Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot error”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

A high precision instrument to measure angular and binocular deviation introduced by aircraft windscreens by using a shadow casting technique

Objects viewed through transparent sheets with residual non-parallelism and irregularity appear shifted and distorted. This distortion is measured in terms of angular and binocular deviation of an object viewed through the transparent sheet. The angular and binocular deviations introduced are particularly important in the context of aircraft windscreens and canopies as they can interfere with decision making of pilots especially while landing, leading to accidents. In this work, we have developed an instrument to measure both the angular and binocular deviations introduced by transparent sheets. This instrument is especially useful in the qualification of aircraft windscreens and canopies. It measures the deviation in the geometrical shadow cast by a periodic dot pattern trans-illuminated by the distorted light beam from the transparent test specimen compared to the reference pattern. Accurate quantification of the shift in the pattern is obtained by cross-correlating the reference shadow pattern with the specimen shadow pattern and measuring the location of the correlation peak. The developed instrument is handy to use and computes both angular and binocular deviation with an accuracy of less than {+-}0.1 mrad ( Almost-Equal-To 0.036 mrad) and has an excellent repeatability with an error of less than 2%.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Light Water Reactor Sustainability Program: Digital Architecture Project Plan

There are many technologies available to the nuclear power industry to improve efficiency in plant work activities. These range from new control room technologies to those for mobile field workers. They can make a positive impact on a wide range of performance objectives – increase in productivity, human error reduction, validation of results, accurate transfer of data, and elimination of repetitive tasks. It is expected that the industry will more and more turn to these technologies to achieve these operational efficiencies to lower costs. At the same time, this will help utilities manage a looming staffing problem as the inevitable retirement wave of the more seasoned workers affects both staffing levels and knowledge retention. A barrier to this wide-scale implementation of new technologies for operational efficiency is the lack of a comprehensive digital architecture that can support the real-time information exchanges needed to achieve the desired operational efficiencies. This project will define an advanced digital architecture that will accommodate the entire range of system, process, and plant worker activity to enable the highest degree of integration, thereby creating maximum efficiency and productivity. This pilot project will consider a range of open standards that are suitable for the various data and communication requirements of a seamless digital environment. It will map these standards into an overall architecture to support the II&C developments of this research program.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Assimilation of a Coordinated Fleet of Uncrewed Aircraft System Observations in Complex Terrain: EnKF System Design and Preliminary Assessment

Abstract Uncrewed aircraft system (UAS) observations collected during the 2018 Lower Atmospheric Process Studies at Elevation—a Remotely Piloted Aircraft Team Experiment (LAPSE-RATE) field campaign were assimilated into a high-resolution configuration of the Weather Research and Forecasting Model using an ensemble Kalman filter. The benefit of UAS observations was assessed for a terrain-driven (drainage and upvalley) flow event that occurred within Colorado’s San Luis Valley (SLV) using independent observations. The analysis and prediction of the strength, depth, and horizontal extent of drainage flow from the Saguache Canyon and the subsequent transition to upvalley and up-canyon flow were improved relative to that obtained both without data assimilation (benchmark) and when only surface observations were assimilated. Assimilation of UAS observations greatly improved the analyses of vertical variations in temperature, relative humidity, and winds at multiple locations in the northern portion of the SLV, with reductions in both bias and the root-mean-square error of roughly 40% for each variable relative to the benchmark run. Despite these noted improvements, some biases remain that were tied to measurement error and/or the impact of the boundary layer parameterization on vertically spreading the observations, both of which require further exploration. The results presented here highlight how observations obtained with a fleet of profiling UAS improve limited-area, high-resolution analyses and short-term forecasts in complex terrain.

