can make them carbon neutral. Fuel cell CHP technology can deliver reliable electricity and heat with high efficiency (70% to 85%) in a small physical footprint with little noise, making it a cost-effective option for federal facilities.

03 NATURAL GAS↗