76 records · Page 5

Test for Reconditioning RA Waste with Simulated Bitumen and Concrete in a 1,2 MW Plasma Test Facility - 20092

The operation and maintenance of nuclear power plants, the non nuclear fuel cycle, etc generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified, oxidized and purified in an off-gas cleaning system. First the paper describes the new full-scale Plasma Melting Facility (PMF) at the Kozloduy Nuclear Power Plant in Bulgaria which was taken in nuclear operation In May 2018. The plant has a capacity of 250 tons per year and the maximum contact dose rates of the incoming waste is 2 mSv/h. Different mixtures of radioactive waste packed in 200 l drums were successfully treated resulting in a glassy slag free from liquids and organic material with an important volume reduction factor (VRF). The Project was co-financed through a grant by Kozloduy International Decommissioning fund (KIDSF) administrated by the EBRD through Bulgarian national funding. Plasma is a suitable technology for treatment of problematic waste or even reconditioning waste so Belgoprocess was contracted to do plasma tests with simulated conditioned waste types. One can do tests on a laboratory scale on smaller samples and torch capacities of e.g. 50 kW but Belgoprocess wanted to do more realistic and reliable tests. So Belgoprocess contracted Phoenix Solutions Co who has a full-scope test facility equipped with a 1200 kW plasma torch for full-scope treatment of simulated conditioned waste. For a first confidential contract simulated 200 l (55 gallon) bitumen drums were treated. The drums contained different pucks of compacted waste such as rags, used filters, granulates, etc. The pucks were stacked in the 200 l drums and subsequently embedded with bitumen. A total of 6 drums were treated in the plasma facility. For a second contract simulated homogeneous 200 l (55 gallon) concrete drums with on the one hand concentrates and on the other hand spent resins were selected. A total of 6 drums with concrete and spent resins were treated and melted in the plasma testing facility. The paper describe the test facility, volume reduction factor (VRF) of different waste streams and most important parameters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Light Water Sustainability Program: Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis

This report describes the interim progress for research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and elsewhere throughout the plant, along with a greater use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human-performance-related organizational and technical design issues are identified and addressed. This report describes modeling tools and techniques, based on sociotechnical system theory, to support these design goals and their application in the current research effort. The report is intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control and feedback relationships amongst the system’s technical and organizational components. Up to this point, we have employed a Causal Analysis based on STAMP (CAST) technique to examine a performance- and safety-related incident at an industry partner’s plant that involved the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. Our ongoing analysis is focused on identifying near-term process improvements and longer-term design requirements for an optimized IAE system. The latter analyses will employ a second STAMP-derived technique, System-Theoretic Process Analysis (STPA). STPA is a useful modeling tool for generating and analyzing actual or potential information control structures. Finally, we have begun modeling plantwide organizational relationships and processes. Organizational system modeling will supplement our CAST and STPA findings and provide a basis for mapping out a plantwide information control architecture. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the initiating event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. We present two preliminary information automation models. The proactive issue resolution model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system. From our results, we have generated a set of preliminary system-level requirements and safety constraints. These requirements will be further developed over the remainder of our project in collaboration with nuclear industry subject matter experts and specialists in the technical systems under consideration. Additionally, we will continue to pursue the system analyses initiated in the first part of our effort, with a particular emphasis on STPA as the main tool to identify weak or weakening control structures that affect the resilience of organizations and programs. Our intent is to broaden the scope of the analysis from an individual use case to a related set of use cases (e.g., maintenance tasks, compliance tasks) with similar human-system performance challenges. This will enable more generalized findings to refine the Proactive Issue Resolution and IAE models, as well as their system-level requirements and safety constraints. We will use organizational system modeling analyses to supplement STPA findings and model development. We conclude the report with a set of summary recommendations and an initial draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi - September 2024 Meeting Notes

Information obtained from Fukushima Daiichi Nuclear Power Station (Daiichi) is required to inform future Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. Commercial nuclear power plants. A collaborative U.S. and Japanese effort was initiated in 2014 by the Department of Energy Office of Nuclear Energy to identify Daiichi examination needs and evaluate recent Daiichi examination data to address these needs. This document summarizes information presented at and findings, action items, and recommendations by U.S. and Japanese experts in reactor safety and plant operations during the September 2024 Forensics Effort meeting. Significant safety insights were obtained in several areas: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties and knowledge gaps in severe accident modeling progression, these insights continue to be used to assess whether additional updates are needed in guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, Daiichi-related activities, such as code modeling improvements and analysis, testing, and new technology deployment efforts, have the potential to offer additional safety and economic benefits to the operating fleet and new light water reactor (LWR) and non-LWR designs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