54 ENVIRONMENTAL SCIENCES↗

Demonstrating high-precision, multiband transit photometry with MuSCAT: A case for HAT-P-14B

The Multicolor Simultaneous Camera for studying Atmospheres of Transiting exoplanets (MuSCAT) is an optical three-band (g{sub 2}{sup ′}-, r{sub 2}{sup ′}- and z{sub s,2}-band) imager that was recently developed for the 188 cm telescope at Okayama Astrophysical Observatory with the aim of validating and characterizing transiting planets. In a pilot observation with MuSCAT we observed a primary transit of HAT-P-14b, a high-surface gravity (g{sub p} = 38 ms{sup −2}) hot Jupiter around a bright (V = 10) F-type star. From a 2.9 hr observation we achieved the five-minute binned photometric precisions of 0.028%, 0.022%, and 0.024% in the g{sub 2}{sup ′}, r{sub 2}{sup ′}, and z{sub s,2} bands, respectively, which provided the highest-quality photometric data for this planet. Combining these results with those of previous observations, we search for variations of transit timing and duration over five years as well as variations of planet-star radius ratio (R{sub p}/R{sub s}) with wavelengths, but can find no considerable variation in any parameters. On the other hand, using the transit-subtracted light curves we simulate the achievable measurement error of R{sub p}/R{sub s} with MuSCAT for various planetary sizes, assuming three types of host stars: HAT-P-14, the nearby K-dwarf HAT-P-11, and the nearby M-dwarf GJ1214. Comparing our results with the expected atmospheric scale heights, we find that MuSCAT is capable of probing the atmospheres of planets as small as a sub-Jupiter (R{sub p}∼6R{sub ⊕}) around HAT-P-14 in all bands, a Neptune (∼4R{sub ⊕}) around HAT-P-11 in all bands, and a super-Earth (∼2.5R{sub ⊕}) around GJ1214 in r{sub 2}{sup ′} and z{sub s,2} bands. These results promise that MuSCAT will produce fruitful scientific outcomes in the K2 and TESS era.

79 ASTRONOMY AND ASTROPHYSICS↗

A Pilot Evaluation of a 4-Dimensional Cone-Beam Computed Tomographic Scheme Based on Simultaneous Motion Estimation and Image Reconstruction

Purpose: To evaluate the performance of a 4-dimensional (4-D) cone-beam computed tomographic (CBCT) reconstruction scheme based on simultaneous motion estimation and image reconstruction (SMEIR) through patient studies. Methods and Materials: The SMEIR algorithm contains 2 alternating steps: (1) motion-compensated CBCT reconstruction using projections from all phases to reconstruct a reference phase 4D-CBCT by explicitly considering the motion models between each different phase and (2) estimation of motion models directly from projections by matching the measured projections to the forward projection of the deformed reference phase 4D-CBCT. Four lung cancer patients were scanned for 4 to 6 minutes to obtain approximately 2000 projections for each patient. To evaluate the performance of the SMEIR algorithm on a conventional 1-minute CBCT scan, the number of projections at each phase was reduced by a factor of 5, 8, or 10 for each patient. Then, 4D-CBCTs were reconstructed from the down-sampled projections using Feldkamp-Davis-Kress, total variation (TV) minimization, prior image constrained compressive sensing (PICCS), and SMEIR. Using the 4D-CBCT reconstructed from the fully sampled projections as a reference, the relative error (RE) of reconstructed images, root mean square error (RMSE), and maximum error (MaxE) of estimated tumor positions were analyzed to quantify the performance of the SMEIR algorithm. Results: The SMEIR algorithm can achieve results consistent with the reference 4D-CBCT reconstructed with many more projections per phase. With an average of 30 to 40 projections per phase, the MaxE in tumor position detection is less than 1 mm in SMEIR for all 4 patients. Conclusion: The results from a limited number of patients show that SMEIR is a promising tool for high-quality 4D-CBCT reconstruction and tumor motion modeling.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Flexible Stellarator Physics Facility

