FY2017 Pilot Project Plan for the Nuclear Energy Knowledge and Validation Center Initiative

To prepare for technical development of computational code validation under the Nuclear Energy Knowledge and Validation Center (NEKVAC) initiative, several meetings were held by a group of experts of the Idaho National Laboratory (INL) and the Oak Ridge National Laboratory (ORNL) to develop requirements of, and formulate a structure for, a transient fuel database through leveraging existing resources. It was concluded in discussions of these meetings that a pilot project is needed to address the most fundamental issues that can generate immediate stimulus to near-future validation developments as well as long-lasting benefits to NEKVAC operation. The present project is proposed based on the consensus of these discussions. Analysis of common scenarios in code validation indicates that the incapability of acquiring satisfactory validation data is often a showstopper that must first be tackled before any confident validation developments can be carried out. Validation data are usually found scattered in different places most likely with interrelationships among the data not well documented, incomplete with information for some parameters missing, nonexistent, or unrealistic to experimentally generate. Furthermore, with very different technical backgrounds, the modeler, the experimentalist, and the knowledgebase developer that must be involved in validation data development often cannot communicate effectively without a data package template that is representative of the data structure for the information domain of interest to the desired code validation. This pilot project is proposed to use the legendary TREAT Experiments Database to provide core elements for creating an ideal validation data package. Data gaps and missing data interrelationships will be identified from these core elements. All the identified missing elements will then be filled in with experimental data if available from other existing sources or with dummy data if nonexistent. The resulting hybrid validation data package (composed of experimental and dummy data) will provide a clear and complete instance delineating the structure of the desired validation data and enabling effective communication among the modeler, the experimentalist, and the knowledgebase developer. With a good common understanding of the desired data structure by the three parties of subject matter experts, further existing data hunting will be effectively conducted, new experimental data generation will be realistically pursued, knowledgebase schema will be practically designed; and code validation will be confidently planned.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program: Digital Architecture Project Plan

There are many technologies available to the nuclear power industry to improve efficiency in plant work activities. These range from new control room technologies to those for mobile field workers. They can make a positive impact on a wide range of performance objectives – increase in productivity, human error reduction, validation of results, accurate transfer of data, and elimination of repetitive tasks. It is expected that the industry will more and more turn to these technologies to achieve these operational efficiencies to lower costs. At the same time, this will help utilities manage a looming staffing problem as the inevitable retirement wave of the more seasoned workers affects both staffing levels and knowledge retention. A barrier to this wide-scale implementation of new technologies for operational efficiency is the lack of a comprehensive digital architecture that can support the real-time information exchanges needed to achieve the desired operational efficiencies. This project will define an advanced digital architecture that will accommodate the entire range of system, process, and plant worker activity to enable the highest degree of integration, thereby creating maximum efficiency and productivity. This pilot project will consider a range of open standards that are suitable for the various data and communication requirements of a seamless digital environment. It will map these standards into an overall architecture to support the II&C developments of this research program.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Project Plan, Status, and Lessons Learned for the LANL 3,706 m{sup 3} TRU Waste Campaign - 13085

The Los Alamos National Laboratory (LANL) is currently engaged in a campaign to disposition 3,706 m{sup 3} of transuranic (TRU) waste stored above grade at its Technical Area 54 (TA-54) Area G waste management facility before June 30, 2014. This campaign includes complete removal of all non-cemented above-grade TRU waste that was in storage on October 1, 2011, and is defined as 3,706 m{sup 3} of material. TRU waste containers were placed into storage up to 40 years ago, and most of the older containers must be remediated to address compliance issues before the waste can be characterized, certified as meeting the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), and shipped for disposition. More than half of the remaining TRU waste volume stored above grade is contained within oversize boxes that contain waste items that must be repackaged or size reduced. Facilities and major types of equipment needed to remediate and characterize the TRU waste inventory include two additional oversize box processing lines that are being brought into service as Nuclear Hazard Category III facilities in fiscal year (FY) 2013. Multiple work shifts are scheduled for most remediation lines in FY 2013. An integrated risk-based project management schedule for all disposition activities has been developed that is based on a 'Solution Package' approach. Inventories of containers that have issues in common were compiled into about 15 waste categories and about 75 'Solution Packages' that identify all of the activities needed to disposition the inventory of TRU waste in storage. Scheduled activities include all precursor activities to begin remediation, remediation processing, characterization and certification to the WIPP WAC, and shipping of containers to WIPP. Other industrial processing practices that have been adopted to improve efficiency include staging of containers for remediation, characterization, and shipping; establishment of a transportation center; and load management practices for transportation payloads. Progress and accomplishments during FY 2012 are reviewed, and plans for FY 2013 are presented in some detail. Lessons learned on adoption of industrial processing practices are also discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Department of Energy, Office of Nuclear Energy, Nuclear Fuels Storage and Transportation Planning Project Modeling Tools

The U.S. Department Energy, Office of Nuclear Energy's (DOE-NE) Nuclear Fuels Storage and Transportation (NFST) is developing foundational capabilities and tools to support and inform the future deployment of consolidated interim storage and large-scale transportation of SNF. These tools include Used Nuclear Fuel Storage, Transportation, and Disposal Analysis Resource and Data System (UNF-Standards), Stakeholder Tool for Assessing Radioactive Transportation (START), Transportation and Storage Logistics (TSL), Next- Generation System Analysis Model (NGSAM), Execution Strategy Analysis (ESA), Multi-Objective Evaluation Framework (MOEF), and the Centralized Used Fuel Resource for Information Exchange (CURIE). (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technical Project Plan for The Enhanced Thermal Conductivity of Oxide Fuels Through the Addition of High Thermal Conductivity Fibers and Microstructural Engineering