We propose to build a Flexible Stellarator Physics Facility to explore promising regions of the vast parameter space of disruption-free stellarator solutions for Fusion Pilot Plants (FPPs). The FESAC Long Range Plan recognized the quasi-symmetric stellarator as “the leading US approach to developing disruption-free, low-recirculating-power fusion configurations”. To deliver the ambitious Decadal Vision for Commercial Fusion Energy, we must establish a persuasive stellarator program in parallel to the tokamak one: the stellarator will prove to be a better path to a reactor if theoretical predictions are confirmed and novel optimization techniques and strategies work as desired. Since the release of the Long Range Plan in 2020, stellarators have arguably made the most significant advances of all fusion concepts. Groundbreaking results from W7-X demonstrated low neoclassical transport and the successful operation of the island divertor. Advances in theory and modeling now allow us to minimize turbulent transport, to achieve equilibria with precise quasisymmetry, to reduce neoclassical transport and fast ion loss to levels far below what has been previously achieved, and to minimize the effect of coil manufacturing errors. If realized, these advances will lead to cost-effective stellarator designs with confinement comparable to tokamaks but without the fundamental challenges of disruptions and current drive.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Wireless Underground Sensor Network Field Pilot for Agriculture and Ecology: Soil Moisture Mapping Using Signal Attenuation

Wireless Underground Sensor Networks (WUSNs) that collect geospatial in situ sensor data are a backbone of internet-of-things (IoT) applications for agriculture and terrestrial ecology. In this paper, we first show how WUSNs can operate reliably under field conditions year-round and at the same time be used for determining and mapping soil conditions from the buried sensor nodes. We demonstrate the design and deployment of a 23-node WUSN installed at an agricultural field site that covers an area with a 530 m radius. The WUSN has continuously operated since September 2019, enabling real-time monitoring of soil volumetric water content (VWC), soil temperature (ST), and soil electrical conductivity. Secondly, we present data collected over a nine-month period across three seasons. We evaluate the performance of a deep learning algorithm in predicting soil VWC using various combinations of the received signal strength (RSSI) from each buried wireless node, above-ground pathloss, the distance between wireless node and receive antenna (D), ST, air temperature (AT), relative humidity (RH), and precipitation as input parameters to the model. The AT, RH, and precipitation were obtained from a nearby weather station. We find that a model with RSSI, D, AT, ST, and RH as inputs was able to predict soil VWC with an R 2 of 0.82 for test datasets, with a Root Mean Square Error of ±0.012 (m 3 /m 3 ). Hence, a combination of deep learning and other easily available soil and climatic parameters can be a viable candidate for replacing expensive soil VWC sensors in WUSNs.

47 OTHER INSTRUMENTATION↗

A Scalable Reduced‐Order Model for the Steady Navier–Stokes Equations

Scaling up new scientific technologies from laboratory to industry often involves demonstrating performance on a larger scale. Computer simulations can accelerate design and predictions in the deployment process, though traditional numerical methods are computationally intractable even for intermediate pilot plant scales. Recently, the component reduced order modeling method has been developed to tackle this challenge by combining projection reduced order modeling and discontinuous Galerkin domain decomposition. However, while many scientific or engineering applications involve nonlinear physics, this method has only been demonstrated for various linear systems. In this work, the component reduced order modeling method is extended to steady Navier–Stokes flow, with application to general nonlinear physics in view. The large‐scale, global domain is decomposed into a combination of small‐scale unit component. Linear subspaces for flow velocity and pressure are identified via proper orthogonal decomposition over sample snapshots collected from each small‐scale unit component. Velocity bases are augmented with a pressure supremizer to satisfy the inf–sup condition for stable pressure prediction. Two different nonlinear reduced order modeling methods are employed and compared for efficient evaluation of nonlinear advection: A third‐order tensor projection operator and the empirical quadrature procedure. The proposed method is demonstrated on the flow over arrays of five different unit objects, achieving a 23‐fold speedup with less than 4% relative error in domains up to 256 times larger than the unit components. Furthermore, a numerical experiment with the pressure supremizer strongly indicates the need for a supremizer for stable pressure prediction. A comparison between the tensorial approach and the empirical quadrature procedure revealed a slight advantage of the empirical quadrature procedure. The framework is compared with an alternating Schwarz‐based reduced‐order approach, demonstrating improved efficiency and robustness for the DG‐based global solver while retaining flexibility for sub‐scale iterative solvers. The method is further extended to a coupled advection–diffusion and Navier–Stokes system, illustrating its applicability to multi‐physics problems and its potential for more general, inter‐coupled nonlinear systems.

42 ENGINEERING↗

SU-F-J-18: Feasibility of Open Mask Immobilization with Optical Imaging Guidance (OIG) for H&N Radiotherapy

Purpose: Full face and neck thermoplastic masks provide standard-of-care immobilization for patients receiving H&N IMRT. However, these masks are uncomfortable and increase skin dose. The purpose of this pilot study was to investigate the feasibility and setup accuracy of open face and neck mask immobilization with OIG. Methods: Ten patients were consented and enrolled to this IRB-approved protocol. Patients were immobilized with open masks securing only forehead and chin. Standard IMRT to 60–70 Gy in 30 fractions were delivered in all cases. Patient simulation information, including isocenter location and CT skin contours, were imported to a commercial OIG system. On the first day of treatment, patients were initially set up to surface markings and then OIG referenced to face and neck skin regions of interest (ROI) localized on simulation CT images, followed by in-room CBCT. CBCTs were acquired at least weekly while planar OBI was acquired on the days without CBCT. Following 6D robotic couch correction with kV imaging, a new optical real-time surface image was acquired to track intrafraction motion and to serve as a reference surface for setup at the next treatment fraction. Therapists manually recorded total treatment time as well as couch shifts based on kV imaging. Intrafractional ROI motion tracking was automatically recorded. Results: Setup accuracy of OIG was compared with CBCT results. The setup error based on OIG was represented as a 6D shift (vertical/longitudinal/lateral/rotation/pitch/roll). Mean error values were −0.70±3.04mm, −0.69±2.77mm, 0.33±2.67 mm, −0.14±0.94 o, −0.15±1.10o and 0.12±0.82o, respectively for the cohort. Average treatment time was 24.1±9.2 minutes, comparable to standard immobilization. The amplitude of intrafractional ROI motion was 0.69±0.36 mm, driven primarily by respiratory neck motion. Conclusion: OGI can potentially provide accurate setup and treatment tracking for open face and neck immobilization. Study accrual and patient/provider satisfaction survey collection remain ongoing. This study is supported by VisionRT, Ltd.

60 APPLIED LIFE SCIENCES↗

Preliminary proof-of-concept of real-time divertor heat flux control from infrared cameras with nitrogen injection in the DIII-D tokamak

In future tokamak reactors like ITER and the Fusion Pilot Plant (FPP), real-time feedback control of heat flux to the plasma-facing components (PFC) will be critical for steady-state operation. This work presents the first experimental demonstration of real-time divertor heat flux estimation with infrared thermography and feedback control with impurity seeding on the DIII-D tokamak. The flexible infrastructure of the Plasma Control System (PCS) on DIII-D makes this new capability possible. The PCS software runs on a gateway computer system, and five real-time compute nodes. An array of low latency streaming digitizers from D-TACQ Solutions connects to these real-time computers to collect and process data, and send commands to actuators during plasma discharges. This system handles the signal IO from the tokamak and allows the PCS to utilize the diagnostic data necessary to perform control in real-time. Feedback control on heat flux was accomplished by feeding infrared camera data from the “Infrared TV” (IRTV) camera to a custom-developed User Datagram Protocol (UDP) server. This server transmits infrared data to a newly developed PCS algorithm that estimates the heat flux to PFC. Here, a proportional integral derivative (PID) controller minimizes the error between a heat flux reference and the real-time estimate by injecting nitrogen gas into the divertor.