The commercial nuclear power industry is investing heavily in advanced fuels that can produce higher power levels with a higher safety margin and be produced at low cost. Although chemically stable and inexpensive to manufacture, the in-core performance of UO{sub 2} fuel is limited by its low thermal conductivity. There will be enormous financial benefits to any utility that can exploit a new type of fuel that is chemically stable, has a high thermal conductivity, and is inexpensive to manufacture. At reactor operating temperatures, UO{sub 2} has a very low thermal conductivity (<5 W/m {center_dot}K), which decreases with temperature and fuel burnup. This low thermal conductivity limits the rate at which energy can be removed from the fuel, thus limiting the total integrated reactor power. If the fuel thermal conductivity could be increased, nuclear reactors would be able to operate at higher powers and larger safety margins thus decreasing the overall cost of electricity by increasing the power output from existing reactors and decreasing the number of new electrical generating plants needed to meet base load demand. The objective of the work defined herein is to produce an advanced nuclear fuel based on the current UO{sub 2} fuel with superior thermal conductivity and structural integrity that is suitable for current and future nuclear reactors, using the existing fuel fabrication infrastructure with minimal modifications. There are two separate components to the research: (1) Enhanced Thermal Conductivity (ETC) - adding high conductivity fibers to the UO{sub 2} prior to sintering, which act as conduits for moving the heat energy generated within the pellet to the outer surface, (2) Microstructural Engineering (ME) - adding second phase particulates to UO{sub 2} bodies to retard grain growth and to increase thermal conductivity, as well as improve fracture and creep resistance. Different groups will perform the laboratory work for each of these research components with some overlap in personnel. The overlapping areas primarily involve computer simulations and final testing of the fuel in a reactor. The estimated cost and duration of this project is $5,000,000 over three years.

enhanced thermal conductivity↗

Metis Hub: The Development of an Intuitive Project Planning System

The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.

97 MATHEMATICS AND COMPUTING↗

Domestic Nuclear Power Plant Physical Security Reevaluation - High-Level Project Plan

The goal for this effort is a validated method which can be used to implement an updated physical security regime to optimize the physical security at domestic nuclear power plants (existing and future). It is the intent for the evaluation recommendations to provide the technical basis for an optimized plant security posture, which could consider reduce conservatisms in that posture, and potentially reduce security costs for the nuclear industry while meeting all security requirements.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Domestic Nuclear Power Plant Physical Security Reevaluation – High Level Project Plan

The goal for this effort is a validated method which can be used to implement an updated physical security regime to optimize the physical security at domestic nuclear power plants (existing and future). It is the intent for the evaluation recommendations to provide the technical basis for an optimized plant security posture, which could consider reduce conservatisms in that posture, and potentially reduce security costs for the nuclear industry while meeting all security requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

805 Stepped Plan Project Description

The 805 MHz system utilizes 1.25 MW class klystron amplifiers. The Solid-State Amplifier (SSA) technology has been utilized in the SC accelerator technology, but more powerful sources are needed for use in the NC accelerator facilities such as LASNCE. The SSA topologies that are widely used need to be scaled and tested for reliability and operation in a high impact accelerator facility, such as the 805 MHz SCCL in Los Alamos. Operational experience with high power SSA needs to be assessed prior to installation of an SSA unit at LANSCE. The RFE group at LANSCE is looking for collaboration in the development of the Solid-State Amplifier.

43 PARTICLE ACCELERATORS↗

Project Planning for Community Resilience: Aquinnah and Chilmark, Massachusetts

This report presents the findings of an energy system planning study for the towns of Aquinnah and Chilmark, MA, on the island of Martha’s Vineyard, conducted under the U.S. Department of Energy ETIPP program. The study used the DER-CAM model to optimize the deployment of PV and battery microgrids to enhance energy resilience against power outages, particularly winter storms. Key findings show that PV is highly cost-effective and delivers net annual savings. However, due to limited rooftop space and low winter solar output, PV and battery storage alone cannot support the full critical load during outages. Solutions incorporating conventional backup generators were found to be more economically viable for achieving 100% critical load support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Project Plan 7930 Cell G PaR Remote Handling System Replacement

For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Independent Verification and Validation Of SAPHIRE 8 Software Configuration Management Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE configuration management is to assess the activities that results in the process of identifying and defining the baselines associated with the SAPHIRE software product; controlling the changes to baselines and release of baselines throughout the life cycle; recording and reporting the status of baselines and the proposed and actual changes to the baselines; and verifying the correctness and completeness of baselines.. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Project plan hydrogen energy systems technology. Phase 1: Hydrogen energy systems technology study

An overview of the potential need for hydrogen as a source of energy in the future was presented in order to identify and define the technology requirements for the most promising approaches to meet that need. The following study objectives were discussed: (1) determination of the future demand for hydrogen, based on current trends and anticipated new uses, (2) identification of the critical research and technology advances required to meet this need considering, to the extent possible, raw material limitations, economics, and environmental effects, and (3) definition and recommendation of the scope and space of a National Hydrogen Energy Systems Technology Program and outline of a Program Development Plan.