Algorithm development↗

Design, construction, and testing of no-insulation small subscale solenoids for compact tokamaks

Fusion energy systems studies (FESS) for next-step devices based on the most promising magnetic configurations indicate that high magnetic fields and high current density for magnet coil systems may reduce device size and lower the cost. High current density and radiation resistant fusion magnets are particularly beneficial for low cost, low aspect ratio compact reactor designs such as Fusion Nuclear Science Facility (FNSF), Fusion Pilot Plant (FPP) of low-aspect ratio spherical tokamak (ST) or compact stellarators. Unlike typical high field magnets for nuclear magnetic resonance (NMR), magnetic resonance imaging (MRI), or high energy physics research applications, neutron irradiation damage to organic insulations in the coil winding pack is a critical issue for next generation fusion reactors where orders of magnitude higher neutron fluence than those in present experimental reactors such as ITER are expected. Moreover, a high coil winding pack current density is needed for high field magnets in low cost, compact radial build next step fusion reactors. The slow current charging time, however, is an issue in fully non-insulated coils. In this work, we present the design, construction and testing of subscale Nb3Sn solenoids, up to half the diameter of the central solenoid (CS) for National Spherical Torus Experiment (NSTX), with and without inter-layer insulation for enhancing radiation resistance while improving the winding pack current density and coil performance. The major radius for the NSTX/NSTX-Upgrade (reference for compact ST) is 0.854/0.934 meter, and 4.8 meters for FNSF. The magnetic field for NSTX/NSTX-U at the plasma center is 0.6/1 Tesla and 9 Tesla for FNSF. The inner diameter of the central solenoid coil is 0.2/0.4 meter for NSTX/NSTX-U and 1.2 meters for FNSF. The current charging and discharging behavior of the prototype solenoids was investigated to quantify performance advantages of a simplified coil fabrication without error-prone vacuum pressure impregnation (VPI) for the removal of epoxy organic insulation. Scalability of the no insulation concept for fusion can be addressed via engineered coating for novel insulation on contact resistance or intra-layer no insulations. Radiation resistance and coil winding efficiency were significantly improved in the no insulation coils for next step compact fusion reactors.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Methods to Automate Assessing the Outage Risk and Technical Specification Compliance for Planned Work and Current Plant Conditions. Light Water Reactor Sustainability Program report

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and the extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages. This is done through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and out of service equipment would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment necessary to meet the requirements of the nuclear safety plan. In addition, the operations and outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently during outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This particular report will provide a demonstration of the capabilities in the development of a predictive software platform for improving configuration control and accessing the plant risks associated with outage work protocols and illustrate how the software assists in strategies to minimize these interactions. In addition to maintaining nuclear safety, there are numerous administrative requirements that must be complied with during an outage. This report will discuss the use of logic modelling to monitor planned work against technical specification requirements for given plant conditions and to integrate these requirements with shutdown risk models, clearance order requirements and other plant condition requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Prototype System for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions. This report describes a prototype tool designed to support plant personnel in controlling work during NPP outages to prevent unintended interactions. A software application was created to manage and display important configuration information and utilize natural language processing to access the impacts of upcoming procedures and work orders. Initial industry feedback is also presented.

99 GENERAL AND MISCELLANEOUS↗

An Applied Strategy for Using Empirical and Hybrid Models in Online Monitoring

The monitoring of plant equipment for failure prediction is one of the key contributors to operation and maintenance (O&M) costs for a nuclear power plant (NPP) because O&M monitoring depends on labor-intensive activities that are required to meet high equipment reliability standards. These activities rely primarily on humans for information gathering, condition diagnosis, and predictive analysis. Online monitoring aims to automate these activities by relying on sensors to replace human information gathering and machine learning to replace human analysis and decision making. To facilitate automated monitoring, a systematic strategy for anomaly detection is needed to optimally use the available sensor data, empirical models, and physics-supported models. This strategy is essential to provide credible reasoning on why and when an empirical (i.e., purely data-driven) versus hybrid (i.e., physics-supported) approach should be used and to determine the ideal mix of these two approaches for a defined anomaly detection scope. The extant methods usually adopt an ad hoc trial-and-error approach that, in addition to being time-consuming and costly, is also highly subjective; it is impacted by the background and the skill set of the personnel making the decisions. Thus, such an approach cannot guarantee an optimum outcome. This represents the motivation of the current research effort, which is focused on devising a scientifically supported strategy for the optimum selection of anomaly detection methods. This report presents a detailed assessment of the main anomaly detection techniques within the empirical or hybrid method streams. Empirical methods include pattern, statistical, and causal inference. Hybrid methods include the use of physics models to train and test data methods, reduce data dimensionality, reduce data-model complexity, augment data, and reduce empirical uncertainty; hybrid methods also include the use of data to tune physics models. The listed techniques within these two streams represent the vast majority of techniques performed for anomaly detection. Using the techniques as outcomes, a strategy was developed to enable a systematic decision-making process to lead to one of these techniques. The strategy is driven by key decision points related to data relevance, simple modeling feasibility, data inference, physics-modeling value, data dimensionality, physics knowledge, method of validation, performance, data availability and suitability for training and testing, cause-effect, entropy inference, and model fitting. Each of these decision points in the strategy is explained in detail in this report with examples, along with the scientific basis behind the decisions and outcomes in common and simplified terminology. The strategy is developed for use by any NPP staff with basic engineering or science knowledge. A user-friendly graphical state flow diagram was also developed as a visual presentation of the strategy. The strategy was tested and demonstrated through two pilot projects for the application of anomaly detection at an NPP. Each pilot had two use cases: an initial case in which certain decisions were made that resulted in one or more empirical techniques and a revised use case where one or more key decisions were modified resulting in using a set of hybrid methods.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

STUDYING THE WHIM CONTENT OF LARGE-SCALE STRUCTURES ALONG THE LINE OF SIGHT TO H 2356-309

We make use of a 500 ks Chandra HRC-S/LETG spectrum of the blazar H 2356-309, combined with a lower signal-to-noise ratio (S/N; 100 ks) pilot LETG spectrum of the same target, to search for the presence of warm-hot absorbing gas associated with two large-scale structures (LSSs) crossed by this sight line and to constrain its physical state and geometry. Strong (log N{sub O{sub VII}} {>=} 10{sup 16} cm{sup -2}) O VII K{alpha} absorption associated with a third LSS crossed by this line of sight (the Sculptor Wall (SW)), at z = 0.03, has already been detected in a previous work. Here, we focus on two additional prominent filamentary LSSs along the same line of sight, one at z = 0.062 (the Pisces-Cetus Supercluster (PCS)) and another at z = 0.128 (the 'Farther Sculptor Wall' (FSW)). The combined LETG spectrum has an S/N of {approx}11.6-12.6 per resolution element in the 20-25 A and an average 3{sigma} sensitivity to intervening O VII K{alpha} absorption line equivalent widths (EWs) of EW{sub O{sub VII}} {approx_gt} 14 mA in the available redshift range (z < 0.165). No statistically significant (i.e., {>=}3{sigma}) individual absorption is detected from any of the strong He- or H-like transitions of C, O, and Ne (the most abundant metals in gas with solar-like composition) at the redshifts of the PCS and FSW structures and down to the EW thresholds mentioned above. However, we are still able to constrain the physical and geometrical parameters of the putative absorbing gas associated with these structures, by performing a joint spectral fit of various marginal detections and upper limits of the strongest expected lines with our self-consistent hybrid-ionization WHIM spectral model. At the redshift of the PCS, we identify a warm phase with log T = 5.35{sup +0.07}{sub -0.13} K and log N{sub H} = (19.1 {+-} 0.2) cm{sup -2} possibly co-existing with a much hotter and statistically less significant phase with log T = 6.9{sup +0.1}{sub -0.8} K and log N{sub H} = 20.1{sup +0.3}{sub -1.7} cm{sup -2} (1{sigma} errors). These two separate physical phases are identified through, and mainly constrained by, C V K{alpha} (warm phase) and O VIII K{alpha} (hot phase) absorption, with single line significances of 1.5{sigma} each. For the second LSS, at z {approx_equal} 0.128, only one hot component is hinted in the data, through O VIII K{alpha} (1.6{sigma}) and Ne IX K{alpha} (1.2{sigma}). For this system, we estimate log T = 6.6{sup +0.1}{sub -0.2} K and log N{sub H} = 19.8{sup +0.4}{sub -0.8} cm{sup -2}. Our column density and temperature constraints on the warm-hot gaseous content of these two LSSs, combined with the measurements obtained for the hot gas permeating the SW, allow us to estimate the cumulative number density per unit redshifts of O VII WHIM absorbers at three different EW thresholds of 0.4 mA, 7 mA, and 25.8 mA. This is consistent with expectations only at the very low end of EW thresholds, but exceeds predictions at 7 mA and 25.8 mA (by more than 2{sigma}). We also estimate the cosmological mass density of the WHIM based on the four absorbers we tentatively detect along this line of sight, obtaining {Omega}{sup WHIM}{sub b} = (0.021{sup +0.031}{sub -0.018})(Z/Z{sub sun}){sup -1}, consistent with the cosmological mass density of the intergalactic 'missing baryons' only if we assume high metallicities (Z {approx} Z{sub sun}).

79 ASTRONOMY AND ASTROPHYSICS↗

Pilot Project Technology Business Case: Mobile Work Packages

Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are “harvestable,” meaning they result in an actual reduction in headcount and/or cost. The report describes the specific activities conducted with a partner utility to examine the various work activities associated with mobile work packages to determine what time savings and error rate reductions are available. The report summarizes these findings in the form of a business case for the technology.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Transforming BIM to BEM: Generation of Building Geometry for the NASA Ames Sustainability Base BIM

Typical processes of whole Building Energy simulation Model (BEM) generation are subjective, labor intensive, time intensive and error prone. Essentially, these typical processes reproduce already existing data, i.e. building models already created by the architect. Accordingly, Lawrence Berkeley National Laboratory (LBNL) developed a semi-automated process that enables reproducible conversions of Building Information Model (BIM) representations of building geometry into a format required by building energy modeling (BEM) tools. This is a generic process that may be applied to all building energy modeling tools but to date has only been used for EnergyPlus. This report describes and demonstrates each stage in the semi-automated process for building geometry using the recently constructed NASA Ames Sustainability Base throughout. This example uses ArchiCAD (Graphisoft, 2012) as the originating CAD tool and EnergyPlus as the concluding whole building energy simulation tool. It is important to note that the process is also applicable for professionals that use other CAD tools such as Revit (“Revit Architecture,” 2012) and DProfiler (Beck Technology, 2012) and can be extended to provide geometry definitions for BEM tools other than EnergyPlus. Geometry Simplification Tool (GST) was used during the NASA Ames project and was the enabling software that facilitated semi-automated data transformations. GST has now been superseded by Space Boundary Tool (SBT-1) and will be referred to as SBT-1 throughout this report. The benefits of this semi-automated process are fourfold: 1) reduce the amount of time and cost required to develop a whole building energy simulation model, 2) enable rapid generation of design alternatives, 3) improve the accuracy of BEMs and 4) result in significantly better performing buildings with significantly lower energy consumption than those created using the traditional design process, especially if the simulation model was used as a predictive benchmark during operation. Developing BIM based criteria to support the semi-automated process should result in significant reliable improvements and time savings in the development of BEMs. In order to define successful BIMS, CAD export of IFC based BIMs for BEM must adhere to a standard Model View Definition (MVD) for simulation as provided by the concept design BIM MVD (buildingSMART, 2011). In order to ensure wide scale adoption, companies would also need to develop their own material libraries to support automated activities and undertake a pilot project to improve understanding of modeling conventions and design tool features and limitations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Simulation and Optimization of Large Scale Subsurface Environmental Impacts; Investigations, Remedial Design and Long Term Monitoring

The global impact to human health and the environment from large scale chemical / radionuclide releases is well documented. Examples are the wide spread release of radionuclides from the Chernobyl nuclear reactors, the mobilization of arsenic in Bangladesh, the formation of Environmental Protection Agencies in the United States, Canada and Europe, and the like. The fiscal costs of addressing and remediating these issues on a global scale are astronomical, but then so are the fiscal and human health costs of ignoring them. An integrated methodology for optimizing the response(s) to these issues is needed. This work addresses development of optimal policy design for large scale, complex, environmental issues. It discusses the development, capabilities, and application of a hybrid system of algorithms that optimizes the environmental response. It is important to note that 'optimization' does not singularly refer to cost minimization, but to the effective and efficient balance of cost, performance, risk, management, and societal priorities along with uncertainty analysis. This tool integrates all of these elements into a single decision framework. It provides a consistent approach to designing optimal solutions that are tractable, traceable, and defensible. The system is modular and scalable. It can be applied either as individual components or in total. By developing the approach in a complex systems framework, a solution methodology represents a significant improvement over the non-optimal 'trial and error' approach to environmental response(s). Subsurface environmental processes are represented by linear and non-linear, elliptic and parabolic equations. The state equations solved using numerical methods include multi-phase flow (water, soil gas, NAPL), and multicomponent transport (radionuclides, heavy metals, volatile organics, explosives, etc.). Genetic programming is used to generate the simulators either when simulation models do not exist, or to extend the accuracy of them. The uncertainty and sparse nature of information in earth science simulations necessitate stochastic representations. For discussion purposes, the solution to these site-wide challenges is divided into three sub-components; plume finding, long term monitoring, and site-wide remediation. Plume finding is the optimal estimation of the plume fringe(s) at a specified time. It is optimized by fusing geo-stochastic flow and transport simulations with the information content of data using a Kalman filter. The result is an optimal monitoring sensor network; the decision variable is location(s) of sensor in three dimensions. Long term monitoring extends this approach concept, and integrates the spatial-time correlations to optimize the decision variables of where to sample and when to sample over the project life cycle. Optimization of location and timing of samples to meet the desired accuracy of temporal plume movement is accomplished using enumeration or genetic algorithms. The remediation optimization solves the multi-component, multiphase system of equations and incorporates constraints on life-cycle costs, maximum annual costs, maximum allowable annual discharge (for assessing the monitored natural attenuation solution) and constraints on where remedial system component(s) can be located, including management overrides to force certain solutions to be chosen are incorporated for solution design. It uses a suite of optimization techniques, including the outer approximation method, Lipchitz global optimization, genetic algorithms, and the like. The automated optimal remedial design algorithm requires a stable simulator be available for the simulated process. This is commonly the case for all above specifications sans true three-dimensional multiphase flow. Much work is currently being conducted in the industry to develop stable 3D, three-phase simulators. If needed, an interim heuristic algorithm is available to get close to optimal for these conditions. This system process provides the full capability to optimize multi-source, multiphase, and multicomponent sites. The results of applying just components of these algorithms have produced predicted savings of as much as $90,000,000(US), when compared to alternative solutions. Investment in a pilot program to test the model saved 100% of the $20,000,000 predicted for the smaller test implementation. This was done without loss of effectiveness, and received an award from the Vice President - and now Nobel peace prize winner - Al Gore of the United States. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